This AIP Supplement informs stakeholders about the closure of Runway 09/27 at Chaudhary Charan Singh International Airport, Lucknow, for construction activities from April 18, 2024, to October 30, 2024. The runway will be unavailable for landing and take-off during specified hours, with exceptions on Labor Day, and all construction work will be conducted under strict safety measures. Detailed work activities are outlined in annexures, including the construction of new taxiways and refurbishment of existing ones.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views15 pages

Aips 2024 42

This AIP Supplement informs stakeholders about the closure of Runway 09/27 at Chaudhary Charan Singh International Airport, Lucknow, for construction activities from April 18, 2024, to October 30, 2024. The runway will be unavailable for landing and take-off during specified hours, with exceptions on Labor Day, and all construction work will be conducted under strict safety measures. Detailed work activities are outlined in annexures, including the construction of new taxiways and refurbishment of existing ones.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

AIRAC AIP SUPPLEMENT

INDIA
TEL: +91-11-24632950 42/2024
AERONAUTICAL INFORMATION SERVICE
Extn: 2219/2233
AIRPORTS AUTHORITY OF INDIA
AFS: VIDDYXAX
RAJIV GANDHI BHAVAN
FAX: +91-11-24615508
SAFDARJUNG AIRPORT 07 MAR 2024
Email: [email protected]
NEW DELHI – 110003

File No. ATM-19013(19)/1/2024-ATM


Following supplement is issued for information, guidance and necessary action.

sd/-
संजीव कुमार
SANJEEV KUMAR
अध्यक्ष/CHAIRMAN
भारतीय ववमानपत्तन प्राविकरण
AIRPORTS AUTHORITY OF INDIA
[EFFECTIVE PERIOD: 18 APR 2024, 1630 UTC 30 OCT 2024, 0030 UTC]

CLOSURE OF RUNWAY 09/27


FOR WORK ACTIVITIES ON RUNWAY EDGE AND CONSTRUCTION
WORKS WITHIN RUNWAY STRIP AT
CHAUDHARY CHARAN SINGH INTERNATIONAL AIRPORT
LUCKNOW (VILK)

1. INTRODUCTION
The purpose of this AIP Supplement is to inform the stakeholders (Airlines, ANSP,
regulator etc.) likely to use the information, about the schedule of work activities that
will be carried out at Chaudhary Charan Singh International Airport, Lucknow.

1.1 This AIP supplement shall be valid from 1630 UTC of 18th April 2024 up to 0030 UTC
of 30th OCTOBER 2024.

1.2 All works / construction activities planned on portion of runway strip within 105m from
centre line of runway and North of Runway End Safety Area (RESA) shall be carried
out during time limited closure of Runway 09-27, the details of work activities have
been enumerated in Annexure 1.

1.2.1 Runway 09-27 is not available for landing and take-off from 18th April 2024 to 15th July
2024, daily, between 1630 UTC to 0030 UTC.

Airports Authority of India AIP Supplement 42/2024 Page 1 of 15


1.2.2 Runway 09-27 shall be available for operations on 01st May 2024 (Wednesday), on the
occasion of Labor Day.

1.2.3 Runway 09-27 shall not be available for emergency landings and diversions during the
closure.

1.2.4 Airlines are advised to include this in flight planning accordingly.

1.3 All works / construction activities, within the runway strip between 105m up to 140m
from centre line of runway 09/27 has been enumerated in Annexure 2.

1.3.1 The work activities planned will be carried out on watch and ward basis, H24, from
1630 UTC of 18th April 2024 up to 0030 UTC of 30th October 2024.

1.4 Annexure I – Work activities on portion of runway strip (up to 105m from centre line
of runway 09-27),

1.4.1 Refer part -1 for construction of portion of 02 new (entry / exit) taxiways (proposed
designation P1 and P3) from edge of existing full-strength pavement of the runway up
to 105m from runway centre line towards North located at the beginning of runway 09.

1.4.2 Refer part 2 for construction of 01 link taxiway (from edge of existing full-strength
pavement of the runway up to 105 m from runway centre line towards North) located
East of existing taxiway A (proposed designation P6).

1.4.3 Refer part 3 for refurbishment of portion of taxiway A (from edge of existing full-
strength pavement of the runway up to 105 m from runway centre line towards North).

1.4.4 Refer part 4 for upgradation of Runway graded strip from edge of paved runway
shoulder up to 105m towards North & South of centreline runway 09-27.

1.4.5 Refer part 5 for Construction of emergency road and fire approach road towards North
at end of RWY 09-27 and at 100m East of proposed taxiway P6 up to 105m from
runway centre line.

1.5 Annexure-II: Work activities on portion of runway strip (between 105m up to 140m
from centreline of runway 09-27) will be carried out on watch and ward basis, H24,
from 1630 UTC of 18th April 2024 to 0030 UTC of 30th October 2024.

1.5.1 Refer Part 1 for Construction of 02 no. of entry / exit taxiways (proposed designation
P1 and P3) and 01 link taxiway (proposed designation P6) for portion of taxiways
falling within runway strip beyond 105 m up to 140m from centre line of runway 09-
27 (in Zone-2 and zone-3).

Airports Authority of India AIP Supplement 42/2024 Page 2 of 15


1.5.2 Refer part 2 Grading and levelling of runway strip from 105m up to 140m towards
North & South of centreline runway 09-27.

1.5.3 Refer part 3 for aeronautical ground lights (AGL) related works such as:

i. Construction of primary and associated duct banks

ii. Construction of AGL chambers / pits.

1.5.4 Refer part 4 for Construction emergency road and fire approach road at 100m East of
proposed taxiway P6 between 105m and 140m from runway centreline.

1.5.5 Refer Part 5 for refurbishment of portion of taxiway A from 105m up to 140m towards
North of centreline runway 09-27.

2. Any change to the contents of this AIP Supplement will be notified through NOTAM.

Airports Authority of India AIP Supplement 42/2024 Page 3 of 15


Annexure I

CLOSURE OF RUNWAY 09-27 FOR WORK ACTIVITIES


PORTION OF RUNWAY STRIP UP TO 105FROM CENTERLINE AND
NORTH OF RUNWAY END SAFETY AREA (RESA)
(FROM 18TH APRIL 2024 UP TO 15TH JULY 2024)

1. Runway 09-27 not available for landing and take-off from 18th April 2024 to 15th July
2024 (except on 1st May 2024 due Labor Day) daily, between 1630 UTC to 0030 UTC
for work activities on portion of runway strip up to 105m from centreline for runway
09-27 and on RESA.

1.1 Part 1: Construction of portion of 02 no. of entry / exit taxiways (proposed


designation P1 and P3) from edge of existing full-strength pavement of runway up
to 105m m from centreline towards North of runway for taxiway located at
beginning of runway 09.

1.1.1 Work shall be carried out during time limited closure of runway 09-27 (Refer Sl No 1
above).

1.1.2 No construction work is planned on existing full-strength pavement of runway, works


for construction of 02 no. of entry / exit taxiways (proposed designation P1 and P3) will
be carried out on shoulders of runway and beyond.

1.1.3 The location of work area is from edge of existing full-strength pavement of the runway
towards North. Distance of the work area from edge of the runway up to 105m from
centreline of runway.

1.1.4 Approximately 150mm level difference shall exist during construction of the pavement.

1.1.5 Compliant slope for ramp is provided between the existing runway surface and newly
constructed surface of shoulder / portion of taxiway.

