DPWH Plan
DPWH Plan
A-8 MAIN STAIR DETAIL PLANS E-3 GROUND FLOOR LIGHTING LAYOUT
P E R S P E C T I V E STRUCTURAL PLUMBING
(TWO STOREY BARRACKS)
S-1 GENERAL NOTES P-1 PLUMBING NOTES
PROJECT TITLE & LOCATION: SHEET CONTENT: DRAFTED: CHECKED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHT NO.:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CHRISTIAN M. MARTINEZ
OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION OF PERSPECTIVE ENGINEERING ASSISTANT
NUEVA ECIJA 2ND DISTRICT ENGINEERING OFFICE TRAINING BARRACKS, TABLE OF CONTENTS 01
REGION III HAAR-PHILIPPINE ARMY, VICINITY MAP
PREPARED: A-1
ROMEO A. LADISLA MARLON G. HERNANDEZ CARLOS M. LEABRES ELPIDIO Y. TRINIDAD 26
SAN ISIDRO, CABANATUAN CITY FORT MAGSAYSAY, NUEVA ECIJA SITE DEVELOPMENT PLAN CARETAKER, OFFICE OF THE ASST. DISTRICT ENGINEER
ASST. CHIEF, PLANNING & DESIGN SECTION CHIEF, PLANNING & DESIGN SECTION DISTRICT ENGINEER
IRENEO C. VALINO CONCURRENT, CHIEF QUALITY ASSURANCE SECTION
27.00
1.50 3.00 3.00 1.50 3.00 1.50 3.00 1.50 2.35 6.65
3.00
W-2 5 7 EXIT LAUNDRY AREA W-2
4 8 D4 FL-2 D4 ELEV. 500.00 mm
FL-2
BEDROOM 3 BEDROOM 4
4.50
4.50
3 9 KITCHEN
BEDROOM 1 2 10 FL-1 FL-1
FL-1 D2 D3 FL-1
D4 1 11
UP 12
IWF-2
2.00
13
C.R.
1.50
D3 D3
W-4 IWF-1
FL-3 D3 D3
9.00
2
FL-3
W-4
1.50
D3 IWF-1
2.00
D4 D3 ELEV. 500.00 mm
4.50
4.50
BEDROOM 2 ELEV. 500.00 mm MESS HALL W-3
FL-1 IWF-1
LOUNGE FL-1
D4
3.00
W-2 FL-1 BEDROOM 5 IWF-1
2.50
FL-2
EWF-1 EWF-1
ELEV. 480.00 mm ELEV. 480.00 mm 27.00
3.00
3.00
STEP UP STEP UP
PORCH PORCH
3.78
4.50 4.50 4.50 4.50 4.50 4.50
1.65
FL-2 FL-2
1 2 3 FL-4 3 2 1 1.50 3.00 3.00 1.50 3.00 1.50 3.00 1.50 2.50 2.00 3.00 1.50
4 3 RAMP 3
0.78
2 UP 2
1 1
STEP UP STEP UP
1 2 3 4 5 6 7 8 9
3.13 1.37 4.50 1.80 1.20 4.20 1.80 4.50 1.37 3.13 FL-2
EWF-1 16 15 14 13 12 11 10
BALCONY DOWN
4.50 18.00 4.50 W-1 W-5 W-4 W-1 W-1 W-4 W-2 W-4
1
FL-3 FL-3
FL-2 D4 W-1
FL-3 C.R.
IWF-1 C.R. C.R.
2.50
2.50
1 GROUND FLOOR PLAN 6 IWF-2
EXIT
IWF-2 IWF-2
SCALE 1:100 M.
A-2 W-2 5 7 D4 D4 W-2
4 8 FL-2
BEDROOM 8 BEDROOM 10
4.50
4.50
BEDROOM 6 3 9 BEDROOM 13
2 10 FL-1 FL-1 FL-1
FL-1 D2 D3
D4 1 11 D4
12 BEDROOM 12
IWF-2 IWF-2
2.00
2.00
13 FL-1
C.R. 14 C.R.
D3 D3
W-4 15 W-4
FL-3 16 DN. D3 D3 FL-3
9.00
2
FL-3 FL-3
W-4 D3 W-4
D3
2.00
2.00
C.R. IWF-1 C.R.
IWF-2 IWF-2
D4 D3 D3 D4
IWF-1 IWF-1 IWF-1 IWF-1
4.50
4.50
SCHEDULE OF FLOOR FINISHES : SCHEDULE OF WALL FINISHES : BEDROOM 7 BEDROOM 14
FL-1 FL-1
MARK FLOOR DESCRIPTION MARK WALL DESCRIPTION W-2 LOUNGE BEDROOM 9 D4 D4
BEDROOM 11 LOUNGE W-2
2.50
2.50
FL-1 FL-1 FL-1
150 mm THK. CHB EXTERIOR WALL WITH PLAIN FL-1
IWF-2 C.R. C.R. IWF-2
FL - 1 600 X 600 mm GLAZED TILES FLOOR FINISH CEMENT PLASTER PAINTED FINISH
EWF - 1 EWF-1 EWF-1
(SUBMIT COLOR SCHEMES FOR APPROVAL) FL-3 FL-3
600 X 600 mm VITRIFIED UNGLAZED TILES
FL - 2 100 mm THK. CHB INTERIOR WALL WITH PLAIN 3
FLOOR FINISH
IWF - 1 CEMENT PLASTER PAINTED FINISH W-1 W-1 W-1 W-1
300 X 300 mm VITRIFIED UNGLAZED TILES (SUBMIT COLOR SCHEMES FOR APPROVAL) D1 D1
FL - 3 EWF-1 EWF-1 EWF-1
FLOOR FINISH
3.00
3.00
300 X 600 mm VITRIFIED GLAZED TILE WALL EWF-1 EWF-1 EWF-1 EWF-1
FL - 4 PLAIN CEMENT FLOOR FINISH IWF - 2 FINISH (SIZE & OR COLOR FOR APPROVAL BY THE BALCONY BALCONY
END-USER) - 1.20m HEIGHT FROM C.R.'s FFL. FL-2 FL-2
EWF-1 EWF-1
PROJECT TITLE & LOCATION: SHEET CONTENT: DRAFTED: CHECKED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHT NO.:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CHRISTIAN M. MARTINEZ
OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION OF GROUND FLOOR PLAN ENGINEERING ASSISTANT
NUEVA ECIJA 2ND DISTRICT ENGINEERING OFFICE TRAINING BARRACKS, SECOND FLOOR PLAN 02
REGION III HAAR-PHILIPPINE ARMY, SCHEDULE OF WALL FINISHES
PREPARED: A-2
ROMEO A. LADISLA MARLON G. HERNANDEZ CARLOS M. LEABRES ELPIDIO Y. TRINIDAD 26
SAN ISIDRO, CABANATUAN CITY FORT MAGSAYSAY, NUEVA ECIJA SCHEDULE OF FLOOR FINISHES CARETAKER, OFFICE OF THE ASST. DISTRICT ENGINEER
ASST. CHIEF, PLANNING & DESIGN SECTION CHIEF, PLANNING & DESIGN SECTION DISTRICT ENGINEER
IRENEO C. VALINO CONCURRENT, CHIEF QUALITY ASSURANCE SECTION
2.50
Ga. 26 PRE-PAINTED ROOFING 3" THICK CONCRETE CANOPY
SHEET (LONG SPAN) EXTRUDES 500mm FROM WALL
TOP OF BEAM TOP OF BEAM
0.30
0.30
CEILING LINE CEILING LINE 2" x 4" x 1.5mm TUBULAR
2" x 4" x 1.5mm TUBULAR STEEL
2.70
2.70
STEEL
9.20
9.20
4" CHB WALL - PLASTERED 6" CHB WALL - PLASTERED
SECOND FINISH FLOOR LINE PAINTED FINISH SECOND FINISH FLOOR LINE PAINTED FINISH
0.40
0.40
CEILING LINE CEILING LINE
38 MM Ø STAINLESS STEEL
PIPE 38 MM Ø STAINLESS STEEL
2.80
2.80
PIPE
0.50
FINISH GRADE LINE FINISH GRADE LINE
G F E D C B A 4 3 2 1
2.50
Ga. 26 PRE-PAINTED ROOFING Ga. 26 PRE-PAINTED ROOFING
SHEET (LONG SPAN) SHEET (LONG SPAN)
0.30
CEILING LINE CEILING LINE
2" x 4" x 1.5mm TUBULAR
STEEL
2.70
2.70
2" x 2" x 1.5mm TUBULAR
9.20
9.20
STEEL HANDRAIL 1" x 1" x 1.5mm TUBULAR
(HORIZONTAL) RAILINGS (VERTICAL)
SECOND FINISH FLOOR LINE SECOND FINISH FLOOR LINE
0.40
0.40
CEILING LINE CEILING LINE
1" x 1" x 1.5mm TUBULAR 2" x 2" x 1.5mm TUBULAR
RAILINGS (VERTICAL) STEEL HANDRAIL
2.80
2.80
(HORIZONTAL)
0.50
FINISH GRADE LINE FINISH GRADE LINE
PROJECT TITLE & LOCATION: SHEET CONTENT: DRAFTED: CHECKED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHT NO.:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CHRISTIAN M. MARTINEZ
OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION OF FRONT ELEVATION ENGINEERING ASSISTANT
NUEVA ECIJA 2ND DISTRICT ENGINEERING OFFICE TRAINING BARRACKS, LEFT-SIDE ELEVATION 03
REGION III HAAR-PHILIPPINE ARMY, REAR ELEVATION
PREPARED: A-3
ROMEO A. LADISLA MARLON G. HERNANDEZ CARLOS M. LEABRES ELPIDIO Y. TRINIDAD 26
SAN ISIDRO, CABANATUAN CITY FORT MAGSAYSAY, NUEVA ECIJA RIGHT-SIDE ELEVATION CARETAKER, OFFICE OF THE ASST. DISTRICT ENGINEER
ASST. CHIEF, PLANNING & DESIGN SECTION CHIEF, PLANNING & DESIGN SECTION DISTRICT ENGINEER
IRENEO C. VALINO CONCURRENT, CHIEF QUALITY ASSURANCE SECTION
2.50
S E E T R U S S D E T A I L
S E E T R U S S D E T A I L
TOP OF BEAM TOP OF BEAM
0.30
0.30
CEILING LINE CEILING LINE
2.70
2.70
C.R. BEDROOM 7 STAIR H A L L W A Y LOUNGE BEDROOM 14 C.R. BALCONY BEDROOM 11 BEDROOM 10 BALCONY
9.20
9.20
SECOND FINISH FLOOR LINE SECOND FINISH FLOOR LINE
0.40
0.40
CEILING LINE CEILING LINE
2.80
2.80
C.R. BEDROOM 2 STAIR H A L L W A Y MESS HALL PORCH BEDROOM 5 BEDROOM 4
0.50
EMBANKMENT EMBANKMENT EMBANKMENT EMBANKMENT EMBANKMENT
FINISH GRADE LINE FINISH GRADE LINE
A B C D E F G
ROOF LEGEND:
29.35
MARK DESCRIPTION
1.175 4.50 4.50 4.50 4.50 4.50 4.50 1.175
G.A. 26 PRE-PAINTED LONG SPAN METAL ROOFING
SHEET
FS FLASHING
1
RD ROOF DRAIN
RR
RR
4.50
RR RR
11.35
2 RD RD
4.50
RR
VG
VG
VG
3
1.175
RR
RR
RD RD RD RD RD RD RD
1.70
FS FS
4 RD RD RD RD
3 ROOF PLAN
SCALE 1:100 M.
