0% found this document useful (0 votes)
297 views48 pages

Footing Design for Structural Columns

The document provides details on the design of footings and columns for a structure. It summarizes the design of three footings (C1, C2, C3) of varying sizes to support different loadings, including reinforcement requirements. It also summarizes the design of two columns (C1, C2) of different heights and loadings, checking for short column criteria. The reinforcement requirements, including number and spacing of longitudinal bars and lateral ties, are specified for the columns.

Uploaded by

Ishandave23
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
297 views48 pages

Footing Design for Structural Columns

The document provides details on the design of footings and columns for a structure. It summarizes the design of three footings (C1, C2, C3) of varying sizes to support different loadings, including reinforcement requirements. It also summarizes the design of two columns (C1, C2) of different heights and loadings, checking for short column criteria. The reinforcement requirements, including number and spacing of longitudinal bars and lateral ties, are specified for the columns.

Uploaded by

Ishandave23
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

Design of Footings:

1) Design of footing for C1 Column:


Load(w) = 695 KN
Fck = 20 N/mm2
Fy = 415 N/mm2
Size of column = 230 * 280
Safe bearing capacity of soil(q) = 160 KN/m2
W = Weight of column = 695 KN
W1= Weight of footing / self weight = 10% of 695 KN = 10/100 * 695 =
W1= 69.5 KN
So,
Total load on footing = W + W1
= 965 + 69.5
= 764.5 KN
Required Area of footing = 764.5/160
Area (A) = 4.77 m2
Assume, we are take square footing
So, Area = B * B
4.77 = B2
B = 2.18 2.2 m
So,
Size of footing = 2.2 * 2.2
Net upward pressure (P) = W/A
= 695/2.2 *2.2
P = 143.59 KN/m2

Calculating of Moment
Moment (M) = P4/8 * B * (B-b)2
= 143.59/8 * 2.2 (2.2 0.28)2
M = 145.56 KN-m
Depth of footing =Mu/Ru * B * fck
D = 145.56 * 106/0.138*20*2.2*1000
D = 154.83 155 mm
Check for shear:Take, d = 2 * 155 [For shear check]
D = 300 mm
For one way shear:Vu = Pu B [B-b/2 d]
= 143.59 * 2.2 [2.2 0.28/2 0.3]
Vu = 208.49 KN
u = Vu/Bd = 208.49 *103/2200 * 300
u = 0.315
Pt = 0.414 * fck/fy * x4max/d * 100
Pt = 0.957
= 0.75 0.55
= 1.0 0.60
So,
Tc = 0.59
Tc= k * Tc
Tc= 1.20 * 0.59
Tc= 0.708 > Tu

Hence safe O.K


Check for 2-way shear:Vu = Pu [B2 (b + d)2]
= 143.59 [(2.2)2 (0.28 + 0.300)2]
Vu = 646.67 KN
u = Vu/4(b0+d)*d
= 646.68 * 103/4(280 + 300) 300
Tu = 0.929 N/mm2
Tc = 0.25fy
Tc = 5.09 N/mm2
Ks = 0.5 + 1
Ks = 1.5 > 1
Adopt, K = 1
Now, Tc = Tc * Ks
Tc = 5.09 N/mm2
Tc>Tv
Hence safe O.K.
Adopt, d = 300
Provide 12 mm bars
D= deff + 50 + + /2
S = 378 370 mm
deff = 302 mm
deff = d -
deff = 290 mm
Ast = 0.5 fck/fy [ 1 - 1 4.6 Mu/fck Bd2] Bd

= 0.5 * 20/415 [1 - 1- 4.6*145.56 * 106/20* 2200 * (290)2] 2200 * 290


Ast = 1460.24 mm2
Number of bars = 1460.69/(/4) * 122
Number of bars = 12.59 13 bars
Spacing:Spacing = (/4) * 122 * 1000/ 1460.69
Spacing = 77.446 80 mm
Provide 12 mm bars @ 80 mm c/c.

