MATERIAL REQUISITION 26th 07,2025
SITE OFFICE STAFF TOILET
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
SITE OFFICE
1 Timber 6x1 229.60 Rft 40.00 9,184.00
2 Fascia board 225 x 25mm 200.00 Rft 85.00 17,000.00
3 Semi solid flush doors 900x2040mm 5.00 No 2,000.00 10,000.00
4 Door frames 4.00 No 1,400.00 5,600.00
5 3 lever mortice lock 5.00 No 1,500.00 7,500.00 49,284.00
OFFICE ELECTRICAL
6 2.5mm single R B G 1.00 Roll 12,600.00 12,600.00
7 1.5mm single R B G 1.00 Roll 10,000.00 10,000.00
8 20mm H/g 40.00 PCS 90.00 3,600.00
9 20mm couplers 30.00 PCS 5.00 150.00
10 4Way R. box 30.00 PCS 20.00 600.00
11 Twin box 11.00 PCS 50.00 550.00
12 Single box 7.00 PCS 30.00 210.00
13 Twin sockets 11.00 PCS 250.00 2,750.00
14 2 gang 3.00 PCS 150.00 450.00
15 3 gang 3.00 PCS 200.00 600.00
16 Tape 1.00 PCS 100.00 100.00
17 Gypsum 1.00 PKT 150.00 150.00
18 4ft florescent complete 5.00 PCS 400.00 2,000.00
19 CG holders 5.00 PCS 100.00 500.00
20 20W floodlights 4.00 PCS 800.00 3,200.00
21 Photocel 1.00 PCS 800.00 800.00
22 6way ccu 1.00 PCS 2,200.00 2,200.00
23 MCB 32A ,20A 10M 1.00 PCS 800.00 800.00
24 4.0mm 10m 10.00 M 200.00 2,000.00
25 Saddles 20mm 100.00 PCS 5.00 500.00 43,760.00
STAFF TOILET
26 IT5 box profile 3.0m 40.00 No 750.00 30,000.00
27 Timber 4x2 246.00 Rft 42.00 10,332.00
28 Timber 2x2 50.00 Rft 22.00 1,100.00
29 3 lever mortice lock 2.00 No 1,500.00 3,000.00
30 Chipboard 57.00 No 950.00 54,150.00
31 Asian low levelWC 2.00 No 2,800.00 5,600.00
32 Cistern 2.00 No 2,300.00 4,600.00
33 Rubber 2.00 No 250.00 500.00
34 Angle valve 2.00 No 600.00 1,200.00
35 Flex 600 2.00 No 250.00 500.00
36 Thread tape 10.00 No 30.00 300.00
37 Saddle clamp 40mm by 3/4" 2.00 No 800.00 1,600.00
38 PPr PIPE 3/4" 50.00 M 120.00 6,000.00
39 PPr Tee PIPE 3/4"x1/2" 2.00 No 120.00 240.00
40 PPr Elbow 1/2" 3.00 No 180.00 540.00 21,080.00
GRAND TOTAL 114,124.00