1.1.6 Level difference between existing and newly laid surface will be backfilled by laying
sandbags up to top level.

1.1.7 Pilot (s) to exercise caution during landing and take-off.

1.1.8 The work area shall be marked and lighted by placing unserviceability / obstruction
light for easy identification.

1.1.9 Refer chart-1 for location of work area for construction of 02 entry / exit taxiways at
the beginning of runway 09.

1.2 Part 2: Construction of portion of link taxiway (proposed designation P6) from
edge of existing full-strength pavement of the runway up to 105m from centre line

Airports Authority of India AIP Supplement 42/2024 Page 4 of 15


of runway towards North for potion of taxiway located at a distance of 554m East
of taxiway A.

1.2.1 Work shall be carried out during time limited closure of runway 09-27 (Refer Sl No 1
above).

1.2.2 No construction work is planned on existing full-strength pavement of runway, works


for construction of link taxiway (proposed designation P6) will be carried out on
shoulders of runway and beyond.

1.2.3 Location of work area is from edge of existing full-strength pavement of the runway
and towards North. Distance of the work area from edge of the runway up to 105m from
centreline of runway.

1.2.4 Approximately 150mm level difference shall exist during construction of the pavement.

1.2.5 Compliant slope for ramp is provided between the existing runway and newly
constructed surface of portion of taxiway.

1.2.6 Level difference between existing and newly laid surface will be backfilled by laying
sandbags up to top level.

1.2.7 Pilot to exercise caution while landing and take-off.

1.2.8 The work area shall be marked and lighted by placing unserviceability / obstruction
light for easy identification.

1.2.9 Refer Chart - 2 for location of work area for construction of entry / exit (link taxiway)
(proposed designation P6) located at a distance of 554m East of taxiway A.

1.3 Part 3: Refurbishment of portion of TWY A

1.3.1 Taxiway A is not available for taxiing of aircraft from 18th April 2024 to 15th July 2024,
daily, between 1630 UTC to 0030 UTC.

1.3.2 Construction work activity for refurbishment of portion of taxiway A shall be carried
out during time limited closure of runway 09-27 (Refer Sl. No 1 above).

1.3.3 Taxiway closure marking and unserviceability / obstruction lights (at every 3m) across
the width of taxiway shall be deployed for indicating the closure of taxiway A.

1.3.4 Pilot(s) operating to and from UP state Apron / hangar shall coordinate with ATC for
taxiing instructions. Follow Me service shall be available on request.

1.3.5 Work for refurbishment of portion of taxiway A shall be undertaken from edge of
runway up to 105m from centre line of runway and towards North of runway 09-27.

1.3.6 Refer Chart -3 for location of work area of refurbishment of portion of taxiway A.

Airports Authority of India AIP Supplement 42/2024 Page 5 of 15


1.4 Part 4: Upgradation of Runway Grading Strip for Runway 09-27.

1.4.1 Work for upgradation on graded strip of runway 09-27 shall be carried out during time
limited closure of runway 09-27 (Refer Sl No 1 above).

1.4.2 Approximately 150 - 200mm level difference shall exist during upgradation of Runway
grading strip.

1.4.3 The level difference between existing top surface of strip and excavated surface will be
backfilled by laying sandbags.

1.4.4 Refer Chart - 4 for location of work area of graded strip of runway 09-27.

1.5 Part 5: Construction of portion of fire approach access road connecting with
proposed fire station approximately at a distance 650m East of TWY A and
emergency fire access road at North of RESA of RWY 09-27 to provide connection
with runway and perimeter road.

1.5.1 Work shall be carried out during the time limited closure of runway 09-27 (Refer Sl.
No 1 above).

1.5.2 Location of work area for fire approach access road from edge of shoulder of runway
towards North from edge of the paved runway shoulder up to 105m from centre line of
runway.

1.5.3 The emergency fire access road connecting runway and perimeter road is clear of
declared dimensions of RESA for runway 09 towards North located at a distance of
52m from extended centre line of runway.

1.5.4 The emergency fire access road connecting runway and perimeter road is clear of
declared dimensions of RESA for runway 27 towards North located at a distance of
50m from extended centre line of runway.

1.5.5 Approximately 150-200mm level difference shall exist during construction of


emergency & fire approach road.

1.5.6 Level difference between existing and newly laid surface will be backfilled by laying
sandbags up to top level.

1.5.7 Pilot to exercise caution while landing and take-off.

1.5.8 The work area shall be marked and lighted by placing unserviceability / obstruction
light for easy identification.

1.5.9 Refer Chart - 5 for location of work area for portion of fire approach access road
connecting with proposed fire station approximately at a distance 650m East of TWY
A and emergency fire access road at North of RESA of 09-27.

Airports Authority of India AIP Supplement 42/2024 Page 6 of 15


Annexure II

CONSTRUCTION WORK ACTIVITY NORTH OF RUNWAY 09-27


BETWEEN 105M UP TO 140M FROM CENTRELINE OF RUNWAY
(FROM 18 APRIL 2024 TO 30 OCTOBER 2024)

1. Works activity for construction of portion of taxiways, refurbishment of taxiway A,


emergency fire approach road, grading of runway strip and AGL duct bank falling
within runway strip beyond 105m up to 140m from centre line of runway 09-27 (in
Zone-2 and zone-3) will be carried out from 1630 UTC of 18th April 2024 up to 0030
UTC of 30th October 2024, H24.

Note: Construction works activity located beyond 140m from centre line of runway
(out of runway strip) and work activities which do not have any impact on aircraft
operations are not considered for promulgation in AIP Supplement.

1.1 Part 1: Construction of 02 no. of entry / exit taxiways (proposed designation P1


and P3) and 01 link taxiway (proposed designation P6) for portion of taxiways
falling within runway strip beyond 105m up to 140m from centreline of runway
09-27 (in Zone-2 and zone-3).

1.1.1 Construction work will be carried out for 03 new taxiways (proposed designations P1,
P3 and P6). (Refer Sl. No 1 above).

1.1.2 The illumination of the work area during the night shall be done by deploying portable
lights which shall be facing downwards to avoid glare to the Pilots.

1.1.3 The work area and deployed machinery will be marked and lighted as per DGCA CAR
4B1.

1.1.4 Machinery deployed shall remain clear of Obstacle Free Zone (OFZ) of runway 09/27.

1.1.5 Refer Chart – 1 and chart 2 for location of work area for construction of 02 entry / exit
taxiways at the beginning of runway 09 and 01 Link Taxiway respectively.

1.2 Part 2: Grading of runway strip from 105m up to 140m from runway centre line
at North and South of runway 09-27 will be carried out on watch and ward basis.
(Refer Sl. No 1 above).

1.2.1 Compliant graded and leveled runway strip will be provided.

1.2.2 Compliant slope will be provided in the graded and leveled portion of runway strip and
will be merged with the slope of existing runway strip.

Airports Authority of India AIP Supplement 42/2024 Page 7 of 15


1.2.3 The illumination of the work area during the night shall be done by deploying portable
lights which shall be facing downwards to avoid glare at the Pilots.

1.2.4 The work area and deployed machinery will be marked and lighted as per DGCA CAR
4B1.

1.2.5 Machinery deployed shall remain clear of Obstacle Free Zone (OFZ) of runway 09/27.

1.2.6 Refer Chart -4 for location of work area of graded strip of runway.

1.3 Part 3: AGL Duct bank & Associate chambers work at 105m from runway centre
line at North & South of runway 09-27. (Refer Sl. No 1 above).

1.3.1 Construction of AGL Duct bank & Associate chambers works shall be carried out.

1.3.2 The illumination of the work area during the night shall be done by deploying portable
lights which shall be facing downwards to avoid glare to the Pilots.