2.) Design of footing for C2 column:Load (W) = 850 KN


Fck = 20 N/mm2
Fy = 415 N/mm2
Size of column = 230 * 350
S.B.C(q) = 160 KN/m2
Weight of column = W = 850 KN
Weight of footing = W1 = 10% of 850
W1 = 85 KN
Total load on footing(W) = 935 KN
Area = Load/S.B.C
= 935/160
Area = 5.84
Shape of footing square
Area = B * B
5.84 = B2
B = 2.41 2.5 m
Size of footing = 2.5 * 2.5
Net upward pressure(P) = W/2.5 * 2.5
P = 136 KN/m2
Calculation for moment :Moment (M) = P4/8 * B (B-b2)
= 136/8 * 2.5 (2.5 0.35)2
M = 196.45 KN-m
Depth of footing (d) = Mu/Ru B fck

= 196.45 * 10 6/0.138 * 20 * 2.5 * 1000


= 168.73 mm 170 mm
d = 170 mm
Take, d = 2d [for footing criteria] d = 340 mm
Check for shear:For one way shear :Vu = Pu B [B-b/2 d]
= 136 * 2.5 [ 2.5 0.35/2 0.340]
Vu = 249.9 KN
Tu = 0.294
Pt = 0.414 * fck/fy * x4max/ D * 100
= 0.414 * 20 /415 * 0.48 * 100
Pt = 0.957
Tc = 0.59
Tc = K * Tc
= 1.40 * 0.59
Tc = 0.708 > Tu
Hence safe O.K
Check for 2-way shear:Vu = Pu [B2 (b + d)2]
= 136 [(2.5)2 ( 0.35 - 0.340)2]
Vu = 785.25 KN
Tu = Vu/4(b0 + d) d
= 785.25 * 103/4(350 + 340) 340
Tu = 0.836 N/mm2

Tu = 0.25fy
Tc = 5.09 N/mm2
Ks= D.S + 1
KS = 1.5 > 1
Adopt, K = 1
Tc = Tc(old) * K
Tc = 5.09 N/mm2
Tc > Tv
Hence safe O.K
Adopt, d = 340 mm
Provide 12 mm bars.
D = deff + 50 + + /2
= 160 +50 + 12 + 6
D = 408 mm 410 mm
deff = 342 mm
deff = d
= 330 mm
Ast = 0.5 fck/fy [1 - 1 4.6 Mu/Fck Bd2] B * d
= 0.5 * 20/415 [ 1 - 1 4.6 * 196.45 * 10 6/ 20 * 2500 * 3302] 2500 * 330
Ast = 1724.42 mm2
Number of bars = 1724.42/(/4) * 122
Number of bars = 15.25 16
Spacing = 65.58 70 mm
Provide 12mm bars @ 70 mm c/c spacing.

3.) Design of footing for C3 column:Load(W) = 540 KN


Fck = 20 N/mm2
Fy = 415 N/mm2
Size of column = 230 * 220 mm
S.B.C (q) = 160 Kn/m2
W = Weight of column = 540 KN
W1= Weight of footing/ Self weight
= 10% of 540
W1= 54 KN
Total load on footing = 594 KN
Area = 594/160
Area = 3.713 m2
Assume, we are take square footing.
So,
Area = B * B
B2= 3.713
B = 1.927 m 2m
So,
Size of footing = 2 * 2 m
Net upward pressure(P) = W/A
P = 135 KN/m2
Calculation of moment:M= P4/8 * B * (B-b)2
M = 135/8 * 2 * (2 0.22)2

M = 106.93 KN-m
Depth of footing (d) = Mu/Ru*B*fck
= 106.93 * 106/0.138 * 20 * 2000
d = 139.18 mm 140 mm
Take,
d = 139.18 mm 140 mm
d = 280 mm
Check for shear:For one way shear:Vu = Pu B[B- b/2 d]
= 135 * 2 [2 0.22/2 0.28]
Vu = 164.7 KN
Tu = Vu/Bd
Tu = 164.7 * 103/2000 * 280
Tu = 0.29
Pt = 0.414 fck/fy * x4max/d * 100
Pt = 0.957
0.75 0.55
1.00 0.60
So,

Tc = 0.59
Tc = K * Tc
= 1.20 * 0.59
Tc = 0.708 > Tu
Hence safe O.K

Check for 2-way shear:-

Vu = Pu [B2 (b + d)2]
= 135 [(2)2 (0.22 + 0.28)2]
Vu = 506.25 KN
Tu = Vu/4 (b0 + d) d
= 506.25 * 103/4(220 + 280) 280
Tu = 0.904 N/mm2
Tc = 0.25fy
Tc = 05.09 N/mm2
Ks = 0.5 + 1
Ks = 1.5 > 1
So,
K=1
Tc = Tc * K
Tc = 5.09 * 1
Tc = 5.09 N/mm2
Tc > Tv
Hence safe O.K
Take,
d = 280 mm
Provide 12 mm bars
D = deff + 50 + + /2
D = 348 350 mm
So,
deff = 282 mm
deff = deff

deff = 270 mm
Ast = 0.5 fck/fy [ 1 - 1- 4.6 Mu/fck Bd2] B* d
Ast = 0.5 20/415 [1 - 1 4.6 * 106.93 * 106/ 20* 2000 * (270)2] 2000 * 270
Ast = 1148.10 mm2
Number of bars = 1148.10/(/4) * 122
Number of bars = 10.15 11 bars
Spacing:Spacing = (/4) * 122/1148.10 * 1000
Spacing = 98.50 100 mm
So, Provide 12 mm bar @ 100 mm c/c.

