0% found this document useful (0 votes)
51 views20 pages

Bbs Price Offer

Bangladesh Buildings Systems submitted a proposal to Standard Asiatic Oil Company for the supply of a Pre-Engineered Steel Building for a boiler room project located in Chattagram. The proposal outlines building specifications, material standards, applicable codes, and terms of service, emphasizing BBS's commitment to quality and support. The document includes detailed sections on building description, material specifications, and standard supply items.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Topics covered

  • Bracing Types,
  • Insulation,
  • Roof Slope,
  • Client's Representative,
  • Construction Timeline,
  • Load Calculations,
  • Canopy Specifications,
  • End Frames,
  • Quotation Number,
  • Price Breakdown
0% found this document useful (0 votes)
51 views20 pages

Bbs Price Offer

Bangladesh Buildings Systems submitted a proposal to Standard Asiatic Oil Company for the supply of a Pre-Engineered Steel Building for a boiler room project located in Chattagram. The proposal outlines building specifications, material standards, applicable codes, and terms of service, emphasizing BBS's commitment to quality and support. The document includes detailed sections on building description, material specifications, and standard supply items.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Topics covered

  • Bracing Types,
  • Insulation,
  • Roof Slope,
  • Client's Representative,
  • Construction Timeline,
  • Load Calculations,
  • Canopy Specifications,
  • End Frames,
  • Quotation Number,
  • Price Breakdown

Standard Asiatic Oil Company Limited

Guptakhal, Airport Road, North Patenga,


Chittagong-4205, Bangladesh
OFFICE :Configure Bapery Tower, House #GA/64 (3rd Floor)
Progati Sharani, Middle Badda, Dhaka-1212
Phone: (+88-02-9850771, Fax: (+88-02-9850772)
E-mail: info@[Link] Website: [Link]

Date: 29/10/2019

To,
Managing Director
Standard Asiatic Oil Company Limited
Guptakhal, Airport Road, North Patenga,
Chittagong-4205, Bangladesh

Reference : BBS-19-242

Project Name : Boiler room

Project Location : Chattagram

Subject : Supply of Pre-Engineered Steel Building

Dear Sir,

Thank you very much for giving Bangladesh Buildings Systems the opportunity to submit a proposal
for the above valued project.

Our proposal is based on Bangladesh Buildings Systems standard design criteria, standard material
specifications, standard terms and conditions of sale and standard BBS panel colors. However, the
overall dimensions and layout are in general accordance with your inquiry.

BBS is very keen to be your project partner by securing this order and we look very much forward to
providing extensive support to execute the work.

BBS is very much confident of its product and services and looking forward to making room and room
in the long run by providing the satisfactory services.

Sincerely Yours

_____________________________
Engr. Mohammad Ruhul Majid
Director

i
OFFICE :Configure Bapery Tower, House #GA/64 (3rd Floor)
Progati Sharani, Middle Badda, Dhaka-1212
Phone: (+88-02-9850771, Fax: (+88-02-9850772)
E-mail: info@[Link] Website: [Link]

Proposal For
Supply of Pre-Engineered Steel Building

Client
Standard Asiatic Oil Company Limited
Guptakhal, Airport Road, North Patenga,
Chittagong-4205, Bangladesh

Prepared By
Bangladesh Building Systems Ltd.
Configure Bapery Tower, GA/ 64 (3rd Floor)
Progati Sharani, Middle Badda,
Dhaka-1212

ii
OFFICE :Configure Bapery Tower, House #GA/64 (3rd Floor)
Progati Sharani, Middle Badda, Dhaka-1212
Phone: (+88-02-9850771, Fax: (+88-02-9850772)
E-mail: info@[Link] Website: [Link]

INDEX
SL No. Topic Page
No.
SECTION 1: Building Description, including Panel Description & Building Accessories
1 01
SECTION 2: Applicable Code and applicable loads
2 03
SECTION 3: Material Specifications
3 05
SECTION 4: Steel Surface Finish
4 05
SECTION 5: Standard Supplied Items
5 06
SECTION 6: Foundation & Anchorage
6 06
SECTION 7: Warranty
7 06
SECTION 8: Proposal Validity
8 07
SECTION 9: Supply Period
9 07
SECTION 10: Changes / Revision
10 07
SECTION 11 : Price & Weight Breakdown
11 08

12 SECTION 12: Mode of Payment 09


13
SECTION 13: Exceptions/Deviations/Assumptions 09
14
SECTION 14: Terms and Conditions 09
15
SECTION 15: Contract Form 10