1.3.3 The work area and deployed machinery will be marked and lighted as per DGCA CAR
4B1.

1.3.4 Machinery deployed shall remain clear of Obstacle Free Zone (OFZ) of runway 09/27.

1.3.5 Refer Chart -6 for location of work area of AGL Duct bank & associate chambers.

1.4 Part 4: Emergency fire approach road from 105m up to 140m from runway
centreline at North of runway 09-27 carried out on watch and ward basis from
1630 UTC of 18th April 2024 up to 0030 UTC 15th July 2024, H24.

1.4.1 Construction of fire approach road work shall be carried out.

1.4.2 Compliant slope of ramp is provided between the existing and newly constructed
surface.

1.4.3 The illumination of the work area during the night shall be done by deploying portable
lights which shall be facing downwards to avoid glare at the Pilots.

1.4.4 The work area and deployed machinery will be marked and lighted as per DGCA CAR
4B1.

1.4.5 Machinery deployed shall remain clear of Obstacle Free Zone (OFZ) of runway 09/27.

1.4.6 Refer Chart -5 for location of work area of Emergency & fire approach road.

1.5 Part 5: Refurbishment of taxiway A from 105m to 140m from runway centreline
at North of runway 09-27 will be carried out from 18th April 2024 to 15th July 2024,
daily, between 1630 UTC to 0030 UTC.

Airports Authority of India AIP Supplement 42/2024 Page 8 of 15


1.5.1 Taxiway A will not be available for operations from 18th April 2024 to 15th July 2024,
daily, between 1630 UTC to 0030 UTC.

1.5.2 Taxiway A shall be available for operations on 1st May 2024 (Wednesday), on the

occasion of Labor Day.

1.5.3 Construction work activity for refurbishment of portion of taxiway A shall be carried

out during time limited closure of runway 09-27.

1.5.4 Taxiway closure marking and unserviceability / obstruction lights (at every 3m) across

the width of taxiway shall be deployed for indicating the closure of taxiway A.

1.5.5 Pilot(s) operating to and from the UP-state Apron / hangar shall coordinate with ATC

for taxiing instructions. Follow Me service shall be available on request.

1.5.6 The illumination of the work area during night shall be done by deploying portable

lights which shall be facing downwards to avoid glare to the Pilots and vehicle

operating at airside.

1.5.7 The work area and deployed machinery will be marked and lighted as per DGCA CAR

4B1.

1.5.8 Refer Chart -3 for location of work area of refurbishment of portion of taxiway A

Airports Authority of India AIP Supplement 42/2024 Page 9 of 15


CHART -1

CA RITY

R3
BIN

.00
D1
DOT DOT DOT

CU
DOT
DOT DOT DOT
DOT DOT
GATE

GA CK

Entry

SLOPE-1:6

SLOPE-1:6
SE

SLOPE-1:6
TE

SLOPE-1:6
PUMP HOUSE

RAMP

RAMP
RAMP

RAMP
SLOPE-1:6

SLOPE-1:6

SLOPE-1:6
EA

an

SLOPE-1:6

UP
Pedestri

RAMP

RAMP

RAMP

RAMP
EX TRU

AR

LANE
WIDE
LEGENDS:

UP
NK

5.0M

M.S FRAME

UPTO 30M
2.60

SUPPORT
1IN10

LANE

0.70
TA
RAMP

WID
UP

WIDE

UP
2.92CLMS 3.15

UPSDB-

1.83
ELDB-3
STORE

UG
IT

1.50
K

5.0M

5.67
Entry
TR TAN

3.38
SLDB

an
EMLDB

Pedestri
MCC-3

630A
VCB

UP
BUILDING

MLDB
m

MPDB
GATE
3.30 RAMP

OLTCER
ELECTRICAL

MODB-3

KVA
11KV/433V
TRANSFORM
DOWN TO BASEMENT

1000
D5

MODB-4
Y/

ION
WITH

LEVEL

11.75
APFC

n
MCC-2
WTMD

Pedestria
LOCAT
CISF

above
SCREENING
SECURITY

Exit

16.35
ND

Canopy
AREA

GROU

HA
N

P
MORC

ETD
GATE

UP

8.78
A
AIRS GREEN AREA

P
x 1000
6000PANEL
RO

TOILET (F)
IDE

PTA-01
TURNSTILE

LT
EN

MCC-1
4.75
1.46
SHED ELECTRICAL

1.29
6.67
Canopy
ROOM

ROOM
JANITOR
DUCT
above

D2
UP
DG
CON
PANEL1
900x1000 DG

.00

D2
PANEL2
CON MAINTENANCE SHAFT

D4
900x1000

(H/C)
SET
(DG-2)DG
W.B.

RELL I HC

KVA

TOILET (M)
1010

PTA-02
R6
WID
HANUMAN&SHIVA
TEMPLE
DE SET
(DG-1)DG
KVA

CA
1010

CL

CL

CL

CL
C
NT
(15
ING
GN I DL I UB
EXISTING
M PUMP

m
X5
M) HO

4.5
US
E

STORE ROOM
CABIN

AD

STORE ROOM
NEW STORE ROOM

ROOM
RAMP

STORE
CANTEEN

RO
BUILDING

OPERATIONAL AREA
HOUSE KEEPING MATERIAL YARD

OP
Y1

ROOM
M)

STAFF
SH
BA

12
RK
MX
Y2

WO
(24
BA
SHED

Y3
GA CY

BA
TE
INDIAN POST

LINE 105M FROM

Y4
HOUSE KEEPING MATERIAL

GE

BA
ER

Y5
BA
EM
RWY CENTER LINE

Y6
HINDUSTAN

BA
PETROLEUM

)
HT
E
Y7

US

Ø X1 KL
-2

2M
HO
BA

M 1000
AVIATION

1.45x1.6
TOILET

FW
1.45x1.6

MP
TOILET

X 8 FICE MIRROR

M)
1.45x1.6
TOILET

(25 R PU
Y8

X5
M)

(12 P :
ROOM
OF

STORE

CA
BA

M
TE
CABIN OFFICER
SHIFT

E WA
IFT
M
LINE 140M FROM RWY

SH
(10

FIR
WORKSTAT

ION

)
HT
UP

Ø X100 KL
WA RY

2M
(12 P : 10 - 1
LL

CA FW
CENTER LINE

DA

M
UN
BO
REQUIRED RUNWAY
CLOSURE
WORK ON WATCH & WARD
BASIS (Beyond 105M)

TWY D & E
TWY - C TWY - B
140 MTR. FROM THE RUNWAY CENTER LINE

02 02 23.00
279.50

23.00

140.00
7.50 7.50
95.00
224.50

105
01 01

7.50

22.50
60.00

RESA 27
22.50
22.50

7.50

AIRSIDE IMPROVEMENT WORKS AT LUCKNOW INTERNATIONAL AIRPORT LEGENDS TIME LINE FOR RUNWAY CLOSURE

ENTRY/EXIT TWYs
ENTRY/EXIT TWYs 01 (P1,P3)(UP TO 105M 18 Apr 2024 TO 15 July 2024
ENTRY/EXIT TWYS
01 (P1,P3)(UP TO 105M 02 (P1,P3) (Beyond 105M
FROM RWY C/L)
FROM RWY C/L)

