0% found this document useful (0 votes)
5 views3 pages

Final Year Project Daily Diary

Uploaded by

pavanaware148
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views3 pages

Final Year Project Daily Diary

Uploaded by

pavanaware148
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Final Year Project Daily Diary

Project Title: Underground Pipeline Leakage Detection System

Guide: Dr. V. A. Parjane

Team Members:

- Aware Pavan Rangnath

- Miss Vedika Pavan Adhav

- Mast Pritam Ekanath Adhav

- Miss Dhanashri Mohan Badhe

Date Work Done Remarks 02/12/

03/12/2024 Tested flow sensor readings with Arduino and documented values.
Reviewed by guide

04/12/2024 Integrated LCD display with I2C module and tested output. Reviewed by guide

05/12/2024 Configured GSM module to send SMS on abnormal flow detection.


Reviewed by guide

06/12/2024 Calibrated both flow sensors and compared reading consistency.Reviewed by guide

09/12/2024 Tested system with simulated leakage scenario. Reviewed by guide

10/12/2024 Made circuit stable on breadboard and started soldering final setup.
Reviewed by guide

11/12/2024 Started working on the project report and presentation. Reviewed by guide

12/12/2024 Finalized project documentation layout. Reviewed by guide

13/12/2024 Completed final testing and debugging. Reviewed by guide

16/12/2024 Prepared charts and diagrams for final submission. Reviewed by guide

17/12/2024 Conducted a mock presentation for internal feedback. Reviewed by guide

18/12/2024 Submitted final project report to guide. Reviewed by guide

19/12/2024 Reviewed mid-sem feedback and discussed improvements with Reviewed


guide. by guide

20/12/2024 Tested flow sensor readings with Arduino and documented values.
Reviewed by guide

23/12/2024 Integrated LCD display with I2C module and tested output. Reviewed by guide

24/12/2024 Configured GSM module to send SMS on abnormal flow detection.


Reviewed by guide

25/12/2024 Calibrated both flow sensors and compared reading consistency.Reviewed by guide
26/12/2024 Tested system with simulated leakage scenario. Reviewed by guide

27/12/2024 Made circuit stable on breadboard and started soldering final setup.
Reviewed by guide

30/12/2024 Started working on the project report and presentation. Reviewed by guide

31/12/2024 Finalized project documentation layout. Reviewed by guide

01/01/2025 Completed final testing and debugging. Reviewed by guide

02/01/2025 Prepared charts and diagrams for final submission. Reviewed by guide

03/01/2025 Conducted a mock presentation for internal feedback. Reviewed by guide

06/01/2025 Submitted final project report to guide. Reviewed by guide

07/01/2025 Reviewed mid-sem feedback and discussed improvements with Reviewed


guide. by guide

08/01/2025 Tested flow sensor readings with Arduino and documented values.
Reviewed by guide

09/01/2025 Integrated LCD display with I2C module and tested output. Reviewed by guide

10/01/2025 Configured GSM module to send SMS on abnormal flow detection.


Reviewed by guide

13/01/2025 Calibrated both flow sensors and compared reading consistency.Reviewed by guide

14/01/2025 Tested system with simulated leakage scenario. Reviewed by guide

15/01/2025 Made circuit stable on breadboard and started soldering final setup.
Reviewed by guide

16/01/2025 Started working on the project report and presentation. Reviewed by guide

17/01/2025 Finalized project documentation layout. Reviewed by guide

20/01/2025 Completed final testing and debugging. Reviewed by guide

21/01/2025 Prepared charts and diagrams for final submission. Reviewed by guide

22/01/2025 Conducted a mock presentation for internal feedback. Reviewed by guide

23/01/2025 Submitted final project report to guide. Reviewed by guide

24/01/2025 Reviewed mid-sem feedback and discussed improvements with Reviewed


guide. by guide

27/01/2025 Tested flow sensor readings with Arduino and documented values.
Reviewed by guide

28/01/2025 Integrated LCD display with I2C module and tested output. Reviewed by guide

29/01/2025 Configured GSM module to send SMS on abnormal flow detection.


Reviewed by guide

30/01/2025 Calibrated both flow sensors and compared reading consistency.Reviewed by guide
31/01/2025 Tested system with simulated leakage scenario. Reviewed by guide

03/02/2025 Made circuit stable on breadboard and started soldering final setup.
Reviewed by guide

04/02/2025 Started working on the project report and presentation. Reviewed by guide

05/02/2025 Finalized project documentation layout. Reviewed by guide

06/02/2025 Completed final testing and debugging. Reviewed by guide

07/02/2025 Prepared charts and diagrams for final submission. Reviewed by guide

10/02/2025 Conducted a mock presentation for internal feedback. Reviewed by guide

11/02/2025 Submitted final project report to guide. Reviewed by guide

12/02/2025 Reviewed mid-sem feedback and discussed improvements with Reviewed


guide. by guide

13/02/2025 Tested flow sensor readings with Arduino and documented values.
Reviewed by guide

14/02/2025 Integrated LCD display with I2C module and tested output. Reviewed by guide

17/02/2025 Configured GSM module to send SMS on abnormal flow detection.


Reviewed by guide

18/02/2025 Calibrated both flow sensors and compared reading consistency.Reviewed by guide

19/02/2025 Tested system with simulated leakage scenario. Reviewed by guide

20/02/2025 Made circuit stable on breadboard and started soldering final setup.
Reviewed by guide

21/02/2025 Started working on the project report and presentation. Reviewed by guide

24/02/2025 Finalized project documentation layout. Reviewed by guide

25/02/2025 Completed final testing and debugging. Reviewed by guide

26/02/2025 Prepared charts and diagrams for final submission. Reviewed by guide

27/02/2025 Conducted a mock presentation for internal feedback. Reviewed by guide

28/02/2025 Submitted final project report to guide. Reviewed by guide

You might also like