0% found this document useful (0 votes)
15 views1 page

Gazebo Outside The Lake

The document contains detailed construction drawings and specifications, emphasizing that all dimensions are in millimeters and must be verified on-site. It instructs that any discrepancies should be reported to the designer before final decisions are made, and the drawing should be read in conjunction with relevant service drawings. Additionally, it highlights that the drawing is for reference only and should not be scaled.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views1 page

Gazebo Outside The Lake

The document contains detailed construction drawings and specifications, emphasizing that all dimensions are in millimeters and must be verified on-site. It instructs that any discrepancies should be reported to the designer before final decisions are made, and the drawing should be read in conjunction with relevant service drawings. Additionally, it highlights that the drawing is for reference only and should not be scaled.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

NOTE :

1. ALL DIMENSIONS ARE IN MM.


2. ANY BRICK WORK ARE MENTIONED IN
WORKING AS BRICK.
3. ALL DIMENSIONS TO BE CHECKED AT SITE.
4. ANY DISCREPANCY FOUND MUST BE
2180 3800 2180 BROUGHT TO THE NOTICE OF DESIGNER
BEFORE ANY FINAL DECISION.
5. THIS DRAWING MUST BE READ ALONG
WITH RELEVANT SERVICE DRAWINGS.
4000 6. THE DRAWING IS TO BE READ ONLY AND
ROOF TOP LVL +52.266 NOT TO BE SCALED.
7. WATER LEVEL +46.466

800

00

40
ROOF MID LVL +51.466

40

00
1100
ROOF BOTTOM LVL +50.366

1400
HAND RAIL LVL +48.966 KEY PLAN

00
40

40
00
47.739

47.355

1000
47.414
47.528
47.912

47.812

47.173 47.259
47.154
47.508

47.303
47.290

47.690 46.362
45.514 47.215
45.679
47.172
45.231 47.274
44.850
AD 45.489 47.257 47.634

NALA

NALA
46.200
47.587 RO 44.701 46.286 47.524 47.768

DE 45.902 44.388 44.867


45.791
46.459

WI 47.448
45.075
45.618 45.912 45.803 47.798

ET
FE
AT
44.952
44.998 47.776
44.521
21
GH
47.561 46.211
44.567 45.898 47.895
47.567 44.407 44.655

45.039 45.218

44.938
47.371 47.300 44.771
47.607
45.612
47.629 44.539
45.057
46.140
47.407
47.247 44.713
47.241
47.591
47.496 45.540
44.786
47.346
47.564 47.843
47.324

47.046 46.142
48.090

47.589 47.186

TBM2A
47.214 46.223
47.231 45.611
47.225
47.149 44.988
48.130

CULVERT
44.441

NALA

NALA
47.241 48.016

NALA

NALA
47.305

45.257 46.529 47.939


45.540

47.180

47.519
46.337
48.107

44.925 45.476
44.511

PATHWAY LVL +47.966


47.274

45.659
45.699

45.036 44.777

47.428 48.111

47.583

48.204
48.484

47.580
44.406
44.931
45.620 45.468
44.753
45.220

4000 47.938

47.935
46.050

45.724 45.255
44.807

45.062
45.660
46.281
47.917
48.232

47.770
46.247 44.710
48.418

44.601
45.574
45.085

GHAT
48.482

48.243 48.322

46.002

200
48.393

FRONT ELEVATION PLAN 48.264

47.619 46.247 45.640

SB
44.649 44.592
45.045

48.376

48.328

48.276
44.640

45.046
44.896
45.583 45.512
45.404 44.699

TEMPLE
45.840
45.971
44.867
44.293

47.755 46.487

TEMPLE
TEMPLE
TEMPLE

WOODEN
48.249
46.908

48.382 46.483 48.377


45.696 48.105
44.919

44.605

48.257

48.523

FINISH FLOOR TOP LINE


48.177

48.528 45.435
45.783
48.604

HARAHI LAKE

30 FEET WIDE ROAD


44.543

48.665 45.675 45.252 44.752

SB
46.463
48.415

47.853
46.011
46.425

48.268 46.460

48.620 48.507

BOTTOM LEVELS
D
48.198
SIGNBOAR
45.186

45.020

48.174 46.326
47.571

48.505

45.368 44.963
45.679

NALA
NALA
12 FEET WIDE ROAD
45.118
44.373 45.641

GHAT
46.878

48.349

44.419
46.048 47.224
44.533

48.141

TBM-3
47.791
46.331

48.370

45.910 47.438
48.363

44.456 44.795
48.35848.200 46.321

45.24544.919

45.678

48.121

48.489

RAILWAY-STATION
47.936

N
ION-DRAI
NSTRUCT
44.531 45.40145.958
47.845

under-CO
46.446

48.465

47.789

44.795

45.407
46.105
45.669
47.127

47.608

44.961 46.04946.738

TANK
48.378

47.587

48.495

SHOP AND BUILDING


44.234
44.218
44.496 45.995 47.351

CULVERT

GHAT
45.174
45.814 45.377

47.376

47.367

47.475 48.170
48.142
47.444
46.350

45.48045.141
45.860

46.439

44.524 45.622
44.280

47.346 45.144

45.546 44.806

0.000 45.343 45.952


45.541
45.792
45.294
47.452 47.929

44.446
45.823

44.876 46.624
45.863

44.529 44.728 46.711


47.528
47.394 45.584
44.430
45.901

TEMPLE
46.407

TEMPLE
44.922
46.478
44.583 46.409
TEMPL 45.539

WALL
47.447
48.175
E 44.763
46.932

WALL
45.601

WALL
44.479 44.399 44.609

44.576 44.698

SHOP
44.865 44.415
45.042 44.424
45.535 44.948 45.205

49.482 AND GHAT


46.495
44.955
45.525 44.644 44.823

BUILD 47.128

45.644
47.348
ING 47.636 47.204 46.247
47.282
46.305
GHAT
47.172
46.708 0.000

NALA
47.262
46.976
46.295
46.283
48.086

47.111

SHOP AND BUILDING


47.809
48.042
47.197 46.472
48.665 48.000
47.619 47.999

48.099
47.205 47.698
47.696

47.565
47.547
10 FEET WIDE ROAD 47.715
47.606
47.717 47.664
47.481

47.354 47.558
47.292

47.991

47.887

47.907

REVISIONS
2180 3800 2180
RV. DESCRIPTION DATE

ROOF TOP LVL +52.266 R0 CRD FOR APPROVAL 25-08-2025


DRAWING STAGE

800
ROOF MID LVL +51.466
CRD
CONSTRUCTION REFRANCE DRAWING

1100
ROOF BOTTOM LVL +50.366
BIHAR URBAN INFRASTRUCTURE
DEVELOPMENT CORPORATION LIMITED

1400 NAME OF WORK:-


BEUTIFICATION & REJUVATION OF GANGASAGAR,
DIGHI & HARAHI LAKE, DARBHANGA, BIHAR.
HAND RAIL LVL +48.966
CONTRACTOR
1000

M/s BHARAT INFRACON - HAJI MOHAMMAD JV

PATHWAY LVL +47.966 DRAWING TITLE :-

DETAILS OF GAZEBO OUTSIDE THE HARAHI LAKE.


200

SIDE ELEVATION
WOODEN SCALE - NOT TO SCALE BUIDCO/BIPL-HMJV/HR/GZB/13
FINISH FLOOR

SHEET- A1 NORTH
N
DATE - 25-08-2025