LEGENDS TIME LINE FOR WORK COMPLETION

ENTRY/EXIT TWYS
02 (P1,P3) (Beyond 105M) 18 Apr 2024 TO 30 Oct 2024

Airside Improvement Works- ENTRY/EXIT TWYs (P1,P3) Plan


____________________________________________________________________________________________________________________________________________________________________________
Airports Authority of India AIP Supplement 42/2024 Page 10 of 15
BIKE PARKING
CHART -2
Lvl.+123.280M 7M WIDE VIP ROAD

CAR PARKING
SECURITY CABIN
LEGENDS:
EXISTING
TOILET VISTARA CARGO OFFICE
OPERATIONAL AREA
SHED

LINE 105M FROM

0
122.35
UNASSIGNED
ROOM
OFFICE
CISF

FRISKING
AREA ELECTRICAL
ROOM

5.0M WIDE LANE 5.0M WIDE LANE

NEW

RWY CENTER LINE


STORE

CARGO

DFMD
MALE

DFMD

HI SCAN
Lvl.+122.530M SHED ATC COMPLEX

6.00
CISF BREAK
ROOM

GATE GATE

OFFICE
COMPRESSOR
TOILET (M)
ROOM
0-09 11 m²

PARKING

POWER
HOUSE
RCC CARGO

ATC BLD HI
LINE 140M FROM RWY
CENTER LINE
134.557

PUMP HOUSE

ATC TOWER
ATC HI

151.659
SHED
BUILDING
ELECTRICAL

RE L L I HC
ROOM
SHED ELECTRICAL

HANUMAN&SHIVA
TEMPLE

STATE STATE
REQUIRED RUNWAY
GN I DL I UB HANGAR HANGAR

CLOSURE

STORE ROOM
STORE ROOM
NEW STORE ROOM
CANTEEN
BUILDING HOUSE KEEPING MATERIAL YARD

SHED

VIP WORK ON WATCH & WARD


13
INDIAN POST

LODGED
HOUSE KEEPING MATERIAL

HINDUSTAN
PETROLEUM
BHARAT
PETROLEUM
BLD BASIS (Beyond105M )
AVIATION AVIATION

TWY - C TWY - B
TWY - A TWY - P6
7.50
23.00
7.50
LINE 105M FROM
RWY CENTER LINE 554.65
02
279.50 7.50 7.50

23.00

140.00
140.00
01

105

7.50
105
7.50

22.50
22.50
LINE 105M FROM
RWY CENTER LINE

DVOR, 439 ft.

DVOR MONITOR
ANTENNA, 432 ft.
DVOR/DME
AIRSIDE IMPROVEMENT WORKS AT LUCKNOW INTERNATIONAL AIRPORT LEGENDS TIME LINE FOR RUNWAY CLOSURE

LINK TWY (P6) (UP TO LINK TWY (P6) (Beyond


01 105M FROM RWY C/L) 02 105M) 01
LINK TWY (P6) (UP TO
18 Apr 2024 TO 15 July 2024
105M FROM RWY C/L)

LEGENDS TIME LINE FOR WORK COMPLETION


Airside Improvement Works- LINK TWY (P6) LINK TWY (P6) (Beyond
02 18 Apr 2024 TO 30 Oct 2024
105M)

____________________________________________________________________________________________________________________________________________________________________________
Airports Authority of India AIP Supplement 42/2024 Page 11 of 15
BIKE PARKING
CHART -3
Lvl.+123.280M 7M WIDE VIP ROAD

CAR PARKING
SECURITY CABIN
LEGENDS:
EXISTING
TOILET VISTARA CARGO OFFICE
OPERATIONAL AREA
SHED

LINE 105M FROM

0
122.35
UNASSIGNED
ROOM
OFFICE
CISF

FRISKING
AREA ELECTRICAL
ROOM

5.0M WIDE LANE 5.0M WIDE LANE

NEW

RWY CENTER LINE


STORE

CARGO

DFMD
MALE

DFMD

HI SCAN
Lvl.+122.530M SHED ATC COMPLEX

6.00
CISF BREAK
ROOM

GATE GATE

OFFICE
COMPRESSOR
TOILET (M)
ROOM
0-09 11 m²

PARKING

POWER
HOUSE
RCC CARGO

ATC BLD HI
LINE 140M FROM RWY
CENTER LINE
134.557

PUMP HOUSE

ATC TOWER
ATC HI

151.659
SHED
BUILDING
ELECTRICAL

RE L L I HC
ROOM
SHED ELECTRICAL

HANUMAN&SHIVA
TEMPLE

STATE STATE
REQUIRED RUNWAY
GN I DL I UB HANGAR HANGAR

CLOSURE

STORE ROOM
STORE ROOM
NEW STORE ROOM
CANTEEN
BUILDING HOUSE KEEPING MATERIAL YARD

SHED

VIP WORK ON WATCH & WARD


13
INDIAN POST

LODGED
HOUSE KEEPING MATERIAL

HINDUSTAN
PETROLEUM
BHARAT
PETROLEUM
BLD BASIS (Beyond105M )
AVIATION AVIATION

TWY - C TWY - B 02
TWY - A TWY - P6
23.00 LINE 105M FROM
7.50 7.50 RWY CENTER LINE 554.65
7.50
279.50 7.50

23.00

140.00
140.00
01

105

7.50
105
7.50

22.50
22.50
LINE 105M FROM
RWY CENTER LINE

DVOR, 439 ft.

DVOR MONITOR
ANTENNA, 432 ft.
DVOR/DME
AIRSIDE IMPROVEMENT WORKS AT LUCKNOW INTERNATIONAL AIRPORT LEGENDS TIME LINE FOR RUNWAY CLOSURE

REFURBISHMENT OF
REFURBISHMENT OF REFURBISHMENT OF 01 TWY 'A' (UP TO 105M 18 Apr 2024 TO 15 July 2024
01 TWY 'A' (UP TO 105M 02 TWY 'A' (Beyond 105M)
FROM RWY C/L)
FROM RWY C/L)

LEGENDS TIME LINE FOR TAXIWAY CLOSURE

Airside Improvement Works- REFURBISHMENT OF TWY 'A' 02


REFURBISHMENT OF
18 Apr 2024 TO 15 July 2024
TWY 'A' (Beyond 105M)

____________________________________________________________________________________________________________________________________________________________________________
Airports Authority of India AIP Supplement 42/2024 Page 12 of 15
QUARTERS
CHART -4

P0-07
CSD - 02

27.000
KENDRIYA POLICE
KALYAN BHANDAR

14532.477 Sqm
LEGENDS:
DOG

P0-08
KENNEL

27.000
CISE AIRPORT
POLICE STATION

AIRPORT

P0-09
POLICE STATION

0
27.00
O
PROPOSED

P0-10
000
ION TR

27.

1
TP0-1
AT E
OPERATIONAL

ST SI M
ELEVATED ROAD FROM
SHAHEED PATH BOUNDARY WALL

AU
ENCROACHMENT

AM
RUNWAY STRIP

2
TP0-1
UPGRADATION (UP TO

P0-13
P0-14
CHILLAWAN VILLAGE 105m FROM RWY C/L)

15
P0-
CHILLAWAN VILLAGE

P0-16

GUARD ROOM
RUNWAY BASIC STRIP

P0-17
LANDSCAPE
AREA

8.1

EXIT
9.5
6.0

6.0
LAND SWAP OF
EQUIVALENT AREA
GUARD
(1701 SQM.)
LOW HT. ROOM
LIGHT MAST

P0-18

2 NOS.
GRADING (105 to 140

9 NOS.
4 NOS.
6.0 M WIDE DRIVEWAY

66.0
5 NOS.

