0% found this document useful (0 votes)
35 views6 pages

Data Collection Format - Rajasthan

Uploaded by

surendra gurjar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views6 pages

Data Collection Format - Rajasthan

Uploaded by

surendra gurjar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Annex

Water Resources Infrastructure Related Data in Respect of Major and Medium Irrigation Projects

Design Gross Storage capacity (MCM) at

Design Live Storage capacity (MCM) at

Since commissioning whether reservoir


capacity survey has been conducted (if
yes then Year and revised live storage
Commulative Length of Canal system (m)

Yearly Diversion in MCM through


Type of

Dam/Barrage/Weir/Lift

No. of main Canals


Nature of Project

capacity (MCM)
Total
Project Storage Gross Ultimate Yearly Main Canal Branch Canals Distributaries
Districts Whether inter Culturable Irrigation Status of the
(Irrigation / (Dam), Command Irrigation Irrigation
Name of Project Benefitting Name of the River basin transfer Command Potential Project

FRL

FRL
S. No. Name of Project Multipurpose/ Diversion Area Potential Potential
State/ UT Authority Form the and River Basin is involved Area (CCA) Created (completed /
Hydro electric (Barrage/wier) (GCA) in (UIP) in Th. Utilized (IPU)
Projects (Yes / No) in Th. Ha (IPC) in Th. Ongoing)
power) , Lift, Th.Ha Ha in Th. Ha
Ha
Combination
thereof, other)

Unlined

Unlined

Unlined
Lined

Lined

Lined
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

Parwati Pickup
1 Rajasthan Baran Ganga Storage 12.55 12.55 Completed
Weir

WFR of Kutch and


2 Sardar Samand Rajasthan Pali Saurashtra including Storage 10.32 10.32 Completed
Luni/ Sukri

Ganganagar,
3 Gang Canal Rajasthan Hanumangar Indus Diversion 307 184.54 Completed
h
4 Kalakh Sagar Rajasthan Jaipur Ganga Storage 10.96 2.34 Completed
5 Chhaparwada Rajasthan Jaipur, Tonk Ganga Storage 11.74 4.93 Completed
6 Sikari Rajasthan Bharatpur Ganga Diversion 10.47 5.2 Completed
Jaisamand
7 Rajasthan Udaipur Mahi Storage 16 9.6 Completed
(Udaipur)
8 Raj Samand Rajasthan Rajsamand Ganga/ Gomti Storage 10.4 7.3 Completed

9 Ramgarh Rajasthan Jaipur, Dausa Ganga Storage 12.12 4.86 Completed

10 Umed Sagar Rajasthan Baran Ganga Storage 2.97 2.54 Completed


Annexure-III

l system (m)

Minor canals
Unlined
Lined

27 28
SCHEDULE FOR CENSUS OF MMI PROJECTS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Season wise irrigation potential created Season wise irrigation potential utilized (IPU)
Existing cropping pattern in the command Area
Nature of (IPC) in Ha. in Ha. (Maximum potential utilized so far)
Whether
project Whether
inter basis
(Irrigation / project is
transfer is
Multipurpose) inter-state
involved
(i)Irrigation (Yes / No) Type of
(Yes / No) Area in

season (Zaid)
Culturabl project

Bi Seasonal
(ii) Hydro Hectares in No. of

Perennial
Gross

Summer
Districts electric power e Category (storage, Ultimate

Others
Khariff
Comman

Rabi
case of Villag
S. No. Name of Name of benefitting Name of the (iii)Flood d Area Comman of project diversion, Project Irrigation
Piped e

Summer season (Zaid)

Summer season (Zaid)


project State/ UT form the River basin control
(GCA) in d Area (Major, lift, Authority
Distribution
Potential
Benef
projects (iv) Domestic (CCA) in Medium) combinatio (UIP) in Ha
Ha Network itted
/industril water

Bi Seasonal

Bi Seasonal
Ha n of three,

Total IPC

Total IPU
Perennial

Perennial
supply (Ha.)

Others

Others
Khariff

Khariff
other)

Rabi

Rabi
(v)Fisheries
(vi) Navigation
(vii) Recreation if yes ,

Crop 1

Crop 2

Crop 1

Crop 2

Crop 1

Crop 2

Crop 1

Crop 2

Crop 1

Crop 2

Crop 1

Crop 2
(viii) Others if yes, Name of name of
the States the basins
involved
SC
ST
OBC
ral
Gene
19

Total Male
No. of People Benefitted

le
Fema
er
Trans
gend Total
Area under Drought Prone Area
Programme (DPAP)

Area under Desert Development


Programme (DDP)

Tribal area

Flood prone area


20

Left wing extremism affected area

Area under Koraput, Bolangir and


Kalahandi (KBK) regions of Odisha
the following information in Ha.)

Area under Vidarbha & Marathwada


regions of Maharashtra

Area under Bundelkhand region of


Whether the command area of the project is benefitting the area under Drought

Madhya Pradesh & Uttar Pradesh


Prone Area Programme (DPAP), Desert Development Programme (DDP), Tribal
area, Flood prone area, left wing extremism affected area, Koraput, Bolangir and

and Bundelkhand region of Madhya Pradesh & Uttar Pradesh (If yes, Please provide
Kalahandi (KBK) regions of Odisha, Vidarbha & Marathwada regions of Maharashtra

Year of Central TAC clearance & cost


(cr.)

