The AIP Workshop Q2 Report details the servicing and repairs of various tractors and equipment, noting that all tractors are functional except for one awaiting parts. Routine maintenance on generators and other machinery is ongoing, with several repairs completed and some items pending procurement. Additionally, land preparation for commercial potatoes and wheat planting has been successfully carried out at multiple locations.

Uploaded by

Nyasha calton
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views2 pages

Aip Workshop q2 Report 2025

The AIP Workshop Q2 Report details the servicing and repairs of various tractors and equipment, noting that all tractors are functional except for one awaiting parts. Routine maintenance on generators and other machinery is ongoing, with several repairs completed and some items pending procurement. Additionally, land preparation for commercial potatoes and wheat planting has been successfully carried out at multiple locations.

Uploaded by

Nyasha calton
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

AIP WORKSHOP Q2 REPORT

 TRACTORS
 MF6712 Electrical control box was repaired by Farmec.
 Servicing of Belarus 820 and Tafe 1015 tractor was done except for MF6712 tractor
which is not yet due for service.
 All tractors are functional except for Belarus 850 still waiting for the procurement of
the requested Clutch assembly components.

 OTHER EQUIPMENTS
 Servicing of Hino truck was done. Repairing of front leaf springs was done.
 All generator needs service kits; we are performing routine check-ups to avoid
breakdowns. (Serviced Mucheke 30, Mucheke 50 and land 60 generator currently
waiting for the procurement of Mucheke 60 and Mucheke 20 generator service kits.
 Installation of lower control arms and ball joints were done for Toyota lite-ace.
 Potatoes lifter harvester nuts were purchased was done
 Repaired tobacco baler machine damaged leadscrew nut was done.
 Repairing of barn electrical motor fan and duct housing was done for bay 7.
 Packing of asbestos gland at Muchekeranwa 100hp pump was done and no leakages.
 Replaced F208-24 bearings and damaged sieves on grinding mill.
 The 18 dish Caesar disc harrow need a new disc mounting shaft, oil bath components
and a new leaf spring for it to be functional.
 The Four Dish William Bain plough needs new mushrooms hubs; and sets of bearing
for it to be functional. A set of plough disc was procured, waiting for the remaining
items.
 Toyota lite-ace small truck is functional.
 Dismantling of Mucheke dam centrifugal pump damaged components was done
currently waiting for the procurement of the items needed.
 The received Yamaha 125XTZ bike 01 is functional.
 Received a 600litres Bain boom sprayer and it's functional.
 Milling and fetching of firewood for DAC’s was being carried out without fail
 Repairing of Mucheke 20 generator work is in progress need a new high pressure
pump to obtain functionality.
 Currently they are need for procurement of batteries for Pedistock generator, Toyota
lite –ace and Tafe 1015 tractor.
 Installation of AIV Laboratory door was done.
 Repairing of bar door lock for AIP lecture hall was done.
 Performing of daily tractor operations as per section is being done without fail.

 Land preparation
 land preparation for commercial potatoes was done, discing and ridging at Mucheke
50.
 Land preparation and wheat planting at Mucheke 20 wheat trial was carried out.
 Land preparation for wheat at land 60 was done, planted 30ha of wheat.