Ms-041 Rock Anchor Bolt

The document outlines the Method Statement for the installation of rock anchor bolts for the Tagbaros Drainage-Ventilation Tunnel project, detailing the materials, equipment, and procedures involved. It includes sections on site preparation, drilling, anchor installation, grouting, and shotcrete application, as well as manpower requirements and risk assessments. Additionally, it provides inspection and test plans to ensure compliance with quality standards throughout the project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views15 pages

Ms-041 Rock Anchor Bolt

The document outlines the Method Statement for the installation of rock anchor bolts for the Tagbaros Drainage-Ventilation Tunnel project, detailing the materials, equipment, and procedures involved. It includes sections on site preparation, drilling, anchor installation, grouting, and shotcrete application, as well as manpower requirements and risk assessments. Additionally, it provides inspection and test plans to ensure compliance with quality standards throughout the project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

DESIGN AND BUILD CONTRACT OF THE

TAGBAROS DRAINAGE-VENTILATION TUNNEL (TDVT) PROJECT


Method Statement for Rock Anchor Bolt (MS-41)

DOC No. : CWE/TDVT/MS-41

REV. No. : 00

1
DESIGN AND BUILD CONTRACT OF THE
TAGBAROS DRAINAGE-VENTILATION TUNNEL (TDVT) PROJECT
Method Statement for Rock Anchor Bolt (MS-41)

RESPONSE TO REVIEW COMMENTS

No. Comments Contractors Response


1
2
3
4

Records of Revision:

Revision
Reason Revision(s) Revision Issued/Date
No.

Prepared/Reviewed/Approved:

Reviewed Reviewed Approved


Prepared by: Reviewed by:
by: by: by:
Item
Site Construction HSE QA/QC Project
Engineer Manager Manager Manager Manager

Signature/
Date Engr. Tristan
Adam Randy
Rey Wang Zhipeng Zeng Jianbo
Vectoriano Paulino
Baclaan

2
DESIGN AND BUILD CONTRACT OF THE
TAGBAROS DRAINAGE-VENTILATION TUNNEL (TDVT) PROJECT
Method Statement for Rock Anchor Bolt (MS-41)

Table of Contents
1.INTRODUCTION......................................................................................................................................4

2.METHODOLOGY.....................................................................................................................................4
2.1. MATERIALS.........................................................................................................................................................................4
2.2. EQUIPMENT.........................................................................................................................................................................4
2.3. PROCEDURE........................................................................................................................................................................5
2.3.1. Drilling of Anchor
Holes…………………………………………………………………………………………........5
2.3.2. Anchor
Installation……………………………………………………………………………………………………..5
2.3.3.

Grouting………………………………………………………………………………………………………………..6
2.3.4. Bearing Plates
Installation……………………………………………………………………………………………..6
2.3.5. Shotcrete
Application………………………………………………………………………………………………….7
3.MANPOWER..............................................................................................................................................7
4. PRELIMINARY GROUT MIX DESIGN……………………………………………………………...7
APPENDIX: A................................................................................................................................................9
INSPECTION AND TEST PLAN ………………………………………………………………………………………………………………10

APPENDIX: B..............................................................................................................................................13
RISK ASSESSMENT…………………………………………………………………………………………………………………………….14

3
DESIGN AND BUILD CONTRACT OF THE
TAGBAROS DRAINAGE-VENTILATION TUNNEL (TDVT) PROJECT
Method Statement for Rock Anchor Bolt (MS-41)

1. INTRODUCTION

This Method Statement outlines the detailed procedure and sequence of installing rock bolt for
slope protection. Significant aspects are highlighted throughout this document to ensure that the
job is carried out in accordance with internationally established codes and standards, and in a
safe and timely manner.

NUT
FACE
PLATE

SPACER

WASHER Rebar
GROUT

Figure 1.0 – 1 Illustration of the Anatomy of Rock Bolt

2. METHODOLOGY

2.1. Materials
 Rock Bolt (Fabricated from 20mmØ Grade 60 DRB threaded by 150mm at one end),
Coated with Clear Laminating Epoxy
 20mmØ Nuts and Washer, ASTM A563, Coated with Clear Laminating Epoxy
 150mmX150mm by 10mm Thick Carbon Steel Plate, as per ASTM A36, Coated with
Clear Laminating Epoxy
 20mmØ PVC Spacer Lantern, Fabricated
 25 MPA Sanded Grout at 7 days

2.2. Equipment
 298SYCT Screw Air Compressor
 Sunward SWDQ138 Drilling Rig
 Grouting Equipment

4
DESIGN AND BUILD CONTRACT OF THE
TAGBAROS DRAINAGE-VENTILATION TUNNEL (TDVT) PROJECT
Method Statement for Rock Anchor Bolt (MS-41)

2.3. Procedure

Site Drilling of Anchor


Preparation Anchor holes Installation

Bearing Plate
Grouting
Installation

Figure 2.3 – 1 Procedure work flow

2.3.1. Site Preparation


 A survey will be conducted to mark the points where the Rock bolt will be installed.
 A scaffolding will be installed by a certified scaffolder for the elevated area where the
rock bolt will be installed.

