Bill CC01
Bill CC01
2025
sMivada P`amaaNa Pa~ saM 0 J- 3.11. CONTRACT CERTIFICATE No.
BR No…………………... Dtd. ………………. zokdo ar ka naama. Name of Contractor: M/s. P & Kscientific Products, Plot No. 547/548, Kursi Road, Behind
Rumkani cold storage, Lucknow- 226026
inamaa-Na kaya- ka naama. Name of Work: Comprehensive annual maintainence contract of plant, machinaries & equipment of mechanized laundry at DBRG for a
period of 2 years.
inamaa-Na kaya- ka p`aiQakar. Authority for work: DRM (M)/TSK
inamaa-Na ko kaya- AarmBa kI tarI#a. Work started: 27.04.2025 inamaaNa kaya- pura haonao kI tarI#a . Work completed: In progress.
saM0 . CA No. NFR-TSK0MECH(AMC)/4/2025 dated : 29.05.2025 Date of measurement : 27.07.2025 Period: 27.04.2025 to 26.07.2025
Quantity as per CA
measurement book
previously measured measurement
Validity of CA:
Accepted Rate
Items of work
J-kaJ- .Unit
kaya- kI mado .
dr .
Since last certificate
Up to date
Total upto date
certificate
Avtna
1 2 3 4 5 6 7 8 9 10 11 12 13
$ 0 . Rs. $ 0 . Rs. $ 0 . Rs. $ 0 . Rs. $ 0 . Rs.
Schedule 01: Cost of Manpower and consumable Items for 02 years
1 Skilled Manpower for maintenance work Month 24 34,000.00 3.00 3.00 1,02,000.00 1,02,000.00
2 De-scaling of 2 nos. of Boilers year 2 10,500.00 1.00 1.00 10,500.00 10,500.00
3 Grease Kg 72 360.00 9.00 9.00 3,240.00 3,240.00
4 Mobile Oil Litre 120 430.00 15.00 15.00 6,450.00 6,450.00
5 Gear Oil Litre 72 239.00 9.00 9.00 2,151.00 2,151.00
Schedule 02: Cost of spare parts for 2 Nos. of Stefab washer extractor for 02 years,
capacity - 120 Kg, Model-AXS-120
1 Hose pipe for drain-straight nos 2 1,673.24 0.00 0.00
2 Hose pipe for drain-L shape 3'' nos 2 1,673.24 0.00 0.00
3 3-way water solenoid valve nos 2 14,366.50 0.00 0.00
4 Water solenoid valve 1.5'' nos 2 19,335.48 0.00 0.00
5 Coil of water solenoid valve 1.5'' nos 2 2,266.78 0.00 0.00
6 Diaphragm of water solenoid valve nos 2 7,470.58 0.00 0.00
7 Steam solenoid valve 1.5'' nos 2 14,897.50 0.00 0.00
8 Coil of steam solenoid valve 0.5'' nos 2 3,648.56 0.00 0.00
9 Vibration sensor nos 2 2,437.88 0.00 0.00
10 Door Gasket nos 2 3,285.12 0.00 0.00
11 Oil seal- Viton nos 2 6,047.50 1.00 1.00 6,047.50 6,047.50
12 Oil seal- Nitrile nos 2 1,248.44 1.00 1.00 1,248.44 1,248.44
13 Oil seal- Nitrile nos 2 1,143.42 1.00 1.00 1,143.42 1,143.42
14 Rear Bearing nos 2 1,24,785.00 1.00 1.00 1,24,785.00 1,24,785.00
15 Front Bearing nos 2 71,002.96 1.00 1.00 71,002.96 71,002.96
16 Drain Valve nos 2 36,302.70 0.00 0.00
17 Coil with core of drain valve nos 2 8,042.88 0.00 0.00
18 V belt Size: B 124 nos 4 2,126.36 0.00 0.00
19 Door Handle with latch-SS nos 2 3,285.12 0.00 0.00
20 High Pressure steam hose pipe-8 ft nos 2 7,952.02 0.00 0.00
21 Hose Clamps nos 2 350.46 0.00 0.00
22 Electric motor rewinding nos 2 21,765.10 0.00 0.00
23 Bearing for electric motor nos 2 5,069.28 0.00 0.00
24 Variable frequency drive nos 1 1,03,899.00 0.00 0.00
25 Limit Switch nos 2 708.00 0.00 0.00
26 Door lock-Electromagnetic nos 2 2,111.02 0.00 0.00
27 Cooling Fan nos 2 7,434.00 0.00 0.00
Total (C/F) - 3,28,568.32 3,28,568.32
Whenever there is an entry in column 10 on the basis of actual measurement the whole of the amount previously paid without detailed measurement should be
adjusted by a minus entry in column 2 equivalent to the amount shown in column 1. So that the total up to date in column 3. may becoms NIL.
