0% found this document useful (0 votes)
157 views2 pages

RAM Projects Status

The document outlines the status of various RAM projects, detailing their project codes, companies involved, contractors, phases, deliverables, and progress. Most projects have achieved 100% completion, while some are on hold or in progress, with specific remarks on their status. Notable projects include the RAM Study for ADNOC Offshore FEED Project and the RAM Studies for Khushaybu Solar PV Project, which are currently on hold.

Uploaded by

Moeid Iqbal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
157 views2 pages

RAM Projects Status

The document outlines the status of various RAM projects, detailing their project codes, companies involved, contractors, phases, deliverables, and progress. Most projects have achieved 100% completion, while some are on hold or in progress, with specific remarks on their status. Notable projects include the RAM Study for ADNOC Offshore FEED Project and the RAM Studies for Khushaybu Solar PV Project, which are currently on hold.

Uploaded by

Moeid Iqbal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

RAM Projects Status

Planned Achieved
Project
Project Project Code COMPANY Contractor Phases/Parts Deliverable Status Progress Progress Remarks
Serial
% %
RAM Study as a part of AIMS for EPC for Asab Phase-II Stage-I RAM Study Basis ON HOLD -
1 VAIL-19-231 ADNOC Al-Asab N/A - -
project RAM Report ON HOLD -
RAM Study as a part EPC for BAB 485 MBD Sustainable Facilities RAM Study Basis COMPLETE -
2 VAIL-20-264 ADNOC Archirodon N/A 100 100
Project RAM Report COMPLETE -
RAM Study Basis COMPLETE -
3 Tawke Gas Injection Facility - AGI EPC VAIL-21-389 GPS N/A 100 100
RAM Report COMPLETE -
Bilfinger RAM Study Basis COMPLETE -
4 SAHIL & HALIBA New Development Conceptual Design Study VAIL-21-442 ADNOC N/A 100 100
Tebodin RAM Report COMPLETE -
RAM Study Basis COMPLETE -
Phase 1 - TIPU 100 100
RAM Report COMPLETE -
RAM Study Basis COMPLETE -
5 RAM Study as a part of Development of AIMS for SGPC VISP-ISB-309-0921 MPCL - Phase 2 - GORU-B 100 100
RAM Report COMPLETE -
RAM Study Basis COMPLETE -
Phase 3 - HRL 100 100
RAM Report COMPLETE -
RAM Study Basis COMPLETE -
Part A - Concept Selection 100 100
RAM Report COMPLETE -
RAM Study for New Future Gas Development – Bab Gas Cap Part A - Conceptual RAM Study Basis COMPLETE -
6 VAIL-23-153 ADNOC Worley 100 100
Study Select Stage Design RAM Report COMPLETE -
Part B - Conceptual RAM Study Basis COMPLETE -
100 100
Design RAM Report COMPLETE -
RAM Study for FEED Services of Refinery Off Gases Recovery Tecnicas RAM Study Basis COMPLETE -
7 VAIL-23-350 ADNOC N/A 100 100
Project Reunidas RAM Report COMPLETE -
RAM Study Basis ON HOLD Project is on hold
RAM Studies for Khushaybu, Muwayah, Ar Rass-1, 2 & Al Khafa
- Khushaybu
Solar PV Project RAM Report ON HOLD Project is on hold