2.3.2. Drilling of Anchor Holes

 Drilling Rig will take position at the predetermined place and begin drilling
procedure.
 Drilling Hole will be 60 – 90mmØ, where the drill hole is approximately
perpendicular to the surface.
 Drilling will be a combination of Dry auger, Tricone-Rotary drill tools, Sunward
SWDQ138 Drilling Rig and Hammer.
 For the elevated area,
 During drilling, the hole will be continuously cleaned by air. When necessary, a short
Temporary Casing, will be installed on the Hole Collar to prevent collapse of the
topsoil
 Upon removal of the Bit and Rods, and the hole collapses, it will be grouted and re-
drilled

2.3.3. Anchor Installation

 Simultaneous with the Drilling Operation, the Anchor bolt will be installed with the
spacers, the Grouting pipes (ø20.0mm HDPE pipe), and Breathing pipes.
 The grouting pipe will be installed along the length of the anchor secured with
Industrial Tape for easy extraction.
 After drilling, the Anchor will be installed and the hole collar will be plugged with
Cement Mortar.

5
DESIGN AND BUILD CONTRACT OF THE
TAGBAROS DRAINAGE-VENTILATION TUNNEL (TDVT) PROJECT
Method Statement for Rock Anchor Bolt (MS-41)

Breathing
Pipe

Grouting
Pipe

Figure 2.3.2 – 2 Illustration of Rock Anchor with Grouting and Breathing Pipes.

2.3.4. Grouting

 After the rock anchor, along with the breather pipe and grouting pipe, is installed,
grouting will be carried out.
 The anchors will be grouted using a pressure of 2.0 bars. Grouting will stop once
grout flows out of the breather pipe.

Figure 2.3.3 – 1 Illustration of the anchor with grout, showing the extracted grouting and breather
pipes.

6
DESIGN AND BUILD CONTRACT OF THE
TAGBAROS DRAINAGE-VENTILATION TUNNEL (TDVT) PROJECT
Method Statement for Rock Anchor Bolt (MS-41)

2.3.5. Bearing Plates Installation

 Once the grout has fully cured, bearing plates will be attached to the anchor and
secured with washers and nuts.

Figure 2.3.5 – 1 Illustration for completed Rock Anchor

2.3.6. Shotcrete Application

 After the Rock Anchor are all installed, shotcrete will be applied as per Method
Statement for Shotcrete using Dry-Mix Method.

3. MANPOWER

Designation Number
Site Engineer 1
Site Supervisor 1
Safety Officer 1
QA/QC Engineer 1
Foreman 1
Instrument Man 1
Drill Rig Operator 2
Drilling Technicians 4
Grout Mixer operator 2
Air Compressor Tender 1
General Labor 6

7
DESIGN AND BUILD CONTRACT OF THE
TAGBAROS DRAINAGE-VENTILATION TUNNEL (TDVT) PROJECT
Method Statement for Rock Anchor Bolt (MS-41)

4. PRELIMINARY GROUT MIX DESIGN


 Mix Design, DPWH 513, ASTM C476
 Compressive Strength: 25.0 MPA @ 7 Days
 W/C Ratio: 0.50
 Design Batch Weight Per One Bag of Cement

Materials Unit Quantity

Holcim OPC Type 1 Bag 1.0

Sand M3 (loose volume) 0.06

Water Liters 20.0

Admixture Liters 0.20

8
DESIGN AND BUILD CONTRACT OF THE
TAGBAROS DRAINAGE-VENTILATION TUNNEL (TDVT) PROJECT
Method Statement for Rock Anchor Bolt (MS-41)

APPENDIX: A
INSPECTION TEST PLAN

9
Document No.: CWE/TDVT/MS-041
Inspection and Test Plan for Rock Revision No.: 00
Bolt Issue Date: 30 July 2025

Contractor: CHINA WATER AND ELECTRIC CO. Document Ref. No. CWE/TDVT/MS-41 Revision Number: 00
Project Number: CCN-2024-198-1120 Project Title: TAGBAROS DRAINAGE VENTILATION TUNNEL PROJECT
Document Title: ROCK BOLT
Inspection & Test Details Inspection & Test Points
Operation/ Inspection / Test Reference Verification / Quality
No. Acceptance Criteria Frequency Responsibility SC / CWE AMCI
Activity method Documents Records
TPL
A MATERIALS

