The pre-construction meeting held on June 6, 2025, covered the scope, schedule, and safety protocols for the project. Key attendees included the PMMO Head, Contractor, End-user Representative, and BAC Chair. The contractor is set to mobilize by June 10, 2025.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
130 views1 page

Pre-Construction Meeting Minutes

The pre-construction meeting held on June 6, 2025, covered the scope, schedule, and safety protocols for the project. Key attendees included the PMMO Head, Contractor, End-user Representative, and BAC Chair. The contractor is set to mobilize by June 10, 2025.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

Pre-Construction Meeting Minutes

Date & Time


June 6, 2025, 10:00 AM

Location
Conference Room, Admin Building

Attendees
- PMMO Head
- Contractor
- End-user Representative
- BAC Chair

Agenda
- Scope review
- Schedule
- Safety and site protocols

Agreements/Action Items
- Contractor to mobilize by June 10, 2025