ENCLOSURES
1. Proposal Drawing

iii
OFFICE :Configure Bapery Tower, House #GA/64 (3rd Floor)
Progati Sharani, Middle Badda, Dhaka-1212
Phone: (+88-02-9850771, Fax: (+88-02-9850772)
E-mail: info@[Link] Website: [Link]

Quotation No. BBS-19-242 Rev. No.:00 Date: 29-10-2019 Page 1 of 10


Section 1: Building Description
Usage : Boiler Room
1.1 Building No: 01
Quantity of identical buildings : 01
Nos. Areas: 01

1.1.1 Area No. 01

Building Parameters
1 Type Single Span (C-S)
2 Width (m) 13.928 C/C Steel Column
3 Length (m) 21.148 C/C Steel Column
4 Clear Height (m) 3.050+3.965+3.965 = 10.98
5 Width Module (m) 2 @ 6.964
6 Roof Slope 1: 10
7 Bay Spacing (m) 3 @ 6.1
8 Type of End Frames Both: Post & Beam
9 End Column Spacing LEW:2 @ 6.964
REW: 2 @ 6.964
10 Type of Bracing in Side Walls ‘Tube’ Bracing
11 Type of Eave Gutters & Steel Downspouts

Open Wall Conditions


1 Near Side Wall Open up to 3.050 m Height for Brick wall by others
2 Far Side Wall Open up to 3.050 m Height for Brick wall by others
3 Left End wall Open up to 3.050 m Height for Brick wall by others
4 Right End wall Open up to 3.050 m Height for Brick wall by others

Roof & Wall Sheeting


1 Roof Panel 0.5 mm Painted Zincalume, BBS Standard Profile & Color
2 Wall Panel 0.5 mm Painted Zincalume, BBS Standard Profile & Color

Insulation
No. Description Area Quantity
Roof Insulation: “D-Cool” Double Bubble Both Side
1 Roof Full roof area
Aluminum Faced Heat Shield Foil. Thickness (mm): 4.5-5.0
OFFICE :Configure Bapery Tower, House #GA/64 (3rd Floor)
Progati Sharani, Middle Badda, Dhaka-1212
Phone: (+88-02-9850771, Fax: (+88-02-9850772)
E-mail: info@[Link] Website: [Link]

Quotation No. BBS-19-242 Rev. No.:00 Date: 29-10-2019 Page 2 of 10

Mezzanines
Our standard mezzanine supply includes support columns, primary beams, secondary joists and a
steel deck that supports a 100 mm reinforced concrete slab (slab by others). The steel deck
thickness, profile and finish will be determined by BBS Engineering Department. The mezzanine
steel deck is intended to carry the weight of the slab during construction only. It is not designed to
carry the floor loads.
The concrete slabs of the mezzanines must be designed by a structural engineer. They must
contain steel reinforcement to support all the loads on the mezzanines. The deck panels, if
supplied by BBS are only for shuttering purposes.
Mezzanine Loads (kN/m2) Minimum Clear Heights (m)
Area From Top of
From FFL to
No. Dead (m2) Mezzanine Joist
Live Collateral Other Floor Finish of
incl. floor to Main Frame
Mezzanine Beam
Rafter / Knee
1 6.23 3.0 --- --- 147.27 3.050 ---
2 6.23 3.0 --- --- 147.27 3.965 ---

Staircases
Treads may be made of pre-galvanized grating, red oxide primed checkered plate
or red oxide primed “U” e shaped pans.
Staircase Out to out width Top Mid Treads
No. Location Quantity Handrails
type of Trade (mm) landing landing Type
1 As per 01 Double 0.915 Yes No Yes Check.
drawing Plate

Canopies
A canopy is a cantilevered roof (located below the roof line of a building) that projects from the
sidewall or the end wall of a building.
Qty of Clear
Location Eave Width Length Canopy Soffit
No. Identical Height
at Condition (m) (m) Roof Panel Panel
Canopies (m)
1 01 End Wall Eave gutter 2.50 4.634 Above Same as building -----------
door Roof panel
OFFICE :Configure Bapery Tower, House #GA/64 (3rd Floor)
Progati Sharani, Middle Badda, Dhaka-1212
Phone: (+88-02-9850771, Fax: (+88-02-9850772)
E-mail: info@[Link] Website: [Link]