java kalama 10 mao p`a@klaona ko p`%yaok ]pSaIYa- saMbaMQaIM dao yaa ]sasao AiQak p`ivaiYTyaaM hao tao ]ppQaanaaoM Wara laoKa rK jaanaovaalao inamaa-Na kayaao- ko maamalao maoM ]naka kula jaaoD, kr donaa caaihyao AaOr inamaa-Na kayaao- ko rijaYTr maoM dja- krnao ko ilayao jaaoD, kI
kalama 11 maoM dja- kr donaa caaihyao .
When there are two or more entries in column 10 relating to each sub-head of estimate they should in the case of works the accounts of which are kept by sub-
heads be totalled and the total recorded to column 11 for posting the Register of works.
Quantity as per CA
measurement book
previously measured measurement
Validity of CA:
Accepted Rate
Items of work
J-kaJ- .Unit
kaya- kI mado .
dr .
Since last certificate
Up to date
Total upto date
certificate
Avtna
1 2 3 4 5 6 7 8 9 10 11 12 13
$ 0 . Rs. $ 0 . Rs. $ 0 . Rs. $ 0 . Rs. $ 0 . Rs.
B/F- 3,28,568.32 3,28,568.32
28 ST-9 computer nos 2 97,019.60 0.00 0.00
29 Temperature sensor probe nos 2 6,169.04 0.00 0.00
30 Buzzer nos 2 2,289.20 0.00 0.00
31 Emergency stop push button nos 2 802.40 0.00 0.00
32 NC/2 for emergency stop nos 2 333.94 0.00 0.00
33 Relay with base nos 2 1,262.60 0.00 0.00
34 Transformer nos 2 1,827.82 0.00 0.00
35 Rectifier unit nos 2 1,099.76 0.00 0.00
36 White teflon wire nos 2 187.62 0.00 0.00
37 PU pipe nos 2 201.78 0.00 0.00
38 Fuse base set nos 2 992.38 0.00 0.00
39 Fuse Link nos 2 174.64 0.00 0.00
Schedule 03: Cost of spare parts for 1 No. flat work ironer for 2 years (Make-
Stefab), Model-FS 83- 330
1 Main Roller bearing Gear side nos 1 6,029.80 0.00 0.00
2 Main Roller Bearing Blower Side nos 1 18,195.60 0.00 0.00
3 Bearing for Conveyor roller nos 1 2,607.80 0.00 0.00
4 Chain nos 1 3,551.80 0.00 0.00
5 Sprocket nos 1 1,321.60 0.00 0.00
6 Pinion Gear- Big nos 1 13,475.60 0.00 0.00
7 Pinion Gear- Small nos 1 2,489.80 0.00 0.00
8 Air Solenoid Valve nos 1 4,967.80 0.00 0.00
9 Coil for Air Solenoid Valve nos 1 2,171.20 0.00 0.00
10 Silencer for Air Solenoid nos 1 837.80 0.00 0.00
11 Air filter, Regulator, and Lubricator nos 1 2,619.60 0.00 0.00
12 Pressure Gauge meter for Air Regulator nos 1 1,073.80 0.00 0.00
13 Pressure Gauge 2.5'' nos 1 1,201.24 0.00 0.00
14 Spring Padding nos 2 2,89,100.00 0.00 0.00
15 Ployester padding nos 1 85,207.80 0.00 0.00
16 Conveyor Belt nos 8 1,793.60 1.00 1.00 1,793.60 1,793.60
17 Steam hose pipe 48'' nos 1 3,009.00 1.00 1.00 3,009.00 3,009.00
18 Steam hose pipe 30'' nos 1 3,197.80 1.00 1.00 3,197.80 3,197.80
Total (C/F) - 3,36,568.72 3,36,568.72
Whenever there is an entry in column 10 on the basis of actual measurement the whole of the amount previously paid without detailed measurement should be
adjusted by a minus entry in column 2 equivalent to the amount shown in column 1. So that the total up to date in column 3. may becoms NIL.