Design of Columns
Column C1:- Use M20 Concrete
Steel Fe-415
Height of the column l= 3.6 m
It is restrained in position and direction at both ends.
Both ends are fixed
Left = 0.65 l = 0.65 x 3.6
= 2.43 m.
Arial loads carried by column C1=
Load by beam B1= 3*75*2
= 225 KN * 2
= 450 KN
Load by beam B2= 3 * 75
= 225 KN
Total Arial load carried by column = B1 + B2
P4 = 450 + 225
= 675 KN
Assuming 1% steel, we get
Ac= 99%Ag and Asc =1% Ag
675 * 1000 = 0.4 fck Ac + 0.67 fy Asc
675 * 1000 = 0.4 * 20 * 99/100 Ag + 0.67 * 415 * 1/100 Ag
Ag = 63081.16 mm2
Using a rectangular column size
= 230 * 280 mm
Provide 230 * 280 mm Column

Check for slenderness of column


Left/b = 2.43 * 1000/260 = 9.346 < 12
Therefore it is a short column
Minimum Eccentricity
Emin = l/500 + D/30 = 3600/500 + 260/500 + 260/30 = 14.87
Emin/D = 14.87/230 = 0.03174 < 0.05
Hence design as arially loaded short column is satisfactory.
Longitudinal reinforcement:
Asc= 1/100 * Ag required
Asc= 1/100 * 63081.16
Asc= 631 mm2

Use 6 bars of 12 mm diameter:


Lateral Ties:
Diameter of lateral ties should not be less than
a) /4= 12/4 = 3 mm
b) 5mm
Hence use 6mm bars spacing of 8mm bars
It shall be minimum of
a) Least lateral dimension = 260 mm
b) 16 * = 16 * 12 = 190 mm
c) 300 mm
Provide 8mm lateral ties at 190 mm c/c
Total load transfer to the footing C1
Total load = Arial load = Arial load on column C1 + 3 * self weight of column
Total load on footing C1 = 675 + 3 * 0.23 * 0.28 * 25 * 3.6
= 675 + 20 = 695 KN

Design of Column
Column C2
Use M20 Grade concrete
Use Steel Fe415
Height of column l = 3.6 m
Both ends are fixed
Left = 0.65 l = 0.65 * 3.6
Left = 2.43 m
Arial load carried by column C2 = load by B2 + Load by B3 + 2 * Load by B1
Load by B1 = 2 * 3 * 75
Load by B1 = 450 KN
Load by B2 = 3 *75
= 225 KN
Load by B3 = 150 KN
Total Arial load carried by column C2
P4 = 450 + 225 + 150
P4 = 825 KN
Assuming 1 % steel, we get
Ac = 99% Ag & Asc= 1% Ag
825 * 1000 = 0.4 * 20 * 99/100 Ag + 0.67 * 415 * 1/ 100 Ag
Ag = 77099.2 mm2
Therefore using a rectangular column size = 230 mm * 350 mm
Provide 230 mm * 350 mm column
Check for slenderness of column
Left/b = 2.43 * 1000/230 = 10.56 < 12

Therefore it is a short column


Minimum Eccentricity
Emin = l/500 + D/30 = 3600/500 + 300/30 = 14.8
Emin/D = 14/230 = 0.049 < 0.05
Hence satisfactory
Longitudinal reinforcement
Asc = 1/100 * Ag
Asc = 1/100 * 77099.2
Asc = 771 mm2
Use 8 bars of 12mm diameter

Lateral Ties:
Diameter of lateral ties should not be less than
a) /4 = 12/4 = 3 mm
b) 5mm
Hence provide 8 mm bars
Spacing:
It shall be minimum of
a) Least lateral dimension = 300 mm
b) 16 * = 16 * 12 = 192 mm
c) 300 mm
Therefore provide 8 mm bar at 190 mm c/c
Total load transferred to the footing
Load transferred = Arial load on column + 3 * self weight + c + column C2
Load on footing C2 = 825 + 3 * 0.3 * .3 * 3.6 * 25
Load on footing C2 = 825 + 25 = 850 KN