6.0 M WIDE DRIVEWAY


LANDSCAPE
LOW HT.
AREA
LIGHT MAST

7 NOS.
9 NOS. TOTAL 48
6.0 M WIDE DRIVEWAY NOS. NEW
LANDSCAPE CAR PARKING
11 NOS.
AREA

FROM RWY C/L)


LOW HT. LIGHT
MAST

52.7

TOILET
HOUSE
R
POWE
TANK

1C
4.437M Clear Ht.
7.560M Clear Ht.

6.825M Clear Ht.

5.236M Clear Ht.

6.145M Clear Ht.

5.989M Clear Ht.

Ht.
Clear
4.730M
Ridg 6.514M Clear Ht.

E3
Line e LINE
PLINTH
LINE
ROOF

+010
LVL
LADIES
D1

EPOLS 21:1
TOILET

D2
D1
V3

SKY
WIDE

J.

TO
OPEN
1800
V2

ELECTRICAL

HANDWASH
GENT'S
FD1
PASSAGE

TOILET

D1
Clear Ht.

ROOM

M.H
V1

SHOWER
+150
LVL
KITCHEN

SHAFT

WIDE
W.C
4.022M

V1

1800
W.C
KD1

URINALS

PASSAGE
W.C
W.C
BUILDING

SHOPS

E1
6.788M Clear Ht.

SEATING
TO
CANTEEN
ENT.
y
ewa

6.00 Mt Wide Driveway


+160
e Driv

LVL
LINE
PLINTH
LINE

+010LVL
ROOF

Wid
Mt
6.948M

6.00
Clear Ht.

1.67

y
ewa
e Driv
Wid
POWER HOUSE

Mt
6.00
7.108M Clear Ht.

DELL

X 12'-6"
8'-3" HEAD DELL

CIVIL

DELL

X 12'6"
8'1"
CABIN-01
12'6"
X
8'4" X 12'6"
CABIN-03

CABIN-02 11'6"
DELL
14'-0"

DELL
X

DELL
14'-0"

DELL

HEAD
PROJECTS
DELL

5'0" X 12'6"
X DELL 11'4"
X 9'-4"
ROOM

9'-0" 79'0" CABIN-04 DELL

ADANI SITE OFFICE


CORRIDOR
SECRETARY
1X 6'0" 2"
12'6"

X 4'-2"
TOI.

X 12'6"
4'-0" 7'6"
X

4'-9
4'6"

CABIN-05 PANTRY LADIES


X 6'0"
2'-9"

X 4'3"
X 4'-2"
3'-4"

3'-3"

X
ROOM

7'-0" 6'-2"
14'-0"

X 6'0"
STORE X 4'3"
10'-0"

DELL
DELL

X 6'0"
GENTS

SAFETY
H.O.D 9'0"
DELL
WORK

TOI.-01 STN.-02
11'-3"
H.O.DC.A.D

X
10'-0"

WORK

DELL STN.-01
X 9'6"
9'6"
DELL
9'6"
14'-0"

X 9'10"
X
X

9'6"
9'11"

28'-0"
ROOM M.E.P CABIN-06
WORK

STN.-03 HEAD
X 29'0"
CONFERENCE 21'2" DELL
WORK

WORK

STN.-04WORK STN.-10 STN.-11 DELL

WORK
DELL
STN.-09

WORK

STN.-05 STN.-12WORK DELL

WORK 21'6"
X 5'0" X
WORK

9'7" 9'6"
STN.-06 WORK
STN.-08 STN.-13

CPAD
9'6"
X
9'10"
TERMINALDESIGN STN.-14
WORK
HEAD
WORK

WORK

STN.-07
WORK

STN.-15
STN.-20
X 8'0"
STN.-19 5'5" 3'10"
X 9'6" X
DELL WORK 19'6" TOI.-02 3'9"
WORK

DELL STN.-18 GENTS


WORK

3'10"
X
WORK

STN.-17 3'9"
DELL STN.-16 X 9'6"
10'0"
PLANNING
MASTER
HEAD
DELL

EGIS OFFICE UG TANK

SHED

WATER
TANK
EMERGENCY
PARKING BAY

4.00
4.00
11 10 3.50 3.50 3.50

09

3.5.0M WIDE LANE

3.5.0M WIDE LANE

3.5.0M WIDE LANE


PUBLIC BUS WITH EV / CHARGING
Met
08
ro Li
ne
PARKING 07
FACILITY
Alig
GATE GATE GATE

06
AUTO Pick Up

W
nm

at
05

ent

er
Green

Ta
04

nk
03

Green Area AUTO Drop Off


02

01

Mango
Tree

Green GREEN GREEN Green Area


SCULPTURE
+3150 Entry
+2700 Exit Exit 16 nos TAXI CAR PICK UP Entry
16 nos PVT CAR PICK UP
+2250 ICONIC WATER FEATHER
+1800 FLAG POLE
HYDROGEN
33 kv Cable +1350 SHED
Alignm PROJECT
.00

+900 IMD
entS ±0.0
R22

Green IMD
SPACE FOR
±0.0 +450
Green Area
OFFICE DEPARTMENT
5.8

ANODE WELL
CENTRE
5M
Cle

CL CL CL CL CL

ME
ar

ROAD 4.5m WIDE


Ht.

Event Arena
W.B.

IMD BUILDING
(Plin TE +300
th Lvl. R R3.00
+12 RM IMD BUILDING
3.63
0M)
. F&B 6
F&B 5 TICKETING GRAB GRAB GRAB GRAB FLOWER FLOWER CHICKEN CHICKEN AVADH AVADH AVADH AVADH HEALTH HEALTH GRAB GRAB GRAB GRAB
& GO 7 & GO 6 & GO 5 & GO 4 & GIFTS 1 & GIFTS KARI 1 KARI HOLIDAYS 1 HOLIDAYS PERFUME PERFUME & CARE 1 & CARE & GO 3 & GO 2 & GO 1 & GO F&B 1 F&B R1
1
GRAB & GO
HT)

T
X12 KL

UR
:1250T-2

Retail as per Retail as per


CAP ATF

CO
E

Retail Designer Retail Designer


WID

Ø
M

OD

F&B 7
(12

WATER FEATURE WATER FEATURE


R3.00

FO
HT)
m

WATER FEATURE
X12 KL
:1250T-4

F&B 4
4.5

F&B 3 F&B 2
W

R5 R4
CAP ATF

NO
AD

CK
M
HT)

GREEN
(12
RO

GREEN
CARGO
LU
:1250T-1
X12 KL
M

122.294
ICONIC BAR

R3
CAP ATF

FUEL FARM ACCESS /

STP (T3)
M

R2
X 5 HOUSE
(12

R15. GREEN GREEN


HT)

00 GREEN
M)
(25 PUMP
(12 :1250T-3
X12 KL

(Lvl. +122.700M)
M

BIKE PARKING
CAP ATF

M
NT
Ø

HYDRA

Lvl.+123.280M Lvl.+123.280M
M

749.9998
280.0000

7M WIDE VIP ROAD


0

1315.0000
EXIT GATE
2.0

1365.0000
915.0000
R1

2000.0000

RO
AD 2000.0000
2560.0000
CAR PARKING
5m
SECURITY

LINE OF WTP BELOW


CABIN

125

WID
ISMC

SECURITY CABIN
200
ISMC
125

ISMC
D1

W1

ISMC
125

E
125
MANHOLES
ISMC

TANK ACCESS
FOR WATER

125
ISMC 200
ISMC

(LVL -405) (LVL -405) (LVL -405)


GREEN GREEN GREEN
125
ISMC
TOC LVL.-300

(LVL -405)
GREEN
(LVL -405)
GREEN

WATERTANK
TOP OF
BASIN

TEST
CUTOUT (150X150)MM IN
FLOOR
LABORATORY

RIG
(F.C.)