A-4
PROJECT TITLE & LOCATION: SHEET CONTENT: DRAFTED: CHECKED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHT NO.:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CHRISTIAN M. MARTINEZ
OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION OF CROSS SECTION ENGINEERING ASSISTANT
NUEVA ECIJA 2ND DISTRICT ENGINEERING OFFICE TRAINING BARRACKS, LONGITUDINAL SECTION 04
REGION III HAAR-PHILIPPINE ARMY, ROOF PLAN
PREPARED: A-4
ROMEO A. LADISLA MARLON G. HERNANDEZ CARLOS M. LEABRES ELPIDIO Y. TRINIDAD 26
SAN ISIDRO, CABANATUAN CITY FORT MAGSAYSAY, NUEVA ECIJA ROOF LEGEND CARETAKER, OFFICE OF THE ASST. DISTRICT ENGINEER
ASST. CHIEF, PLANNING & DESIGN SECTION CHIEF, PLANNING & DESIGN SECTION DISTRICT ENGINEER
IRENEO C. VALINO CONCURRENT, CHIEF QUALITY ASSURANCE SECTION
27.00
1.50 3.00 3.00 1.50 3.00 1.50 3.00 1.50 2.35 6.65
INTERIOR CEILING:
1/4" FIBER CEMENT CEILING BOARD
ON LIGHT STEEL FRAMING SYSTEM
SPACED @ 0.40m - SHORT
DIRECTION, 0.60m - LONG
DIRECTION
1
2.50
2.50
STAIR
LAUNDRY AREA
±2.80m
BEDROOM 3 BEDROOM 4
4.50
4.50
BEDROOM 1 KITCHEN
±2.80m ±2.80m ±2.80m
±2.80m
2.00
2.00
9.00
2.00
1/4" FIBER CEMENT CEILING BOARD 1/4" FIBER CEMENT
ON LIGHT STEEL FRAMING SYSTEM CEILING BOARD ON LIGHT
SPACED @ 0.40m - SHORT STEEL FRAMING SYSTEM
4.50
4.50
BEDROOM 2 MESS HALL
LOUNGE ±2.80m DIRECTION, 0.60m - LONG SPACED @ 0.60m - BOTHWAYS
±2.80m DIRECTION PAINTED FINISH (WHITE)
±2.80m BEDROOM 5
2.50
2.50
±2.80m
A B C D E F G
3
1.35
27.00
3.00
PORCH PORCH
±2.80m ±2.80m
1.65
1.50 3.00 3.00 1.50 3.00 1.50 3.00 1.50 2.50 2.00 3.00 1.50
3.13 1.37 4.50 1.37 6.25 1.37 4.50 1.37 3.13 BA LCONY
2.50
2.50
BEDROOM 7 BEDROOM 9
4.50
4.50
1 GROUND FLOOR REFLECTED CEILING PLAN BEDROOM 5 BEDROOM 12
±2.70m ±2.70m ±2.70m
A-5 SCALE 1:100 M. ±2.70m
BEDROOM 11
2.00
2.00
±2.70m
9.00
2
2.00
2.00
4.50
4.50
BEDROOM 6 BEDROOM 13
±2.70m LOUNGE ±2.70m
LOUNGE BEDROOM 8 BEDROOM 10 ±2.70m
2.50
2.50
±2.70m ±2.70m ±2.70m
3.00
3.00
BALCONY BALCONY
±2.70m ±2.70m
PROJECT TITLE & LOCATION: SHEET CONTENT: DRAFTED: CHECKED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHT NO.:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CHRISTIAN M. MARTINEZ
OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION OF ENGINEERING ASSISTANT
GROUND FLOOR REFLECTED CEILING PLAN 05
NUEVA ECIJA 2ND DISTRICT ENGINEERING OFFICE TRAINING BARRACKS,
REGION III HAAR-PHILIPPINE ARMY,
SECOND FLOOR REFLECTED CEILING PLAN PREPARED: A-5
CEILING DETAILS ROMEO A. LADISLA MARLON G. HERNANDEZ CARLOS M. LEABRES ELPIDIO Y. TRINIDAD 26
SAN ISIDRO, CABANATUAN CITY FORT MAGSAYSAY, NUEVA ECIJA CARETAKER, OFFICE OF THE ASST. DISTRICT ENGINEER
ASST. CHIEF, PLANNING & DESIGN SECTION CHIEF, PLANNING & DESIGN SECTION DISTRICT ENGINEER
IRENEO C. VALINO CONCURRENT, CHIEF QUALITY ASSURANCE SECTION
DEPTH OF CEILING
HANGER WITH
ADJUSMENT SPRING
400
1 ANGLE ∠20 X 20 X 2 ATTACHED TO CHB WALL 2
400
W/ TOKS SCREWS @ 600 O.C.
METAL DOUBLE FURRING CHANNEL (NAILER)
400
12mm x 38mm x 5m x 0.8mm THK.
400 ROD SUSPENSION HANGER AT 400mm O.C.
250 WITH ADJUSTMENT SPRING 250
400
400
SPOT DETAIL
100
RB-2
METAL CARRYING CHANNEL (CEILING JOIST)
12mm x 38mm x 5m x 0.8mm THK. AT 1200mm O.C.
PRIMARY CHANNEL 12
00 FIBER CEMENT CEILING BOARD 4.5mm THK.
1.60
0.80 0.80
0.90 0.80 0.70
0.30
PROVIDE INSECT SCREEN 25 x 25mm WOOD SLAT
7
A-3
FROM 25 x 75mm WOOD FRAME (PAINT FINISH)
2.40
2.10
2.10
2.10
2.10
300
0.60
0.60
PROVIDE INSECT SCREEN F F F F
12 325 12
1.20
1.20
1.20
4.5mm THK. FIBER CEMENT
2.10
2.10
2.10
2.10
2.10
CEILING BOARD (PAINTED) ON
1.50
1.50
METAL FURRING CHANNEL @
ROOF BEAM
0.90
0.90
0.90
400mm O.C. (SEE DETAIL)
PROJECT TITLE & LOCATION: SHEET CONTENT: DRAFTED: CHECKED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHT NO.:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CHRISTIAN M. MARTINEZ
OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION OF ENGINEERING ASSISTANT
CEILING DETAILS
NUEVA ECIJA 2ND DISTRICT ENGINEERING OFFICE TRAINING BARRACKS, 06
REGION III HAAR-PHILIPPINE ARMY,
VENT DETAILS PREPARED: A-6
SCHEDULE OF DOORS & WINDOWS ROMEO A. LADISLA MARLON G. HERNANDEZ CARLOS M. LEABRES ELPIDIO Y. TRINIDAD 26
SAN ISIDRO, CABANATUAN CITY FORT MAGSAYSAY, NUEVA ECIJA CARETAKER, OFFICE OF THE ASST. DISTRICT ENGINEER
ASST. CHIEF, PLANNING & DESIGN SECTION CHIEF, PLANNING & DESIGN SECTION DISTRICT ENGINEER
IRENEO C. VALINO CONCURRENT, CHIEF QUALITY ASSURANCE SECTION
LOUNGE COMFORT ROOM BEDROOM 5 MESS HALL NON - SKID CEMENT FLOOR FINISH
WITH 6mm HORIZONTAL GROOVE LINES
1.30
1.30
H A L L W A Y
2.75
19mm/VARIABLE
19mm/VARIABLE
6
NON - SKID CEMENT FLOOR FINISH
3.70
PORCH PORCH 6 mm THK.
GROOVE LINE
6
WITH 6 mm HORIZONTAL GROOVE LINES
1.45
6
2.40
FL-4 REINFORCED CONCRETE SLAB
4 3 3
RAMP UP
2 2
1 1
STEP UP STEP UP 2 RAMP DETAIL SECTION (BLOW-UP)
SCALE: 1: 20M.
A-7
38 mm Ø STAINLESS STEEL PIPE
1.625 1.20 3.00 1.20 1.625 RAILINGS HANDRAIL
8.65
C D E C D E
NON - SKID CEMENT FLOOR NON - SKID CEMENT FLOOR
FINISH WITH 6mm HORIZONTAL FINISH WITH 6mm HORIZONTAL
GROOVE LINES GROOVE LINES
0.22
0.22
0.22
0.22
0.90
0.90
0.90
0.90
0.90
0.90
0.68
0.68
0.68
0.68
FINISH FLOOR LINE FINISH FLOOR LINE
0.50
0.50
0.48
0.48
0.48
0.48
0.24
0.24
NATURAL GRADE LINE NATURAL GRADE LINE
1.625 1.20 3.00 1.20 1.625 1.625 1.20 3.00 1.20 1.625
8.65 8.65
PROJECT TITLE & LOCATION: SHEET CONTENT: DRAFTED: CHECKED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHT NO.:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CHRISTIAN M. MARTINEZ
OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION OF ENGINEERING ASSISTANT
NUEVA ECIJA 2ND DISTRICT ENGINEERING OFFICE TRAINING BARRACKS, 07
REGION III HAAR-PHILIPPINE ARMY,
RAMP DETAILS PREPARED: A-7
ROMEO A. LADISLA MARLON G. HERNANDEZ CARLOS M. LEABRES ELPIDIO Y. TRINIDAD 26
SAN ISIDRO, CABANATUAN CITY FORT MAGSAYSAY, NUEVA ECIJA CARETAKER, OFFICE OF THE ASST. DISTRICT ENGINEER
ASST. CHIEF, PLANNING & DESIGN SECTION CHIEF, PLANNING & DESIGN SECTION DISTRICT ENGINEER
IRENEO C. VALINO CONCURRENT, CHIEF QUALITY ASSURANCE SECTION
1 1
L A N D I N G L A N D I N G
1.40
1.40
1.40
1.40
FL-2 2" x 2" x 1.5mm TUBULAR FL-2 L A N D I N G L A N D I N G
1.00
1.00
1.00
1.00
6 STEEL HANDRAIL 6
(HORIZONTAL) FL-2 FL-2
5 7 5 7 9 9
4 8 1" x 1" x 1.5mm TUBULAR 4 8 8 10 8 10
4.10
4.10
RAILINGS (VERTICAL)
1.50
1.50
3 9 3 9 7 11 7 11
4.50
4.50
3.40
3.40
3.40
3.40
2 10 2 10 6 12 6 12
1.80
1.80
2.70
2.70
1 11 1 11 5 13 5 13
2.40
2.40
UP 12 12 4 14 4 14
13 3 15 3 15
2 16 2 16 DOWN
1.60
1.60
14
0.60
0.60
15 1 1
16 UP
DOWN
2 2
1 MAIN STAIR DETAIL PLAN (GROUND FLOOR) 2 MAIN STAIR DETAIL PLAN (SECOND FLOOR) 3 FIRE EXIT STAIR DETAIL PLAN (GROUND FLOOR) 4 FIRE EXIT STAIR DETAIL PLAN (SECOND FLOOR)
SCALE 1 : 50 M. SCALE 1 : 50 M. SCALE 1 : 50 M. SCALE 1 : 50 M.
A-8 A-8 A-8 A-8
1 1 B G 1
4.50 2.95
2.50
SEE T RUSS DETAIL
SEE T RUSS DET AIL
1" x 1" x 1.5mm TUBULAR
SE E ROOF DE T AIL
RAILINGS (VERTICAL)
SEE TRUSS DETAIL
TOP OF BEAM TOP OF BEAM
0.30
0.30
CEILING LINE CEILING LINE
2.70
1" x 1" x 1.5mm TUBULAR
9.20
9.20
RAILINGS (VERTICAL)
0.90
0.90
0.90
0.65
0.65
0.65
SECOND FINISH FLOOR LINE SECOND FINISH FLOOR LINE
0.40
0.40
CEILING LINE CEILING LINE
0.90
0.65
2.80
2.80
50mm thk. GRAVEL FILL
0.90
0.65
FINISH FLOOR LINE FINISH FLOOR LINE
0.50
0.50
E M B A N K M E N T E M B A N K M E N T
NATURAL GRADE LINE NATURAL GRADE LINE
50mm thk. GRAVEL FILL
PROJECT TITLE & LOCATION: SHEET CONTENT: DRAFTED: CHECKED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHT NO.:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CHRISTIAN M. MARTINEZ
OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION OF MAIN STAIR DETAIL PLANS ENGINEERING ASSISTANT
NUEVA ECIJA 2ND DISTRICT ENGINEERING OFFICE TRAINING BARRACKS, FIRE EXIT STAIR DETAIL PLANS 08
REGION III HAAR-PHILIPPINE ARMY, MAIN STAIR BAY SECTIONS
PREPARED: A-8
ROMEO A. LADISLA MARLON G. HERNANDEZ CARLOS M. LEABRES ELPIDIO Y. TRINIDAD 26
SAN ISIDRO, CABANATUAN CITY FORT MAGSAYSAY, NUEVA ECIJA FIRE EXIT STAIR BAY SECTIONS CARETAKER, OFFICE OF THE ASST. DISTRICT ENGINEER
ASST. CHIEF, PLANNING & DESIGN SECTION CHIEF, PLANNING & DESIGN SECTION DISTRICT ENGINEER
IRENEO C. VALINO CONCURRENT, CHIEF QUALITY ASSURANCE SECTION
GENERAL NOTES NOTES ON CONCRETE MIXES & PLACING 3. IF SLABS AR E REINFORCED BOTHWAYS BARS ALONG THE SHORTER SPAN SHALL BE
1.0 STANDARDS AND REFERENCES PLACED BELOW THOSE ALONE THE LONG SPAN AT THE CENTER AND OVER THE LONGER
THE FOLLOWING SHALL GOVERN THE DESIGN FABRICATION AND CONSTRUCTION OF THE 1. ALL CONCRETE SHALL DEVELOP A MIN. COMPRESSIVE STRENGTH AT THE END OF SPAN FOR REINFORCING BARS NEAR THE SUPPORTS. THE SPACING OF THE BARS AT THE
TWENTY EIGHT COLUMN STRIPS SHALL NOT BE MORE THAN ONE AND A HALF ( ) SLAB
PROJECT. JOINT HOOP SPACE @ "2Sh"
(28) DAYS W/ CORRESPONDING MAXIMUM SIZE AGGREGATE & SLUMP AS FOLLOWS. THICKNESS.
1.1 NATIONAL STRUCTURAL CODE OF THE PHILIPPINES (N.S.C.P 2015) VOL. 1, SEVENTH WHEN THERE ARE BEAMS
1
EDITION. 4. TEMPERATURE 1BARS FOR SLAB SHALL BE GENERALLY PLACED NEAR THE FACE IN HAVING WIDTH OF AT LEAST
CONF. REINF.