Year of investment clearance & Cost


21

(cr.)
clearances :

Year of State Govt. clearance & Cost


year of the following

(cr.)
Approval Status: (Central
TAC/IC/State approved) - (If

Stage I Environment
Clearance
Stage II (Latest)
Stage I
Forest
22

Stage II Clearance

Stage I NBWL
Clearance
approved, Please provide Status of other clearnace:

Stage II

Final Cost of the project


(cr.)

Price level (year)


Year of commencement
Completed

of the project
Year of completion
23

Year of commencement
of the project
Ongoing)

Physical Progress (%)


Financial Progress (%)
Ongoing

Latest estimated cost of


the proejct (cr.)
Status of the Project (Whether completed /

Price level (year)


a) Whether the Project comproses of
Head works with Dam, Barrage , Weir or
Gated Structure (yes / No)

b) if yes , No. of head works

1. Name of head works (Dam/


Barrage/ Weir/ Gated Structure)
Design Features of the project

i. Nature of head works (Dam/


Barrage/ Weir/ Gated Structure)

ii. Whether the Dam/ Barrage/ Weir/


Gated Structure is included in the
DHARMA portal if yes then enter
NRLD code

iii. Name of river

iv. Name of the didtrict of head works

v. Latitude , Longitude of headworks

vi. Type of Dam, Barrage , Weir or


Gated Structure (Concrete / Masonry /
Earthen /Rock fill / combination)

vii. Length of Dam, Barrage , Weir or


Gated Structure (meters)

viii. Maximum height of the structure


above deepest foundation
(Dam/Barrage/Weir) (meters)

ix. FRL / pond level (in meter above msl)


24 25

No. of Lifts in the Lift irrigation Scheme and for the project
Design Features of the project with lift irigation as component. (Yes / No) if yes then enter
no. of Lifts

xv. Catchment area of the reservoir/pond


xiv. Design Dead Storage capacity (MCM)

howmany times the reservior reached at


xiii. Design Live Storage capacity (MCM)

conducted (if yes then Year and revised


xix.Since commissioning of the project,
xii. Design Gross Storage capacity

reserviour capacity survey has been


xviii. No. of Project affected people
xvii. No. of Project affected families

xx. Since commissioning whether


xxiii. Design Discharge (m3/Sec) of each For Lift irrigation Scheme and for the project with lift irigation

xvi. Area of Submergence in Ha.


xi. MDDL (in meter above msl)

xxii. Length of Canal system (m)


x. MWL (in meter above msl)

live storage capacity (MCM))


canal system (main canals ) as component.

xxi. No. of main Canals


(MCM) at FRL

displaced

displaced
in Km2
at FRL

at FRL

FRL
Latitude Total
Main Canal Branch Canal Distributary Minor canals Location
Desigin Desigin & Source of No. of capacity Head of
i. Name Ii. Name of Pump
Discharge Discharge Longitude lifting and pumps of pumps Lift in
of Canal of Canal House
(m3/Sec) (m3/Sec) of pump name installed installed Meters.
(District)
house in HP.

Unlined Lined PDN Total Unlined Lined PDN Total Unlined Lined PDN Total Unlined Lined PDN Total
26 27 28 29 30 31 32 33 34 35
Has the Project taken Cost of Methods of Area Whether Command Area
over the command of O&M irrigation covered Development (CAD) Work
Water Utilization for various sectors in any other project during as under has been executed
MCM (Irrigation and Water Utilization for (Yes/No) the year envisaged micro (Yes/No)
Whether scope of the project has been increased by ERM (Yes/No). If Yes, name and year of start and completion of the ERM(s) (Rs Crore) in DPR irrigation
various sectors in MCM (Irrigation and Whether WUA's have been formed (Yes/No) if yes then Plz upload
work. ( Flood ( Ha)
others viz Hydro/ Drinking / Industrial, the GIS
etc.) Irrigation, based
Drip or Index
Sprinkler) Plz upload
map
the high
If Yes, pl provide the area showing
resolution
in Th Ha the
If yes, list the photogra
DAM/Res
if Completion if Ongoing Additional projects and area of iv. Breakup of the members ph of the
erviour/
overlap project
River/
Head
iii. main
works
ii. Area Numbers canal/
Approved showing
Name of Original Original i. Number covered of Branch
i. Total by panarami
ERM Year of Approved of WUA under members Canal
Irrigation ii Drinking iii. Others (i+ii+iii) IC/TAC/S Area
system
c view
projects Approval cost (cr.) Area of CAD covered formed WUA in WUA’s
A/UA with
complitio latest Area of Work under ( Ha) registered
Complitio Expenditu Name of command
n Year
n cost estimated
re (Cr.) CCA (Ha.) UIP (Ha.) IPC (Ha.) IPU (Ha.) Project
overlap executed CADWM . Male Female Transgen Total SC ST OBC General Total
(cr.) cost (cr.) (Th Ha) from State Scheme of der area
Govt Funding DoWR,
RD&GR, GoI.

You might also like