Software Process Models: Dr. Mallikharjuna Rao K 1

The document discusses various software process models, including the waterfall model, incremental models, and evolutionary models such as the spiral model. It outlines the structured activities involved in software development, emphasizing the importance of requirements gathering, design, implementation, and maintenance. Each model has its advantages and disadvantages, with the waterfall model being suitable for well-understood requirements, while incremental and evolutionary models allow for more flexibility and adaptation to changing requirements.

Uploaded by

mdsingh20039026
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views34 pages

Software Process Models: Dr. Mallikharjuna Rao K 1

The document discusses various software process models, including the waterfall model, incremental models, and evolutionary models such as the spiral model. It outlines the structured activities involved in software development, emphasizing the importance of requirements gathering, design, implementation, and maintenance. Each model has its advantages and disadvantages, with the waterfall model being suitable for well-understood requirements, while incremental and evolutionary models allow for more flexibility and adaptation to changing requirements.

Uploaded by

mdsingh20039026
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 34

SOFTWARE PROCESS MODELS

Dr. Mallikharjuna Rao K 1


Syllabus

Software Process models:


• The waterfall model
• Incremental process models
• Evolutionary process models
The software process
• A structured set of activities required to
develop a software system
– Specification;
– Design;
– Validation;
– Evolution.
• A software process model is an abstract
representation of a process. It presents a
description of a process from some particular
perspective.

Dr. Mallikharjuna Rao K 3


Generic software process models
• The waterfall model
– Separate and distinct phases of specification and development.
• Evolutionary development
– Specification, development and validation are interleaved.
• Component-based software engineering
– The system is assembled from existing components.
• Formal systems development
– A mathematical system model is formally transformed to
an implementation
• Reuse-based development
– The system is assembled from existing components
Dr. Mallikharjuna Rao K 4
Waterfall model
• It is also called classical life cycle model.
• This situation is sometimes encountered when well
defined adaptations or enhancements to an exciting
system must be made.
• When this model is applied:-
– Real projects rarely follow the sequential flow that the
model proposes.
– Indirectly, the linear model can accommodate
iteration.
– Often difficult for the customer to state all
requirements explicitly.

Dr. Mallikharjuna Rao K 5


Waterfall model (Contd….)

• Requirements analysis and definition


• System and software design
• Implementation and unit testing
• Integration and system testing
• Operation and maintenance

Dr. Mallikharjuna Rao K 6


Waterfall Model (contd….)
Communication
Project Initiation
Requirements –
Gathering

Planning
Estimating
Scheduling
Tracking

Modeling
Analysis
Design

Construction
Code
Test

Deployment
Delivery
Support
Feedback
Dr. Mallikharjuna Rao K 7
Communication: Because s/w is a largest part of the system, work begins by
establishing requirements for all system elements and then allocating some subset of these
requirements to s/w. This system view is essential when s/w must interface with other
elements such as hardware, people, and databases.

Analysis: The requirements gathering process is intensified and focused specially on s/w.
To understand the nature of the programs to be built. The s/w engineer must understand the
information domain for the s/w as well as required function, performance, and interfacing.
Requirements both s/w and h/w are documented and reviewed with the customer.

Modeling: Design is concerned with identifying s/w components, h/w components and
relationship between them. And specifying architecture….etc.
Design consists of
1. Architectural design
2. Detailed Design.

Architectural design involves identifying s/w components, decomposing and decoupling


them into processing modules, conceptual data structures, and specifying the relationship
between them.

Dr. Mallikharjuna Rao K 8


Detail design is concerned with the details of “how-to”:
● How to package the processing modules?
● How to implement the processing algorithms, data structures, and their
connections among modules and data structures

Construction:
Code: The design must be translated into a machine readable form. If
design is performed in a detailed manner, coding can be accomplished
mechanistically.
Test: Once code has been generated, program testing begins. The testing
process focuses on the logical internals of the s/w. And it ensuring that all
statements have been tested on the functional externals.
Maintenance: S/w will undoubtedly undergo change after it is released to
the customer. Change will occur because errors have been encountered,
because the s/w must be adapted to accommodated changes in its external
environment.

Dr. Mallikharjuna Rao K 9


Advantages:

● It enforces discipline.
● Useful in project planning
● Shows phase containment errors.

Disadvantages:

● Inflexible partitioning of the project into distinct stages


● This makes it difficult to respond to changing customer
requirements
● Therefore, this model is only appropriate when the
requirements are well-understood

Dr. Mallikharjuna Rao K 10


Disadvantages (contd…)
• Sequential approach to software development
• Oldest paradigm for software engineering.
• Inflexible partitioning of the project into distinct stages makes it
difficult to respond to changing customer requirements.
• One phase has to be complete before moving onto the next
phase.
• It is only appropriate when the requirements are well-understood
and changes will be fairly limited during the design process.
• Few business systems have stable requirements.
• mostly used for large systems engineering projects where a
system is developed at several sites.
• Difficulty accommodating the natural uncertainty that exists at
the begging of many projects.
• Customers' must have patience.
• If undetected until the working program is reviewed, a major
blunder can be disastrous.

