RAM Projects Status
Planned Achieved
Project
Project Project Code COMPANY Contractor Phases/Parts Deliverable Status Progress Progress Remarks
Serial
% %
RAM Study as a part of AIMS for EPC for Asab Phase-II Stage-I RAM Study Basis ON HOLD -
1 VAIL-19-231 ADNOC Al-Asab N/A - -
project RAM Report ON HOLD -
RAM Study as a part EPC for BAB 485 MBD Sustainable Facilities RAM Study Basis COMPLETE -
2 VAIL-20-264 ADNOC Archirodon N/A 100 100
Project RAM Report COMPLETE -
RAM Study Basis COMPLETE -
3 Tawke Gas Injection Facility - AGI EPC VAIL-21-389 GPS N/A 100 100
RAM Report COMPLETE -
Bilfinger RAM Study Basis COMPLETE -
4 SAHIL & HALIBA New Development Conceptual Design Study VAIL-21-442 ADNOC N/A 100 100
Tebodin RAM Report COMPLETE -
RAM Study Basis COMPLETE -
Phase 1 - TIPU 100 100
RAM Report COMPLETE -
RAM Study Basis COMPLETE -
5 RAM Study as a part of Development of AIMS for SGPC VISP-ISB-309-0921 MPCL - Phase 2 - GORU-B 100 100
RAM Report COMPLETE -
RAM Study Basis COMPLETE -
Phase 3 - HRL 100 100
RAM Report COMPLETE -
RAM Study Basis COMPLETE -
Part A - Concept Selection 100 100
RAM Report COMPLETE -
RAM Study for New Future Gas Development – Bab Gas Cap Part A - Conceptual RAM Study Basis COMPLETE -
6 VAIL-23-153 ADNOC Worley 100 100
Study Select Stage Design RAM Report COMPLETE -
Part B - Conceptual RAM Study Basis COMPLETE -
100 100
Design RAM Report COMPLETE -
RAM Study for FEED Services of Refinery Off Gases Recovery Tecnicas RAM Study Basis COMPLETE -
7 VAIL-23-350 ADNOC N/A 100 100
Project Reunidas RAM Report COMPLETE -
RAM Study Basis ON HOLD Project is on hold
RAM Studies for Khushaybu, Muwayah, Ar Rass-1, 2 & Al Khafa
- Khushaybu
Solar PV Project RAM Report ON HOLD Project is on hold
RAM Studies for Khushaybu, Muwayah, Ar Rass-1, 2 & Al Khafa RAM Study Basis ON HOLD Project is on hold
- Muwayah
Solar PV Project RAM Report ON HOLD Project is on hold
AR RASS
8 RAM Studies for Khushaybu, Muwayah, Ar Rass-1, 2 & Al Khafa VAIL-23-392 SOLAR L&T RAM Study Basis ON HOLD 100 70.36 Project is on hold
Ar Rass-1
Solar PV Project ENERGY RAM Report ON HOLD Project is on hold
NAWWAR
COMPANY
RAM Studies for Khushaybu, Muwayah, Ar Rass-1, 2 & Al Khafa RENEWABLE RAM Study Basis ON HOLD Project is on hold
Ar Rass-2
Solar PV Project ENERGY RAM Report ON HOLD Project is on hold
ISHA
COMPANY
RAM Studies for Khushaybu, Muwayah, Ar Rass-1, 2 & Al Khafa RENEWABLE RAM Study Basis COMPLETE -
Al Khafa
Solar PV Project ENERGY RAM Report COMPLETE -
COMPANY RAM Study Basis COMPLETE -
9 RAM Study for Sabic BCRU Pre-Feed_Feed Project VAIL-23-419 SABIC Flour N/A 100 100
RAM Report COMPLETE -
Louise Burger RAM Study Basis COMPLETE -
10 RAM Study for 65MWp Solar PV Power plant-Shuaibah 3 IWP VAIL-S23-419 ACWA Power N/A 100 100
Power KSA RAM Report COMPLETE -
RAM Study for ADNOC Offshore FEED Project for Lower Zakum ADNOC RAM Study Basis COMPLETE -
11 VAIL-23-482 Wood N/A 100 100
Habshan Upper Recovery and Lekhwair +20MBD Project Offshore RAM Report COMPLETE -
RAM Study for Feedstock, Utilities and Interconnecting RAM Study Basis COMPLETE -
12 VAIL-23-637 ADNOC Kent N/A 100 100
Pipelines for TA'ZIZ Industrial Park RAM Report COMPLETE -
RAM Study Basis COMPLETE -
13 RAM Study for Mirfa Plant Modification & Pipeline VAIL-24-192 ADNOC CPP N/A 100 100
RAM Report COMPLETE -
RAM Study Basis COMPLETE -
14 RAM Study for Desalination plant of Rabigh 4 IWP Facilities VAIL-24-195 Rawabi Wetico N/A 100 100
RAM Report COMPLETE -
RAM Study Basis COMPLETE -
RAM Study for POST FEED Services of Refinery Off Gases Tecnicas
15 VAIL-24-295 ADNOC N/A 100 100
Recovery (ROG) Project Reunidas RAM Report COMPLETE -
RAM Study Basis WIP -
Bab (Train 9) - 0
RAM Report WIP -
23 AiP5 Bab & Bu Hasa Off-Plot and On-Plot VAIL-24-356 ADNOC CPECC
23 AiP5 Bab & Bu Hasa Off-Plot and On-Plot VAIL-24-356 ADNOC CPECC
RAM Study Basis WIP -
Bu Hasa (Train 6) - 0
RAM Report WIP -
RAM Studies for ADNOC Project 5.0 (P5) – Define (FEED) Das RAM Study Basis COMPLETE -
17 VAIL-24-492 ADNOC Wood N/A 100 100
Island Project RAM Report COMPLETE -
RAM Study Basis IFA Approval / Response is awaited.
18 Upgrade MEG Recovery Units - Wasit Gas Plant VAIL-24-502 Saudi Aramco SLFE N/A 100 86.2
RAM Report IFR Approval / Response is awaited.
HSE STUDIES FOR MUBARRAZ REDEVELOPMENT PROJECT (EPC RAM Study Basis WIP - - Input data not received.
19 VAIL-25-319 ADOC - N/A
PHASE) RAM Report WIP - - -
Project VOLTA: Central Utility Plant (CUP) as part of TA’ZIZ RAM Study Basis IFA Approval / Response is awaited.
20 VAIL-24-730 ADNOC Al Ghanim N/A - 40
Derivative Park (TDK) RAM Report WIP -
RAM Study Basis IFR Approval / Response is awaited.
21 Dorra Field Development VAIL-24-676 KGOC Technip N/A 78.63 53.69
RAM Report WIP -
RAM Study Basis WIP -
22 EPC of Sahil Phase 3 Development Project VAIL-24-679 ADNOC Target N/A 0 0
RAM Report WIP -
RAM Study Basis COMPLETE -
23 RAM Study for HSE Studies for WAVE Project at Mirfa AUH VAIL-S24-491 ADNOC ORASCOM N/A 100 100
RAM Report COMPLETE -
RAM Study Basis IFA Approval / Response is awaited.
24 Upgrade North Flare System – Ras Tanura Refinery VAIL-25-175 Saudi Aramco Wood N/A 75.5 82
RAM Report IFA Approval / Response is awaited.