Executive Project
Architectural Plans
Once this is known, now let's get to what concerns us: What plans
Does it contemplate the Executive Project? Well, to start the executive project
it must include all architectural plans. Let us remember that these plans
they are the ones who embody the form and style of our project, everything that is projected
here it will be supported by the following plans more in detail and specific of the
functioning for example of the facilities. Within the Architectural the
Plans and elements that make up an executive project are the following:
Descriptive report of the project
Combined plant
Architectural Plants
Sections (longitudinal, transversal or as many as necessary)
Facades or elevations
Cuts by facade
Masonry plant
Finishing plant
Finishes and painting on facades
Construction details
Gardening details
Carpentry and blacksmithing plans.
Plan of doors and windows.
Structural Plans
Within the structural aspect of the executive project, we will be able to find the plans.
they project the structural design as well as the necessary calculations to achieve that
solution of structure, we will also find the elements and composition of
the structural elements in detail. Within the plans and elements that
we can find the following in structural material:
Calculation memory
Foundation plant
Plan of slabs and reinforcement details
Details of beams, columns, and pillars
Specifications and quantifications of steel
Concrete specifications
Load schedule
Installation Plans
In terms of installations, we must include all the plans that help to
understand and execute the services and systems of a home's installations
or a building, the installation plans of an executive project are the
following:
Sanitary installation and rainwater plant. Sanitary network plan.
sanitary section and details of pipe diameters as well as details
constructive elements of inspection chambers or access pits.
Hydraulic installation. Hydraulic network plant, isometry and details of
pipe diameters and reductions. Bathroom details, pump
hydropneumatics, cisterns or tanks and swimming pool (if existing)
Electrical installation. Power plant, circuit panel, details of
luminaires as well as their distribution and connections, detail of the service connection and
electric memory.
Gas installation. Plant, isometry, and connection details, detail of
machine room and boilers (if existing)
Special facilities. Within these facilities, we will find
air conditioning systems, telephony, internet, closed circuit of
TV, etc. In these cases, we must attach the distribution plans as well.
like the details of connections and wiring.
Home automation. In the case of designing a house or building that ...
it contains a home automation system or smart home, the plans would be the
following: Distribution plant of the cabling network, as well as details
connection of the touch panels to program the tasks of the
housing.
Sustainability
In the case that some ecotech is implemented in the home, we must
attach all the necessary plans to the executive project in order to be able to
execute them on site, among the most commonly used systems we can find the
following:
Green Roofs. Distribution plant, section and details of the
components of the system as well as details of the flora that the roof will have
Biodigester. Constructive detail of the biodigester and location in the plant
within the project.
Composed. Constructive detail and location within the project.
Rainwater harvesting system. Collection network plant and
distribution and details of pipe diameters and fittings.
Solar panels. Plant for the installation of panels as well as the network of
cabling and distribution, as well as connection details.
Work schedule or calendar
The schedule or work calendar is essential for good control of the
work, it must detail the start and end dates of all the jobs or
concepts that are going to be executed. There are two ways to create a schedule
One for months and items being a bit more generic, and the other for days
and concepts, which allows for a more detailed examination of the work. From
then the second one offers us greater control and detail, but also the
A schedule by months and items is mainly drawn up for large projects.
magnitude, the schedules can be made through a process called 'route
"criticism," also through programs or software.
Budget
Another fundamental part of the executive project is the budget, which is composed of
from different parts among which we can find the following:
Catalog of concepts
Labor catalog
Material Catalog
Generator numbers
Unit Prices
Breakdown of taxes
Budget
3D visualization (render, physical model or virtual tour)
Last but not least, we have the 3D visualization of the project,
in this case we have the rendering that consists of images that represent the
three-dimensional project, we can also find the physical model that
we all know and finally the virtual tour that is also a way of
know the project before it is built.
Example of executive project