java kalama 10 mao p`a@klaona ko p`%yaok ]pSaIYa- saMbaMQaIM dao yaa ]sasao AiQak p`ivaiYTyaaM hao tao ]ppQaanaaoM Wara laoKa rK jaanaovaalao inamaa-Na kayaao- ko maamalao maoM ]naka kula jaaoD, kr donaa caaihyao AaOr inamaa-Na kayaao- ko rijaYTr maoM dja- krnao ko ilayao jaaoD, kI
kalama 11 maoM dja- kr donaa caaihyao .
When there are two or more entries in column 10 relating to each sub-head of estimate they should in the case of works the accounts of which are kept by sub-
heads be totalled and the total recorded to column 11 for posting the Register of works.
Quantity as per CA
measurement book
previously measured measurement
Validity of CA:
Accepted Rate
Items of work
J-kaJ- .Unit
kaya- kI mado .
dr .
Since last certificate
Up to date
Total upto date
certificate
Avtna
1 2 3 4 5 6 7 8 9 10 11 12 13
$ 0 . Rs. $ 0 . Rs. $ 0 . Rs. $ 0 . Rs. $ 0 . Rs.
B/F- 3,36,568.72 3,36,568.72
19 Conveyor roller rubberised cladding nos 1 21,841.80 0.00 0.00
20 Bearing for chest slider nos 1 837.80 0.00 0.00
21 Pneumatic cylinder nos 1 29,500.00 0.00 0.00
22 Pneumatic cylinder kit nos 1 3,669.80 1.00 1.00 3,669.80 3,669.80
23 Steam trap valve nos 1 7,611.00 0.00 0.00
24 V Belts nos 2 759.92 0.00 0.00
25 LP Air hose pipe 3/8'' X 36'' nos 1 1,236.64 0.00 0.00
26 Electric motor- main drive-3 HP- rewinding nos 1 13,570.00 0.00 0.00
27 Bearing for electric motor- Main Drive-3HP nos 1 3,412.56 0.00 0.00
28 Electric motor blower nos 1 13,581.80 0.00 0.00
29 Bearing for electric motor-blower nos 1 1,838.44 0.00 0.00
30 Digital temperature controller- Selctron nos 1 8,319.00 0.00 0.00
31 Thermocouple-J type 3 Mtr length nos 1 661.98 0.00 0.00
32 Twin push valve nos 1 905.06 0.00 0.00
33 Rocker Switch nos 1 217.12 0.00 0.00
34 Inching switch nos 1 325.68 0.00 0.00
35 Potentio meter nos 1 558.14 0.00 0.00
36 VFD nos 1 62,540.00 0.00 0.00
37 Emergency stop push button nos 1 598.26 0.00 0.00
38 Contactor nos 1 3,599.00 0.00 0.00
39 Single phase preventor-VSPD-1 nos 1 3,315.80 0.00 0.00
40 HRC fuse base Vaishno or equal nos 2 606.52 0.00 0.00
41 HRC fuse links 2 Amps nos 2 107.38 0.00 0.00
42 Limit switch nos 1 1,121.00 0.00 0.00
Schedule 04:Cost of spare parts for 2 No. flat work ironer for 2 years Make -
Thermax, Model-RXA-06
1 Blow Down Connector nos 1 3,823.20 0.00 0.00
2 Burner Rod nos 1 12,437.20 0.00 0.00
3 Cable High Tension nos 2 165.20 0.00 0.00
4 Cap Rubber nos 2 224.20 0.00 0.00
5 Coil nos 1 53,100.00 0.00 0.00
Total (C/F) - 3,40,238.52 3,40,238.52
Whenever there is an entry in column 10 on the basis of actual measurement the whole of the amount previously paid without detailed measurement should be
adjusted by a minus entry in column 2 equivalent to the amount shown in column 1. So that the total up to date in column 3. may becoms NIL.