2
JOINT REINF.
2.0 DESIGN CRITERIA LOCATION 28 DAYS MAX. SIZE MAX SLUMP TENSION AND SHALL NOT BE LESS THAN 0.0025 X GROSS-SECTIONAL AREA (Ag) ONE-HALF THE COLUMN
2.1 LOADINGS STRENGTH OF OF THE SLAB. ( SEE SCHEDULE BELOW) WIDTH & DEPTHS NOT LESS
D
ALL OTHERS, INCLUDING
A. DEAD LOAD AGGREGATE THAN THREE QUARTERS OF
SUSPENDED SLABS 4000 PSI (27.6 MPa) 20 mm 100mm
CONCRETE 23.56 kN/m SCHEDULE OF MINIMUM SLAB REINFORCEMENT THE DEEPEST BEAM THAT
COLUMNS 4000 PSI (27.6 MPa) 20 mm 100mm
STEEL 76.93 kN/m FRAME INTO FOUR SIDES OF
BEAMS 4000 PSI (27.6 MPa) 20 mm 100mm MINIMUM TEMPERATURE
150 mm THK. CHB WALL 2.73 kPa THE COLUMN. ALL OTHER
CONF. REINF.
2. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS.
ROOF 1.00 kPa 150 mm 10mm Ø @ 250mm EACH WAY
SUSPENDED SLABS 20mm
OFFICES 1.90 kPa
175 mm 10mm Ø @ 250mm EACH WAY
D
SLAB ON GRADE 40mm
TOILETS 1.90 kPa
WALLS ABOVE THE GRADE 25mm 200 mm 10mm Ø @ 250mm EACH WAY FOR COL. BAR SPLICES SEE
STAIRS 3.80 kPa
BEAM STIRRUPS AND COLUMN TIES 40mm TABLE OF MIN. LAP SPLICE
PORCH 4.80 kPa
WHERE CONCRETE IS EXPOSED TO AT 250mm O.C. EACH WAY TO CENTER OF SLAB AND CONSTRUCTION JOINTS FOR SAME LENGTH OF COLUMN
C. WIND LOAD
EARTH BUT POURED AGAINST FORMS 50mm SHALL NOT BE LESS THAN 3.65 METER APART. REINFORCEMENT
BUILDING CATEGORY = 1 (ESSENTIAL FACILITIES)
WHERE CONCRETE IS DEPOSITED
DIRECTLY AGAINST EARTH 75mm 5. CONCRETE SLAB REINFORCEMENT BE PROPERLY SUPPORTED WITH 10mm STEEL
CHAIR OR APPROVED EQUIVALENT SPACED AT 1.0 METER ON CENTER BOTHWAYS.
OPTION 1 OPTION 2
CONF. REINF.
3. CONCRETE SHALL BE DEPOSITED IN ITS FINAL POSISITON WITHOUT SEGREGATION. AS SHOWN BELOW.
JOINT REINF.
EXPOSURE CAT.
(FLAT UNOBSTRUCTED AREAS
D AND/OR NEAR BODIES OF WATER)
(URBAN OR SUBURBAN AREAS WITH NUMEROUS
B CLOSELY SPACED OBSTRUCTIONS) RE-HANDLING OR PLACING SHALL BE DONE PREFERABLY WITH BUGGIES , BUCKETS OR NOTE:
WHEELBARROWS, NO CHUTES WILL BE ALLOWED EXCEPT TO TRANSFER CONCRETE DOWN INTO EDGE BEAM.
D
WIND VELOCITY V=340 KPH
P = qh [(GCpf)-(GCpi)] V=270 KPH
(DESIGN WIND PRESSURE) ALL CONCRETE REINF.
FROM HOPPERS TO BUIGGIES, WHEELBARROWS OR BUCKETS IN WHICH CASE THEY EXTENDED 4-Ø 12@ 1800 DETAIL SHOULD BE DONE IN
WHERE: qh = VELOCITY PRESSURE (kPa)
SHALL NOT EXCEED SIX (6) METERS IN AGGREGATE LENGTH. LONG TOP BARS BEND ACCORDANCE WITH ACI
GCpf = EXTERNAL PRESSURE COFFECIENT
4. NO DEPOSITING OF CONCRETE SHALL BE ALLOWED WITHOUT THE USE OF VIBRATORS BARS MIN. OF 1,200 (4'-0") DETAILING MANUAL (LATEST
GCpf = INTERNAL PRESSURE COFFECIENT
UNLESS AUTHORIZED IN WRITING DESIGNER AND ONLY FOR UNUSUAL CONDITIONS INTO BARS. EDITION)
D. SEISMIC LOAD
WHERE VIBRATIONS ARE EXTREMELY DIFFICULT TO ACCOMPLISH.
Ø12x1000 LONG AT
5. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS SHALL BE PROPERLY POSITIONED &
CONF. REINF.
MID-DEPTH OF SLAB
WHERE: W = TOTAL DEAD LOAD V = Cvl W (DESIGN BASE SHEAR) SECURED IN PLACE PRIOR TO PLACING OF CONCRETE.
RT 6. ALL CONCRETE SHALL BE KEPT MOST FOR A MINIMUM OF SEVEN CONSECUTIVE DAYS
D
T = NATURAL PERIOD = Ct (h) 0 AT EACH
C = NUMERICAL COEFFICIENT Vmax = 2.50CaI W
IMMEDIATELY AFTER POURING BY THE USE O WET BURLAP, FOG SPRAYING, CURING 60 TYPICAL COLUMN ELEV. SHOWING
COMPOUNDS OR OTHER APPROVED METHODS. CORNER 1-Ø12
RT
h = BUILDING HEIGHT
7. STRIPPING OF FORMS AND SHORES: TOP & BOTT. DOWELS AND TIES SPACING
0
60
I = IMPORTANCE FACTOR = 1.50 BARS LAP SPLICE LENGTH:
Vmin = 0.11 CalW FOUNDATION 24 HOURS
SEISMIC COEFFICIENT Cv = 0.44 Nv
Vmin = 0.80 ZNvI W (ZONE 4) AT ANY LEVEL NO MORE THAN
400
Ca = 0.64 Nv SUSPENDED SLAB EXCEPT WHEN
R ADDITIONAL LOADS ARE IMPOSED 8 DAYS ALTERNATE BARS SHOULD BE
NEAR SOURCE FACTOR (5 km) Nv = 1.6 SPLICED. MIN. DISTANCE BET. TWO
2.2 DESIGN STRESSES WALLS 21 DAYS
BEAMS 14 DAYS ADJACENT BARS SPLICES SHALL
A. CONCRETE COMPRESSIVE STRENGTH @ 28 DAYS: BE 600mm.
60
b. SLAB ON FILL f'c = 17.5 MPa (2,500 psi) 4-Ø12 BOTT. BARS
0
c. SLAB f'c = 27.6 MPa (4,000 psi) CONSTRUCTION JOINTS TO THE STRUCTURAL ENGINEER AT LEAST (4) DAYS PRIOR TO THE 9.
B. REINFORCING STEEL BARS THE CONTRACTOR SHALL FURNISH AND MAITAIN ADEQUATE FORMS AND SHORINGS UNTIL
WITHIN CENTER
a. FOR BARS 16mm AND GREATER
HALF OF "H"
(INTERMEDIATE GRADE DEFORMED BAR) fy = 414 MPa (60,000 psi) fy = 414 MPa (60,000 psi)
NOTES ON FOOTINGS
[Link] BARS LESS THAN 16mm 0.25 L
(STRUCTURAL GRADE DEFORMED BAR) fy = 275 MPa (40,000 psi)
1. FOOTINGS ARE DESIGNED FOR AN ALLOWANCE SOIL BEARING PRESSURE OF 96 KPa IN TWO WAY SLAB EXTEND BARS TOP BARS @ SUPPORT (CONT.)
C. STRUCTURAL STEEL ASTM-A36
(2000psf). CONTRACTOR SHALL REPORT TO THE ENGINEER, IN WRITING ,THE ACTUAL SOIL UP TO BEAM SUPPORT
FOR TRUSSES, BRACINGS , & STRUTS fy = 248 MPa (36,000 psi) REQ'D. BOTT. BARS @ SUPPORT
CONDITIONS UNCOVERED AND CONFIRM ACTUAL BEARING CAPACITY OF SOIL BEFORE OMIT TRIMMER BARS WHERE 38mm CLEAR
D. PURLINS
DEPOSITING CONCRETE.
JT. REINF.
COLD FORMED LIGHT fy = 248 MPa (36,000 psi) OPENING IS FRAMED BY BEAM
2. FOOTING SHALL REST AT LEAST 1500mm BELOW NATURAL GRADE LINE UNLESS
E. MASONRY UNIT (CHB)
NON - LOADING BEARING CHB WALLS fm' = 3.45 MPa (500 psi)
OTHERWISE INDICATED IN PLANS. NO FOOTING SHALL REST ON FILL. TYPICAL SLAB OPENING DETAIL
3. MINIMUM CONCRETE PROTECTION FOR REINFORCEMENT SHALL BE 75mm CLEAR FOR
F. WELDS E - 60XX ELECTRODE
CONCRETE DEPOSITED THE GROUND AND 50mm FOR CONCRETE DEPOSITED AGAINST A
G. STRUCTURAL BOLTS ASTM- A307 a. Ft = 96.60 mPa (14, 000
FORMWORK.
psi)
4. IN CASES WHERE THE SOIL CONDITION IS SUCH THAT THE MINIMUM ALLOWABLE SOIL
b. Fv= 69.00 mPa (10, 000 0.165L SPLICE BOTTOM BARS AT MID SPAN
PRESSURE OF 96KPa (2000 psf) CAN NOT BE ATTAINED AT A PRACTICAL DEPTHS THE USE
psi) NOTES ON COLUMNS
OF MICROPILES, BORED PILES, OR DRIVEN PILES MAY BE ADOPTED IN LIEU OF STANDARD
3.0 IN THE INTERPRETATION OF THE DRAWING, INDICATED DIMENSIONS SHALL GOVERN. AT MID SPAN @ SUPPORT
ISOLATED FOOTINGS. 0.22L
DISTANCES AND SIZES SHALL NOT BE SCALED FOR CONSTRUCTIONS PURPOSES. [Link] EXTRA SETS OF TIES AT 100 O.C. FOR TIED COLUMN REINFORCEMENT ABOVE
NOTES ON REINFORCEMENT
4.0 IN REFERENCES TO OTHER DRAWINGS, SEE ARCHITECTURAL DRAWINGS FOR AND BELOW BEAM-COLUMN CONNECTIONS FOR A DISTANCE FROM FACE OF
1. UNLESS OTHERWISE NOTED IN PLANS, THE YIELD STRENGTH OF REINFORCING BARS
DEPRESSIONS IN FLOOR CONNECTION EQUAL TO GREATER OF THE OVERALL THICKNESS OF COLUMN, 1/6 THE
SHALL BE:
SLABS , OPENINGS IN THE WALLS AND SLABS , INTERIOR PARTITIONS , LOCATIONS OF CLEAR HEIGHT OF COLUMN OR 450mm.
A. FOOTINGS , FOOTING BEAMS AND GIRDERS fy = 414 MPa (
DRAINS ETC.
60,000 psi ) 1.2. COLUMN TIES SHALL BE PROTECTED EVERYWHERE BY A COVERING OF CONCRETE TYPICAL DETAIL OF COL. LAP SPLICE
5.0 IN CASE OF DISCREPANCIES AS TO THE LAYOUT, DIMENSIONS AND ELEVATIONS BETWEEN
THE B. COLUMNS AND SHEAR WALLS fy = 414 MPa ( CAST MONOLITHICALLY WIT HTHE CORE WITH A MINIMUM THICKNESS OF 40mm AND NOT & TYPICAL EXT. GIRDER TO COL. CONNECT
60,000 psi ) LESS THAN 40 TIMES THE MAXIMUM SIZE OF COARSE AGGREGATE IN MILLIMETERS.