RAM Studies for Khushaybu, Muwayah, Ar Rass-1, 2 & Al Khafa RAM Study Basis ON HOLD Project is on hold
- Muwayah
Solar PV Project RAM Report ON HOLD Project is on hold
AR RASS
8 RAM Studies for Khushaybu, Muwayah, Ar Rass-1, 2 & Al Khafa VAIL-23-392 SOLAR L&T RAM Study Basis ON HOLD 100 70.36 Project is on hold
Ar Rass-1
Solar PV Project ENERGY RAM Report ON HOLD Project is on hold
NAWWAR
COMPANY
RAM Studies for Khushaybu, Muwayah, Ar Rass-1, 2 & Al Khafa RENEWABLE RAM Study Basis ON HOLD Project is on hold
Ar Rass-2
Solar PV Project ENERGY RAM Report ON HOLD Project is on hold
ISHA
COMPANY
RAM Studies for Khushaybu, Muwayah, Ar Rass-1, 2 & Al Khafa RENEWABLE RAM Study Basis COMPLETE -
Al Khafa
Solar PV Project ENERGY RAM Report COMPLETE -
COMPANY RAM Study Basis COMPLETE -
9 RAM Study for Sabic BCRU Pre-Feed_Feed Project VAIL-23-419 SABIC Flour N/A 100 100
RAM Report COMPLETE -
Louise Burger RAM Study Basis COMPLETE -
10 RAM Study for 65MWp Solar PV Power plant-Shuaibah 3 IWP VAIL-S23-419 ACWA Power N/A 100 100
Power KSA RAM Report COMPLETE -
RAM Study for ADNOC Offshore FEED Project for Lower Zakum ADNOC RAM Study Basis COMPLETE -
11 VAIL-23-482 Wood N/A 100 100
Habshan Upper Recovery and Lekhwair +20MBD Project Offshore RAM Report COMPLETE -
RAM Study for Feedstock, Utilities and Interconnecting RAM Study Basis COMPLETE -
12 VAIL-23-637 ADNOC Kent N/A 100 100
Pipelines for TA'ZIZ Industrial Park RAM Report COMPLETE -
RAM Study Basis COMPLETE -
13 RAM Study for Mirfa Plant Modification & Pipeline VAIL-24-192 ADNOC CPP N/A 100 100
RAM Report COMPLETE -
RAM Study Basis COMPLETE -
14 RAM Study for Desalination plant of Rabigh 4 IWP Facilities VAIL-24-195 Rawabi Wetico N/A 100 100
RAM Report COMPLETE -
RAM Study Basis COMPLETE -
RAM Study for POST FEED Services of Refinery Off Gases Tecnicas
15 VAIL-24-295 ADNOC N/A 100 100
Recovery (ROG) Project Reunidas RAM Report COMPLETE -
RAM Study Basis WIP -
Bab (Train 9) - 0
RAM Report WIP -
23 AiP5 Bab & Bu Hasa Off-Plot and On-Plot VAIL-24-356 ADNOC CPECC
23 AiP5 Bab & Bu Hasa Off-Plot and On-Plot VAIL-24-356 ADNOC CPECC
RAM Study Basis WIP -
Bu Hasa (Train 6) - 0
RAM Report WIP -
RAM Studies for ADNOC Project 5.0 (P5) – Define (FEED) Das RAM Study Basis COMPLETE -
17 VAIL-24-492 ADNOC Wood N/A 100 100
Island Project RAM Report COMPLETE -
RAM Study Basis IFA Approval / Response is awaited.
18 Upgrade MEG Recovery Units - Wasit Gas Plant VAIL-24-502 Saudi Aramco SLFE N/A 100 86.2
RAM Report IFR Approval / Response is awaited.
HSE STUDIES FOR MUBARRAZ REDEVELOPMENT PROJECT (EPC RAM Study Basis WIP - - Input data not received.
19 VAIL-25-319 ADOC - N/A
PHASE) RAM Report WIP - - -
Project VOLTA: Central Utility Plant (CUP) as part of TA’ZIZ RAM Study Basis IFA Approval / Response is awaited.
20 VAIL-24-730 ADNOC Al Ghanim N/A - 40
Derivative Park (TDK) RAM Report WIP -
RAM Study Basis IFR Approval / Response is awaited.
21 Dorra Field Development VAIL-24-676 KGOC Technip N/A 78.63 53.69
RAM Report WIP -
RAM Study Basis WIP -
22 EPC of Sahil Phase 3 Development Project VAIL-24-679 ADNOC Target N/A 0 0
RAM Report WIP -
RAM Study Basis COMPLETE -
23 RAM Study for HSE Studies for WAVE Project at Mirfa AUH VAIL-S24-491 ADNOC ORASCOM N/A 100 100
RAM Report COMPLETE -
RAM Study Basis IFA Approval / Response is awaited.
24 Upgrade North Flare System – Ras Tanura Refinery VAIL-25-175 Saudi Aramco Wood N/A 75.5 82
RAM Report IFA Approval / Response is awaited.