Design of Column
Column C3:
Use M20 concrete
Steel Fe-415
Height of column l = 3.6 m
Fixed at both ends
Left = 0.65 l = 0.65 * 3.6
Left = 2.43 m
Arial load carried by column C3 = Load by B3 * 2 + Load by B2
Total Arial load carried by column
P4 = 2 * 3 * 50 + 225
Total Arial load P4 =525 KN
Assuming 1 % steel, we get
Ac = 99% Ag & Asc = 1% Ag
525 *1000 = 7.92 Ag + 2.7805 Ag
Ag = 49063.12 mm2
Therefore using a rectangular column size
= 230 mm * 220 mm
Provide 230 mm * 220 mm column
Check for slenderness of column
Left/b = 2430/230 = 10.56 <12
Therefore it is a short column
Longitudinal reinforcement
Asc = 1/100 * Ag

Asc = 1/100 * 49063.12


Asc = 490.63 mm2
Provide 6 bars of 12 mm diameter
Lateral Ties:
Diameter of lateral ties should not be less than
a) /4 = 12/4 = 3 mm
b) 5 mm
Use 8 mm diameter bars.
Spacing: It shall be minimum of
a) Least lateral dimension = 230
b) 16 * = 16 * 12 = 192 190 mm
c) 300 mm
Therefore provide 8 mm lateral ties at 190 mm c/c
Total load transfer to the footing
Total load transferred = Arial load on column + w + o + column * 3 [That is three floors there]
= 525 KN + 15 KN
Load on footing C3 = 540 KN

Design of Beam:
Design of beam B1
1.) Given Data:a.) Size 230 * 450 mm
b.) Fck = 25 N/mm2
c.) Fy = 415 N/mm2
d.) L0 = Clear Span = 3.2 m
e.) Ls = Width of support = 200 mm
2.) Loud calculation:Self weight of beam = 230 * 450 * 1 * 25
Self we of slab = * 3.20 * 2.12 * 25
Finishing load = 1
Live load = 4
Weight of brick wall = 2 * 3.6 * 18 = 12.96 KN
Applied load = 105.34 KN
Factored load = 1.5 * 105.34 KN = 150 KN
Bending Moment:BMapplied = Wu * L02/24
= 150 * 3.42/24
= 72.25 Kn m
Left => L0 + d = 3.2 + 0.450 = 3.650
Left => L0 + Ls = 3.2 + 0.1 + 0.1 = 3.4

Moment of resistance for Balance section:MR = 0.138 fck bd2

for beam

= 0.138 * 25 * 230 * (450 30 16/2)2


= 134.69 * 106 N-mm
MRb= 134.69 KN m
Since MRB > BMapplied. Hence beam design as a simplify.
Shear Force:Check for depth:dreq = mu/Q.B => 72.25 * 106/138 * 25 * 230
dreq = 301.75 mm
So that is safe dreq < dprov
Area of Steel:Ast = 0.5 fck/fy [ 1- 1 4.6 Mu/fck bd2] bd
= 0.5 * 25/415 [1 - 1 4.6 * 72.25 * 106/25 * 23 * 4122] * 230 * 412
Ast = 533.7 mm2
Number of bars:Numbers of bars = Ast/Ast1 = 533.7/(/4) * 162 = 2.443 3 bars
Check for deflection:Span/deff = 20 * mf1
3400/412 = 20 * mf1
mf1 => fs = 0.58 fy * area/ Aprovided
0.58 * 415 * 419.219/3 * (/4) * 162
100906.01/603.185 = 167.288
Tension steel y. = Ast/bd * 100 = 0.6 %
3400/412 = 20 * 1.8
8.252 36
Hence it is safe.

Check for development length:Ld 1.3 M1/Vu + L0


Ld = 0.87 fy /4 * Tbd
= 0.87 * 415 * 16/4 * 1.4
= 1031.57 mm
Vu = Wu * Leff/2 = 150 * 3.4/2 = 255 KN
Ld 1.3 M1/Vu + L0
1031.57 1.3 * 72.25 * 106/235.5877 * 103 + 3200
1031.57 3598.68 mm
Hence it is safe.
Design of stirrups:Vu = 235.5877 KN
Zv = Vv/bd = 235.5877 * 103/230 * 412
= 2.486 N/mm2
Vuc = Zc * b * d
= p0T0O0
Zc => % Steel Ast/bd * 100 = 3 * (/4) * 162/230 * 412 * 100 = 0.6%
Grade of concrete M-25
Zc = 0.52
Since Zv > Zc < Tmax Sheer P/8 should be provide.
Spacing:Asv/b * Sv 0.4/ 0.87 fg
2 * (/4) * 82/230 * Sv = 0.4/0.87 * 415
Sv = 300 mm
Provided 8 mm @ 300 c/c