STRUCTURAL PLANS AND ARCHITECTURAL DRAWINGS, THE CONTRACTORS SHALL NOTIFY 1.3. WHERE COLUMNS CHANGE IN SIZE ,VERTICAL REINFORCEMENT SHALL BE OFFSET AT A
BOTH. C. BEAMS AND GIRDER fy = 414 MPa ( NOTES ON BEAMS AND GIRDERS
60,000 psi ) SLOPE MONOLITHICALLY WITH THE CORE WITH MINIMUM THICKNESS OF 40mm AND NOT
6.0 ALL CONCRETE WORKS AND CONCRETE REINFORCEMENTS SHALL BE DONE IN LESS THAN 40 TIMES THE MAXIMUM SIZE COARSE AGGREGATE IN MILLIMETERS
D. NON-LOAD BEARING WALL PARTITIONS ,BEDDED SLABS , FLOOR & ROOF SLABS, 1. UNLESS, OTHERWISE NOTED IN PLANS , CAMBER ALL BEAMS AND GIRDER AT LEAST 6mmØ
ACCORDANCE WITH THE [Link] OTHERWISE INDICATED IN THE PLANS, LAP SPLICES FOR VERTICAL COLUMN
PARAPETS , CATCH BASIN,SIDE WALK fy FOR EVERY 4.5O M OF SPAN , EXCEPT CANTILEVERS FOR WHICH THE CAMBER SHALL BE
ACI.318-14M BUILDING CODE REQUIREMENT AND ALL STRUCTURAL STEEL WORKS REINFORCEMENT SHALL BE MADE WITHIN THE CENTER HALF OF COLUMN HEIGHT, AND
= 275 MPa ( 40,000 psi ) AS NOTED IN PLANS OR AS ORDERED BY THE ENGINEER BUT IN NO CASE LESS THAN 20
ACCORDING WITH THE THE SPLICE LENGTH SHALL BE LESS THAN 40 BAR DIAMETERS. WELDING OR APPROVED
2. ALL REINFORCING BARS SIZE 10mm OR LARGER SHALL BE DEFORMED IN ACCORDANCE mm FOR EVERY 3.0 M OF FREE SPAN.
AISC-05 IN SOFAR AS THEY DO NOT CONFLICT WITH THE LOCAL BUILDING CODE MECHANICAL DEVICES MAY BE USED PROVIDED THAT NOT MORE THAN ALTERNATE
WITH THE ASTM A-706 BARS SMALLER THAN 10mm MAY BE PLAIN. 2. TYPICAL BARS BENDING AND CUTTING DETAILS FOR BEAMS SHALL BE AS SHOWN IN FIG.
REQUIREMENT. BARS ARE WELDED OR MECHANICALLY SPLICED AT ANY LEVEL AND THE VERTICAL
3. SPLICES SHALL BE SECURELY WIRED TOGETHER & SHALL LAP OR EXTEND IN B-1 L1 L2
7.0 ACI REFERS TO AMERICAN CONCRETE INSTITUTE, AISC REFERS TO AMERICAN INSTITUTE DISTANCES BETWEEN THESE WELDS OR SPLICES OF ADJACENT BARS IS NOT LESS
ACCORDANCE w/ TABLE B (TABLE OF LAP SPLICE & ANCHORAGE LENGTH) UNLESS
OF STEEL
OTHERWISE SHOWNON DRAWINGS , SPLICES SHALL BE STAGGERED WHENEVER THAN 600mm. L1 31 L1 31 L2 31 L2 31
CONSTRUCTION AND ASTM REFERS TO AMERICAN SOCIETY FOR TESTING MATERIALS.
POSSIBLE.
8.0 CONSTURCTION NOTES AND TYPICAL DETAILS APPLY TO ALL DRAWINGS UNLESS
OTHERWISE SHOWN
NOTES ON CONCRETE SLABS H
OR NOTED. MODIFY TYPICAL DETAILS AS DIRECTED TO MEET SPECIAL CONDITIONS.
9.0 SHOP DRAWING WITH ERECTION AND PLACING DIAGRAMS OF ALL STRUCTURAL STEELS, CROSS-TIE
1. ALL SLAB REINFORCEMENTS SHALL BE 20mm CLEAR MINIMUM FROM BOTTOM AND FROM
MISCELLANEOUSIRON, PRE-CAST CONCRETE, ETC. SHALL BE SUBMITTED FOR ENGINEERS
APPROVAL
THE TOP OF SLAB. L1 51 L1 51 L2 51 L2 1
5
2. UNLESS OTHERWISE SHOWN, REINFORCEMENT IN CONTINUOUS ELEVETED SLAB SHALL TOP BARS
350mm. MAX.
BEFORE FABRICATION. BENT BAR
10
BE CUT AS FOLLOWS: 2 Ø 12mm SIDE BARS BOTTOM WEB BARS
dm
10. CONTRACTOR SHALL NOTE AND PROVIDE ALL MISCELLANEUOS CURBS, SILLS , STOOLS
in.
EQUIPMENT AND L1 L2 BARS
MECHANICAL BASES THAT ARE REQUIRED BY THE ARCHITECTURAL , ELECTRICAL AND
FIGURE B-1
H
MECHANICAL L1/4 L1/4 L2/4
DRAWINGS. TOP BAR
11. ALL RESULTS OF THE MATERIAL TESTING FOR CONCRETE, REINFORCING BARS &
STRUCTURAL STEEL
MUST BE NOTED & APPROVED BY THE MATERIALS ENGINEER/STRUCTURAL DESIGNER.
BOTTOM BAR
PROJECT TITLE & LOCATION: SHEET CONTENT: DRAFTED: CHECKED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHT NO.:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CHRISTIAN M. MARTINEZ
OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION OF ENGINEERING ASSISTANT
NUEVA ECIJA 2ND DISTRICT ENGINEERING OFFICE TRAINING BARRACKS, 09
REGION III HAAR-PHILIPPINE ARMY,
GENERAL CONSTRUCTION NOTES PREPARED: S-1
ROMEO A. LADISLA MARLON G. HERNANDEZ CARLOS M. LEABRES ELPIDIO Y. TRINIDAD 26
SAN ISIDRO, CABANATUAN CITY FORT MAGSAYSAY, NUEVA ECIJA CARETAKER, OFFICE OF THE ASST. DISTRICT ENGINEER
ASST. CHIEF, PLANNING & DESIGN SECTION CHIEF, PLANNING & DESIGN SECTION DISTRICT ENGINEER
KIMBERLY G. JAVIER CONCURRENT, CHIEF QUALITY ASSURANCE SECTION
(DOWEL)
VERIFY DEPRESSION
BARS
400
BAR SIZES fc`= 20.7MPa(300psi) fc`= 27.6 MPa (4000psi) LINTELS IN BLOCK WALLS
(DEFORMED MM) DOWEL BARS TO
SEE CONSTRUCTION
EMBEDMENT LAPPED EMBEDMENT LAPPED
MATCH
D=FOR BEAM
t=FOR SLAB
CLEAR TOTAL MIN. HEIGHT OF REINFORCEMENT NOTES
Ø10 300 300 300 300 CHB VERT. BARS
SPAN LENGTH fc' LINTEL 2-Ø12 TOP BARS
Ø12 300 300 300 300 (L) (L+0.40M) (MPa) (mm) BOTTOM TOP STIRRUPS
200
Ø16 300 400 300 400
1.20 M 1.60 M 200 1-Ø10 1-Ø10 Ø6 mm @ 200mm 2-Ø12 BOTT. BARS
Ø20 400 550 350 500
1.50 M 1.90 M 14.0 200 1-Ø10 1-Ø10 Ø6 mm @ 200mm
Ø25 600 800 550 750
1.80 M 2.20 M 200 1-Ø12 1-Ø10 Ø6 mm @ 200mm SECTION
Ø28 750 1000 650 850 D=FOR BEAM
Ø32 950 1300 850 1100 2.10 M 2.50 M 250 1-Ø12 1-Ø10 Ø6 mm @ 200mm 2t=FOR SLAB
NOTES: 2.40 M 2.90 M 17.0 250 1-Ø12 1-Ø10 Ø6 mm @ 200mm
30 BAR DIA. (min.)
1. TOP PLAIN BARS, MULTIPLY VALUE BY 2 2.70 M 3.10 M 250 1-Ø16 1-Ø12 Ø10mm @ 200mm TYP. SECTION OF MASONRY PARTITION
2. NOT MORE THAN 33% OF THE BARS SHALL BE
SPLICED WITHIN THE REQUIRED LAP LENGTH
3.00 M 3.40 M 300 1-Ø16 1-Ø12 Ø10mm @ 200mm REINFORCEMENTS
3.30 M 3.70 M 20.0 300 1-Ø16 1-Ø12 Ø10mm @ 200mm
3.60 M 4.00 M 300 1-Ø20 1-Ø12 Ø10mm @ 200mm
DOWEL BARS TO
NOTES ON CONCRETE WALLS
[Link] OR BEAM MATCH VERT. BARS
TABLE 'B' TYPICAL CONNECTION DETAIL OF MASONRY WALL 1. ALL WALLS SHALL BE REINFORCED ACCORDING TO THE FOLLOWING SCHEDULE OF WALL
COMPRESSION BARS
400 (DOWEL)
REINFORCEMENT UNLESS OTHERWISE INDICATED IN THE PLANS.
(DOWEL)
TABLE OF LAP SPLICE & ANCHORAGE LENGTH (mm) 12 THK. EXPANSION
400
JOINT WITH MASTIC WALL REINFORCEMENT
BAR SIZES fc`= 20.7MPa(300psi) fc`= 27.6 MPa (4000psi) 1. ALL JOINTS AND VERTICAL
VERIFY ARCHITECTURAL
(DEFORMED MM) FILLER THICKNESS SECTION
EMBEDMENT LAPPED EMBEDMENT LAPPED CELLS CONTAINING HORIZONTAL VERTICAL REMARKS
Ø10 225 300 200 300 REINFORCING BARS 100mm Ø10mm @ 250mm O.C.
Ø10mm @ 300mm O.C.
HORIZONTAL BARS
1-Ø16 VERT. BARS VER. BARS
Ø12 275 300 250 300 SHALL BE FILLED 125mm Ø10mm @ 200mm O.C. AT CENTERS VERTICAL
Ø10mm @ 250mm O.C.
WITH CONCRETE BARS STAGGED OUT HOR. BARS
Ø16 350 400 325 400 CHB WALL 150mm Ø12mm @ 250mm O.C.
Ø12mm @ 300mm O.C.
1-Ø16 VERT. BARS GROUT.
Ø20 450 500 475 500 FOR SIZE AND 2. FOR REINFORCING BARS SHALL HAVE 25mm CLEAR CONCRETE COVER FROM FACE OF WALL
Ø25 550 625 550 625 SPACING REINFORCEMENTS
FOR SIZE AND EXCEPT FOR
Ø28 625 675 625 675 OF HOR. & VERT. SEE CONSTRUCTION
(DOWEL)
SPACING OF HOR. & WALLS IN CONTACT WITH THE GROUND WHERE A MINIMUM OF 60mm SHALL BE PROVIDED
700 BARS NOTES.
400
Ø32 700 775 775 AND FOR EXPOSED FACES OF FORMED WALLS WHERE THE MINIMUM SHALL BE 50mm
VERT. BARS SEE SEE CONSTRUCTION 1-Ø16 CONT. HOR.
NOTES: CONSTRUCTION BARS CLEAR.
1. TOP PLAIN BARS, MULTIPLY VALUE BY 2 NOTES.
NOTES. FOR FLOOR SLAB 2. CARRY VERTICAL BARS AT LEAST 60mm ABOVE FLOOR LEVEL TO PROVIDE FOR SPLICES
2. NOT MORE THAN 33% OF THE BARS SHALL BE CHB WALL WHEN NECESSARY STOP AT 50mm BELOW TOP SLAB OR SOLID BAND WHERE THE WALL
ONLY
SPLICED WITHIN THE REQUIRED LAP LENGTH ENDS VERTICAL AND HORIZONTAL BARS SHALL BE SPLICED BY LAPPING A DISTANCE
3. VALUES GIVEN ABOVE CAN ALSO BE USED FOR COLUMNS
EQUAL TO 30 DIAMETERS AND WIRED SECURELY WITH 16 G.I. WIRE PROVIDED THAT
CORNER WALL OPENING OR END WALL SPLICES IN ADJACENT BARS ARE STAGGERED AT LEAST 1.50M O.C.
3. UNLESS OTHERWISE NOTED IN THE PLANS, ALL OPENINGS IN WALLS 250mm OR THICKER
SHALL BE REINFORCED AROUND WITH 2-20mmØ BARS. FOR 225mm, 200mm, 175mm, 150mm
3. IF THE BEAM REINFORCING BARS END IN A WALL, THE CLEAR DISTANCE FROM THE BAR
THICK WALLS, USE 2-16mmØ. FOR 125mm AND 100mm THICK WALLS, USE 2-12mmØ BARS.
TO THE FARTHER FACE OF THE WALL IS NOT LESS THAN 25mm. EMBEDMENT LENGTH
R.C. COLUMN OR ALL WALLS SPANNING SHALL HAVE VERTICAL REINFORCEMENT BENT A U-FORM LIKE
SHALL BE SHOWN IN A TABLE 'A' FOR TENSION BARS AND TABLE 'B' FOR COMPRESSION
WALL STIRRUPS AND SPACED ACCORDING TO THE SCHEDULE UNLESS OTHERWISE NOTED.
BARS UNLESS UNLESS SPECIFIED IN PLAN. TOP BARS AND SHALL NOT BE SPLICED WITHIN DOWEL BARS TO
CHB WALL
THE COLUMN OR TWO STIRRUPS SHALL BE PROVED AT ALL SPLICES.
