CRONOGRAMA
CRONOGRAMA
T_CAP_0125_427 Transporte de CAP 50/70 p/ mistura betuminosa - jan/25 - CE - BR-427/RN 98,322 t 427,52 42.034,62 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
A_EAI_0125 Aquisição de EAI p/ imprimação asfáltica - jan/25 - CE 11,670 t 3.727,92 43.504,82 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
A_RR-1C_0125 Aquisição de RR-1C p/ pintura de ligação - jan/25 - CE 32,129 t 4.148,74 133.294,86 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
A_RM-1C_0125 Aquisição de RM-1C p/ mistura betuminosa - jan/25 - CE 550,271 t 4.383,66 2.412.200,97 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
A_RR-1C-E_0125 Aquisição de RR-1C-E p/ selagem de trincas - jan/25 - CE 1,319 t 5.099,96 6.726,84 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
A_CAP_0125 Aquisição de CAP 50/70 p/ mistura betuminosa - jan/25 - CE 98,322 t 5.723,43 562.739,08 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
3 CONSERVAÇÃO CORRETIVA ROTINEIRA
3.1 Serviços Gerais
Concreto fck = 20 MPa - confecção em betoneira e lançamento manual -
1107892 3.095,790 m³ 523,37 1.620.243,61 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
areia e brita comerciais
Fôrmas de tábuas de pinho para dispositivos de drenagem - utilização de 3
3103302 26.317,206 m² 110,40 2.905.419,54 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
vezes - confecção, instalação e retirada
3108022 Guia de madeira de 2,5 x 8,0 cm - confecção e instalação 4.024,572 m 7,93 31.914,85 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
4805750 Escavação manual em material de 1ª categoria na profundidade de até 1 m 3.650,763 m³ 59,50 217.220,39 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
4805755 Apiloamento manual 17.320,254 m³ 44,16 764.862,41 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
1600436 Demolição manual de concreto simples 619,158 m³ 547,08 338.728,95 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
4915733 Recomposição manual de aterro com material de jazida 4.941,000 m³ 53,16 262.663,56 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
Recomposição total de cerca com mourão de concreto seção quadrada -
4915725 11.578,500 m 39,50 457.350,75 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
areia e brita comerciais
4915727 Recomposição parcial de cerca com mourão de concreto - arame 7.719,000 m 14,68 113.314,92 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
Remoção de painel publicitário, tipo outdoor, com estrutura e suportes em
1600898 1.334,070 m² 16,18 21.585,25 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
madeira
Demolição manual de construções provisórias de madeira - sem
1600895 1.820,166 m² 18,77 34.164,51 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
reaproveitamento
Demolição manual de construções provisórias de madeira, sem fechamento
1600897 494,100 m² 5,09 2.514,96 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
lateral e sem pavimentação
1600896 Demolição mecânica de alvenaria com escavadeira hidráulica 910,083 m² 21,74 19.785,20 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
1600408 Apicoamento manual de concreto 3.120,000 m² 25,21 78.655,20 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
Argamassa para reparos e grauteamento - confecção em misturador e
1109680 74,880 m³ 5.200,13 389.385,73 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
lançamento manual
3806402 Limpeza em superfície de concreto com jateamento d’água sob pressão 7.488,000 m² 3,31 24.785,28 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
Pintura com primer epóxi de dois componentes com pistola a ar comprimido,
2419704 2.496,000 m² 17,85 44.553,60 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
uma demão, espessura de 70 µm
4915639 Limpeza em superfície de concreto com escova de aço 2.496,000 m² 5,89 14.701,44 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
4413986 Regularização de superfície com motoniveladora 49.410,000 m² 0,09 4.446,90 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,16% 4,16% 4,16% 4,16% 4,16% 4,16% 4,16% 4,17% 4,17% 4,17% 4,17% 4,16%
Recuperação ambiental de pedreiras ou áreas degradadas com biomanta
4413014 9.882,000 m² 23,00 227.286,00 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,16% 4,16% 4,16% 4,16% 4,16% 4,16% 4,16% 4,17% 4,17% 4,17% 4,17% 4,16%