java kalama 10 mao p`a@klaona ko p`%yaok ]pSaIYa- saMbaMQaIM dao yaa ]sasao AiQak p`ivaiYTyaaM hao tao ]ppQaanaaoM Wara laoKa rK jaanaovaalao inamaa-Na kayaao- ko maamalao maoM ]naka kula jaaoD, kr donaa caaihyao AaOr inamaa-Na kayaao- ko rijaYTr maoM dja- krnao ko ilayao jaaoD, kI
kalama 11 maoM dja- kr donaa caaihyao .
When there are two or more entries in column 10 relating to each sub-head of estimate they should in the case of works the accounts of which are kept by sub-
heads be totalled and the total recorded to column 11 for posting the Register of works.
Quantity as per CA
measurement book
previously measured measurement
Validity of CA:
Accepted Rate
Items of work
J-kaJ- .Unit
kaya- kI mado .
dr .
Since last certificate
Up to date
Total upto date
certificate
Avtna
1 2 3 4 5 6 7 8 9 10 11 12 13
$ 0 . Rs. $ 0 . Rs. $ 0 . Rs. $ 0 . Rs. $ 0 . Rs.
B/F- 3,40,238.52 3,40,238.52
6 Connector Coil Inlet nos 1 28,851.00 0.00 0.00
7 Economiser nos 1 2,655.00 1.00 1.00 2,655.00 2,655.00
8 Electrode Assembly nos 1 259.60 0.00 0.00
9 Electrode Cap nos 1 3,717.00 0.00 0.00
10 Electrode Timer nos 1 21,299.00 0.00 0.00
11 Fuel Pump nos 1 11,257.20 1.00 1.00 11,257.20 11,257.20
12 Heat Optimiser nos 1 1,121.00 0.00 0.00
13 Hose Metallic Braided 0.5'' X 20" nos 1 979.40 0.00 0.00
14 Hose Metallic Braided 3/8'' X 30" nos 1 1,793.60 0.00 0.00
15 Hose metallic dia 1'' X 80'' nos 1 7,717.20 0.00 0.00
16 Ignition Transformer nos 1 1,817.20 0.00 0.00
17 Limit switch nos 1 1,085.60 0.00 0.00
18 Nozzle 6.05 GPH nos 1 3,351.20 0.00 0.00
19 Oil Filter nos 1 4,071.00 0.00 0.00
20 Outlet Coil Header nos 1 1,793.60 0.00 0.00
21 Phot Resistor-8250 nos 1 212.40 0.00 0.00
22 Plug and socket Assembly nos 2 849.60 0.00 0.00
23 Pressure Gauge 0-40 KG/68 mm nos 1 1,817.20 0.00 0.00
24 nos 1 3,717.00 0.00 0.00
Pressure Gauge 0-40 KG/100 mm back connection
Quantity as per CA
measurement book
previously measured measurement
Validity of CA:
Accepted Rate
Items of work
J-kaJ- .Unit
kaya- kI mado .
dr .