4. IF THERE ARE TWO OR MORE LAYERS OF REINFORCING BARS, USED 25mm BAR
MATCH TYPICAL CHB FOOTING DETAILS
1-Ø16 VERT. BARS CHB HOR. BARS
SEPARATORS SPACED AT 1.0M ON ON CENTER ON NO CASE SHALL THERE BE THAN TWO 12 THK. EXPANSION ( WHERE APPLICABLE )
(2) SEPARATORS BETWEEN LAYERS OF BARS. JOINT WITH MASTIC
5. MINIMUM CONCRETE PROTECTION FOR REINFORCING BARS OR STEEL SHAPES SHALL BE 12 THK. EXPANSION FILLER 4-Ø16 VERT. BARS
AS SHOWN IN FIGURE B-2 UNLESS ELSEWHERE. JOINT WITH MASTIC
4-Ø16 VERT. BARS
550
FILLER SEE CONSTRUCTION
MAIN NOTES
550
REINFORCEMENT FIN. FLR. LVL. FOR MASONRY WALL
(DOWEL)
REINFORCEMENTS
t OR 1/4 D
VARIES
400
(TYPICAL)
t
600 (MIN.)
SPACING OF HOR. & MATCH
VERT. BARS SEE CHB VERT. BARS
Ø10 BOTT. BARS
PROVIDE 3-Ø10 EXTRA
CONSTRUCTION @ 300 O.C.
TYPICAL CONNECTION DETAIL
250
STIRR.
NOTES.
EACH SIDE OF SLEEVES CORNER WALL INTERSECTING R.C. 3-Ø10 BOTT. BARS
OF R.C. WALL AT CORNERS
TYP. DET. FOR COLUMN OR WALL
SLEEVES THRU 400 DOWEL BARS TO
MATCH NOTES ON WELDS
CONCRETE BEAM CHB VERT. BARS
FIGURE B-2 300 (TYP.) 1. USE E60xx ELECTRODES FOR ALL MEMBERS WELDED.
2. WELDS SHALL DEVELOP THE FULL STRENGTH OF MEMBERS JOINED UNLESS OTHERWISE
6. WHEN A BEAM CROSSES A GIRDER , REST BEAM ON TOP OF GIRDER BARS, BEAM
DOWEL
SHOWN OR DETAILED IN THE DRAWINGS.
REINFORCING BARS SHALL BE SYMMETRICAL ABOUT THE CENTER LINE WHENEVER TYP. DET. OF LINTEL BEAM AT CHB WALL OPENING
400
POSSIBLE.
FIN. FLR. LVL. NOTES ON STRUCTURAL STEEL
7. GENERALLY, NO SPLICES SHALL BE PERMITTED AT POINTS WHERE CRITICAL BENDING
200 (MIN) 200 (MIN) 1. STRUCTURAL STEEL TO BE USED FOR FABRICATION AND ERECTION OF THIS STRUCTURE
STRESSES OCCUR, SPLICES WHERE SO PERMITTED SHALL BE INDICATED IN TABLE 'A' AND
250
SHALL COMPLY WITH ALL THE PERTINENT PROVISION OF AISC SPECIFICATION FOR THE
'B'. WELDED SPLICES SHALL DEVELOP IN TENSION AT LEAST 125% OF THE SPLICED YIELD
DESIGN, FABRICATION AND ERECTION OF STRUCTURAL STEEL FOR BUILDING LATEST
STRENGTH OF THE BAR NOT MORE THAN 50% OF THE BARS AT ANY ONE SECTION IS 6-Ø10 BARS (AS
DOWEL BARS TO EDITION.
ALLOWED TO BE SPLICED THEREIN. SHOWN)
Ø10 STIRRUPS MATCH Ø10 BOTT. BARS @ 2. ALL STRUCTURAL STEEL SHAPES SHALL CONFORM TO ASTM A36 STRUCTURAL STEEL
1.44 300 O.C. UNLESS OTHERWISE INDICATED.
NOTES ON CONCRETE HOLLOW BLOCKS WALLS @ 150 O.C. CHB VERT. BARS
3. ALL WELDED CONNECTIONS SHALL DEVELOP THE FULL STRENGTH OF THE MEMBERS
300 (TYP.) CONNECTED.
1. UNLESS OTHERWISE SHOWN IN PLANS ALL CONCRETE HOLLOW BLOCKS AND CERAMIC
4. UNLESS OTHERWISE SPECIFIED ALL WELDING RODS SHALL CONFORM WITH E60
DOWEL
BLOCKS SHALL BE REINFORCED AS SHOWN IN THE SCHEDULE OF CONCRETE HOLLOW CHB WALL
400
ELECTRODES.
BLOCKS AND CERAMIC BLOCK REINFORCEMENT. PROVIDE 150mm x 300mm STIFFENER
5. ALL BOLTS USED UNLESS OTHERWISE SPECIFIED SHALL BE ASTM A 307 BOLTS.
COLUMN REINFORCED WITH 4-12mm WITH 10mm Ø TIES AT 150mm ON CENTER WHERE FIN. FLR. LVL.
CONCRETE HOLLOW BLOCK TERMINATES AND AT EVERY 3.0M LENGTH OF CONCRETE OPENING
250
BARS TYPICAL NOTES ON EMBBED PIPES
HOLLOW BLOCK WALLS UNLESS NOTED IN STRUCTURAL PLANS.
6-Ø10 BARS (AS 1. ALL EMBEDED PIPES FOR UTILITIES ETC. THAT PASS THRU BEAMS SHALL NOT EXCEED
NOTES ON CONCRETE HOLLOW BLOCKS WALLS REINFORCEMENTS SHOWN)
Ø10 BOTT. BARS @ 100mm IN DIAMETER OR 1/3 BEAM DETPH WHICHEVER IS LESS, UNLESS OTHERWISE
1.44 300 O.C. APPROVED IN WRITING BY THE STRUCTURAL ENGINEER.
BLOCK THICKNESS REINFORCEMENT NOTES FIN. FLR. LVL. 2. NO PIPES SHALL BE ALLOWED TO PASS THRU BEAMS VERTICALLY.
HORIZONTAL LAPPED
A. MINIMUM LAPS AT SPLICE= 0.25 M 3. NO PIPES SHALL BE EMBEDDED IN COLUMNS.
75 mm 10mm Ø EVERY 3RD LEVEL
10mm Ø @ 600mmB.O.C.
PROVIDE RIGHT ANGLED REINFORCEMENT
AT CORNERS 0.92 m LONG
125 mm 10mm Ø EVERY 3RD LEVEL
10mm Ø @ 600mm O.C.
[Link] CHB OR CER. BLK. WALL DOWELS
150mm 10mm Ø EVERY 3RD LEVEL
10mm Ø @ 600mm O.C.
WITH THE SAME SIZE AS VER. OR HOR. ELEVATION
REINFORCEMENT SHALL BE PROVIDED
200 mm 12mm Ø EVERY 3RD LEVEL
10mm Ø @ 600mm O.C.
PROJECT TITLE & LOCATION: SHEET CONTENT: DRAFTED: CHECKED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHT NO.:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CHRISTIAN M. MARTINEZ
OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION OF ENGINEERING ASSISTANT
NUEVA ECIJA 2ND DISTRICT ENGINEERING OFFICE TRAINING BARRACKS, 10
REGION III HAAR-PHILIPPINE ARMY,
GENERAL CONSTRUCTION NOTES PREPARED: S-2
ROMEO A. LADISLA MARLON G. HERNANDEZ CARLOS M. LEABRES ELPIDIO Y. TRINIDAD 26
SAN ISIDRO, CABANATUAN CITY FORT MAGSAYSAY, NUEVA ECIJA CARETAKER, OFFICE OF THE ASST. DISTRICT ENGINEER
ASST. CHIEF, PLANNING & DESIGN SECTION CHIEF, PLANNING & DESIGN SECTION DISTRICT ENGINEER
KIMBERLY G. JAVIER CONCURRENT, CHIEF QUALITY ASSURANCE SECTION
G E N E R A L C O N S T R U C T I O N N O T E S
L1/3 L1/3 L2/3 L2/3 L3/3
LAP SPLICES LAP SPLICES
ALLOWED ONLY ALLOWED ONLY
IN THIS AREA IN THIS AREA
NOTES ON CONSTRUCTION JOINTS IN CONCRETE
1. WHERE A CONSTRUCTION JOINT IS TO BE MADE, THE SURFACE OF CONCRETE SHALL BE 180° HOOK 90° HOOK
BAR SIZE DIAMETER
(DEFORMED) (mm)
CLEANED AND ALL LAITANCE AND STANDING WATER REMOVED SHEAR KEY SHALL BE D+2db L L
PROVIDE AT THE JOINT. 10 mm Ø 40 125 85 100
MAIN 12 mm Ø 50 165 115 115
REINFORCEMENTS 16 mm Ø 65 200 140 150
TO BE CONTINUOUS
20 mm Ø 115 300 165 300
Ø10x1000 LONG
32 mm Ø 150 335 230 405 L1/5 12mm Ø RSB L1/5 L2/5 L2/5
@ 300 O.C.
EXTRA BAR 12mm Ø RSB
EXTRA BAR
40
t/3
t/3
NOTE: B-1 250 400 16 5 3 2 4 5 3 1@50, 6@100, REST @200mm O.C. PROVIDE 2-12mmØ WEB BARS
D/3
50
PROVIDE THESE ADDITIONAL B-2 200 400 16 4 2 2 3 4 2 1@50, 6@100, REST @200mm O.C. PROVIDE 2-12mmØ WEB BARS
D BARS FOR ALL OPENINGS B-3 200 300 16 3 2 2 2 3 2 1@50, 6@100, REST @200mm O.C. PROVIDE 2-12mmØ WEB BARS
PLUS BARS (NOT SHOWN)
PARALLEL TO SIDE OF CB-1 200 400 16 4 2 4 2 4 2 1@50, 6@100, REST @200mm O.C. PROVIDE 2-12mmØ WEB BARS
D/3
DOOR OPENING EQUAL TO THE RB-1 200 300 12 3 3 3 3 3 3 1@50, 6@100, REST @200mm O.C.
NUMBER OF TERMINATED
OPENING BARS AT OPENING WF-1 400 200 12 - 3 - 3 - 3 1@ EVERY 300mm O.C.
TYPICAL SLAB & BEAM CONSTRUCTION JOINT DET.
SEE ARCHITECTURAL &
MECHANICAL SCHEDULE OF SLAB
PLANS FOR SLAB OPENING REBAR SPACING ALONG SHORT DIRECTION REBAR SPACING ALONG LONG DIRECTION
LOCATION. SLAB THICKNESS REBAR REMARKS
LEFT MID SPAN RIGHT REBAR LEFT MID SPAN RIGHT
MARK in mm (mm Ø) (mm Ø)
TOP BOTT. TOP BOTT. TOP BOTT. TOP BOTT. TOP BOTT. TOP BOTT.
S-1 125 12 200 125 200 125 200 125 10 200 250 200 250 200 250 TWO - WAY
NOTES ON STIRUPS
WINDOW
1. ALL REINFORCEMENT SHALL BE BENT COLD UNLESS OTHERWISE PERMITTED BY THE 38mm CLEAR S-2 125 12 200 125 200 125 200 125 10 250 250 250 250 250 250
OPENING ONE - WAY
STRUCTURAL ENGINEER.
2. AS SHOWN IN THE DESIGN DRAWINGS OR PERMITTED BY THE STRUCTURAL ENGINEER.
3. TIES & CLOSE STIRRUPS MUST BE AT 135.
S-3 100 10 200 200 200 200 200 200 10 300 300 300 300 300 300 ONE - WAY
Dbar
Dbar
0.125
L
0.018
0.045
12db
.015
0.152 0.245
4db OR 65mm
D 3 STEEL DECK SECTION DETAIL
SCALE 1: 10 M.