Quotation No. BBS-19-242 Rev. No.:00 Date: 29-10-2019 Page 3 of 10


Section 2: Applicable Codes and Loads
2.1. Applicable codes
All buildings included in this proposal are designed in accordance with the following codes that dictate
the design and manufacture of pre-engineered steel buildings. The Codes are as follows.
Loads on all buildings are applied in accordance with
1 American Society of Civil Engineers (ASCE/SEI 7-05)
Published by American Society of Civil Engineers.
1801 Alexander Bell Drive
Reston Virginia 20191
[Link]
2 International Building Code: 2006
International Code Council Inc. (ICC)
5203 Leesburg pike, Suit No 600, Falls Church, VA-22041
3 2006 edition of the Low Rise Buildings Manual
Metal Building Manufacturers Association Inc (MBMA)
1300 Summer Avenue, Cleveland, Ohio 44115, USA
4 Bangladesh National Building Code (BNBC): 2006
5 1997 Uniform Building Code
By International Conference of Building Officials
5360 Workman Mill Road, Whittier California 90601-2298

Build-up Sections are designed in accordance with


1 1989 Manual of Steel Construction – Allowable Stress Design
American Institute of Steel Construction, Inc. (AISC)
1 East Wacker Drive, Suite 3100, Chicago, Illinois 60601-2001, USA
2 AISC (2005): LRFD Manual of Steel Construction (3rd Edition)
American Institute of Steel Construction, Inc., Chicago, IL

Cold Formed Sections are designed in accordance with


1 2007 Edition of Cold Formed Steel design Manual
American Iron and Steel Institute (AISI)
1000 16th Street, NW, Washington, DC 20036, USA

Welding is applied in accordance with


1 2004 American Welding Society (AWS D.1.1/D1.1 M:2004)
Structural Welding Code - Steel Manual
550 NW LeJejune Road, Miami, FL 33126, USA
OFFICE :Configure Bapery Tower, House #GA/64 (3rd Floor)
Progati Sharani, Middle Badda, Dhaka-1212
Phone: (+88-02-9850771, Fax: (+88-02-9850772)
E-mail: info@[Link] Website: [Link]

Quotation No. BBS-19-242 Rev. No.:00 Date: 29-10-2019 Page 4 of 10


2.2. Applicable Loads

Design Loads: (Refer to Section 2 ‘Applicable Codes’ of this offer).


1 Design Live Load (kN/m2) on roof As Per design
2 Design Live Load (kN/m2) on frame As Per design
3 Basic Wind Speed (KPH) 260
4 Wind Exposure A
5 Earthquake Zone Zone-2
6 Earthquake Coefficient 0.15
7 Rain Water Intensity(mm/hr) 150
8 Snow Load (kN/m2) N/A
9 Co-lateral Load (kN/m2) N/A
10 Temperature Changes ( 0C ) N/A
OFFICE :Configure Bapery Tower, House #GA/64 (3rd Floor)
Progati Sharani, Middle Badda, Dhaka-1212
Phone: (+88-02-9850771, Fax: (+88-02-9850772)
E-mail: info@[Link] Website: [Link]

Quotation No. BBS-19-242 Rev. No.:00 Date: 29-10-2019 Page 5 of 10


Section 3: Material Specifications
The following is the list of the material standards and specifications for which the building components
have been designed:

Material Specifications
Below are BBS standard material specifications that will be used in the project. BBS reserves the right
to make material substitutions and changes in specifications as and when deemed necessary.
No. Components Specifications Strength
1 Built-up ASTM A572 /Q345B Grade 50 Fy = 34.5 kN/cm2
Tubes JIS - G 3466 – STKR 490 Fy = 32.5 kN/cm2
2 Hot Rolled
Channels EN - 10025 S355JR Fy = 35.5 kN/cm2
3 ASTM A653, Grade 340
Cold Formed Fy = 34.5 kN/cm2
,Galvanized
4 Wall, Roof & Liner ASTM A792M Grade 340, Fy = 34.5 kN/cm2
Panel Coating AZ150
ASTM A653, Grade 340, Fy = 34.5 kN/cm2
5 Mezzanine Deck Panel
Coating Z275
Rods ASTM A36 or equivalent Fy = 23.5 kN/cm2
6 X-Bracing Angles JIS - G 3101 - SS 400 Fy = 23.5 kN/cm2
Cable Fy=45KN/cm2
7 Anchor Bolts ASTM A36 or equivalent Fy = 23.5 kN/cm2
8 High Strength Bolts DIN 933 Class 8.8 Zinc coated Ft = 30.3 kN/cm2
Fy= Yield Strength; Ft = Allowable Tensile Stress; Fu= Ultimate Tensile Strength;
Pu = Minimum Breaking Load.

