0% found this document useful (0 votes)
3K views6 pages

Machine Quotation Format

The document is a quotation for a Semi Automatic Web Sealer and Shrink Tunnel Machine, detailing technical specifications, pricing, and terms of payment. It includes information on installation, warranty, and conditions for order cancellation and delivery. The quotation is valid for 21 days and outlines additional charges for modifications and service post-installation.

Uploaded by

flippacksystems
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3K views6 pages

Machine Quotation Format

The document is a quotation for a Semi Automatic Web Sealer and Shrink Tunnel Machine, detailing technical specifications, pricing, and terms of payment. It includes information on installation, warranty, and conditions for order cancellation and delivery. The quotation is valid for 21 days and outlines additional charges for modifications and service post-installation.

Uploaded by

flippacksystems
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

Quote:

Date :

To
Mr.
M/s.

Dear Sir,

Many thanks for your enquiry.


As per our ongoing discussion we submit our offer for Shrink Wrap Machine as
under:

MACHINE : SEMI AUTOMATIC WEB SEALER + SHRINK TUNNEL MACHINE (MANUAL


COLLATION)

TECHNICAL SPECIFICATIONS
Product to be packed Boxes / Cartons / Articles
Packing Speed 3 to 10 packs/min
with Matrix (depending upon operator speed)
Max. pack size
mm
(as per push direction)
Width of Sealing Knife inches long
EN8 Material
Sealing Knife Design
Teflon coated unibody design
Film Unwinding Motorized Top unwinding system

Outfeed Conveyor Dead Plate translation

Standard Machine Feeding Height Approx. inches

Pneumatics
Separate Panels for sealer & tunnel; body
Electrical Panel
attached
Compact PLC based design for high
Machine operation
accuracy
Opening –
Tunnel Chamber (customized)
Chamber length –
Heater construction heaters

Tunnel Conveyor conveyor with Chain Drive.

Discharge Conveyor Conveyor

www.flippacksystems.com
Tunnel Blowers impellers

Packet Cooling Zone cooling system


Heavy duty MS body
Machine Structure
Robust construction
Machine dimension Approx. feet – length, feet – width

Machine weight Approx. kg

Starting heating load Kw

BOUGHT OUT COMPONENTS

Motors AC geared motors


AC Drives / VFD
Electricals Siemens
Contactors Siemens
Relays Omron
Switchgear Select
Temperature Controller Mast
Switches T
Panel Wirings Polycab

Delivery : Subject to stock availability else, 2 – 3 weeks from date of receipt of order
and credit of advance to our account & receipt of 50 - 100 sample boxes of each size.

IMAGE FOR REPRESENTATION PURPOSE ONLY

PRICE SUMMARY

www.flippacksystems.com
Sr. Unit Price
Description Qty Amount
No. (Rs.)

Web Sealer + Shrink Tunnel


(semi automatic) 1
1. tbd tbd
set
BOXES / CARTONS

2. Change Over Parts (for given sizes) 1 INCLUDED

3. Packaging - rugged plastic wrapped 1 INCLUDED

4. Freight / Transportation (customer’s scope) 1 EXCLUDED

Installation & Commissioning


5. 1 EXCLUDED
To & Fro air tickets, Boarding & Lodging, local
expenses to be borne by customer

6. Subtotal (1+2+3+4+5)

7. GST on subtotal (6.) 18% 1 /-

8. Grand Total (6+7) 1 /-

TERMS OF PAYMENT : 50 % advance, 100% balance before despatch.


MODE OF PAYMENT : By RTGS / NEFT
INSTALLATION : In Mumbai free of cost else B&L and local conveyance in your
scope. To and fro tickets in your scope. Service charges @4500/day

with best regards

Mr.

TERMS & CONDITIONS


Prices: Unpacked, Ex-works, Factory unit.

www.flippacksystems.com
Taxes/Duties (at additional cost)
GST rates will be @ 18%
GSTIN:
Freight: Extra at actual

Bank Details:
Company Name:

Payment terms:
1) 50%+GST as down payment with Purchase Order.
2) 50% after FAT or before dispatch

Delivery time: 6 - 7 weeks after receipt of advance along with valid Purchase
order.The
delivery time is subject to confirmation on order placement and any other
mutually agreed pre-approvals.