Design of beam B2
1.) Size of Beam :- 230 * 530
2.) Fck = 25 N/mm2
3.) Fy = 415 N/mm2
4.) Effective length = 4.43

1.) Load Calculations:


Self weight of beam = 230 * 530 * 1 * 25 = 3.05 KN
Self weight of slab = * 4.23 * 1.6 * 25 = 84.6 KN
Finishing = 1 KN
Live load = 4 KN
Self weight of brick wall = 0.1 * 3.6 * 18 +> 6.48
Total load = 92.65 KN + 6.48 => 99.13
Featured load => 99.13 * 1.5 => 148 150 KN
2.) M0 = W * L2/24
= 150 * 4.432/24
= 122.6 KN m
Mu = 122.6 KN m
M0 of resistance for balance reaction:MR = 0.138 fck bd2
= 0.138 * 25 * 230 * (530 30 16/2)2
= 192.077 * 106 N- mm
[MRB < 192.077 KN m]
Since M0 of resistance > applied M0
Design of singly reinforced:-

Area of steel:Ast = 0.5 fck/fy [1 - 1 4.6 Mu/fck * b * d2] * b * d


= 0.5 * 25/415 * [1 - 1 4.6 * 122.6 * 106/ 25 * 230 * 4922] * 230 * 492
= 777.4092 mm2
Number of bars:Numbers of bars = Ast/Ast1 => 777.4092/ (/4) * 162 => 3.55 4 Bars
Check for depth:d = M0/Q.B => 122.6 * 106/ 0.138 * fck * B
d = 393 mm
So depth is fine.
Check for deflection:Span/Deff = 20* mf1
4.43 * 1000/492 = 20 * mf1
Mf1 => fs = 0.58 fy * Area/ Aprovided
0.58 * 415 * 714.77/ 4 * (/4) * 162
214.02
Tension steel = Ast/b*d * 100
= 43 %
4.43 * 1000/492 20 * 1.4
[9 28] Safe is deflection
Check for development length:Ld 1.3 M1/V0 + L0
Ld = 0.87 fy / 4 Tbd => 0.87 * 415 * 16/ 4 *1.4 => 1031.51 m
Vv = Wv * Leff/2 => 1.5 * 99.13 * 4.43/2 = 329.36 KN
Ld 1.3 M1/Vv + L0

1031.57 1.3 122.6 * 106/ 329.36 * 103 + 4430


1031.57 3982 + 4430
[1031.57 4914.44 mm] Safe
Spacing:Asv/b * Sv 0.4/0.87 fy
2 * (/4) * S2/230 * Sv = 0.4/0.57 * 415
Sv = 394 mm 400 mm
[Sv = 400 mm]
[Provided 8 mm @ 400 mm c/c.]

Design of Beam B3
Given data:Size = 230 * 450 mm
Fck = 25 || fy = 415
L0 = Clear Span = 1.5 m
Ls = Width of support = 200 mm
Load Calculation:Weight of beam = 0.230 * 0.450 * 1 * 25 = 2.6
Weight of slab = * 1.5 * 2.75 * 25 = 51.56
Finishing load = 1 KN
Live load = 4 KN
Self weight of way
0.1 * 3.6 * 18 = 6.48 KN
Total load = 65.64
Factored load = 1.5 * 65.64 = 100 KN
B.M=
BMapplied = Wu * L02/24
= 100 * 5122/24 = 15
= 9.6 10 KM m
Leff => L0 + d = 1.5 + 0.012 = 1.512
Leff => L0 + Ls = 1.5 + 0.2 = 1.7
Moment of resistance for Balance section:MR = 0.138 fck * bd2
= 0.138 * 25 * (230 *(450 30 12/2))2
= 136.002 KN m

Hence MRB > BMapplied, hence beam design as singly reinforcement.


