0% found this document useful (0 votes)
37 views4 pages

Counter Weight Deadman Foundation Rebar Inspection Report

Uploaded by

charliemolavin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
37 views4 pages

Counter Weight Deadman Foundation Rebar Inspection Report

Uploaded by

charliemolavin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

Counter Weight @ Deadman Foundation Rebar Inspection Report

Site Code: PH410207


Region: IV-
Site Address: PUROK PAUNLARIN, BRGY. CALATEGAS, B
NARRA, PALAWAN

Counter Weight @ Deadman Foundation Rebar Inspection Report


Work Control Record

This is to certify that the reinforcement works has been supervised and conducted
as per project specifications and in accordance with local codes and standards.

Date : September 27 , 2025 Rebar Supplier: Twin’s D Construction


Supply
Structure : Deadman Foundation
Line and Grade : NGL Excavation (Depth) : 200mm
Footing Dimension(L,W,H): 600 x 2500 x Pedestal Dimension(L,W,H): N/A
2500mm
Diameter Installation
Top Bar : 12mm Top Bar : 12mm
Bottom Bar : 12mm Bottom Bar : 12mm
Stirrups / Lateral Ties : N/A Stirrups / Lateral Ties : N/A
Vertical Bar : N/A Vertical Bar : N/A
Quantity Spacing
Top Bar : 128 pcs Top Bar : spcd @ 150mm o c
Bottom Bar : 128 pcs Bottom Bar : spcd @ 150mm o c
Stirrups / Lateral Ties : N/A Stirrups / Lateral Ties : N/A
Vertical Bar : N/A Vertical Bar : N/A
Chair Bar : 12mm Def. Bar
Marking Legend :
Formworks 2 x 2
P - Passed :
NP – Not Passed Anchor Bolts : N/A
Setting Plate : N/A
Tie wires : #16 GI Tie Wires
Concrete Cover: Bottom: 75mm
Sides: 75mm
Top: 75mm
Remarks :

FTAP Tower Foundation Rebar


Inspection Report Page 1 of
4
Counter Weight @ Deadman Foundation Rebar Inspection Report
Site Code: PH410207
Region: IV-
Site Address: PUROK PAUNLARIN, BRGY. CALATEGAS, B
NARRA, PALAWAN

PHOTOGRAPHS

Reinforcement
Setting

FTAP Tower Foundation Rebar


Inspection Report Page 2 of
4
Counter Weight @ Deadman Foundation Rebar Inspection Report
Site Code: PH410207
Region: IV-
Site Address: PUROK PAUNLARIN, BRGY. CALATEGAS, B
NARRA, PALAWAN

Concrete Cover Foundation Base Concrete Cover Foundation @ sides

Concrete Cover @ Top

CONTRACTOR REPRESENTATIVE FTAP REPRESENTATIVE


Name : TYRONE PATRICK T. MORANTE Name : RAUL M CENIZA
Signature : Signature :

Date : 9/27/2025 Date : 9/27/2025

FTAP Tower Foundation Rebar


Inspection Report Page 3 of
4
Counter Weight @ Deadman Foundation Rebar Inspection Report
Site Code: PH410207
Region: IV-
Site Address: PUROK PAUNLARIN, BRGY. CALATEGAS, B
NARRA, PALAWAN

FTAP Tower Foundation Rebar


Inspection Report Page 4 of
4