Since last certificate
Up to date
Total upto date
certificate
Avtna
1 2 3 4 5 6 7 8 9 10 11 12 13
$ 0 . Rs. $ 0 . Rs. $ 0 . Rs. $ 0 . Rs. $ 0 . Rs.
B/F- 3,92,064.12 3,92,064.12
Schedule 05:Cost of spare parts for 01 No. Laundry Effluent Treatment Plant
(ETP) 80 KLD for 02 years Model- APFT-ETP-80
1 Dosing Pump 0-6 lph nos 4 6,999.76 1.00 1.00 6,999.76 6,999.76
2 Press sand filter vessel nos 2 12,998.88 0.00 0.00
3 Distribution 4R2-63 nos 2 4,998.48 0.00 0.00
4 Media nos 4 6,999.76 0.00 0.00
5 MNO2 40 KG bag nos 4 2,999.56 0.00 0.00
6 Lamella settler nos 2 69,999.96 0.00 0.00
7 Water Transfer Pump nos 6 15,998.44 1.00 1.00 15,998.44 15,998.44
8 Carbon Filter nos 2 25,063.20 0.00 0.00
9 Vaccuum Pump nos 1 30,632.80 0.00 0.00
10 Diffuser nos 16 2,088.60 0.00 0.00
Schedule 06:Cost of spare parts for 01 No. Electric Control Panel for 02 years
1 MCB-16,32,40 Amp nos 4 6,549.00 1.00 1.00 6,549.00 6,549.00
2 Wire and connector nos 4 6,678.80 0.00 0.00
(#a) [sa tarI#a tk ikyao gayao inamaa-Na kaya- ka kula maulya (k)/
(B) Total value of work done to date (A)
ipClao p`maaNa-p~ pr inamaa-Na kaya- ka id#aayaa gayaa maulya GaTayaoM/
Deduct - value of work shown on last certificate.
ipClao p`maaNa-p~ sao inamaa-Na kaya- ka kula maulya (ef)
Net value of work since last certificate (F)
(ef) saM#yaa Sabdao maoM /
Figure (F) in words
11 . Pa`maaNa-p~ Aaoor hstaxar / Certificate and Signatures
1. lao#aa 1 ko kalama 4 sao 10 tk kI p`ivaiYTyaaM ijana maapaoM pr AaQaairt haonao ----------------------- kao -------------------Wara tooyaar kI ga[- qaI Aaoor ]p - maMDlaaiQakarI Wara jaacaI ga[- qaI Aaoor maap pUistka saM 0 ---------
----- ko pRYz --------------- pr dja- kI ga[- hooM /
The measurements on which are based the entries in columns 4 to 10 of the account 1, were made by SSE/C&W/DBRG and checked by
SSE/C&W/IC/DBRG and are recorded at pages....................................of Measurement Book No...............................................
zokodar ka hstaxar
idnaaMk / Dated --------------------20 Signature of contractor CDO/DBRG
V. [sa kaya- ko karNa ]pya-> ivavarNa ko Anausaar maaMga ko inapTana mao AMitma Baugatana ko $p mao ----------------------------- $ 0 payaa .Received Rs._____________________a final
payment in settlement of demands as per details above on account of the work.
mao ---------------------------etddWara p`maiNat krta hMU ik -----------------------ijalaa -------------------------- AnaumaMDla saM 0 ------------------- #aMD moaoM ikyao gayao kama yaa majaduraoM ik AapUit- yaa
Anya iksaI karNa maora kao[` davaa pU 0 saI 0 rolavao ko naama baakI nahI hooM Aaoor mauJao AMitma Baugatana tqaa maoro saBaI davaaoM ka saMtaoYajanak pUra Baugatana idyaa jaa cauka hooM .I --------------------------- hereby certify
that I have no outstanding against the [Link] either for work done or for labour supplied or for material suppliedor on any other account on
the -------------------- District -------------------------Sub-Division, No. -------------------------- Zone and that I have been paid in full and in final
settlement and satisfaction of all my claims.