ASTM A615M (Grade 60) Every 10,000


QA/QC H R Quality Test Report
Tensile Test ASTM A370 Yield strength ≥ 420 MPa kg or fraction
Engineer
Tensile Strength ≥ 550 MPA thereof

Rock Bolt (Ø 20mm Every 10,000


D<25mm ≥ 14 QA/QC
A1 Reinforcement Bar Elongation ASTM 370 kg or fraction H R Quality Test Report
Grade 60) D=/>25mm ≥ 12 Engineer
thereof

Every 10,000
QA/QC H R Quality Test Report
Bending ASTM E290 No cracks kg or fraction
Engineer
thereof

Ø 20mm Nuts and As per ASTM A563 QA/QC


A2 Quality Test ASTM A563 Every delivery H R Quality Test Report
washer Requirements Engineer

A3 QA/QC H R Quality Test Report


Carbon Steel Plate Quality Test A36 As per A36 Requirements Every delivery
Engineer

Every 2,000
Physical and Manufacturer’s Certification / bags or
A4 QA/QC - H R Quality Test Report
Portland Cement Chemical ASTM C150
ASTM C150 Requirement fraction Engineer
Properties
thereof

Sieve Analysis and ASTM C33 Grading Every 1,500


A5 Fine Sand ASTM C136 - H R Quality Test Report
Silt Content Requirement m3 or fraction QA/QC
10
Document No.: CWE/TDVT/MS-041
Inspection and Test Plan for Rock Revision No.: 00
Bolt Issue Date: 30 July 2025

Engineer
thereof

ASTM C33
QA/QC - H R Quality Test Report
Organic Impurities ASTM C40 Shall be free of amount of Every Source
Engineer
injurious organic impurities

Soundness ASTM C33 QA/QC - H R Quality Test Report


(Magnesium ASTM C88 Every Source
≤ 15% Engineer
Sulfate)

ASTM C1602 QA/QC


ASTM C144 ≤ 500 ppm – Chloride Every Source - H R Quality Test Report
Engineer

ASTM C1602 QA/QC


ASTM C144 Every Source - H R Quality Test Report
≤ 3,000 ppm – Sulfate Engineer
A6 Water Quality Test
ASTM C1602 QA/QC
ASTM C144 Every Source - H R Quality Test Report
≤ 600 Alkalies Engineer

ASTM C1602
≤ 50,000ppm –Total QA/QC - H R Quality Test Report
ASTM 1603 Every Source
Engineer
Solids

ASTM C494/ACI 301 QA/QC Quality Test Report


A7 Chemical Admixtures Quality Test ASTM C494 Every Delivery - H R
Requirements Engineer

B SITE CONTROL AND MONITORING ACTIVITIES

11
Document No.: CWE/TDVT/MS-041
Inspection and Test Plan for Rock Revision No.: 00
Bolt Issue Date: 30 July 2025

Drilling of Anchor Check hole Ø, Drilling Log, Daily


B1 Visual 90mm Ø, correct angle, depth Each hole Site Engineer H R
Hole depth, alignment Report

Confirm air- Visual, Cleaning


B2 QA/QC I I
Hole Cleaning flushed and clean Visual No debris, dry borehole Each hole Checklist
Engineer
borehole
Visual, Pull/push
Anchor Bolt test for fitting, Approved Pipes and spacers secured;
B3 QA/QC H I Visual, Installation Log
breather & grout Design Each hole
Assembly anchor centered Engineer
pipe placement, Drawing
spacers
Grout pressure and
flow, Pressure ACI 351.1R, 2.0 bars; grout flows from Grouting Log, Pressure
B4 QA/QC H I Records, Compressive
Grouting gauge reading, DPWH Item breather pipe, 25MPA @ 7 Each Anchor
Engineer Strength Results
Compressive 513 days
strength
Grout Curing Time Record ambient, Records properly filled; Curing
QA/QC Test Report
B5 and Temperature Borehole, Grout ASTM D4435 time per manufacturer’s specs Each anchor H R
Engineer
Monitoring temperature (1–7 days)
3% of total
number or a
Design strength of DPWH No rock bolt slippage or QA/QC
B6 Pull test minimum of 3 W W Pull-out Report
the rock bolt 522.4.4.1 unusual displacement observed Engineer
installed rock
bolts