Check for depth:dreq = Mu/Q.b
= 10 * 106/0.138 * 25 * 230
= 112.26 m
Hence that is safe.
Area of steel:Ast = 0.5 fck/fy [1 - 1 4.6 Mu/fck bd2] bd
= 0.5 * 25/415 [1- 1 4.6 * 10 * 106/ 25 * 230 * 4142] * 230 * 414
= 72.33 mm2
Numbers of bars:Numbers of bars = Ast/Ast1 = 72.339/(/4) * 122
= 0.503 1 bar
So have to have at least 2 bar.
Check for deflection:Span/deff 20 mf1
512/414 20 * 1.2
5.6 24
Hence it is safe.
Check for development length:Ld 1.3 * M1/Vv + L0
Ld = 0.87 fy * / 4 * Tbd
= 0.87 * 415 * 12/4 * 1.4
= 773.678 mm
V0 = W0 * Leff/2 = 100.25 * 1.512/2

100 * 1.512/2 => 100 * 1.512/2


75.6 KN
Ld 1.3 M1/Vu + L0
773.678 1.3 * 10 * 106/75.6 * 103 + 1512
[773.678 1683.9]

Design of Slab (S1)


Given :
Room Size = 2.75X4.50m
Type of Concrete
Type of Steel

M.20
Fe. 415 HYSD bars.

Live load 4KN/m2.


Design Steps
(1)

= 1.636<2

Hence it is a two way Slab.


Bearing = 200 mm.
Assuming. Dia of bars = 12 mm in both the direction.
Assuming 20 mm clear Cover.
Effective depth (dx)=
=

= 98.2mm.
=

Overall depth (D)

100mm.

= d + cover +
= 100+20+
= 126 mm.

Effective depth for longer Span


Dy = dx = 100-12
= 88mm.
(2)

Effective Span
Least of following two.
I.
Lx = clear span + bearing.
= 2.75+0.2

overall depth.
Taking max o the two
we take 130 mm.

II.

= 2.95m
Lx = clear Span + effective depth (dx)
= 2.75+0.1
= 2.85 m
There fore

Lx = 2.85m

Least of following two.


i.
Ly= Clear Span + bearing.
= 4.5 + 0.2
= 4.7m.
ii.
Ly = Clear span + effective depth(dy)
= 4.5+0.088
= 4.5888m
Ly = 4.588m

(3)

Load Calculation
(i)
Self weight
(ii)
Live load
(iii)
Finishing load

= 0.126X1X25
= 3.15 KN/m.
= 4X1
= 4 KN/m.
= 1X1
= 1 KN/m.
Total load Wu
= 8.15 KN/m.

Factored or Ultimate load


=
1.5 X 8.15

Wu = 12.225 KN/m.
(4)

Moment Calculation
=

= 1.64.

Mux = dx Wu lx2.
Muy = dy Wu lx2.
Refering IS 456:2000 Page 91, Table 26
( corner Slabs are held down).
x

= 1.5

0.089

0.046

= 1.75

0.10

0.037

By linear Interpolation.
X = 0.089 +

x = 0.095.
X = 0.046 -

x = 0.041.
Mux
Muy

= 0.095 X 12.225 X (2.85)2


= 9.43 KN.m
= 0.41 X 12.225 X (2.85)2
= 4.07 KN.m

Design Constants
[

Ru = 0.36fck
[

Dx required =
=
Dx required = 58.45mm
Dx assumed = 100 mm
Dx assumed > dx required.
Design is sabe.
(5)

Main Reinforcement
Along shorter Span (Artx)
Mux = 0.87fy Astx dx (

9.43X106 = 36105 Astx 7.49 Astx2

Astx = 277-11mm2

Check for minimum Reinforcement.


Astmin = 0.12 % of bD.
=

X 1000 X 100

= 120 mm2
Spacing of Barsd
S=

= 408 mm.

But Maximum Spacing.


Least of.
1. 408 mm
2. 3d = 3x100 = 300 mm.
3. 300 mm.
Providing 12 mm dia bars @ 300mm c/c along Shorter Span
Main Reinforcement along longer Span.
Muy = 0.87 fy Asty dy (

= 4.07x106 = 31772.4Asty 7.49 Asty2


Asty = 120 mm2
Astmin = 120 mm2

OK

Spacing
=

= 855.37 mm

But Max. Spacing is


Ieast of
i.
3d 3x88 = 264mm.
ii.
855.37 mm.
iii. 300 mm.
Spacing = 264 mm.

Providing 12 mm dia bars @ 264 mm c/c along longer Span


Torsional or Corner Steel
Area of torsional steel =
= x
=207.83

Spacing of 8mm dia bars.


=
= 241.85 mm
240 mm
Provide 8mm dia bars @240mm c/c in a mesh

Mesh Size =

= 0.57

Say 570
mm
Check for deflection
Area of steel provided =
= 376.99
377 mm2
% of steel provided
Pt =

= 0.377%
Stress in Steel at Service load
Fs = 0.58fy *

= 0.58X415 X *

= 176.9 N/mm2.
190N/mm2.
Reading out modification factor (k1) from (curve fig 4 of IS 456:2000) for = 190 N/mn 2.
& pt = 0.377 Values.)
Kt = 1.8
( )max = 20 X kt = 20 x 1.8 = 36
( )Provided =

= 28.5

( )max > ( )Provided


Hence, Ok.