vegetal de fibras de coco
Revestimento vegetal por semeadura a lanço manual de gramíneas e
4413993 23.058,000 m² 0,71 16.371,18 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,16% 4,16% 4,16% 4,16% 4,16% 4,16% 4,16% 4,17% 4,17% 4,17% 4,17% 4,16%
leguminosas
Plantio de muda de árvore com altura de 0,30 a 0,80 m em cova de 0,60 x
4413989 658,800 un 54,13 35.660,84 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,16% 4,16% 4,16% 4,16% 4,16% 4,16% 4,16% 4,17% 4,17% 4,17% 4,17% 4,16%
0,60 x 0,60 m
CCP-04 Fosfatagem, gessagem e adubação de base 49.410,000 m² 0,31 15.317,10 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,16% 4,16% 4,16% 4,16% 4,16% 4,16% 4,16% 4,17% 4,17% 4,17% 4,17% 4,16%
CCP-05 Controle de formiga em superfície de solo 49.410,000 m² 0,06 2.964,60 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,16% 4,16% 4,16% 4,16% 4,16% 4,16% 4,16% 4,17% 4,17% 4,17% 4,17% 4,16%
4800412 Raspagem e limpeza de terreno plano 658,800 m² 5,94 3.913,27 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,16% 4,16% 4,16% 4,16% 4,16% 4,16% 4,16% 4,17% 4,17% 4,17% 4,17% 4,16%
CCP-06 Adubação de cobertura (90 dias após o plantio) 49.410,000 m² 0,08 3.952,80 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,16% 4,16% 4,16% 4,16% 4,16% 4,16% 4,16% 4,17% 4,17% 4,17% 4,17% 4,16%
4413987 Irrigação de área plantada para proteção vegetal do corpo estradal 1.317.600,000 m² 0,47 619.272,00 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,16% 4,16% 4,16% 4,16% 4,16% 4,16% 4,16% 4,17% 4,17% 4,17% 4,17% 4,16%
1600966 Remoção de cerca com mourões de concreto 14.823,000 m 1,02 15.119,46 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,17% 4,16% 4,16% 4,16% 4,16% 4,16% 4,16% 4,16% 4,17% 4,17% 4,17% 4,17% 4,16%
4 CONSERVAÇÃO PREVENTIVA PERIÓDICA
4011353 Pintura de ligação 576.450,000 m² 0,39 224.815,50 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00%
4011463 Concreto asfáltico - faixa C-12,5 - areia e brita comerciais 61.220,880 t 207,41 12.697.822,72 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00%
Pintura de faixa com tinta acrílica emulsionada em água - espessura de 0,5
5213403 86.467,500 m² 26,06 2.253.343,05 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00%
mm
4915655 Fresagem contínua de revestimento asfáltico - espessura de 3 cm 17.293,500 m³ 117,42 2.030.602,77 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00%
Suporte polimérico ecológico maciço colapsível quadrado de 8 cm para
5213352 500,000 un 1.519,81 759.905,00 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00%
placa de sinalização - fornecimento e implantação
5213572 Placa em aço - película III + III - fornecimento e implantação 494,100 m² 849,09 419.535,36 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00%
4011372 Tratamento superficial duplo com banho diluído - brita comercial 329.400,000 m² 7,67 2.526.498,00 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00%
5 CONSERVAÇÃO DE EMERGÊNCIA
4915734 Recomposição mecanizada de aterro com material de jazida 1.482,300 m³ 16,27 24.117,02 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
4915735 Remoção manual de barreira em solo 2.470,500 m³ 17,85 44.098,42 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
4915737 Remoção mecanizada de barreira em solo 2.470,500 m³ 6,64 16.404,12 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
4915738 Remoção mecanizada de barreira em rocha 988,200 m³ 7,97 7.875,95 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
6 SERVIÇOS AUXILIARES - CONSERVAÇÃO CORRETIVA ROTINEIRA / CONSERVAÇÃO PREVENTIVA PERIÓDICA / CONSERVAÇÃO EMERGENCIAL
5914389 Transporte com caminhão basculante de 10 m³ - rodovia pavimentada 7.903.427,564 tkm 1,14 9.009.907,42 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
5914479 Transporte com caminhão carroceria de 15 t - rodovia pavimentada 167.805,573 tkm 0,95 159.415,29 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
5915468 Transporte de água com caminhão tanque de 10.000 l - rodovia pavimentada 133.077,600 tkm 1,79 238.208,90 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
7 SINALIZAÇÃO DE OBRA
7.1 Sinalização Temporária
Placa de regulamentação para sinalização de obras montada em suporte