NB: BBS reserves the right to substitute partly or entirely some of the materials in case of material non-
availability or supply shortage

Section 4: Steel Surface Finish


4.1 Primary Members
All primary members (i.e. Column, Mezzanine Beam and Joist) will be cleaned and painted with red
oxide primer.
4.2 Secondary Members
All secondary members (i.e. Purlin, Girts and Eave Strut) will be cold formed Galvanized/Galvalume.
OFFICE :Configure Bapery Tower, House #GA/64 (3rd Floor)
Progati Sharani, Middle Badda, Dhaka-1212
Phone: (+88-02-9850771, Fax: (+88-02-9850772)
E-mail: info@[Link] Website: [Link]

Quotation No. BBS-19-242 Rev. No.:00 Date: 29-10-2019 Page 6 of 10


Section 5: Standard supply items
The following are normally supplied unless mentioned otherwise:
1. Electro Galvanized anchor bolts for rigid frames, end wall posts & framed wall openings.
2. Eave gutters & downspouts on sidewalls or curved eaves at sidewalls with projection.
3. All necessary flashing & trims.
4. Foam closures.
5. Bead mastic for panel end-lap.
6. Galvanized high strength connection bolts.
7. Sheeting fasteners.

Section 6: Foundation and Anchorage


Foundation design by others shall be based on job site soil conditions, and shall be executed under
separate offer. Anchor bolts shall be supplied by BBS and set by the civil contractor in strict accordance
with BBS anchor bolt setting plan and supervision, unless otherwise specified.

Section 7: Warranty
For any material BBS provides 100% replacement warranty for first one (01) years, and a free service
for first two (02) years from the date of building hand over. If the materials are damaged by others in
that case BBS will not be liable.
OFFICE :Configure Bapery Tower, House #GA/64 (3rd Floor)
Progati Sharani, Middle Badda, Dhaka-1212
Phone: (+88-02-9850771, Fax: (+88-02-9850772)
E-mail: info@[Link] Website: [Link]

Quotation No. BBS-19-242 Rev. No.:00 Date: 29-10-2019 Page 7 of 10

Section 8: Proposal Validity


This proposal is valid for 15 days from the above noted date. Any extension of validity by BBS must be
in writing.

Section 9: Delivery Period


Our current Delivery Period is TBE weeks from the latest date of receipt and acceptance of the
following
 Signed contract (Any change must be noted and initialed by both parties)
 Down payment as agreed mode of payment
 Final change order
 Acceptable LC/Final accepted LC amendment

Section 10: Changes/Revisions


Any kind of changes in the contracted building will be entertained only before the completion of the
fabrication drawing. Any change and/or revision to the above stated scope of supply may lead to a
variation in the price and the delivery period. A change must not hold payment for work completed in
the original contract.
OFFICE :Configure Bapery Tower, House #GA/64 (3rd Floor)
Progati Sharani, Middle Badda, Dhaka-1212
Phone: (+88-02-9850771, Fax: (+88-02-9850772)
E-mail: info@[Link] Website: [Link]

Quotation No. BBS-19-242 Rev. No.:00 Date: 29-10-2019 Page 8 of 10


Section 11: Price & Weight Breakdown (Tolerance: +/-5%)

SL Total Amount
Items Description Quantity Unit Unit Price
No. (Tk.)
Built up member (Column, Beam,
1 Rafter, MS Tube, Joist and 31.87 MT 107,950.00 3,440,538.14
Connection plate)
2 MS Purlin, Girts, Sheeting Angle 7.66 MT 121,040.00 926,673.72
3 Roof & Wall Sheet 4.46 MT 191,250.00 852,695.61
Sheeting Accessories including
(Gutter, Gutter Strip, Trim, Capping,
4 1.88 MT 158,131.60 350,181.03
Foam Closure, Both way Tape,
Silicon, Bead Mastic etc.)
5 Mezzanine decking 2.11 MT 132,600.00 279,993.56
6 Anchor Bolts 2.46 MT 165,750.00 407,247.75
7 Nut Bolts 0.58 MT 221,000.00 129,267.32
8 Cable Bracing, Flange bracing etc. 1.02 MT 126,974.41 129,940.69
9 Roof Insulation (0.17 MT) 375 SQM 155.48 58,287.18
10 Steel Stair Double flight 2.34 MT 114,868.68 315,868.30
11 Canopy 0.42 MT 144,198.32 60,177.15
12 Shear Stud (0.3 MT) 0.35 MT 221,000.00 66,521.44
13 Screw (0.10 MT) 9766 PCS 5.10 49,807.79
Sub Total Cost (A) 55.42 MT - 7,067,200.00
Two coat enamel paint over steel
14 39.53 MT 5,000.00 197,638.00
surface area
15 Transportation 55.42 MT 4,000.00 221,681.48
16 Erection 55.42 MT 8,000.00 443,363.00
Sub Total Cost (B) 862,682.00
Total Cost with Transportation, Erection & Painting (A+B) 7,929,882.00
Price Tk. Per SFT 1,208.00
Price Tk. Per MT 143,087.00