TWOWAY SLAB REINFORCEMENT DETAIL.


NO.

DIMENSION
2.75 X 4.5m

SLAB-1
2.75 X 3.5m
SLAB-2

SIZE
130mm
D=100
Cover = 30
130mm
D=100
Cover=30mm

MAIN STEEL
12 @
300 mm

12 @
250 mm

TORISIONAL
REINBORE MENT.
8 @ 240 mm
c/c for 570 mm.

10 @
300 mm

8 @
260mm

8 @ 300 mm
c/c for 570 mm.

Design of slab (S2)


Given
Room Size
Type of concrete
Type of Steel Live Load

2.75x3.50
M-20
fe 415 HYSD bars
4kN/m2

Design steps :
i.
Hence it is a two way
Bearing = 200 mm
Assuming Dia of bars = 12 mm in both the direction
Assuming 20 mm clear cover
Effective depth (dx) =

= 98.21mm
100mm

Overll depth (D)


= d + cover +
Take 130mm
Effective depth for longer span.
Dy = dx -

= 100 12 = 88mm.

Taking max. of the above two take overall depth = 130mm.


ii.

Effective span
Least of following two
i.
ii.

Lx = clear span + bearing


= 2.75+0.2 =2.95m
Lx = clear span + effective depth (dx)
= 2.75 + 0.1 = 2.85m
Therefore
Lx = 2.85m

Least of following two


i.

Ly = clear span + bearing

= 3.5 + 0.2
= 3.7 m
Ly = clear span + effective depth (dy)
= 3.5 + 0.088 = 3.588mm

ii.

= 3.588mm

iii.

Load Calculation
i.
ii.
iii.

Self weight
Live Load
Finishing load

= 0.13 x1x25 = 3.25KN/m


= 4x1
= 4KN/m
= 1x1
= 1KN/m
Total load w = 8.25 KN/m.

Factored or Ulternate load


Wu = 1.5 X 8.25 = 12.375
iv.

Moment Calculation
= 1.27
Mux
Muy

=
=

xwulx2
y wulx2

Rebering IS 456:2000 Page 96 table 26


( Corner slabs are held down)
= 1.27
x
= 1.2
= 1.3

0.072
0.079

By linear interpolation
x = 0.072 +
x = 0.0769

y
0.059
0.055

y = 0.059 y = 0.0541
Mux = .0769x12.375x(2.85)2
= 7.72 KN/m.

Muy = 0.051x12.375x(2.85)2
= 5.4379 KN/m.
Design constants (Ref Iscode 456 Page no. 96
[

Ru = 0.36 fck

]
(

[ for M -20
dx required =

)
2.76

dx required = 52.28
dx assumed = 100mm
dx assumed > dx requied
Design is sabe

v.

Maain Reintorcement
Along shorter span. (Axtx fy)
Mux - .87 fyAstx dx (

7.72X106 = 36102 Astx 7.49 Astx2


Astx = 224.25 mm2
Check for minimum reinforcement
Astin = .12% of bD
=
= 120 mm2
Thus sabe.

Spacing of Bars
S=
But Maximu spacing
Least of
i.
350.08mm
ii.
3dx = 3x100=300m
iii.
300mm
Provid 10 mm dia bars @ 300mm c/c along shorter span.
Main Reinforcement along longer span.
Muy = .87 fy Asty dy (

5.4379x106 = 31772.4 Asty 7.49 Asty2


5.4379x106 = 31772.4 Asty 7.49 Asty2
Asty = 178.64 mm2
Ast min = 120mm2
Hence design safe.
Spacing
=

= 281.23mm

But max spacing 18


Leas of
i.
ii.
iii.

3d = 3x 88 = 264 mm
281 mm
300 m

Provide 8mm dia bars @ 260 c/c along longer span.