S-3
0.30
RB
0.16
0.375
32 mm Ø 300 335 450 600 E M B A N K M E N T 0.20m ON CENTER
4 - 12mmØ RSB
0.30
0.16
MAIN BAR
NGL
0.075
0.20
3 - 10mmØ RSB ALONG
135 DEG. HOOKS THE LENGTH OF THE SLAB
VARIES
L
0.58
b
3 - 10mmØ RSB ALONG THE
0.15
LENGTH OF THE SLAB
W1F2
L1 3 - 12mmØ FOOTING BARS w/ 10mmØ SECTION
L STIRRUPS SPACED @ 0.30m ON CENTER
PLAN
PROJECT TITLE & LOCATION: SHEET CONTENT: DRAFTED: CHECKED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHT NO.:
REPUBLIC OF THE PHILIPPINES GENERAL CONSTRUCTION NOTES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TYPICAL STAIR ENTRANCE SECTION DETAIL CHRISTIAN M. MARTINEZ
OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION OF ENGINEERING ASSISTANT
NUEVA ECIJA 2ND DISTRICT ENGINEERING OFFICE TRAINING BARRACKS,
TYPICAL BEAM DETAILS 11
REGION III HAAR-PHILIPPINE ARMY,
SCHEDULE OF BEAMS PREPARED: S-3
SCHEDULE OF SLAB ROMEO A. LADISLA MARLON G. HERNANDEZ CARLOS M. LEABRES ELPIDIO Y. TRINIDAD 26
SAN ISIDRO, CABANATUAN CITY FORT MAGSAYSAY, NUEVA ECIJA STEEL DECK SECTION DETAIL CARETAKER, OFFICE OF THE ASST. DISTRICT ENGINEER
ASST. CHIEF, PLANNING & DESIGN SECTION CHIEF, PLANNING & DESIGN SECTION DISTRICT ENGINEER
TYPICAL CANOPY/SUNBREAKER DETAIL KIMBERLY G. JAVIER CONCURRENT, CHIEF QUALITY ASSURANCE SECTION
27.00 27.00
4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50
1.50 3.00 3.00 1.50 3.00 1.50 3.00 1.50 2.35 6.65 1.50 3.00 3.00 1.50 3.00 1.50 3.00 1.50 2.50 2.00 3.00 1.50
WF1
WF1
WF1
STAIRWELL
S3 S3 S3
CB-1
CB-1
CB-1
CB-1
CB-1
S3
FTB1 - GB1 FTB1 - GB1 FTB1 - GB1 FTB1 - GB1 FTB1 - GB1 FTB1 - GB1 B2 B2 B2 B2 B2 B2
1 WF1 1
2.50
2.50
2.50
3.00
S1
FTB1 - WF1
FTB1 - WF1
FTB1 - WF1
FTB1 - WF1
FTB1 - WF1
FTB1 - GB1
FTB1 - GB1
WF1
WF1
4.50
4.50
4.50
4.50
S1 S1 S1 S1
B1
B1
B1
B1
B1
S3 S1
B2
B3
B3
B2
WF1 STAIRWELL
WF1
2.00
2.00
2.00
1.50
S1
FTB1 - WF1 FTB1 - WF1 FTB1 - WF1 FTB1 - WF1 FTB1 FTB1 - WF1 B1 B1 B1 B1 B1 B1
9.00
9.00
2 2
1.50
2.00
2.00
2.00
WF1
WF1
FTB1 - WF1
FTB1 - WF1
FTB1 - WF1
FTB1 - GB1
FTB1 - GB1
FTB1
FTB1
4.50
4.50
4.50
4.50
S1 S1 S1 S1 S1 S1
B1
B1
B1
B1
B1
B2
B2
WF1
WF1
3.00
2.50
2.50
2.50
WF1
3 3
FTB1 - GB1 FTB1 - GB1 FTB1 - GB1 FTB1 - GB1 FTB1 - GB1 FTB1 - GB1 B2 B2 B2 B2 B2 B2
1.35
FTB1 - GB1
FTB1 - GB1
FTB1 - GB1
FTB1 - GB1
WF1
WF1
3.00
3.00
3.00
3.00
S2 S2
3.78
WF1 WF1
1.65
WF1
4 WF1 WF1 4
0.78
FTB1 - GB1
B2 B2
3.13 1.37 4.50 1.80 1.20 4.20 1.80 4.50 1.37 3.13 3.13 1.37 4.50 1.37 6.25 1.37 4.50 1.37 3.13
1.50
0.35
0.10 0.30
8 - 16mmØ RSB 0.10
0.30
10mmØ COLUMN TIES SPACED: 10mmØ VERTICAL BARS
BARS NGL
0.30
0.40
FFL
0.60
10mmØ COLUMN TIES
0.35
1.50
0.20
1.10
0.30
PLAN 4 WALL 1 AND FOOTING 1 (W1F1) DETAIL 5 WALL 1 AND FOOTING 2 (W1F2) DETAIL
SCALE 1: 25 M. SCALE 1: 25 M.
S-4 S-4
PROJECT TITLE & LOCATION: SHEET CONTENT: DRAFTED: CHECKED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHT NO.:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS FOUNDATION PLAN
CHRISTIAN M. MARTINEZ
OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION OF SECOND FLOOR BEAM PLAN ENGINEERING ASSISTANT
NUEVA ECIJA 2ND DISTRICT ENGINEERING OFFICE TRAINING BARRACKS, COLUMN AND FOOTING DETAILS 12
REGION III HAAR-PHILIPPINE ARMY, WALL FOOTING DETAILS PREPARED: S-4
FOOTING TIE BEAM DETAILS
ROMEO A. LADISLA MARLON G. HERNANDEZ CARLOS M. LEABRES ELPIDIO Y. TRINIDAD 26
SAN ISIDRO, CABANATUAN CITY FORT MAGSAYSAY, NUEVA ECIJA CARETAKER, OFFICE OF THE ASST. DISTRICT ENGINEER
GRADE BEAM DETAILS ASST. CHIEF, PLANNING & DESIGN SECTION CHIEF, PLANNING & DESIGN SECTION DISTRICT ENGINEER
KIMBERLY G. JAVIER CONCURRENT, CHIEF QUALITY ASSURANCE SECTION
29.35
2.50
4.50 4.50 4.50 4.50 4.50 4.50
0.68 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.68
11.35
TRUSS 1 (T-1)
1 1 - SET
2.84
2.84
HT-2
HT-2
HT-2 HT-2 4.92 6.20
1
HP
T-
HP
T
4.50
4.50
-1
2.84
2.84
2.50
HT-1 HT-1
T-1
T-2
T-2
T-2
T-2
0.52
2
13.18
13.18
2.84
2.84
0.50 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.68
T-4 T-4
4.50
4.50
HP 10.17
1
T-
T-
1
HP
HT-2 HT-2
TRUSS 2 (T-2)
4 - SETS
HP HP
HT-2
HT-2
2.83
2.83
2
2
T- T-
T-
T-
3 2 2
HP
HP
3.74 2.46
3.00
3.00
1.84
1.84
1.51
1.51
0.52
T-3 T-3
4
0.43 1.00 1.00 1.00 1.00 1.00 1.00 0.43 0.25 0.96 1.04 1.00 1.00 0.25
6.85 4.50
3.13 1.37 4.50 1.37 6.25 1.36 4.50 1.37 3.13
2.50
1.25
1.00 1.00 1.00
GA.24 PRE-PAINTED RIDGE ROLL
2.50
1.51
1 - 38 x 38 x 6mm THICK ANGLE BAR (WEB MEMBERS)
STRAINER
1 - 38 x 38 x 6mm THICK ANGLE BAR (KING POST)
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.03 1.00 1.00 1.00 1.00 0.84
1 - 50 x 50 x 6mm THICK ANGLE BAR (BOTTOM CHORD)
8.03 4.84
3" Ø DRAIN PIPE
HIP TRUSS 1(HPT-1) HIP TRUSS 2 (HPT-2)
4 - SETS 4 - SETS
2 TYPICAL TRUSS DETAIL 3 TRUSS DIAGRAM
SCALE 1:100 M.
S-5 SCALE 1:20 M. S-5
PROJECT TITLE & LOCATION: SHEET CONTENT: DRAFTED: CHECKED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHT NO.:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CHRISTIAN M. MARTINEZ
OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION OF ROOF FRAMING PLAN ENGINEERING ASSISTANT
NUEVA ECIJA 2ND DISTRICT ENGINEERING OFFICE TRAINING BARRACKS, 13
REGION III HAAR-PHILIPPINE ARMY,
TYPICAL TRUSS DETAIL PREPARED: S-5
TRUSS DIAGRAM ROMEO A. LADISLA MARLON G. HERNANDEZ CARLOS M. LEABRES ELPIDIO Y. TRINIDAD 26
SAN ISIDRO, CABANATUAN CITY FORT MAGSAYSAY, NUEVA ECIJA CARETAKER, OFFICE OF THE ASST. DISTRICT ENGINEER
ASST. CHIEF, PLANNING & DESIGN SECTION CHIEF, PLANNING & DESIGN SECTION DISTRICT ENGINEER
KIMBERLY G. JAVIER CONCURRENT, CHIEF QUALITY ASSURANCE SECTION
3.00
1.50 1.50
1.40 1 2
1.40
12mm DSB @ 200 mm O.C.
CONT. BOTTOM BARS
4.10
1.50
4.50
2.70
0.40
12mmØ TEMP. BARS @ 300 1-10mm Ø NOSING BAR
1.60
2.00
0.30
0.20
12mm Ø RSB @ 200mm O.C.
2 L
TOP & BOTTOM BARS
L A N D I N G
GROUND FLOOR L/3
LINTEL BEAM
B 4.30
3.00
12mmØ TEMP. BARS @ 300
1.50 1.50 mm O.C.
2.80
12mm Ø RSB @ 200mm O.C. 1.30 1.50
1 TOP & BOTTOM BARS
10mm Ø CHAIR BARS @ 300
L A N D I N G
O.C.
1.40
1.40
LINTEL BEAM
L/3 0.30
1-10mm Ø NOSING BAR
1.20
0.20
SPACED AS SHOWN
12mm Ø RSB @ 150 mm O.C.
MAIN BARS L
L/3
12mm Ø RSB @ 150 mm O.C.
0.50
EMBANKMENT EMBANKMENT
4.10
2.70
SECOND FLOOR
PROJECT TITLE & LOCATION: SHEET CONTENT: DRAFTED: CHECKED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHT NO.:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CHRISTIAN M. MARTINEZ
OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION OF ENGINEERING ASSISTANT
NUEVA ECIJA 2ND DISTRICT ENGINEERING OFFICE TRAINING BARRACKS, RSB DETAILS OF STAIR 14
REGION III HAAR-PHILIPPINE ARMY, DETAIL SECTION OF STAIR PREPARED: S-7
ROMEO A. LADISLA MARLON G. HERNANDEZ CARLOS M. LEABRES ELPIDIO Y. TRINIDAD 26
SAN ISIDRO, CABANATUAN CITY FORT MAGSAYSAY, NUEVA ECIJA CARETAKER, OFFICE OF THE ASST. DISTRICT ENGINEER
ASST. CHIEF, PLANNING & DESIGN SECTION CHIEF, PLANNING & DESIGN SECTION DISTRICT ENGINEER
KIMBERLY G. JAVIER CONCURRENT, CHIEF QUALITY ASSURANCE SECTION
0.05
0.10
2" x 2" x 6mm THK. ANGLE BAR
℄
TOP BAR & KING POST 6mm
TYP.
0.05
FULL
50 50
WELD
6mm
16mm Ø CROSS-BRACINGS,
16mm Ø STEEL CROSS-BRACINGS, 10mm THICK STEEL ,
T.C. W/ STANDARD TURN-BUCKLE
W/ STANDARD TURN-BUCKLE W/ 18mmØ HOLES; TYPICAL
PRE PAINTED
ROOFING SHEET
2 DETAIL CONN. OF CROSS-BRACING
SCALE 1:10 M
S-7
150
50
2" x 2" x 6mm THK. ANGLE BAR . LC PURLINS
TOP BAR & KING POST
4 DETAIL CONN. OF PURLIN TO TOP CHORD 5 DET. CONN. OF PURLIN TO SAG ROD
SCALE 1:10 M SCALE 1:15M
S-7 S-7
LC PURLINS
ROO
FIN
150
G
T.C.
10mm Ø SAG RODS
@ MID-POINT, STAGGERED T.C.
PROJECT TITLE & LOCATION: SHEET CONTENT: DRAFTED: CHECKED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHT NO.:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TRUSS CONNECTION DETAILS CHRISTIAN M. MARTINEZ
OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION OF ENGINEERING ASSISTANT
DETAIL CONNECTION OF CROSS BRACING 15
NUEVA ECIJA 2ND DISTRICT ENGINEERING OFFICE TRAINING BARRACKS,
REGION III HAAR-PHILIPPINE ARMY,
DETAIL OF PURLIN SPLICE PREPARED: S-7
DETAIL CONNECTION OF PURLIN TO TOP CHORD ROMEO A. LADISLA MARLON G. HERNANDEZ CARLOS M. LEABRES ELPIDIO Y. TRINIDAD 26
SAN ISIDRO, CABANATUAN CITY FORT MAGSAYSAY, NUEVA ECIJA CARETAKER, OFFICE OF THE ASST. DISTRICT ENGINEER
DETAIL CONNECTION OF PURLIN TO SAGROD ASST. CHIEF, PLANNING & DESIGN SECTION CHIEF, PLANNING & DESIGN SECTION DISTRICT ENGINEER
KIMBERLY G. JAVIER CONCURRENT, CHIEF QUALITY ASSURANCE SECTION
200AT
125AT 125AT
ELECTRICAL NOTES: Ground Bus
1. ALL ELECTRICAL INSTALLATION WORKS HEREIN SHALL BE DONE IN ACCORDANCE
WITH THESE
PLANS & SPECS, AND THE APPLICABLE PROVISIONS OF THE LATEST EDITION OF THE ELECTRICAL LEGEND:
PHILIPPINE
ELECTRICAL CODE, IT'S RULES & REGULATIONS OF THE LOCAL POWER COMPANY. 2200 LM 40W (295mm x 1195)
THE LED PANEL LIGHT
ELECTRICAL WORK SHALL BE UNDER THE IMMEDIATE SUPERVISION OF A DULY
LICENSED 6"Ø DOWN LIGHT/ PIN LIGHT FIXTURE LIGHTING LIGHTING ACU ACU
1 15AT 15AT 2 1 30AT 30AT 2
PROFESSIONAL ELECTRICAL ENGINEER. W/ 15W COMPACT FLOURESCENT LAMP
LIGHTING LIGHTING ACU ACU
LIGHT SWITCH, SUBSCRIPT 3 15AT 15AT 4 3 30AT 30AT 4
2. THE POWER SUPPLY SHALL BE 1Ø SINGLE PHASE 2 - WIRE LINE TO LINE OR LINE TO
GROUND 230 Sdef INDICATES LIGHTING DESIGNATION ACU ACU
LIGHTING LIGHTING
VOLTS, 60 HZ. 5 15AT 15AT 6 5 30AT 30AT 6
DUPLEX RECEPTACLE OUTLET WALL
3. THE ELECTRICAL WIRING INSTALLATION SHALL BE DONE IN PVC PIPES. IF NOT MOUNTED (FLUSH), 220V,GROUNDING TYPE. LIGHTING LIGHTING ACU ACU
CO 7 15AT 15AT 8 7 30AT 30AT 8
INDICATED OR
SPECIFIED, IT SHALL BE DONE AS FOLLOWS: LIGHTING LIGHTING ACU ACU
8 HOMERUN TO CIRCUIT @ PANEL BOARD. 9 15AT 15AT 10 9 30AT 30AT 10
A.) SERVICE ENTRANCE - RIGID CONDUIT ( RSC ) OR INTERMEDIATE METTALIC LIGHTING LIGHTING ACU ACU
CONDUIT ( IMC ). PANELBOARD BOTTOM FEED AND FLUSH 11 15AT 15AT 12 11 30AT 30AT 12
PB MOUNTED.
