0% found this document useful (0 votes)
24 views11 pages

Source Selection

Uploaded by

thisisrohaniit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views11 pages

Source Selection

Uploaded by

thisisrohaniit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

RAV

I NISHANT

PROJECT PROCUREMENT
SOURCE SELECTION CRITERIA
SOURCE SELECTION
METHODS

Selecting a source selection method for a tender


process should be based on objective factors
such as:

The completeness of the scope to be


procured by the buyer before the tendering
process.

Available budget for the procurement.

Available time for tendering process.


SOURCE SELECTION
CRITERIA
Under project management, source selection criteria are
often included as part of the procurement documents.
Source selection criteria describes properties that are
crucial for a purchaser when deciding on a supplier.

Source selection criteria describes properties that are crucial for a


purchaser when deciding on a supplier and are used to score seller
proposals.
Snapshot of Evaluation Critereia
MARKET
INTELLIGENCE
YOUR SOURCE OF SUPPLIER INFORMATION....

Commodity profile information:


Cost structure:
Supply base information:
Supply and demand price drivers, capacity utilization:
Buyers’ and suppliers’ relative size and buying power:
Quality:
SOURCES OF
INFORMATION
Current suppliers

Preferred suppliers

Sales representatives

Information databases

Trade journals

Trade directories

Trade shows

Second-party or indirectinformation

Internal sources

Internet searches
STANDARD CRITERIA
FOR EVALUATION..
Sr.No Category Criterion Explanation

Does
Management seller have, or can it develop, management
1 Integration
approach processes and procedures to ensure
a successful project?

Does
Understanding
2 Scope proposal address the Procurement Statement
of need
of Work (SOW)?

With
what degree of confidence can the seller
3 Time Deadline
produce the product within the
specified deadline?

What
Overall
4 is the total cost of the procurement (purchase
or life-cycle cost
cost plus operating cost)?

Financial Does
5..
capacity seller have necessary financial resources?

Cost Does
IP seller assert intellectual property rights in the
6
Rights product they produce for
the project?

Does
Proprietary
7 seller assert proprietary rights in the product
Rights
they produce for the project?
STANDARD CRITERIA
FOR EVALUATION..
Sr.No Category Criterion Explanation

Can
Technical seller’s technical methodologies, techniques and solutions
8
approach meet the technical
requirements in the procurement documents?

What
9 Quality Warranty will seller covered by warranty, and for what time
period?

Does
Production seller have sufficient production capacity to meet potential
10
capacity future
requirements?

Human Technical Does


11
Resources capability seller have technical knowledge and skills needed?

How
Risk much risk is being assigned of transferred to the seller?
12 Risk
response How does the
seller mitigate risk?

Does
seller’s enterprise meet a specific category of business
Business (disadvantaged,
13 EEFs
type and size etc.) defined by the organization or established as
condition by government
agency?

Past What
14 OPAs
performance is past performance of selected sellers?
WEIGHTAGE

After the attributes have been identified, a weight is assigned to


each category based on the importance of that attribute.
The weighting system is a tool used to eliminate or reduce bias by
quantifying the attributes of the vendors.
Although there’s no one right way to
build a scorecard, consider these five
core criteria that every scorecard
should include:
Level of service
Cost control
Ease of doing business
Regulatory compliance
Innovation
@Ravi Nishant

DONT FORGET TO
SAVE THIS POST

You might also like