5212558 metálico móvel, R1 lado 0,414 m - utilização de 600 ciclos - fornecimento, 01 6.215,000 [Link] 5,13 31.882,95 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
implantação e 01 retirada diária
Placa de regulamentação para sinalização de obras montada em suporte
5212557 metálico móvel - D = 1,00 m - utilização de 600 ciclos - fornecimento, 01 14.098,000 [Link] 5,06 71.335,88 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
implantação e 01 retirada diária
Placa de advertência para sinalização de obras montada em suporte
5212560 metálico móvel, lado 1,00 m - utilização de 600 ciclos - fornecimento, 01 11.237,000 [Link] 5,39 60.567,43 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
implantação e 01 retirada diária
Placa para sinalização de obras montada em cavalete metálico - 1,00 x 1,00
5212556 m - utilização de 600 ciclos - fornecimento, 01 implantação e 01 retirada 3.108,000 [Link] 2,66 8.267,28 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
diária
Cone plástico para canalização de trânsito - utilização de 150 ciclos -
5213835 238.115,000 [Link] 1,05 250.020,75 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
fornecimento, 01 implantação e 01 retirada diária
5213850 Operação de sinalização por bandeirola de tecido ou com placa metálica 16.673,243 h 29,43 490.693,54 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
8 AQUISIÇÃO E TRANSPORTE DE MATERIAL BETUMINOSO
8.1 Aquisição e Transporte de Material Betuminoso - Conservação Preventiva Periódica
T_RR-1C_0125_427 Transporte de RR-1C p/ pintura de ligação - jan/25 - CE - BR-427/RN 259,403 t 426,73 110.695,04 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00%
T_CAP_0125_427 Transporte de CAP 50/70 p/ mistura betuminosa - jan/25 - CE - BR-427/RN 3.394,698 t 427,52 1.451.301,28 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00%
A_RR-1C_0125 Aquisição de RR-1C p/ pintura de ligação - jan/25 - CE 259,403 t 4.148,74 1.076.195,60 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00%
A_CAP_0125 Aquisição de CAP 50/70 p/ mistura betuminosa - jan/25 - CE 3.394,698 t 5.723,43 19.429.316,37 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00%
A_RR-2C_0125 Aquisição de RR-2C p/ TSD - jan/25 - CE 1.571,238 t 4.372,71 6.870.568,11 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00%
T_RR-2C_0125_427 Transporte de RR-2C p/ TSD - jan/25 - CE - BR-427/RN 1.571,238 t 426,73 670.494,39 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00%
9 DEMAIS SERVIÇOS DE MANUTENÇÃO - DSM
9.2 Serviços de Execução Melhoramento – Drenagem - BR-427/RN
4915669 Remoção mecanizada de camada granular do pavimento 40,062 m³ 10,52 421,45 5,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 5,00%
2003377 Meio-fio de concreto - MFC 05 - areia e brita comerciais - fôrma de madeira 36,420 m 75,36 2.744,61 5,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 5,00%
4915667 Remoção mecanizada de revestimento asfáltico 10,016 m³ 16,86 168,86 5,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 5,00%
4805757 Escavação mecânica de vala em material de 1ª categoria 150,233 m³ 9,04 1.358,10 5,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 5,00%
1619003 Demolição mecânica de concreto armado com escavadeira hidráulica 107,157 m³ 86,17 9.233,71 5,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 5,00%
4011276 Base ou sub-base de brita graduada com BGS comercial 80,124 m³ 260,73 20.890,73 5,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 5,00%
5503041 Compactação de aterros a 100% do Proctor intermediário 110,171 m³ 7,90 870,35 5,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 5,00%
4011353 Pintura de ligação 200,310 m² 0,39 78,12 5,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 5,00%
4011352 Imprimação com emulsão asfáltica 200,310 m² 0,56 112,17 5,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 5,00%
4011463 Concreto asfáltico - faixa C-12,5 - areia e brita comerciais 24,037 t 207,41 4.985,51 5,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 5,00%
Corpo de BSCC 1,50 x 1,50 m - moldado no local - altura do aterro 0,00 a
0705169 24,200 m 3.227,65 78.109,13 5,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 5,00%
1,00 m - areia e brita comerciais
0705225 Boca de BSCC 1,50 x 1,50 m - esconsidade 0° - areia e brita comerciais 4,000 un 15.109,13 60.436,52 5,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 5,00%
