The document outlines the basic information and requirements for the electrical supply demand exceeding 100KVA for the Gamuda Garden Phase 1B project. It includes details about the installation address, owner, consultant engineer, and electrical contractor, along with requirements for temporary supply and plans certified by a professional engineer. Additionally, it highlights the necessity for approved master development/layout plans and specific layout plans for sub-stations and main switch rooms.

Uploaded by

kuanzc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
42 views2 pages

Map A

The document outlines the basic information and requirements for the electrical supply demand exceeding 100KVA for the Gamuda Garden Phase 1B project. It includes details about the installation address, owner, consultant engineer, and electrical contractor, along with requirements for temporary supply and plans certified by a professional engineer. Additionally, it highlights the necessity for approved master development/layout plans and specific layout plans for sub-stations and main switch rooms.

Uploaded by

kuanzc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

SUMMARY OF LOAD FOR DEMAND EXCEEDING

100KVA(~140A)
MAP A
Project Name : Gamuda Garden Phase 1B Application Number : PRJ-000-004-9733
[Link] INFORMATION
1. Address of Installation LOT 4179,SEBAHAGIAN DARIPADA LOT 4179, 4180, 4188, 4189,
4190, 84173,48050 RAWANG,SEL
2. Site Location(Lot & Mk Number) LOT 4179
3. Premise Category Multi Premise
4. Type of Premise Landed
5. Total Gross Built-in Floor Area
6. Total Land Area
7. Architect
Name
Address
Telephone No
Fax No
E-Mail Address
8. Surveyor
Name
Address
Telephone No
Fax No
E-Mail Address
9. Owner/Developer
Name BANDAR SERAI DEVELOPMENT SDN BHD
IC/Company No 1050090-W
Address -,MENARA GAMUDA, PJ TRADE CENTRE,NO.8,JALAN PJU
8/8A,47820 PETALING JAYA,SELANGOR
Telephone No 0374913200
Fax No 0377241992
E-Mail Address jhleow@[Link]
10. Consultant Engineer
Name KWA CONSULT SDN BHD
Company No 790788-T
Address 73-2,ZENITH CORPORATE PARK,BLOCK G,JALAN SS 7/26,KELANA
JAYA,47301 PETALING JAYA,SELANGOR
Telephone No 0378876618
Fax No 0378876628
E-Mail Address kohwj@[Link]

Page1/2
SUMMARY OF LOAD FOR DEMAND EXCEEDING
100KVA(~140A)
MAP A
11. Electrical Contractor
Name Sunshine Construction Sdn Bhd
Contractor No 144233-X
Address NO.8 & 8A,JALAN PERISA SATU, TAMAN GEMBIRA,OFF JALAN
KUCHAI LAMA,58200 KUALA LUMPUR,KUL
Telephone No 0379820411
Fax No 0379828562
E-Mail Address sunshineserai134@[Link]
12. Requirement For Temporary Supply MD(kW): Date Supply Required:
Voltage(V):
13. Date Supply Required - ORIGINAL MD(kW):762.19 Date Supply Required:01-Feb-2019
- FINAL MD(kW): Date Supply Required:
14 PLANS-CERTIFIED BY PROFESIONAL ENGINEER
3 SETS-Please specify Plan no & date below
14a. Master Development/Layout plan Plan No : Date :
(Approve by JPB&D)

14b. Site Plan/Proposed Sub-station Sites Plan No : Date :

14c. Layout Plan of Sub-station Building Plan No : Date :


(Stand-Alone/Compartment)

14d. Layout Plan of Main Switch Rooms Plan No : Date :

14e. Single Line Diagram/Schematic of Installation Plan No : Date :

15. Front elevation of building requiring supply

NOTES:
I The Master Development/ Layout Plans (14a) are approved by Local Authority/ Jabatan Perancangan Bandar & Desa/ Jabatan Tanah &
Galian. These plans should already contain TNB preliminary comments on sub-station and right of way/wayleave requirement, as the case
may be.
II The Site Plans/ Proposed Sub-stations Sites (14b) indicate the locations of sub-station sites for the overall development area.
III The Layout Plans of sub-station building (14c) must show the cable entry locations, trencing and ducting details according to TNB
specifications.
IV Layout Plans of Main Switch-room (14d) must indicate the location of MSB, trenching/ ducting details for cable entry.
V The wiring diagrams should indicate incoming switches, metering location and devices, protection schemes and devices, bus-bar and
switchgear rating
IV All drawings and plans are to be submitted in three (3) complete sets. Soft copies in ACAD are also preferable.