ROOM

ELECTRICAL
ROOM

Fuel Farm
S2

(150X150)MM

8130 X 5070
CUTOUT

F.F.L.±00 OFFICE-1
IN FLOOR
ROOM
RECORD

OL

Fuel Farm
F.F.L.±00
(F.C.)
STAFF

FINANCE

PLINTH PROTECTION
& CONTR

WAITING

TOILET VISTARA CARGO OFFICE


450 WIDE (TYP)

AREA OFFICERS
SAFETY

CABIN
N

(F.C.)
2
ENTRANCE

FINANCE
OFFICERS
CABIN

SUBSTATION
TIO

1 (F.C.)
UP
BUILDG

LADIES

FIRE
EXIT
TOILET

SLOPE-1:6
SERVICES INTO
TUNNEL
CUTOUT FOR
DIRECTING
UP
STEPS:27

RISER:148.14mm
TREAD:300mm

RAMP
PLATFORM

BASIN

NO.OF

WIDTH:1500mm
M) RA

GENT'S

SHED
PANTRY

(T3)
ADMIN

TOILET

CUTOUT FOR
EQUIPMENT

1.20

PUMP PANEL
X 3 LIB

PLATFORM VENT. PANEL


SLOPE-1:6
TRAINING

FIRE

UP
EXIT
(F.C.)

CONFERANCE/

F.F.L.±00

RAMP
MINI

122.350
STAFF
ROOM

(Lvl. +123.280M)
(F.C.)
CA

UNASSIGNED
ROOM

(LVL -405)
GREEN

ROOM
SOAK

SOAK
WID

DN

UP

OFFICE
PIT

PIT

CISF

1.50
(LVL -405)
GREEN

MAIN LT PANEL LIGHT & POWER PANEL


(3 TER

NO SMOKING
NO SMOKING
3500 MM WIDE

FRISKING
AREA
m

EXTINGUISHERS ELECTRICAL
ROOM
J.CLOSET
PANTRY

& 2 NO. FOAM TYPE FIRE CL


2000 KVA, OIL TYPE WITH
MS GATE

NEW
4 NO. DRY POWDER TYPE
TOI(M)
OLTC 11/0.433KV, Dyn

CL

L Service Tunnel 5.0M WIDE LANE 5.0M WIDE LANE


4.5

Below
11,TRAFO.-3
ME
M

CAP.-3 CAP.-2 CAP.-1


NO SMOKING

STORE
UPS/BATT.

BMS/PLC
CONTROL
ROOM

ROOM

TOI(F)

OUTLET
AREA

RETURN RETURN
OUTLET

CARGO
PUMP-1

DIP HATCH DIP HATCH


AD

DFMD

DFMD
MALE

HI SCAN
BULK
PUMP-2

TANK HSD
20KL FUEL
INLET INLET SLOPE WIDE

ATC COMPLEX
PUMP-3

STAND
WITHBUCKET
FIRE SLOPE-1:6
2000 KVA, OIL TYPE WITH

INLET INLET PASSAGE 4500


F.F.L.-405

OLTC 11/0.433KV, Dyn


ING

RO

RAMP
F.F.L.±00

PUMP-4

11KV HVAC/ SERVICE YARD PANEL COVERED


Lvl.+122.530M

SHED
11,TRAFO.-2

Lvl.+122.530M

6.00
SPACE FOR CYLINDERS
-

CISF BREAK
PARK

F.F.L.±00

SPARE MANHOLE SPARE MANHOLE ROOM

Lvl.+123.280M
NO SMOKING
F/A OPENING 2300X1100

F/A OPENING 2200X1000

F/A OPENING 2200X1000

F/A OPENING 2200X1000

F/A OPENING 2200X1000

11KV MAIN HT VCB PANEL


IN WALL (BELOW BEAM)

IN WALL (BELOW BEAM)

IN WALL (BELOW BEAM)

IN WALL (BELOW BEAM)

IN WALL (BELOW BEAM)

TANK LORRY
NO SMOKING PLATFORM
DECANTING 11KV NIC PANEL GATE GATE
SLOPE-1:6

Dn Slope
LER

OFFICE
RAMP COMPRESSOR
2000 KVA, OIL TYPE WITH

ROOM TOILET (M)


OLTC 11/0.433KV, Dyn

0-09 11 m²
RTCC PANEL
11,TRAFO.-1

33 KV ROOM
RE-FU

33 KV RMU
11 KV ROOM

GROUNDING PANEL
11KV DG. NEUTRAL
PANEL
CHANGEOVER
PARKING
(LVL -405)
GREEN

DG AUXILIARY PANEL
UP

CARGO
BOARD
11KV DG. SYNCH. PANEL

R C C
33 KV HT PANEL

POWER
DG. SET FUTURE

LANDSIDE
DG. SET-6

DG. SET-5

DG. SET-4

DG. SET-3

DG. SET-2

DG. SET-1
F.F.L.±00

HOUSE
SOAK

SOAK
PIT

PIT

6.25MVA 6.25MVA 6.25MVA


W1

GATE
F.F.L.±00

POWER TRF.-3 POWER TRF.-2 POWER TRF.-1


TRF. FUTURE
SOAK

SOAK
RITY

33/11KV ONAN 33/11KV ONAN 33/11KV ONAN


R3
PIT

PIT

ATC BLD HI

134.557
CABIN

.00
D1

DOT DOT
DOT DOT DOT
DOT DOT DOT DOT
SECU
T GA CK

GATE

SLOPE-1:6

SLOPE-1:6
Entry
TE

SLOPE-1:6

SLOPE-1:6

PUMP HOUSE
RAMP

RAMP
SLOPE-1:6

SLOPE-1:6

SLOPE-1:6
AREA

RAMP

RAMP
Pedestrian

UP
SLOPE-1:6
RAMP

RAMP

RAMP

RAMP
/ EXIK TRU

LANE

ATC TOWER SHED


WIDE

UP
TANK

5.0M

M.S FRAME
2.60

UPTO 30M
SUPPORT

1IN10
RAMP
0.70
LANE
WID

UP
UPSDB-3

WIDE

3.15
UP

CLMS
1.83
2.92
UG

ELDB-3

STORE
1.50
5.0M

ATC HI
5.67
Entry

151.659
TRY TAN

3.38
Pedestrian
EMLDBSLDB

630A
MCC-3

VCB

UP

BUILDING
MLDB
5m

MPDB

GATE
RAMP
MODB-3

TRANSFORMERKVA

3.30
11KV/433V

ELECTRICAL
OLTC
1000

DOWN TO BASEMENT
MODB-4

LOCATION

11.75
WITH
APFC
MCC-2

LEVEL

Pedestrian

WTMD
above
CISF
Exit

SCREENING
SECURITY
AD

AREA
Canopy
GROUND

16.35
MORCHA

GATE P
N
ETD

8.78
UP

P
AIRSIDE GREEN AREA
LT PANEL
x 1000
RO

PTA-01
TOILET (F)
6000
MCC-1

TURNSTILE
EN

4.75

SHED ELECTRICAL
1.46
1.29

Canopy DUCT
above
ROOM
6.67

ROOM
JANITOR

D2

UP
DG

900x1000
PANEL1
CON

D2

DG
00

MAINTENANCE SHAFT
PANEL2

CON
D4

900x1000
(H/C)
(DG-2)DG SET

R E L L I H C
W.B.
KVA

E
1010

TOILET (M)
R6.

