MAIN DECK COSMETIC MAINTENANCE PLAN
MT.SIHE
Condition of Load Line marks: Aft: GOOD Midship: GOOD
MSI comments:
Main deck area /Pipes, Stands, Winches and Deck Fittings incl tank domes / Ballast ventheads
Paint Maker: HEMPEL Primer ROB: AS PER PAINT INVENTORY Final coat ROB: Hydroblaster on board: NO FW R 430 mt
Poop deck ACCOM
Pump Room SLOP-W 6W COT 5W COT 4W COT 3W COT 2W COT 1W COT
Frame / Long
A 1 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.3 sq.m 0.3 sq.m 0.3 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m
B 0.0 sq.m 0 sq.m 0.0 sq.m 0.0 sq.m 1.0 sq.m 0.0 sq.m 0.5 sq.m 0.0 sq.m 0.0 sq.m 0.5 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.7 sq.m 0.0 sq.m 0.0 sq.m 0.3 sq.m 0.0 sq.m 0.0 sq.m
C 0.0 sq.m 0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m
D 0.0 sq.m 0 sq.m 0.5 sq.m 0.0 sq.m 1.0 sq.m 1.0 sq.m 1.0 sq.m 1.0 sq.m 1.0 sq.m 0.5 sq.m 0.5 sq.m 1.0 sq.m 1.0 sq.m 1.0 sq.m 1.0 sq.m 0.8 sq.m 1.0 sq.m 1.0 sq.m 1.0 sq.m 0.5 sq.m 0.6 sq.m
E 0.0 sq.m 0 sq.m 0.5 sq.m 0.0 sq.m 1.0 sq.m 1.0 sq.m 0.8 sq.m 0.6 sq.m 0.5 sq.m 0.5 sq.m 1.0 sq.m 1.0 sq.m 1.0 sq.m 1.0 sq.m 0.8 sq.m 1.0 sq.m 0.8 sq.m 0.8 sq.m 0.7 sq.m 0.7 sq.m 1.0 sq.m
F 0.0 sq.m 0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m
G 0.0 sq.m 0 sq.m 0.0 sq.m 0.0 sq.m 1.0 sq.m 0.0 sq.m 0.5 sq.m 0.0 sq.m 0.0 sq.m 0.5 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.7 sq.m 0.0 sq.m 0.0 sq.m 0.3 sq.m 0.0 sq.m 0.0 sq.m
H
1 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0 sq.m 0 sq.m 0 sq.m 0 sq.m 0 sq.m 0 sq.m 0.3 sq.m 0.3 sq.m 0.3 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m
4.00 mt
Areas sq.m: 1000 sq.m 700 sq.m 600 sq.m 300 sq.m 1250 sq.m 1250 sq.m 1250 sq.m 1250 sq.m 1250 sq.m
Rust Area 1.0 1.0 0.0 4.0 6.4 5.0 7.8 6.8 5.3
% of rusted area 0.1% 0.1% 0.0% 1.3% 0.5% 0.4% 0.6% 1% 0.4%
Est. no of days to address 3 2 2 5 4 4 4
(1)
Completed
Priority level: 2 1 1 2 2 3 2
Legend:
Finish coat area 1st coat applied Primer coat Problematic areas Spot problematic
Total Area 10450 sq.m Total rust area 45 sq.m Total completed areas 0 sq.m Total estimated % of corroded 0.4% Total estimated days to copmplete 31
Remarks :
1. A area including non slip way,ballast tank ventheads,handrail,bollard etc.
2.C area including winch/windlass
3. D,E area including Pipes, Stands, Winches and Deck Fittings incl tank domes,fire/foam line etc.
4. ACCOM D and E including compass deck.
5.Above estimated days are calculated with 3 crew works 9 hrs a day; If performance is less, pls provide comments
Fwd: GOOD
ds
1W COT F'CLE
0.0 sq.m 0.0 sq.m . sq.m
0.0
0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m
0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0 sq.m
0.6 sq.m 0.8 sq.m 1.0 sq.m 0.0 sq.m 0 sq.m 1 sq.m
1.0 sq.m 1.0 sq.m 1.0 sq.m 0.0 sq.m 0 sq.m 1 sq.m
0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m 0 sq.m
0.0 sq.m 0.0 sq.m 0.0 sq.m 0.0 sq.m
0.0 sq.m 0.0 sq.m 0.0 sq.m
1100 sq.m 500 sq.m
5.4 2.2
0.5% 0.4%
4 3
1 1
DATE WEEKLY UPDATE
1. Chipping / grinding / painting the 5W,4W partly.
2. Painting the second primer coat on the 6W of the main deck.
13-05-2024 3. Repair the nipple in the No.4 remote valve control box,because of the nipple is
crack and leakage.