Boca de BDTC D = 0,80 m - esconsidade 0° - areia e brita comerciais - alas
0804213 2,000 un 1.935,11 3.870,22 5,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 5,00%
retas
0804181 Corpo de BDTC D = 0,80 m PA1 - areia, brita e pedra de mão comerciais 12,100 m 1.395,68 16.887,72 5,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 5,00%
Corpo de BTCC 2,00 x 2,00 m - moldado no local - altura do aterro 0,00 a
0705360 12,100 m 10.602,09 128.285,28 5,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 5,00%
1,00 m - areia e brita comerciais
0705411 Boca de BTCC 2,00 x 2,00 m - esconsidade 0° - areia e brita comerciais 2,000 un 33.216,12 66.432,24 5,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 5,00%
9.3 Serviços Auxiliares de DSM - Transporte
5914389 Transporte com caminhão basculante de 10 m³ - rodovia pavimentada 34.323,573 tkm 1,14 39.128,87 5,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 5,00%
5914479 Transporte com caminhão carroceria de 15 t - rodovia pavimentada 2.819,984 tkm 0,95 2.678,98 5,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 5,00%
Transporte com caminhão carroceria com capacidade de 7 t e com
5914614 79,079 tkm 2,41 190,58 5,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 5,00%
guindauto de 20 t.m - rodovia pavimentada
9.4 Aquisição e Transporte de Material Betuminoso - DSM
T_RR-1C_0125_427 Transporte de RR-1C p/ pintura de ligação - jan/25 - CE - BR-427/RN 0,090 t 426,73 38,40 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00%
T_CAP_0125_427 Transporte de CAP 50/70 p/ mistura betuminosa - jan/25 - CE - BR-427/RN 1,333 t 427,52 569,88 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00%
A_RR-1C_0125 Aquisição de RR-1C p/ pintura de ligação - jan/25 - CE 0,090 t 4.148,74 373,38 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00%
A_CAP_0125 Aquisição de CAP 50/70 p/ mistura betuminosa - jan/25 - CE 1,333 t 5.723,43 7.629,33 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00%
T_EAI_0125_427 Transporte de EAI p/ imprimação asfáltica - jan/25 - CE - BR-427/RN 0,260 t 426,73 110,94 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00%
A_EAI_0125 Aquisição de EAI p/ imprimação asfáltica - jan/25 - CE 0,260 t 3.727,92 969,25 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00% 10,00%
10 SERVIÇOS COMPLEMENTARES
Montagem e desmontagem da usina de asfalto a quente com capacidade de
0919013 120 t/h - inclusive construção e demolição de bases, rampas, depósitos de 1,000 un 168.028,54 168.028,54 100,00%
agregados e dique de contenção
Montagem e desmontagem da usina de pré-misturado a frio com capacidade
0919008 de 60 t/h - inclusive construção e demolição de bases, rampas, depósitos de 1,000 un 121.800,04 121.800,04 100,00%
agregados e bacia de contenção
INST_CANT_427 Instalação de canteiro de obras em container - BR-427/RN 1,000 un 367.023,60 367.023,60 100,00%
ADM_LOC_427 Administração local - BR-427/RN 1,000 und 4.450.983,56 4.450.983,56 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
Aluguel Aluguel Terreno - Canteiro de Obras 36,000 mês 4.364,25 157.113,00 2,77% 2,77% 2,77% 2,77% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,78% 2,77% 2,77% 2,77% 2,77%
MOB_DESMOB_427 Mobilização e desmobilização de equipamentos - BR-427/RN 2,000 und 112.302,58 224.605,16 50,00% 50,00%
VALOR MENSAL 1.783.334,05 1.014.179,29 6.066.288,62 6.088.240,79 6.114.465,19 6.114.465,19 6.114.465,20 6.114.465,19 6.114.465,19 6.114.465,19 6.114.465,19 6.114.465,19 1.022.978,38 1.001.026,21 978.320,95 978.320,95 978.320,95 978.320,95 978.320,95 978.320,95 978.320,95 978.320,96 978.320,96 978.320,97 1.017.604,00 1.017.604,03 1.017.604,01 1.017.604,01 1.017.604,02 1.017.604,02 1.017.604,02 1.017.698,46 1.014.179,32 1.014.179,30 1.014.179,30 1.126.387,44
VALOR ACUMULADO 1.783.334,05 2.797.513,34 8.863.801,96 14.952.042,75 21.066.507,94 27.180.973,13 33.295.438,33 39.409.903,52 45.524.368,71 51.638.833,90 57.753.299,09 63.867.764,28 64.890.742,66 65.891.768,87 66.870.089,82 67.848.410,77 68.826.731,72 69.805.052,67 70.783.373,62 71.761.694,57 72.740.015,52 73.718.336,48 74.696.657,44 75.674.978,41 76.692.582,41 77.710.186,44 78.727.790,45 79.745.394,46 80.762.998,48 81.780.602,50 82.798.206,52 83.815.904,98 84.830.084,30 85.844.263,60 86.858.442,90 87.984.830,34