Total Cost with Erection, Transportation & Paint : Tk. 7,929,882.00 (1,208.00 Tk./ft2)
OFFICE :Configure Bapery Tower, House #GA/64 (3rd Floor)
Progati Sharani, Middle Badda, Dhaka-1212
Phone: (+88-02-9850771, Fax: (+88-02-9850772)
E-mail: info@[Link] Website: [Link]

Quotation No. BBS-19-242 Rev. No.:00 Date: 29-10-2019 Page 9 of 10


Section 13: Mode of Payment
Payment will be made by Irrevocable L/C at sight or Cash as per following Schedule.
 30% Advance Payment
 Balance Amount As Per Running Bill

Section 14: Exceptions / Deviations / Assumptions:


 Quoted price includes from all government impose taxes.
 Site painting price will be calculated on surface area of primary & secondary steel member. It
may vary depending on the actual amount of surface area.
 Price will be valid for entire project time from the date of signing of contract. If the project
being delayed by the client the price may be adjusted under the circumstances of unusual price
hike of raw materials.

.
Section 15: Terms and conditions
 Any kind of changes in the building should be confirmed by client before fabrication drawing.
 Tolerance of the weight variation is +/- 5%
 Client’s representative will receive all the materials delivered by BBS and BBS will not be
responsible if any item is missing or lost. For any lost item client has to pay BBS.
 Client has to ensure electricity supply and secured materials shed at site for proper and
continuous work.
 Any force measure like- Flood, Earth Quake, Rain Fall etc to be considered to follow the
stipulated time frame in the contract.
 If the job is rejected by client at any stage after signing the contract or issuing the work order,
client has to pay a compensation of amount 10% of contract value (excluding the price of
supplied materials).
OFFICE :Configure Bapery Tower, House #GA/64 (3rd Floor)
Progati Sharani, Middle Badda, Dhaka-1212
Phone: (+88-02-9850771, Fax: (+88-02-9850772)
E-mail: info@[Link] Website: [Link]

Quotation No. BBS-19-242 Rev. No.:00 Date: 29-10-2019 Page 10 of 10


Section 16: Contract Form
THIS CONTRACT is entered into on: Day:….…. Month:…..…Year: 2019

BETWEEN

Standard Asiatic Oil Company Limited, ON THE OTHER HAND, located in Guptakhal, Airport
Road, North Patenga, Chittagong-4205 Bangladesh. Represented by Mr. ………………….. duly
authorized to enter into this contract.

AND

Bangladesh Building Systems Ltd. ON THE OTHER HAND, located in Configure Bapery Tower,
GA/ 64 (3rd Floor) Progati Sharani, Middle Badda, Dhaka-1212, and represented by Engr. Mohammad
Ruhul Majid, duly authorized to enter into this contract.

NOW THEREFORE the parties agree as follows:

CONTRACT SCOPE: The supply of BBS Steel building(s) as described in the contract documents.

CONTRACT DOCUMENTS: The following documents constitute the contract documents:

1. BBS’s Proposal No. BBS-19-242 Rev. No. 00, Dated October 29, 2019
2. BBS’s Standard Terms & Conditions of Sale.
3. BBS’s Standard Product Specifications.

CONTRACT PRICE: Taka. …………………………………….. Only.

IN WITNESS HEREOF, the authorized parties hereto have executed this Contract.

For Bangladesh Building Systems Limited For Standard Asiatic Oil Company Limited

Name: : Engr. Mohammad Ruhul Majid Name : Mr. ………..

Designation : Director Designation :

Signature : Signature :

Date: : Date: :

Company : Company :
Seal: Seal:
B B S
B B S

SLOPE
SLOPE
SLOPE
SLOPE
B B S

SLOPE
SLOPE
SLOPE
SLOPE
B B S

SLOPE
SLOPE
SLOPE
SLOPE
B B S
B B S

SLOPE
SLOPE
SLOPE
SLOPE

You might also like