Data Collection Format - Rajasthan
Data Collection Format - Rajasthan
Water Resources Infrastructure Related Data in Respect of Major and Medium Irrigation Projects
Dam/Barrage/Weir/Lift
capacity (MCM)
Total
Project Storage Gross Ultimate Yearly Main Canal Branch Canals Distributaries
Districts Whether inter Culturable Irrigation Status of the
(Irrigation / (Dam), Command Irrigation Irrigation
Name of Project Benefitting Name of the River basin transfer Command Potential Project
FRL
FRL
S. No. Name of Project Multipurpose/ Diversion Area Potential Potential
State/ UT Authority Form the and River Basin is involved Area (CCA) Created (completed /
Hydro electric (Barrage/wier) (GCA) in (UIP) in Th. Utilized (IPU)
Projects (Yes / No) in Th. Ha (IPC) in Th. Ongoing)
power) , Lift, Th.Ha Ha in Th. Ha
Ha
Combination
thereof, other)
Unlined
Unlined
Unlined
Lined
Lined
Lined
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
Parwati Pickup
1 Rajasthan Baran Ganga Storage 12.55 12.55 Completed
Weir
Ganganagar,
3 Gang Canal Rajasthan Hanumangar Indus Diversion 307 184.54 Completed
h
4 Kalakh Sagar Rajasthan Jaipur Ganga Storage 10.96 2.34 Completed
5 Chhaparwada Rajasthan Jaipur, Tonk Ganga Storage 11.74 4.93 Completed
6 Sikari Rajasthan Bharatpur Ganga Diversion 10.47 5.2 Completed
Jaisamand
7 Rajasthan Udaipur Mahi Storage 16 9.6 Completed
(Udaipur)
8 Raj Samand Rajasthan Rajsamand Ganga/ Gomti Storage 10.4 7.3 Completed
l system (m)
Minor canals
Unlined
Lined
27 28
SCHEDULE FOR CENSUS OF MMI PROJECTS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Season wise irrigation potential created Season wise irrigation potential utilized (IPU)
Existing cropping pattern in the command Area
Nature of (IPC) in Ha. in Ha. (Maximum potential utilized so far)
Whether
project Whether
inter basis
(Irrigation / project is
transfer is
Multipurpose) inter-state
involved
(i)Irrigation (Yes / No) Type of
(Yes / No) Area in
season (Zaid)
Culturabl project
Bi Seasonal
(ii) Hydro Hectares in No. of
Perennial
Gross
Summer
Districts electric power e Category (storage, Ultimate
Others
Khariff
Comman
Rabi
case of Villag
S. No. Name of Name of benefitting Name of the (iii)Flood d Area Comman of project diversion, Project Irrigation
Piped e
Bi Seasonal
Bi Seasonal
Ha n of three,
Total IPC
Total IPU
Perennial
Perennial
supply (Ha.)
Others
Others
Khariff
Khariff
other)
Rabi
Rabi
(v)Fisheries
(vi) Navigation
(vii) Recreation if yes ,
Crop 1
Crop 2
Crop 1
Crop 2
Crop 1
Crop 2
Crop 1
Crop 2
Crop 1
Crop 2
Crop 1
Crop 2
(viii) Others if yes, Name of name of
the States the basins
involved
SC
ST
OBC
ral
Gene
19
Total Male
No. of People Benefitted
le
Fema
er
Trans
gend Total
Area under Drought Prone Area
Programme (DPAP)
Tribal area
and Bundelkhand region of Madhya Pradesh & Uttar Pradesh (If yes, Please provide
Kalahandi (KBK) regions of Odisha, Vidarbha & Marathwada regions of Maharashtra
(cr.)
clearances :
(cr.)
Approval Status: (Central
TAC/IC/State approved) - (If
Stage I Environment
Clearance
Stage II (Latest)
Stage I
Forest
22
Stage II Clearance
Stage I NBWL
Clearance
approved, Please provide Status of other clearnace:
Stage II
of the project
Year of completion
23
Year of commencement
of the project
Ongoing)
No. of Lifts in the Lift irrigation Scheme and for the project
Design Features of the project with lift irigation as component. (Yes / No) if yes then enter
no. of Lifts
displaced
displaced
in Km2
at FRL
at FRL
FRL
Latitude Total
Main Canal Branch Canal Distributary Minor canals Location
Desigin Desigin & Source of No. of capacity Head of
i. Name Ii. Name of Pump
Discharge Discharge Longitude lifting and pumps of pumps Lift in
of Canal of Canal House
(m3/Sec) (m3/Sec) of pump name installed installed Meters.
(District)
house in HP.
Unlined Lined PDN Total Unlined Lined PDN Total Unlined Lined PDN Total Unlined Lined PDN Total
26 27 28 29 30 31 32 33 34 35
Has the Project taken Cost of Methods of Area Whether Command Area
over the command of O&M irrigation covered Development (CAD) Work
Water Utilization for various sectors in any other project during as under has been executed
MCM (Irrigation and Water Utilization for (Yes/No) the year envisaged micro (Yes/No)
Whether scope of the project has been increased by ERM (Yes/No). If Yes, name and year of start and completion of the ERM(s) (Rs Crore) in DPR irrigation
various sectors in MCM (Irrigation and Whether WUA's have been formed (Yes/No) if yes then Plz upload
work. ( Flood ( Ha)
others viz Hydro/ Drinking / Industrial, the GIS
etc.) Irrigation, based
Drip or Index
Sprinkler) Plz upload
map
the high
If Yes, pl provide the area showing
resolution
in Th Ha the
If yes, list the photogra
DAM/Res
if Completion if Ongoing Additional projects and area of iv. Breakup of the members ph of the
erviour/
overlap project
River/
Head
iii. main
works
ii. Area Numbers canal/
Approved showing
Name of Original Original i. Number covered of Branch
i. Total by panarami
ERM Year of Approved of WUA under members Canal
Irrigation ii Drinking iii. Others (i+ii+iii) IC/TAC/S Area
system
c view
projects Approval cost (cr.) Area of CAD covered formed WUA in WUA’s
A/UA with
complitio latest Area of Work under ( Ha) registered
Complitio Expenditu Name of command
n Year
n cost estimated
re (Cr.) CCA (Ha.) UIP (Ha.) IPC (Ha.) IPU (Ha.) Project
overlap executed CADWM . Male Female Transgen Total SC ST OBC General Total
(cr.) cost (cr.) (Th Ha) from State Scheme of der area
Govt Funding DoWR,
RD&GR, GoI.