LIGHTING LIGHTING ACU ACU
B.) UNDERGROUND & EMBEDDED IN CONCRETE SLAB & WALLS PVC CONDUITS SHALL 13 15AT 15AT 14 13 30AT 30AT 14
BE
SCHEDULE
M KWHR METER LIGHTING LIGHTING
15 15AT 15AT 16
4. THE MIMNIMUM MOUNTING HEIGHTS OF WIRING DEVICES SHALL BE AS FF: ELECTRIC SERVICE ENTRANCE LIGHTING CONVENIENCE 18
17 15AT 20AT
A. LIGHT SWITCHES - 1.40 M. ABOVE FINISH FLOOR LINE
19 CONVENIENCE CONVENIENCE 20
B. CONVENIENCE OUTLETS - 0.30 M. ABOVE FINISH FLOOR LINE CIRCUIT BREAKER 20AT 20AT
C. CONVENIENCE OUTLETS - 1.20 M. ABOVE FINISH FLOOR LINE
ABOVE COUNTERS 21 CONVENIENCE CONVENIENCE 22
20AT 20AT
D. PANEL BOARD - 1.40 M. ABOVE FINISH FLOOR LINE
23 CONVENIENCE 20AT 20AT
CONVENIENCE 24
5. ALL LIGHTING OUTLET SHALL BE PROVIDED BY C.F.L. (COMPACT FLOURESCENT LAMP).
31 CONVENIENCE 20AT
CONVENIENCE 32
3100mm (MIN.) - 5500mm (MAX.)
ELECTRIC PEDESTAL
5.00m X 0.30m X 0.30m
ELECTRIC SERVICE
METER (CTC METERING)
M "PB1"
1800mm
MANHOLE SIZE AS
REQUIRED
FIN. FLOOR LINE
FIN. GRADE LINE
MH
PROJECT TITLE & LOCATION: SHEET CONTENT: DRAFTED: CHECKED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHT NO.:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ELECTRICAL NOTES CHRISTIAN M. MARTINEZ
OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION OF ENGINEERING ASSISTANT
NUEVA ECIJA 2ND DISTRICT ENGINEERING OFFICE TRAINING BARRACKS,
ELECTRICAL LEGEND 17
REGION III HAAR-PHILIPPINE ARMY,
SINGLE LINE DIAGRAM PREPARED: E-1
RISER DIAGRAM ROMEO A. LADISLA MARLON G. HERNANDEZ CARLOS M. LEABRES ELPIDIO Y. TRINIDAD 26
SAN ISIDRO, CABANATUAN CITY FORT MAGSAYSAY, NUEVA ECIJA CARETAKER, OFFICE OF THE ASST. DISTRICT ENGINEER
SERVICE ENTRANCE ON SITE DEVELOPMENT PLAN ASST. CHIEF, PLANNING & DESIGN SECTION CHIEF, PLANNING & DESIGN SECTION DISTRICT ENGINEER
ROEL O. MARTIN CONCURRENT, CHIEF QUALITY ASSURANCE SECTION
KVA = (53,380)(0.85)
1000 (1.10)
= 41.25 kVA
PROJECT TITLE & LOCATION: SHEET CONTENT: DRAFTED: CHECKED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHT NO.:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CHRISTIAN M. MARTINEZ
OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION OF ELECTRICAL LOAD SCHEDULE ENGINEERING ASSISTANT
NUEVA ECIJA 2ND DISTRICT ENGINEERING OFFICE TRAINING BARRACKS, ILLUMINATION LEVEL COMPUTATION 18
REGION III HAAR-PHILIPPINE ARMY, VOLTAGE DROP CALCULATION
PREPARED: E-2
ROMEO A. LADISLA MARLON G. HERNANDEZ CARLOS M. LEABRES ELPIDIO Y. TRINIDAD 26
SAN ISIDRO, CABANATUAN CITY FORT MAGSAYSAY, NUEVA ECIJA OVERCURRENT CIRCUIT PROTECTION CARETAKER, OFFICE OF THE ASST. DISTRICT ENGINEER
ASST. CHIEF, PLANNING & DESIGN SECTION CHIEF, PLANNING & DESIGN SECTION DISTRICT ENGINEER
ROEL O. MARTIN CONCURRENT, CHIEF QUALITY ASSURANCE SECTION
27.00
1.50 3.00 3.00 1.50 3.00 1.50 3.00 1.50 2.35 6.65
1 2
1
S2ab
b b b b y b b b b
z 3
2.50
2.50
a a 5
c
S1a S1a a a
4.50
4.50
a MDP a a a
S1a
1 y S1a
S3abc S z PB1
2
S yz
2.00
2.00
PB2 c c
a
z y y
b b b 3
S abc b b
3
S abc b 4 b b
9.00
2
b b c c
2.00
2.00
c d c d
a
S3abc 7
S1a S2ab S1y
b b
4.50
4.50
1
a Sd
a a b b
S1a
2.50
2.50
a
c
a
b b b a a a A B C D E F G
b b b b
3 S3abc S1a S1z S3abc
6
1.35
27.00
3.00
a a z z
1.65
1.50 3.00 3.00 1.50 3.00 1.50 3.00 1.50 2.50 2.00 3.00 1.50
17
8 12
3.13 1.37 4.50 1.37 6.25 1.37 4.50 1.37 3.13 10
x x x 11 x x x
4.50 18.00 4.50 1
b b b b b b b b
z c S1a a
2.50
2.50
a a
c c
9 S1 z S1
4.50
4.50
b b
a a a a
1 GROUND FLOOR LIGHTING LAYOUT S1x S3abc
E-3 SCALE 1: 100M. S1a S1a
S3abc a
2
S3abc
2.00
2.00
c S yz c
a a
y a
b b b S3abc b b S3abc b b b b b
9.00
2 1
Sa
b b b b
2.00
2.00
13 c d c d d
a a
3 3
S1a S abc S abc
S2ab S2ab S1a
b b b 15 b
4.50
4.50
a a a a
S1 S1
2.50
2.50
a a
c c
a a
b b b S3abc b b b b b b S3abd b b b
3
S1z S1z 16
14
3.00
3.00
z z z z
PROJECT TITLE & LOCATION: SHEET CONTENT: DRAFTED: CHECKED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHT NO.:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CHRISTIAN M. MARTINEZ
OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION OF ENGINEERING ASSISTANT
NUEVA ECIJA 2ND DISTRICT ENGINEERING OFFICE TRAINING BARRACKS, GROUND FLOOR LIGHTING LAYOUT 19
REGION III HAAR-PHILIPPINE ARMY, SECOND FLOOR LIGHTING LAYOUT
PREPARED: E-3
ROMEO A. LADISLA MARLON G. HERNANDEZ CARLOS M. LEABRES ELPIDIO Y. TRINIDAD 26
SAN ISIDRO, CABANATUAN CITY FORT MAGSAYSAY, NUEVA ECIJA CARETAKER, OFFICE OF THE ASST. DISTRICT ENGINEER
ASST. CHIEF, PLANNING & DESIGN SECTION CHIEF, PLANNING & DESIGN SECTION DISTRICT ENGINEER
ROEL O. MARTIN CONCURRENT, CHIEF QUALITY ASSURANCE SECTION
27.00
1.50 3.00 3.00 1.50 3.00 1.50 3.00 1.50 2.35 6.65
1
2.50
2.50
21
4.50
4.50
MDP
20
PB1
2.00
2.00
PB2 19
18
9.00
2
2.00
2.00
22
24
4.50
4.50
23
2.50
2.50
A B C D E F G
3
1.35
27.00
3.00
1.65
1.50 3.00 3.00 1.50 3.00 1.50 3.00 1.50 2.50 2.00 3.00 1.50
2.50
2.50
4.50
4.50
1 GROUND FLOOR POWER LAYOUT
SCALE 1: 100M.
E-4
28
2.00
2.00
9.00
2
2.00
2.00
26 27
4.50
4.50
31
2.50
2.50
32
3
30
3.00
3.00
4
PROJECT TITLE & LOCATION: SHEET CONTENT: DRAFTED: CHECKED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHT NO.:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CHRISTIAN M. MARTINEZ
OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION OF ENGINEERING ASSISTANT
NUEVA ECIJA 2ND DISTRICT ENGINEERING OFFICE TRAINING BARRACKS, GROUND FLOOR POWER LAYOUT 20
REGION III HAAR-PHILIPPINE ARMY, SECOND FLOOR POWER LAYOUT
PREPARED: E-4
ROMEO A. LADISLA MARLON G. HERNANDEZ CARLOS M. LEABRES ELPIDIO Y. TRINIDAD 26
SAN ISIDRO, CABANATUAN CITY FORT MAGSAYSAY, NUEVA ECIJA CARETAKER, OFFICE OF THE ASST. DISTRICT ENGINEER
ASST. CHIEF, PLANNING & DESIGN SECTION CHIEF, PLANNING & DESIGN SECTION DISTRICT ENGINEER
ROEL O. MARTIN CONCURRENT, CHIEF QUALITY ASSURANCE SECTION
4. HANGE IN DIRECTION OF DRAINAGE PIPING SHALL BE MADE WITH APPROPRIATE USE OF APPROVED FD FLOOR DRAIN
FITTINGS & SHALL BE OF THE ANGLES REPRESENTED BY A 1/16 BEND, 1/8 BEND, 1/6 BEND OR OTHER
APPROVED FITTINGS OR EQUIVALENT SWEEP.
GV GATE VALVE
5. PROVIDE CLEANOUT FOR EACH CHANGE IN DIRECTION IF THE TOTAL
DS DOWN SPOUT
6. EACH CLEANOUT SHALL BE INSTALLED SO THAT IT OPENS IN A DIRECTION OPPOSITE TO THE FLOW OF
SOIL OR WASTE OR AT RIGHT ANGLES THERETO. ADDITIONAL CLEANOUTS SHALL BE INSTALLED AT
CO CLEAN OUT 12mmØ BARS SPACED MAN HOLE
INTERVALS NOT TO EXCEED 100 FT (30.5 m.) IN STRAIGHT RUNS.
@ 0.30m BOTH WAYS
7. HORIZONTAL DRAINAGE PIPING SHALL RUN IN PRACTICAL ALIGNMENT & A UNIFORM SLOPE OF NOT LESS RD ROOF DRAIN 2.00 1.00
THAN 1/4 OF AN INCH PER FOOT (20.8 mm/mt.) OR 2% TOWARD THE POINT OF DISPOSAL.
0.40 0.40
WC WATER CLOSET
8. UNLESS PROHIBITED BY STRUCTURAL CONDITIONS, EACH VENT SHALL RISE VERTICALLY TO A POINT NOT
LESS THAN 6" (152.4 mm) ABOVE THE FLOOD LEVEL RIM OF THE FIXTURE SERVED BEFORE OFFSETTING
HORIZONTALLY. LAV LAVATORY
9. EACH VENT PIPE OR STACK SHALL EXTEND THROUGH ITS FLASHING & SHALL TERMINATE VERTICALLY NOT
KS KITCHEN SINK
LESS THAN 6" (152.4 mm) ABOVE THE ROOF & ONE FOOT (0.30 m.) FROM ANY VERTICAL SURFACE.