12
DESIGN AND BUILD CONTRACT OF THE
TAGBAROS DRAINAGE-VENTILATION TUNNEL (TDVT) PROJECT
Method Statement for Rock Anchor Bolt (MS-41)

APPENDIX: B
RISK ASSESSMENT

13
HAZARD
CLASSIFICATIO IMPACT
RISK
` ACTIVITIES HAZARD IDENTIFICATION N MITIGATION AND CONTROL MEASURE ACTION BY:
LEVEL
H S E P E A
TAGBAROS DRAIANAGE-VENTILATION TUNNEL (TDVT) PROJECT
Elimination:
 Do not wear loose clothing while working with the drilling rig
RISK ASSESSMENT FORM
Engineering Control:
 Conduct equipment daily inspection.
Contractor China International Water & Electric Corporation  Ensure that the equipment is in good working condition
Job Description  Equipment Breakdown
Rock anchor bolt  Scaffolding With the height more thanLocation
6 meters must have Industrial Site
Equipment & Tools  Dust Inhalation structural analysis, signed and seal byStart
a structural
Date engineer. July 30, 2025
 Eye injury due to flying fragments  The scaffolding system will be erected under the supervision a
 Hand pinch during rod certified scaffolding erector.
Drilling
1 installation/extension X X X HIGH  The scaffolding system must be inspected and verify the integrity Site Supervisor
Operation
 Clothing caught on moving parts by a certified scaffolding erector.
 Manual Lift Administrative Control:
 Fire
 Prior to activity, the safety officer will conduct Toolbox meeting to
 Fall
discuss the hazard and control measure in working at heights.
 Ensure that all workers are aware of the proper manual handling
techniques
 A safety officer will be present at all times during the said activity.
PPE:
 A safety harness is a must have while working at a height more
than 6 feet.
Elimination:
 Collect all empty additives containers and packaging and placed
to a Hazmat bag for proper disposal
 Do not wear loose clothing while working with the one bagger
concrete mixer.
 Handling with Chemicals Engineering Control:
 Cement burn  Ensure that the equipment machine guard is in place
Mixing of  Inhalation of cement dust  Install Informative and Warning Signages on the site.
2 X X LOW Site Supervisor
Material  Manual Lift Administrative Control:
 Clothing Caught on Moving Parts  Discuss the MSDS during Tool Box Meeting
 Fire  Discuss during Tool Box Meeting the proper Manual Lift
Technique
PPE:
 Wear appropriate PPE’s, such as Dusk Mask, Safety Glasses,
Working Gloves, In addition to other PPE’s wear long sleeve
working clothes
Elimination:
 Collect all empty additives containers and packaging and placed
to a Hazmat Bag for proper disposal.
Administrative Control:
 Handling with Chemicals
 Discuss the MSDS during Tool Box Meeting
 Cement burn
3 Grouting X X X LOW  Discuss during tool box meeting the proper manual lifting Site Supervisor
 Inhalation of cement dust
technique.
 Manual lift
PPE:
 Wear Appropraite PPE’s, suchs as Dust Mask, Safety Glasses,
Working Gloves, In addition to other PPE’s and a long sleeve
Working Clothes
Engineering Control:
 Ensure that all Pneumatic Equipment and Tools are equipped with
Whip Check.
 Always release the pressure when the equipment or tools are not
in use.
Use of  Bodily Injury due to Hose Whip
4 X X LOW Administrative Control: Site Supervisor
Pneumatic Tools  Eye Injury due to Flying Debris
 Train on safe handling and housekeeping.
 Never use compressed air to clean your hand or the surrounding
area.
PPE:
 Use proper PPE, such as Working Gloves and Safety Goggles

14 Engineering Control:
 Inspect hoses connection for deficiencies
 Install Whip Check when Applicable
Testing of  Hand Pinch Equipment installation
5 X X LOW PPE: Site Supervisor
Anchor  Whip lash Injury
 Wear appropriate PPE’s, such as Dust Mask, Safety Glasses,
Working Gloves, in addition to other PPE’s and a Long Sleeve
Working Clothes
TAGBAROS DRAIANAGE-VENTILATION TUNNEL (TDVT) PROJECT

RISK ASSESSMENT FORM

H: Health, S: Safety, E: Environmental | P: Person, E: Environment, A: Assests


Low Risk – Site Supervisor, Medium Risk – Construction Manager, High Risk – Project Manager
Site Supervisor Construction Manager Project Manager
Tristan Rey Baclaan Wang Zhipeng Zeng Jianbo

15