Dr. Mallikharjuna Rao K 11


Incremental Process Models

1. The Incremental Model

2. The RAD Model

Dr. Mallikharjuna Rao K 12


Process iteration
• System requirements ALWAYS evolve in the
course of a project so process iteration where
earlier stages are reworked is always part of the
process for large systems.

• Iteration can be applied to any of the generic


process models.

• Two (related) approaches


– Incremental delivery;
– Spiral development.

Dr. Mallikharjuna Rao K 13


Incremental delivery
• This model combines elements of the waterfall model applied in an
iterative fashion.
• This model applies linear sequences in a spread out fashion as calendar
time progresses.
• Example:-
– Word processing software developed using the incremental paradigm might
deliver basic file management, editing & document production functions in the
1st increment;
– more sophisticated editing & document production capabilities in the 2nd
increment;
– spelling & grammar checking in the 3rd increment &
– advanced page layout capability in the 4th increment
• Rather than deliver the system as a single delivery, the development and
delivery is broken down into increments with each increment delivering
part of the required functionality.
• User requirements are prioritised and the highest priority requirements
are included in early increments.
• Once the development of an increment is started, the requirements are
frozen though requirements for later increments can continue to evolve.

Dr. Mallikharjuna Rao K 14


MS-WORD 97vs 2016

Dr. Mallikharjuna Rao K 15


Incremental development

Define outline Assign requirements Design system


requirements to increments architectur e

Develop system Valida te Integ rate Validate


increment increment increment system
Final
system
S ystem incomplete

Dr. Mallikharjuna Rao K 16


Incremental Model

increment # n
Co m m u n i c a t i o n
Pl a nni ng
M ode li ng
analy sis Co n s t r u c t i o n
design
code De p l o y m e n t
t est d e l i v e ry
fe e dba c k

delivery of
nt h increment
increment # 2

Co m m u n i c a t i o n
Pl a nni ng
M ode l ing
analy sis Co n s t ru c t i o n
design code De p l o y m e n t
t est d e l i v e ry
fe e dba c k
delivery of
increment # 1 2nd increment

Co m m u n i c a t i o n
Pla nni ng
M ode li ng
analysis Co n s t r u c t i o n
design code De p l o y m e n t
t est de l i v e ry delivery of
fe e dba ck
1st increment

project calendar time


Dr. Mallikharjuna Rao K 17
Incremental Model (Contd….)
• The 1st increment is often a core product.
• The basic requirements are addressed but many supplementary
features (some known/unknown) remain undelivered.
• The core product is used by the customer.
• As a result of use/ evaluation, a plan is developed for the next
increments.
• This process is repeated until the complete product is produced
• This model is particularly useful when staffing is unavailable for
complete implementation by the business deadline has been
established for the project.
• Increments can be planned to manage technical risks.
Dr. Mallikharjuna Rao K 18
Advantages

• Customer value can be delivered with each increment so


system functionality is available earlier.
• Early increments act as a prototype to help draw requirements
for later increments.
• Lower risk of overall project failure.
• The highest priority system services tend to receive the most
testing.

Dr. Mallikharjuna Rao K 19


The RAD Model
(Rapid Application Development)

• It is an incremental software process model that emphasizes a


short development cycle.
• It is a “high speed” adaptation of the water fall model in which
rapid development is achieved by using a component based
construction.
• If requirements are well understood & project scope is
meaningless constrained, it enables a development team to
create a “fully functional system” within a very short time
period (e.g. 60 to 90 days).

Dr. Mallikharjuna Rao K 20


The RAD Model (contd….)
Team # n
M o d e lin g
business m odeling
dat a m odeling
process m odeling

C o n st r u ct io n
com ponent reuse
Team # 2 aut om at ic code
Co m m u n icat io n generation
t esting
Mo d el i ng
busi ness m odel i ng
dat a m ode li ng
process m o del in g

Plan n in g
Co nst r uct i o n De p lo ym e n t
Team # 1 com po nent reuse int egrat ion
au t om at ic code
deliv ery
gene rat i on
Mo d e lin g t est i ng f eedback
business modeling
dat a modeling
process modeling

Co n st r u ct io n
component reuse
aut omat ic code
generat ion
t est ing

6 0 - 9 0 d ays

Dr. Mallikharjuna Rao K 21


The RAD Model (contd….)