Machine Installation & Commissioning: The machine will be thoroughly


tested at our factory with your product before shipment. Any additional
modification will incur additional charges. The installation of equipment at your
plant can be carried out by our Service Engineer. To and fro air travel, local
conveyance, boarding and lodging would be to customer’s account. Customer to
make available, a team of technical and non-technical people, to work with our
commissioning person.

Any Extra number of days would be charged at: - INR 5,000 /Day/Engineer
Service charges @ INR 5,000/Day/Engineer would be applicable after the
machine is hand overed to customer.

Other Charges: In the event of cancellation of orders, cancellation charges


would apply @50% of the Purchase Order Value before dispatch or machine
completion date.
After machine completion date or dispatch no cancellation would be entertained
irrespective of the machine condition, Buyer is liable to pay complete price
including GST. Any changes requested by Buyer after Seller has received the
original PO shall require an agreement for Price changes and delivery date
changes.

Payment Deferral : Charge for storage @2% per month on the Invoice value
shall be payable by the Buyer if the Buyer requests shipment deferral beyond
the date of completion. Deferral of shipment will not defer invoicing or payment
terms of order.

Clerical Errors: Seller may correct any clerical errors appearing in the typed
portion of this proposal at any time.

www.flippacksystems.com
Freight and forwarding: Extra at actuals / arranged by buyer. Transit
Insurance Extra at actuals / arranged by buyer.

Validity: This quotation is valid for 21 days. The offered delivery is based on our
present engineering and manufacturing workload and may be subject to
variations from the time of the offer to the time of the order confirmation.

Warranty: The equipment is warranted (free from manufacturing defects in


materials and workmanship under normal use and proper maintenance) for a
period of 12 months from the date of shipment and at one shift operation only (8
hours shift). This, however, does not apply for any normal wear parts. Pneumatic
and electrical parts are not covered under warranty. The warranty shall only
apply to the equipment properly used and cared for and shall not apply to any
equipment which shall have been repaired, altered or changed by persons other
than authorized by the Seller. Warranty does not include cost of travel, boarding
and lodging expenses for Engineers.
Failure of spares availiability would not be inlcuded under warranty conditions.

Limitation of Liability: To the fullest extent permitted by law and


notwithstanding any provision to the contrary, FLIPPACK SYSTEMS shall in no
event be liable for any special, indirect, consequential, or incidental damage or
lost profits, lost opportunities, lost
revenues, business interruption, obligations to compensate a third party or other
similar indirect damage arising under or in connection with the parties’
cooperation.

Force Majeure:- Seller shall not be liable or responsible to Buyer, nor be


deemed to have defaulted or breached this Agreement, for any failure or delay in
fulfilling or performing any term of this Agreement when and to the extent such
failure or delay is caused by or results from acts or circumstances beyond the
reasonable control of Seller including, without limitation, acts of God, flood, fire,
earthquake, explosion, governmental actions, war, invasion, or hostilities
(whether war is declared or not), terrorist threats or acts, riot, or other civil
unrest, national emergency, revolution, insurrection, epidemic, lockouts, strikes
or other labor disputes (whether or not relating to either party’s workforce), or
restraints or delays affecting carriers or inability or delay in obtaining supplies of
adequate or suitable materials, materials or telecommunication breakdown or
power outage.

Exclusions: Plant utilities, steam generator etc., local freight, loading and
unloading of equipment at site, hiring of any special equipment required for
moving and positioning machinery is not included in the scope of supply.
Anything not expressly mentioned in the offer is excluded from the scope of
supply.

Jurisdiction : In case of any dispute/s all the claims are subject to Mumbai
jurisdiction only.

www.flippacksystems.com
PO to be raised on as under details:
FLIPPACK SYSTEMS

www.flippacksystems.com

You might also like