PTA-02

STATE
WID

HANUMAN&SHIVA

STATE
TEMPLE

DECAN
SET
DG
KVA(DG-1)
1010
CL CL CL CL CL

TING
(15
M PUMP G N I D L I U B HANGAR HANGAR
m

X5
M) HOUSE
4.5

STORE ROOM
CABIN

STORE ROOM
AD

NEW STORE ROOM


ROOM
RAMP

STORE

CANTEEN
RO

BUILDING HOUSE KEEPING MATERIAL YARD


(24MX SHOP
1

ROOM
BAY

12M)

STAFF
WORK
2
BAY

SHED

VIP
3
BAY
GA Y

INDIAN POST
ENC
TE

HOUSE KEEPING MATERIAL


LODGED
BAY
ERG

5
BAY

BLD
EM

HINDUSTAN BHARAT
BAY

PETROLEUM PETROLEUM
HT)
HOUSE

KL
7

-2
8 BAY

AVIATION AVIATION
: 1000
1.45x1.6

X12
TOILET

FW
PUMP
1.45x1.6
TOILET

E MIRROR

M)
1.45x1.6
TOILET
OFFIC

X5

Ø
M)

CAP
BAY

WATER
ROOM
STORE

M
M
X8

(25

(12
CABIN OFFICER
SHIFT

SHIFT

FIRE
(10

WORKSTATION
HT)

UP
Ø X12 KL
WA RY

: 1000- 1

M
LL

CAP FW
DA

M
UN

(12
BO

GLIDE PATH

TWY - C TWY - B 02
TWY D & E
01 TWY - A GLIDE PATH CRITICAL AREA
300.00

75.00
105.00
75.00

RESA 09

75.00
RESA 27
105.00
75.00

150.00
150.00
01 300.00

02 DVOR, 439 ft.

DVOR MONITOR
ANTENNA, 432 ft.
DVOR/DME
LKN 117.4
CH 121X
ELEV. 424 ft.

ISOLATION BAY

AIRSIDE IMPROVEMENT WORKS AT LUCKNOW INTERNATIONAL AIRPORT


RUNWAY STRIP RUNWAY BASIC STRIP
01 UPGRADATION (UP TO 02 GRADING (105 to 140 LEGENDS TIME LINE
105m FROM RWY C/L) FROM RWY C/L)
RUNWAY STRIP
01 UPGRADATION (UP TO 18 Apr 2024 TO 15 July 2024 During
105M FROM RWY C/L) Runway Closure

RUNWAY BASIC STRIP


I S I G IO 02 GRADING (105 to 140 TIME LINE-18 APR 2024 TO 30 OCT
2024, H24, ON WATCH & WARD
FROM RWY C/L)

____________________________________________________________________________________________________________________________________________________________________________
Airports Authority of India AIP Supplement 42/2024 Page 13 of 15
CHART-5

Y3
GA CY

BA
TE
N
LEGENDS:

Y4
GE

BA
ER

Y5
BA
EM

Y6
BA

)
HT
USE
Y7

Ø X1 0 KL
(12 P : 100 2

2M
5 M) HO
BA

-
1.45x1.6
TOILET

FW
1.45x1.6

P
TOILET

MIRROR

X 8 FICE

PUM
1.45x1.6
TOILET
Y8

M)

X
ROOM

TER
STORE
OF

M
CA
BA

M
(25
CABIN OFFICER
SHIFT

E WA
IFT
M
SH
(10

FIR
WORKSTATI

EXISTING
ON

)
UP

HT
X1 KL
WA RY

(12 P : 100 - 1

2M
0
LL

CA FW
DA

Ø
M
UN
BO
OPERATIONAL AREA
LINE 105M FROM
RWY CENTER LINE
LINE 140M FROM RWY
CENTER LINE
REQUIRED RUNWAY
CLOSURE
WORK ON WATCH &
WARD BASIS (Beyond
105M)
319.14

TWY - P3

5.50
TWY - P1

140.00
223.62

52.0
RESA 09
5.50

50.0

7.50

RESA 27 100.00 FIRE ACCESS ROAD

TWY - P6
0

140.00
7. 7.5
50

90.00
140.00

50.88 98.70

90.00
140.00
EMERGENCY ROAD AT RWY 27
FIRE ACCESS ROAD

EMERGENCY ROAD AT RWY 09


DVOR, 439 ft.

DVOR MONITOR
ANTENNA, 432 ft.
DVOR/DME
LKN 117.4
CH 121X
AIRSIDE IMPROVEMENT WORKS AT LUCKNOW INTERNATIONAL AIRPORT
EMERGENCY & FIRE EMERGENCY & FIRE LEGENDS TIME LINE FOR RUNWAY CLOSURE
01 APPROACH ROAD 02 APPROACH ROAD
EMERGENCY & FIRE
01 18 Apr 2024 TO 15 July 2024
APPROACH ROAD (UP TO
105M FROM RWY C/L)
TIME LINE FOR RUNWAY CLOSURE - 18 Apr 2024 TO 15 July 2024

LEGENDS TIME LINE FOR WORK COMPLETION

EMERGENCY & FIRE


Airside Improvement Works- EMERGENCY & FIRE APPROACH ROAD 02 APPROACH ROAD
(Beyond 105M)
18 Apr 2024 TO 15 July 2024

____________________________________________________________________________________________________________________________________________________________________________
Airports Authority of India AIP Supplement 42/2024 Page 14 of 15
QUARTERS
CHART-6

P0-07
CSD - 02

27.000
KENDRIYA POLICE
KALYAN BHANDAR

14532.477 Sqm
LEGENDS:
DOG

P0-08
KENNEL

000
CISE

27.
AIRPORT
POLICE STATION

AIRPORT

P0-09
POLICE STATION

000
27.
O

10
000

P0-
EXISTING

ION TR

27.

1
TP0-1
AT E
ST SI M
ELEVATED ROAD FROM OPERATIONAL AREA
SHAHEED PATH

AU
ENCROACHMENT

DUCT BANK

AM

2
TP0-1
13
P0-
PULL PIT

P0-14
CHILLAWAN VILLAGE

15
P0-
CHILLAWAN VILLAGE

P0-16

GUARD ROOM
P0-17
LANDSCAPE
AREA

8.1

9.5
EXIT
TRANSFORMER PIT
6.0

6.0
LAND SWAP OF
EQUIVALENT AREA
GUARD
(1701 SQM.)
LOW HT. ROOM
LIGHT MAST

P0-18

2 NOS.

9 NOS.
4 NOS.
6.0 M WIDE DRIVEWAY

66.0
5 NOS.

6.0 M WIDE DRIVEWAY


LANDSCAPE
AREA LOW HT.
LIGHT MAST

7 NOS.
9 NOS. TOTAL 48
6.0 M WIDE DRIVEWAY NOS. NEW
LANDSCAPE CAR PARKING
11 NOS.
AREA

LOW HT. LIGHT


MAST

52.7

TOILET
PROPOSED

HOUSE
R
POWE
TANK

1C
4.437M Clear Ht.
OPERATIONAL
BOUNDARY WALL
7.560M Clear Ht.

6.825M Clear Ht.

5.236M Clear Ht.

6.145M Clear Ht.

5.989M Clear Ht.

Ht.
Clear
4.730M
Ridg 6.514M Clear Ht.

E3
Line e LINE
LINE
ROOF

+010LVL
PLINTH

D1

LADIES
TOILET

EPOLS 21:1
D1 D2
V3

SKY
WIDE

J.

