0% found this document useful (0 votes)
13 views5 pages

Vol - 2

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views5 pages

Vol - 2

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Sl. No.

Particulars
25 Annexure – 11: Any other additional information

26 Annexure – 12(A): Bank certificate for credit facility

27 Annexure – 12(B): Form of solvency certificate by banks

Section-IV (General Condition of Contract)


A. General
1 Interpretation
2 Engineer-in-Charge’s Decision
3 Delegation
4 Communication
5 Sub-contracting
6 Other contractors
7 Personnel
8 Contractor’s risk
9 Insurance
10 Site Inspection
11 Contractor to construct the works
12 Diversion of streams/ Nallas/ Drains
13 Power Supply
14 Temporary Diversion (Works on Highways)
15 Ramps
16 Monsoon Damages

17 The works to be completed by the stipulated Completion Date


18 Safety
19 Discoveries
20 Possession of site
21 Access to site
22 Instructions
23 Settlement of disputes
B. Time for completion
24 Period of completion
25 Construction Programme
26 Speed of work
Sl. No. Particulars
27 Suspension of works by Contractor
28 Extension of completion date
29 Delays ordered by Engineer-in-charge
30 Early warning
31 Management meetings
C. Quality Control
32 Identifying defects
33 Tests
34 Action in case of improper materials & workmanship

35 Action and compensation payable in case of bad works


36 Quality control
D. Cost Control
37 Contract price-Schedule of payment-Bill of Quantities
38 Change in Quantities
39 Cash flow forecast

40 Contract price-Schedule of payment-Payment Certificates

41 Measurements & Payments


42 Interest on money due to contractor
43 Commissioning of project
44 Certificate of completion of works
45 Taxes included in the bid
46 Escalation in prices
47 Liquidated damages for delay
48 Rescission of contract
49 Mobilization Advance
50 Security Deposits
51 Cost of repairs
E. Finishing the Contract
52 Completion
53 Takeover
54 Final Account
55 Termination
56 Payment upon termination
57 Property
Sl. No. Particulars
58 Release form performance
F. Other General Conditions
59 Water supply
60 Electrical Power
61 Land
62 Approach roads and roads in working area
63 Payment for camp construction
64 Explosives and fuel storage tanks
65 Labour
66 Safety measures
67 Fair wage clause
68 Indemnity Bond
69 Compliance with Labour regulations
70 Salient features-Labour law applicable
71 Liabilities of the contractor
72 Contractor’s staff, representatives and Labour
73 Accommodation and food
74 Relationship
75 Protection of adjoining premises
76 Work during night (or)on Sundays and Holidays
77 Layout of materials stacks
78 Use of Blasting materials
79 Plant and equipment
80 Steel forms
81 Inconvenience of the Public
82 Conflict of interest
83 Contract documents and materials to be treated as confidential
84 General obligations of Contractor
85 Security measures
86 Fire fighting measures
87 Sanitation
88 Training of personnel
89 Ecological balance
90 Preservation of existing vegetation
91 Possession of prior to completion
Sl. No. Particulars
92 Access to contractor’s Blocks
93 Drawings to be kept at site
94 B.I.S (ISI) books and OSS to be kept at site
95 Site order book
96 Variation by way of modification, Omissions or Additions
97 Care and Diversion of river/stream
98 Income Tax
99 Royalty charges
100 GST
101 Labour welfare cess
102 Supply of construction material
103 Setting Out
104 Site Data
105 Sufficiency of contract price
106 Un-foreseen difficulties
107 Rights of way and facilities
108 Avoidance of Interference
109 Access route
110 Transport of goods
111 Contractor’s equipment
112 Progress reports
113 Designs
114 Programme
115 Change of site
116 Changes in drawing
Section-V (Special Condition of Contract)
1 General
2 Sufficiency of bid
3 Major project components and project basic parameters

4 Scope of work

5 Tests and quality control

6 Measurements and payments

7 Supply of gates & and hydro/electro mechanical plant and machinery


Sl. No. Particulars
8 Supplementary requirements

9 Regulations and bye-laws

10 Passing of foundation, centering, reinforcement etc.

11 Quality Control

12 Signing field books, longitudinal sections, cross- sections and measurement books

13 Cleaning up

14 Communications and notices by contractors:

15 Compensation for delay by department in approval of design drawing

16 Works to be executed in accordance with specifications, drawings, orders etc.,

17 Alterations in specifications and designs

17 Time limit for unforeseen claims

18 Recovery of dues from the contractor

19 Works to be open for inspection

20 Notice to be given before work is covered up

21 Contractor to supply plant, ladders, scaffolding etc.

22 Audit and technical examinations:

23 Permission for crossing railway, NH/SH/ other roads

24 Land acquisitions

25 Use of site

26 Water user association

27 Availability of power

29 Other Special Conditions

30 Modern Technology

SECTION – VI (Appendices)

1 Appendix-S & I (Surveys and Investigation)

2 Appendix – D&E (Design & Engineering)

3 Appendix - CW (Civil works)