1. Chipping / grinding / painting the nearly gangway areas and 5W.
2. Painting the second primer coat on the 5w deck.
3. Painting the some pipes in the Cable trunk of B deck.
14-05-2024
4. Painting the topcoat of the pump room’s fan.
5. Cleaning the drip tray of the maindeck.
1. Painting some markers on deck.
2. Clean the pump room.
3. Clean all drip trays on the maindeck.
15-05-2024 4. Test all PV valve,Check all fire screen of the ballast tank’s vent head.
5. Clean the maindeck,clear up the deck store room and paint room.
6. Test mooring winch,deck crane,gangway.
7. Preparation for mooring at Dalian.
1. Berth at Dalian for discharging
16-05-2024
1. Berth at Dalian for discharging.
2. Carry the store provision which supplied at Dalian to the store room. And clear
17-05-2024 up the store room.
3. Clean and sweap the main deck.
1. Paint second primer coat on the deck.
2. Paint the topcoat on the deck.
3. Grease the winch’s gear tooth.
18-05-2024 4. Assist to repair the BWMS AFU’s filter,change the axis in the pump room.
5. Clean the bottom and pump out the draining water,after draining the AFU to
bilge tank in the pump room.
REMARKS
JOBS DONE PHOTO REP
13-05-2024
14-05-2024
15-05-2024
17-05-2024
18-05-2024
NE PHOTO REPORTS
A
F
T
A
P C
E C
A O
K M
O
T D
A
A T
N I
K O
N
Legend: Major upgrade required
Upgrade plan: 5S/6S/FPT require major upgrade including blasting of hatch coami
frame's edge corrosion
BALLAST TA
Comments: ballast tanks will b
WBT 6P WBT 5P
COMMENCED DERUSTING: COMMENCED DERUSTING:
% COMPLETED: % COMPLETED:
DERUSTING COMPLETED: DERUSTING COMPLETED:
COMMENCED PAINTING: COMMENCED PAINTING:
% COMPLETED: % COMPLETED:
COMPLETED PAINTING: COMPLETED PAINTING:
TARGET COMPLETION: TARGET COMPLETION:
WBT 6S WBT 5S
COMMENCED DERUSTING: COMMENCED DERUSTING:
% COMPLETED: % COMPLETED:
DERUSTING COMPLETED: DERUSTING COMPLETED:
COMMENCED PAINTING: COMMENCED PAINTING:
% COMPLETED: % COMPLETED:
COMPLETED PAINTING: COMPLETED PAINTING:
TARGET COMPLETION: TARGET COMPLETION:
e major upgrade including blasting of hatch coamings, access ladders, and double bottom frames and topsi
BALLAST TANKS UPGRADE PLAN
Comments: ballast tanks will be planned after completion of accommodation block and main
WBT 4P WBT 3P
COMMENCED DERUSTING: COMMENCED DERUSTING:
% COMPLETED: % COMPLETED:
DERUSTING COMPLETED: DERUSTING COMPLETED:
COMMENCED PAINTING: COMMENCED PAINTING:
% COMPLETED: % COMPLETED:
COMPLETED PAINTING: COMPLETED PAINTING:
TARGET COMPLETION: TARGET COMPLETION:
WBT 4S WBT 3S
COMMENCED DERUSTING: COMMENCED DERUSTING:
% COMPLETED: % COMPLETED:
DERUSTING COMPLETED: DERUSTING COMPLETED:
COMMENCED PAINTING: COMMENCED PAINTING:
% COMPLETED: % COMPLETED:
COMPLETED PAINTING: COMPLETED PAINTING:
TARGET COMPLETION: TARGET COMPLETION:
Touch spot required Primer applied
d double bottom frames and topside recoat.2W/3W/4W are in good condition. APT/1W/5P/6P require tou
mmodation block and main deck areas.
WBT 2P WBT 1P
COMMENCED DERUSTING: COMMENCED DERUSTING:
% COMPLETED: % COMPLETED:
DERUSTING COMPLETED: DERUSTING COMPLETED:
COMMENCED PAINTING: COMMENCED PAINTING:
% COMPLETED: % COMPLETED:
COMPLETED PAINTING: COMPLETED PAINTING:
TARGET COMPLETION: TARGET COMPLETION:
WBT 2S WBT 1S
COMMENCED DERUSTING: COMMENCED DERUSTING:
% COMPLETED: % COMPLETED:
DERUSTING COMPLETED: DERUSTING COMPLETED:
COMMENCED PAINTING: COMMENCED PAINTING:
% COMPLETED: % COMPLETED:
COMPLETED PAINTING: COMPLETED PAINTING:
TARGET COMPLETION: TARGET COMPLETION:
First coat applied Finsih coat spot
on. APT/1W/5P/6P require touch spots blasting hatch coamings and access ladders and
F
O F
R O
E R
E
P C
E A
A S
K T
L
T E
A
N
K
Fully recoated