0% found this document useful (0 votes)
199 views2 pages

EKANGAR SARAI (ROB) - Sub Structure-02

The document outlines the general arrangement drawing for the construction of a 4-lane Road Over Bridge (ROB) at the level crossing LC No. 29-B on NH-110 in Bihar, India. It includes details about the project proposal, client information, contractors, and design specifications. The drawing is set to be approved by railway authorities and is scheduled for completion in January 2025.

Uploaded by

dy ce br d
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
199 views2 pages

EKANGAR SARAI (ROB) - Sub Structure-02

The document outlines the general arrangement drawing for the construction of a 4-lane Road Over Bridge (ROB) at the level crossing LC No. 29-B on NH-110 in Bihar, India. It includes details about the project proposal, client information, contractors, and design specifications. The drawing is set to be approved by railway authorities and is scheduled for completion in January 2025.

Uploaded by

dy ce br d
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

CE'S/ECR/DRG.

NO :-
DIV/DRG.NO :-
EAST CENTRAL RAILWAY
DIVISION - DANAPUR
SECTION : FATUHA-ISLAMPUR
GAD FOR ROB AT RAILWAY KM 34.207 BETWEEN RAILWAY STATION
EKANGARSARAI-ISLAMPUR AND AT ROAD KM 29.0 ON NH-110 BYPASS IN LIEU OF
L.C. NO.-29B AT RAILWAY KM 32.630 BETWEEN RAILWAY STATION
RAMBHAVAN-EKANGARSARAI.

(GENERAL ARRANGEMENT DRAWING)


APPROVAL OF RAILWAY AUTHORITY

RAILWAY HQ OFFICER'S SIGNATURE

DY.C.E/BR/D-II :

XEN/BR/D :

SSE/DRG :

PROPOSAL ID :- ECRDNR0032

CE'S FILE NO. W-3/162/03/ROB/NH110/LC No.-29B


CLIENT:
MINISTRY OF ROAD TRANSPORT
& HIGHWAYS (MoRT&H)
GOVERNMENT OF INDIA
PROJECT: CONSTRUCTION OF 4 LANE ROB AND ITS APPROACHES AT THE LEVEL
CROSSING (LC NO. 29- B) OF KM 29 (EKANGARSARAI) AT NH-110 (NEW
NH 33) (RAILWAY KM 32.63 OF FATWA (FUT) – ISLAMPUR (IPR)) SECTION
IN THE STATE OF BIHAR. (JOB NO. NH-110 (NEW NH 33)/BR/2022-23/71)
EPC CONTRACTOR : DESIGN CONSULTANT :
HARI CONSTRUCTION AEONIC ENGINEERING AND
& ASSOCIATES PVT. LTD. COMPANY PVT LTD
P.O. - KESHAWE, P.S. - 1103 ERGO TOWER (11TH
BARAUNI BEGUSARAI FLOOR) , BLOCK -GP,
BIHAR-851134, INDIA STREET NO 23, SECTOR V,
SALT LAKE KOLKATA 700091

DRAWING TITLE :- DIMENSIONS AND REINFORCEMENT DETAILS OF RAIL PIER SUB STRUCTURE
(FOR CP1 AND CP2)
DRAWING NO.: 202407-A/EKANGARSARAI/STR/ROB/SUB STRUCTURE/RAIL PIER

SCALE :- AS SHOWN DATE :- JANUARY 2025 REVISION :- R0

DESIGN BY DRAWN BY CHECKED BY APPROVED BY

A. ROY P. DAS S. HUI D. GUPTA


CE'S/ECR/DRG.NO :-
DIV/DRG.NO :-
EAST CENTRAL RAILWAY
DIVISION - DANAPUR
SECTION : FATUHA-ISLAMPUR
GAD FOR ROB AT RAILWAY KM 34.207 BETWEEN RAILWAY STATION
EKANGARSARAI-ISLAMPUR AND AT ROAD KM 29.0 ON NH-110 BYPASS IN LIEU OF
L.C. NO.-29B AT RAILWAY KM 32.630 BETWEEN RAILWAY STATION
RAMBHAVAN-EKANGARSARAI.

(GENERAL ARRANGEMENT DRAWING)


APPROVAL OF RAILWAY AUTHORITY

RAILWAY HQ OFFICER'S SIGNATURE

DY.C.E/BR/D-II :

XEN/BR/D :

SSE/DRG :

PROPOSAL ID :- ECRDNR0032

CE'S FILE NO. W-3/162/03/ROB/NH110/LC No.-29B


CLIENT:
MINISTRY OF ROAD TRANSPORT
& HIGHWAYS (MoRT&H)
GOVERNMENT OF INDIA
PROJECT: CONSTRUCTION OF 4 LANE ROB AND ITS APPROACHES AT THE LEVEL
CROSSING (LC NO. 29- B) OF KM 29 (EKANGARSARAI) AT NH-110 (NEW
NH 33) (RAILWAY KM 32.63 OF FATWA (FUT) – ISLAMPUR (IPR)) SECTION
IN THE STATE OF BIHAR. (JOB NO. NH-110 (NEW NH 33)/BR/2022-23/71)
EPC CONTRACTOR : DESIGN CONSULTANT :
HARI CONSTRUCTION AEONIC ENGINEERING AND
& ASSOCIATES PVT. LTD. COMPANY PVT LTD
P.O. - KESHAWE, P.S. - 1103 ERGO TOWER (11TH
BARAUNI BEGUSARAI FLOOR) , BLOCK -GP,
BIHAR-851134, INDIA STREET NO 23, SECTOR V,
SALT LAKE KOLKATA 700091

DRAWING TITLE :- DIMENSIONS AND REINFORCEMENT DETAILS OF RAIL PIER SUB STRUCTURE
(FOR CP1 AND CP2)
DRAWING NO.: 202407-A/EKANGARSARAI/STR/ROB/SUB STRUCTURE/RAIL PIER

SCALE :- AS SHOWN DATE :- JANUARY 2025 REVISION :- R0

DESIGN BY DRAWN BY CHECKED BY APPROVED BY

A. ROY P. DAS S. HUI D. GUPTA

You might also like