10. PIPING SHALL BE LAID ON A FIRM BED THROUGHOUT ITS ENTIRE LENGTH. IF ANY SUCH PIPING IS LAID IN M M WATER METER
0.40
1.20
MADE OR FILLED GROUND, IT
PLAN
700
AIR SPACE
150 400 150
150
DRAINAGE PIPE
1.60
400
700
PLAN
0.15
0.40
700 12mmØ BARS SPACED 12mmØ BARS SPACED
150 400 150 @ 0.30m BOTH WAYS @ 0.30m BOTH WAYS
SECTION
100
(VARIABLE)
50 INLET
600 min
2% SLOPE
VARIABLE
OUTLET 50
2% SLOPE
100
100
150mm THK CHB W/ 100mm Ø 2 SEPTIC VAULT DETAILS
REBARS HOR. @2-LAYER VERT. P-1 SCALE: 1 : 25 M.
@600mm OC
SECTION
PROJECT TITLE & LOCATION: SHEET CONTENT: DRAFTED: CHECKED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHT NO.:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CHRISTIAN M. MARTINEZ
OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION OF PLUMBING NOTES ENGINEERING ASSISTANT
NUEVA ECIJA 2ND DISTRICT ENGINEERING OFFICE TRAINING BARRACKS, PLUMBING LEGENDS 20
REGION III HAAR-PHILIPPINE ARMY, CATCH BASIN DETAILS PREPARED: P-1
SEPTIC VAULT DETAILS
ROMEO A. LADISLA MARLON G. HERNANDEZ CARLOS M. LEABRES ELPIDIO Y. TRINIDAD 26
SAN ISIDRO, CABANATUAN CITY FORT MAGSAYSAY, NUEVA ECIJA CARETAKER, OFFICE OF THE ASST. DISTRICT ENGINEER
ASST. CHIEF, PLANNING & DESIGN SECTION CHIEF, PLANNING & DESIGN SECTION DISTRICT ENGINEER
FERDINAND F. RAMITERRE CONCURRENT, CHIEF QUALITY ASSURANCE SECTION
27.00
1.50 3.00 3.00 1.50 3.00 1.50 3.00 1.50 2.35 6.65
1
WC WC
2.50
2.50
F F
LAV LAV KS
4.50
4.50
20mmØ PPR PIPE
F F
LAV
2.00
2.00
F
WC
9.00
2
WC
2.00
2.00
F
LAV
4.50
4.50
LAV
2.50
2.50
CWL RISER F
CWL RISER
WC A B C D E F G
3
1.35
3.00
4.50 4.50 4.50 4.50 4.50 4.50
20mmØ PPR PIPE
1.65
1.50 3.00 3.00 1.50 3.00 1.50 3.00 1.50 2.50 2.00 3.00 1.50
3.13 1.37 4.50 1.37 6.25 1.37 4.50 1.37 3.13 20mmØ PPR PIPE
2.50
2.50
F F
LAV LAV
4.50
4.50
(GROUND FLOOR) LAV LAV
1 COLD WATER LINE LAYOUT
2.00
2.00
SCALE 1: 50 M.
F F
P-2
WC WC
9.00
2
WC WC
2.00
2.00
F F
LAV LAV
4.50
4.50
LAV LAV
2.50
2.50
F F
WC WC
3
3.00
3.00
4
(SECOND FLOOR)
2 COLD WATER LINE LAYOUT
SCALE 1: 50 M.
P-2
PROJECT TITLE & LOCATION: SHEET CONTENT: DRAFTED: CHECKED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHT NO.:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CHRISTIAN M. MARTINEZ
OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION OF ENGINEERING ASSISTANT
NUEVA ECIJA 2ND DISTRICT ENGINEERING OFFICE TRAINING BARRACKS, GROUND FLOOR COLD WATER LINE LAYOUT 21
REGION III HAAR-PHILIPPINE ARMY, SECOND FLOOR COLD WATER LINE LAYOUT PREPARED: P-2
ROMEO A. LADISLA MARLON G. HERNANDEZ CARLOS M. LEABRES ELPIDIO Y. TRINIDAD 26
SAN ISIDRO, CABANATUAN CITY FORT MAGSAYSAY, NUEVA ECIJA CARETAKER, OFFICE OF THE ASST. DISTRICT ENGINEER
ASST. CHIEF, PLANNING & DESIGN SECTION CHIEF, PLANNING & DESIGN SECTION DISTRICT ENGINEER
FERDINAND F. RAMITERRE CONCURRENT, CHIEF QUALITY ASSURANCE SECTION
LAV LAV FD KS
150mm Ø CDP
CO
150mm Ø CDP
CO
2"Ø VS PIPE
LAV
FD A B C D E F G
WC
3 CB CB
CB CO CB
CB CB
1 CO CO CO
WC WC WC
LAVFD
FD FD CO
CONNECTED TO CONNECTED TO CONNECTED TO CONNECTED TO LAV LAV
THE NEAREST THE NEAREST THE NEAREST THE NEAREST
SEWER SEWER CONNECTED TO SEWER SEWER CO 2"Ø VS PIPE
THE NEAREST
SEWER
LAV 2"Ø VS PIPE LAV
2"Ø VS PIPE
FD FD
WC WC
1 GROUND FLOOR SEWER LINE LAYOUT 2
SCALE 1: 100M.
P-3 CO
WC WC
FD FD
LAV LAV
CO CO
LAV LAV
FD FD
WC WC
3
CO CO
2"Ø VS PIPE
PROJECT TITLE & LOCATION: SHEET CONTENT: DRAFTED: CHECKED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHT NO.:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CHRISTIAN M. MARTINEZ
OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION OF ENGINEERING ASSISTANT
NUEVA ECIJA 2ND DISTRICT ENGINEERING OFFICE TRAINING BARRACKS, GROUND FLOOR SEWER LINE LAYOUT 22
REGION III HAAR-PHILIPPINE ARMY, SECOND FLOOR SEWER LINE LAYOUT PREPARED: P-3
ROMEO A. LADISLA MARLON G. HERNANDEZ CARLOS M. LEABRES ELPIDIO Y. TRINIDAD 26
SAN ISIDRO, CABANATUAN CITY FORT MAGSAYSAY, NUEVA ECIJA CARETAKER, OFFICE OF THE ASST. DISTRICT ENGINEER
ASST. CHIEF, PLANNING & DESIGN SECTION CHIEF, PLANNING & DESIGN SECTION DISTRICT ENGINEER
FERDINAND F. RAMITERRE CONCURRENT, CHIEF QUALITY ASSURANCE SECTION
B
KS
2
F
LAV C
3 F WC
WC
LAV
4 F D
WC
LAV
WC
RISER F
LAV KS
F
F
LAV
WC F
LAV G
F WC
LAV
WC
WC F
LAV
LAV
F
KS
2 COLD WATER LINE ISOMETRIC LAYOUT (SECOND FLOOR)
SCALE: 1 : 100 M.
P-4
A
RISER
1
F
LAV C
3 F WC
WC
RISER LAV
4 F D
WC
M C GA
TA HE TE V
AC P TO CK AL E
TU W VA VE
AL AT LV / W
LO ER E A AT
CA SU SS ER
TIO PP EM ME
L
N O Y, BL TE
V Y R/ WC
N S ER
ITE IFY LAV F
LAV F
WC
F G
F
F
KS
KS
G
CH ATE
EC VA RISER
K V LV
AL E/ W
VE A
AS TER
SE M
MB ET
LY ER
/
TA M
AC P TO
TU W
AL AT
LO ER
CA SU
TIO PP
1 COLD WATER LINE ISOMETRIC LAYOUT (GROUND FLOOR) N O LY,
P-4 SCALE: 1 : 100 M. N S VER
ITE IFY
PROJECT TITLE & LOCATION: SHEET CONTENT: DRAFTED: CHECKED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHT NO.:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CHRISTIAN M. MARTINEZ
OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION OF ENGINEERING ASSISTANT
NUEVA ECIJA 2ND DISTRICT ENGINEERING OFFICE TRAINING BARRACKS, COLD WATER LINE ISOMETRIC LAYOUT
23
REGION III HAAR-PHILIPPINE ARMY,
PREPARED: P-4
ROMEO A. LADISLA MARLON G. HERNANDEZ CARLOS M. LEABRES ELPIDIO Y. TRINIDAD 26
SAN ISIDRO, CABANATUAN CITY FORT MAGSAYSAY, NUEVA ECIJA CARETAKER, OFFICE OF THE ASST. DISTRICT ENGINEER
ASST. CHIEF, PLANNING & DESIGN SECTION CHIEF, PLANNING & DESIGN SECTION DISTRICT ENGINEER
FERDINAND F. RAMITERRE CONCURRENT, CHIEF QUALITY ASSURANCE SECTION
2"Ø VS PIPE CO
LAV C
3
2"Ø VS PIPE
FD
LAV WC
4 D
CO LAV
WC
CO FD
E
2"Ø VS PIPE
2"Ø VS PIPE
LAV F
KS
2"Ø VS PIPE
FD WC
LAV CO
KS
LAV KS G
WC FD
CO CO
CO FD
CO WC
2"Ø VS PIPE
LAV
CO
LAV
WC
WC
CO
1
4"Ø PVCSS PIPE
S W/ CLEAN OUT
VA EPT B
UL IC
T
2
2"Ø VS PIPE
LAV C
3
2"Ø VS PIPE 4"Ø PVCSS PIPE
FD
LAV WC W/ CLEAN OUT
WC D
4 FD CO
CO
LAV
WC
FD
E
2"Ø VS PIPE
CO
4"Ø PVCSS PIPE
CO F W/ CLEAN OUT
2"Ø VS PIPE LAV
LAV
FD WC
CO
FD G
CO WC
2"Ø VS PIPE S
VA EPT
UL IC
FD T T
(VEO N
E
15RIFY ARE
0 m S ST
m ITE SE
Ø CO W
PV N ER
CS DIT L
KS P IO INE
N)
CO
PROJECT TITLE & LOCATION: SHEET CONTENT: DRAFTED: CHECKED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHT NO.:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CHRISTIAN M. MARTINEZ
OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION OF ENGINEERING ASSISTANT
NUEVA ECIJA 2ND DISTRICT ENGINEERING OFFICE TRAINING BARRACKS, 24
REGION III HAAR-PHILIPPINE ARMY,
SEWER LINE ISOMETRIC LAYOUT PREPARED: P-5
ROMEO A. LADISLA MARLON G. HERNANDEZ CARLOS M. LEABRES ELPIDIO Y. TRINIDAD 26
SAN ISIDRO, CABANATUAN CITY FORT MAGSAYSAY, NUEVA ECIJA CARETAKER, OFFICE OF THE ASST. DISTRICT ENGINEER
ASST. CHIEF, PLANNING & DESIGN SECTION CHIEF, PLANNING & DESIGN SECTION DISTRICT ENGINEER
FERDINAND F. RAMITERRE CONCURRENT, CHIEF QUALITY ASSURANCE SECTION
RD
2 B
RD RD
3 C
4 RD
D
RD
RD
E
RD
RD
RD
F
RD RD
G
RD
RD
RD RD
RD
15
0m
m
C Ø
THONN CD
P E
E
SE NEECT
WE AR ED CB CB
R ES TO
T
CB
F
2"Ø CB
C VS
THONN P IPE
E
SE NEECT
15
KS 0m
m
WE AR ED
FD LAV
Ø
R ES TO CD
T CB KS P G
CO WC CO
CB
CB
15
0m
m
C Ø
CD
THONN P
E
SE NEECT
WE AR ED CB
R ES TO CB
T CB
C
THONN CB PCO
E CD
SE NEECT m
Ø
WE AR ED 0m
R ES TO 15
T C
THONN CB
SEE NEECT CB
WE AR ED P
R ES TO CD
T m
Ø
0m
15
CB
1 DRAINAGE LINE LAYOUT CB
SCALE: 1 : 100 M.
P-6
C
THONN C
SEE NEECT THONN
WE AR ED SEE NEECT
R ES TO WE AR ED
T R ES TO
T
1
PROJECT TITLE & LOCATION: SHEET CONTENT: DRAFTED: CHECKED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO.: SHT NO.:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CHRISTIAN M. MARTINEZ
OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION OF ENGINEERING ASSISTANT
NUEVA ECIJA 2ND DISTRICT ENGINEERING OFFICE TRAINING BARRACKS, DRAINAGE LINE LAYOUT 25
REGION III HAAR-PHILIPPINE ARMY, ROOF DRAIN LAYOUT PREPARED: P-6
ROMEO A. LADISLA MARLON G. HERNANDEZ CARLOS M. LEABRES ELPIDIO Y. TRINIDAD 26
SAN ISIDRO, CABANATUAN CITY FORT MAGSAYSAY, NUEVA ECIJA CARETAKER, OFFICE OF THE ASST. DISTRICT ENGINEER
ASST. CHIEF, PLANNING & DESIGN SECTION CHIEF, PLANNING & DESIGN SECTION DISTRICT ENGINEER
FERDINAND F. RAMITERRE CONCURRENT, CHIEF QUALITY ASSURANCE SECTION