Torisional or corner steel


Area of torisional steel = (mid span steel)

= 168.18mm2
Spacing of 8mm dia bars.
=

= 298.72
300 mm

Provide 8 mm dia bars @ 300mm c/c in a mesh


Mesh size Say 570 mm

Check for deflection


Are of steel provided =
= 314 mm2
% of steel provided
Pt =
Stren in steel at service load
Fs = .58 fy
= .58 x 415 x
= 171.90
190 N/mm2

Reading out modification factor (k1) born


(Curve fig. 4 of IS 456 : 2000) for fs = I>on/mm2
& pt = .314 value
The value of fs 145 is tending like assumptiontes. Taning
Kt = 1.8
( )

= 20 1.8 = 36

( )
( )

= 28.5
>( )

Design of slab (S3)


Given
Room Size

3.20x1.20m

Type of concrete = M 20
Type of steel Fe 415. HYSD bars
3.5 KN/m2

Live load

Design Steps : 1)

2) Assume Overall depth (100mm to 150 mm)


Or D =

= 60 mm

Let D = 100mm
Effective depth d = 100 clear cover = 10 15 5
= 80 mm.
3) Effective Span
Lest of the following
(i)
Lc + ls
= 1.2 + 0.2
= 1.4 m
(ii)

Lc + d
= 1.2 + 0.08
= 1.28 m
Eeffective span = left = 1.28 m.

4) Load Calculation

(i)
(ii)
(iii)

Dead load = 0.2x25 =


2.5KN/m2
Live load
=
3.5 KN/m2
Finishing load
=
1 KN/m2
Total Load =
7.5 KN/m2
Factored load per m = Wu

7.5x1.5
=
11.25 KN/m

5) Factored Moment
Mu =

=
= 2.304 KN/m

6) Check for effective depth.


Dreq =
=
= 28.89mm.
D assumed = 80mm.
Hence design is safe
7) Area of main reinforcement.
Mu = 2.304x106 =0.87fu Astd *
= 2.304x106 =0.87x415x80 Astd *
Ast = 81.49 mm2
Check or minimum Reinforcement
Ast min = 0.12% of bD
=
= 120 mm2
Thus Ast = 120 mm2
Spacing =
= 418.88mm. 415mm.

+
+

415mm c/c.

Distribuition reinforcement
Astmin = 0.12% bD
=120mm.
Spacing =
= 418.88mm. 415mm.
Check for Deflection
Area of steel provide =
= 121.12 mm2
% of steel provide = pt =
=
= 0.15
Fs = 0.58fy *

= 0.58x415 x
=238.47
240 N/mm2
Modification factor from curve
(fig 4 OS 456)
Fs = 240 & pt = 0.15
Kt = 2
( )max = 20x kt = 20x2 =40
( )Provided =
( ) max > ( ) Provided

ONE WAY SLAB REINFORCEMENT DETAIL


N0.

SLAB-3
(rs-18)

DIMENSION

3.2X1.2M

SIZE

MAIN STEEL

100mm 8 @415mm
120mm 300mm

DISTRIBUTIONSTEEL

8 @415mm
300mm

Design of staircqse
RISE = R = 150 mm
TRADE = T = 250 mm
Floor to floor height = 3.6m
Hight of one flight =
Number of Rise =

= 12

Number of trade = 12 - 1 = 11
For 11 trade we need length = 11XT
= 11X250 = 2750mm
= 2.7 m.
Land width = 3.97-2.75=1.20m centre to centre
Effective span = 1.20+2.75+

(wall thickness)
= 4.065

Thickness of waist slab

th to

= 300 + 0.240 mm
We are take = t = 250 mm
Overall depth D = 280 mm

2.75

1.2

0.23/2

Weight of waist slab = t

( ) X 25
= .250

= 7.14 KN/m

Weight of step

= X R X X 25
= X .150 X 25
= 1.875 KN/m.

Deqd load

= 1.875 7.14
= 9.025 KN/m.

With finishing is taken

= 1 (finishing)
D L = 10 KN/m

In landing position

= 0.250 X 1 X 25
= 6.25KN/m.

With Arishing = 1 KN/m.


Total

= 6.25 + 1 KN

Live laod

= 7.25 KN/m.

Factorey going portion of = 1.5 (10+3)


= 19.5 KN/m.

Factored canding slab per meter width


= 1.5 (7.7+3)

) X 25

= 16.05 KN/m.
19.5 KN/m

16.05 KN/m

2.75
RA

= 1.315

RB

Taking moment about B


RA X 4.065

= 19.5 X 2.75(4.065= 144.25 + 13.87

RA X 4.065

= 198.12

RA

= 38.89

Shear force zero +


X

= 1.99

= 2m from A

Maxi. Bm
M

38.89X2 16.09 X

77.78 32. 1

45.68 KN/m

Reinforcement

) + 16.05

Ast = 0.5

= 0.5X

)b.d

Ast = 529.61 mm2

Distribution steel
Ast

X 1000X 250

300 mm2
Spacing =
Provided 8 mm bqd at 160 c/c

)X 250 X 1000

1.1 m