Business
Modeling

Data
Modeling

Process
Modeling

Application
Generation

Testing & Release


Turnover

60-90 days
The RAD Model (contd….)
• Business Modeling:
• It describes the information flow among business functions are
modeled. Like
– What information drives the business process?
– What information is generated?
– Who generates it?
– Where does the information go?
– Who process it?
• Data Modeling:
• The information flow defined as a part of the business modeling
phase is refined into a set of data objects are needed to support
the business. The characteristics are of each object is identified
and the relationships between these objects defined.
Dr. Mallikharjuna Rao K 23
● Process Modeling:
The data objects defined in the data modeling phase are transformed to
achieve information flow necessary to implement a business function.
Processing descriptions are created for adding, deleting, or retrieving a data
object.
● Application Generation:
- RAD forces the use of fourth generation techniques, rather than
creating a s/w using conventional third generation programming languages.
- The RAD process works to reuse existing program components to create
reusable components.
- In all cases it uses automated tools to construct the s/w.
● Testing & Turnover:
- Since the RAD process emphasizes reuse many of the program
components have already been tested. This reduces overall testing time.
- However, new components must be tested and all interfaces must be
fully exercised.
Dr. Mallikharjuna Rao K 24
Disadvantages
• For large, It requires sufficient human resources to create a right
number of RAD teams.
• It fails, if customers & developers are not committed for rapid-fire-
activities.
• It may problematic if not properly modularized.
• It may not work, if high performance is achieved through tuning
interfaces to system components.
• It may not appropriate in case of more technical risks

Dr. Mallikharjuna Rao K 25


Evolutionary Models
Types:
• Prototyping Model
• Spiral Model
• Concurrent Development Model

Dr. Mallikharjuna Rao K 26


Spiral development
• It was originally proposed by Boehm.
• It has been developed to include the best features of both the
sequential life model and prototyping models. These two models are
missing risk analysis. The risk analysis is included in it. It provides
the potential for rapid development of incremental versions of the
software.
• Using the spiral model, software is developed in a series of
incremental releases. During early iterations, the incremental
release might be a paper model or prototype. During later iterations,
increasingly more complete versions of the engineered system are
produced.
• Process is represented as a spiral rather than as a sequence of
activities with backtracking.
• Each loop in the spiral represents a phase in the process.
• No fixed phases such as specification or design - loops in the spiral
are chosen depending on what is required.
• Risks are explicitly assessed and resolved throughout the process.
Dr. Mallikharjuna Rao K 27
Spiral model (Meta Model)
• A spiral model is divided into a number of framework activities, also
called task regions. Typically, there are between three and six task
regions. Figure shows a spiral model that contains 6 task regions:
• Customer communication— tasks required to establish effective
communication between developer and customer.
• Planning— tasks required to define resources, timelines, and other
project related information.
• Risk analysis— tasks required to assess both technical and
management risks.
• Engineering— tasks required to build one or more representations of
the application.
• Construction and release— tasks required to construct, test, install,
and provide user support (e.g., documentation and training).
• Customer evaluation— tasks required to obtain customer feedback
based on evaluation of the software representations created during the
engineering stage and implemented during the installation stage.

Dr. Mallikharjuna Rao K 28


Spiral model (contd….)
• Objective setting
– Specific objectives for the phase are identified.
• Risk assessment and reduction
– Risks are assessed and activities put in place to
reduce the key risks.
• Development and validation
– A development model for the system is chosen
which can be any of the generic models.
• Planning
– The project is reviewed and the next phase of the
spiral is planned.

Dr. Mallikharjuna Rao K 29


Spiral Model (contd….)
planning
estimation
scheduling
risk analysis

communication

modeling
analysis
design
start

deployment
construction
delivery code
feedback test
Dr. Mallikharjuna Rao K 30
Spiral model Concept
development
projects
New product
development projects

Product
enhancement
projects
Product
maintenance
projects

Dr. Mallikharjuna Rao K 31


Spiral Model (contd….)
Deter mine objecti ves,
Evaluate alterna tives,
Alterna tives and
identify, resolv e risks
constr aints Risk
anal ysis

Risk
anal ysis

Risk
Oper a-
anal ysis
Prototype 3 tional
Prototype 2 protoype
Risk
R EVIEW anal ysis Proto-
type 1
Requir ements plan Simulations , models , benchmar ks
Life-cycle plan Concept of
Oper ation S/W
er quirements Product
design Detailed
Requir ement design
Development
plan v alidation Code
Unit test
Integration Design
V&V Integ ration
and test plan
Plan ne xt phase test
Acceptance
Service test Develop , v erify
ne xt-level product

Dr. Mallikharjuna Rao K 32


Advantages:
• Easy and quick to identify customer requirements
• Customers can validate the prototype at the earlier
stage and provide their inputs and feedback
• It is a realistic approach to the development of large
scale systems and s/w.
• Good to deal with the following cases:
– Customer can not provide the detailed
requirements
– Very complicated system-user interactions
– Use new technologies, hardware and algorithms
– Develop new domain application systems

Dr. Mallikharjuna Rao K 33


Disadvantages:
• It is not a solution.
• Difficult to convince customers.
• Demands considerable risk assessment
expertise and depends on this expertise for
success.
• If a major risk is not uncovered and
managed, problems will undoubtedly occur.
• Finally the model has not been used as
widely used as the waterfall , prototyping
models.
Dr. Mallikharjuna Rao K 34