TO
OPEN
V2
1800

ELECTRICAL

HANDWASH
Ht.

FD1

GENT'S
PASSAGE

D1
TOILET
ROOM

M.H
Clear
V1

+150

SHOWER
LVL
KITCHEN

SHAFT

WIDE
4.022M

W.C
V1

1800
KD1

W.C

URINALS
W.C

PASSAGE
W.C
BUILDING

SHOPS

E1
6.788M Clear Ht.

SEATING
CANTEENTO
ENT.
y
ewa

6.00 Mt Wide Driveway


+160
e Driv

LVL
LINE
PLINTH
LINE

LVL
+010
ROOF

Wid
Mt
6.948M

6.00
Clear Ht.

1.67

y
ewa
e Driv
Wid
POWER HOUSE

Mt
6.00
7.108M Clear Ht.

DELL
X 12'-6"
8'-3" DELL

HEAD
CIVIL

12'6" DELL

X
8'1"
CABIN-01

X 12'6"
CABIN-02
8'4" 12'6"
X DELL

11'6"
CABIN-03

DELL
X 14'-0" DELL

HEAD
14'-0" DELL

DELL PROJECTS 12'6"


X

X 9'-4" X 5'0" DELL 11'4"


9'-0"
ROOM 79'0"
CORRIDOR CABIN-04 DELL

SECRETARY
ADANI SITE OFFICE 12'6"
X 6'0"
TOI.12

"
4'-9

CABIN-05
X 4'-2" X X 12'6"
4'-0" 7'6" 4'6" LADIES
PANTRY

2'-9"
STORE X 4'-2"
X 6'0"
3'-4" X 3'-3" 4'3"

7'-0"

X
ROOM 6'-2" 6'0"

14'-0"
X
X 4'3"
DELL 10'-0"SAFETY X
6'0" DELL

STN.-02
H.O.D 9'0" TOI.-01 DELL

11'-3" GENTS WORK

X
DELL 10'-0"
C.A.D STN.-01
X 9'6"
H.O.D WORK 9'6"
DELL

9'10"

14'-0"
X
X 9'6" 9'6"
X M.E.P

STN.-03
28'-0"ROOM HEAD
9'11" CABIN-06
CONFERENCE 29'0"
X DELL

WORK 21'2"

STN.-11

DELL
STN.-04
WORK STN.-10
WORK WORK

WORK
STN.-05 DELL

WORK
STN.-12 DELL

STN.-09WORK
X 5'0" X 21'6"
9'7" WORK 9'6"

STN.-08

WORK
STN.-13WORK

TERMINAL
STN.-06
WORK
X 9'6"

STN.-14
CPAD
9'10"
DESIGN
HEAD

STN.-20
STN.-07
WORK STN.-15
WORK

3'10"
WORK
X 9'6" X 8'0"

GENTS
STN.-19 19'6" 5'5"

X
3'9"
DELL WORK TOI.-02
DELL STN.-18

STN.-16
X 3'10"
STN.-17 WORK 3'9"
WORK
DELL WORK 9'6"
X
MASTER 10'0"
HEAD
PLANNING

DELL

EGIS OFFICE UG TANK

SHED
WATER
TANK
EMERGENCY
PARKING BAY

4.00

4.00
11 10 3.50 3.50 3.50
09

3.5.0M WIDE LANE

3.5.0M WIDE LANE

3.5.0M WIDE LANE


PUBLIC BUS WITH EV / CHARGING
Met
08
ro Li
PARKING
FACILITY
07
ne
AUTO Pick Up
06
Alig GATE GATE GATE

nm

W
at
05

ent

er
Green

Ta
04

nk
03

02
Green Area AUTO Drop Off
01

Mango
Tree

Green GREEN GREEN Green Area


SCULPTURE
+3150 Entry
+2700 Exit Exit 16 nos TAXI CAR PICK UP Entry
16 nos PVT CAR PICK UP ICONIC WATER FEATHER
+2250
+1800 FLAG POLE HYDROGEN
33 kv Cable +1350
Alignm PROJECT SHED
0

IMD
2.0

+900
entS ±0.0 Green Green Area IMD
OFFICE
R2

SPACE FOR +450


±0.0 DEPARTMENT
5.8

ANODE WELL
CENTRE
5M
Cle

CL CL CL CL CL

ME
ar

ROAD 4.5m WIDE Event Arena


Ht.

W.B.

(Plin TE +300
IMD BUILDING
th Lvl. R R3.0
0
+12 RM IMD BUILDING
3.63 . F&B 6
GRAB GRAB GRAB GRAB
0M) F&B 5 TICKETING GRAB GRAB GRAB GRAB FLOWER FLOWER CHICKEN CHICKEN AVADH AVADH AVADH AVADH HEALTH HEALTH
& GO 6 & GO 4 HOLIDAYS 1 HOLIDAYS PERFUME PERFUME & CARE 1 & GO 3 & GO 2 & GO 1 & GO
& GO 7 & GO 5 & GIFTS 1 & GIFTS KARI 1 KARI
1
& CARE F&B 1 F&B R1
GRAB & GO
HT)

T
X12 KL

UR
:1250T-2

Retail as per Retail as per


CAP ATF
E

CO

Retail Designer
WID

Retail Designer
M

OD

F&B 7
(12

WATER FEATURE WATER FEATURE


HT)

R3.00
4.5m

FO

WATER FEATURE
X12 KL

F&B 4
:1250T-4

F&B 3 F&B 2 R5 R4
W
CAP ATF

NO
AD

Ø
M

CK
HT)

GREEN
RO

(12

GREEN
CARGO
LU
X12 KL
:1250T-1

ICONIC BAR

R3
122.294
CAP ATF

FUEL FARM ACCESS /


M

STP (T3) R2
X 5 HOUSE
(12

R15. GREEN GREEN


HT)

00 GREEN
M)
(25NT PUMP

(Lvl. +122.700M)
:1250T-3
X12 KL
M

BIKE PARKING
CAP ATF

M
HYDRA
Ø

Lvl.+123.280M Lvl.+123.280M
M

749.9998
280.0000

7M WIDE VIP ROAD


(12

1315.0000
2.0
EXIT GATE

1365.0000
915.0000
R1

2000.0000

RO
AD 2000.0000
2560.0000

CAR PARKING
5m
SECURITY

LINE OF WTP BELOW


CABIN

WID
125

ISMC

200 SECURITY CABIN


ISMC

125
ISMC
D1

W1

ISMC
125
MANHOLES

TANK ACCESS
125

FOR WATER

ISMC

125

E
200
ISMC

ISMC (LVL -405) (LVL -405) (LVL -405)


125 GREEN GREEN GREEN
ISMC

TOC LVL.-300

(LVL -405)
GREEN
(LVL -405)
GREEN

WATERTANK
TOP OF
BASIN

TEST
CUTOUT (150X150)MM IN
FLOOR
LABORATORY

RIG
(F.C.)

ROOM

ELECTRICAL
ROOM

Fuel Farm
S2

(150X150)MM

8130 X 5070
CUTOUT

F.F.L.±00 OFFICE-1
IN FLOOR
ROOM

RECORD

OL

Fuel Farm
F.F.L.±00
(F.C.)
STAFF
FINANCE

PLINTH PROTECTION
& CONTR

WAITING

TOILET VISTARA CARGO OFFICE


450 WIDE (TYP)

SAFETY
AREA
CABIN
OFFICERS
N

(F.C.)

2
ENTRANCE

FINANCE
OFFICERS
CABIN

SUBSTATION
TIO

1
UP

(F.C.)
BUILDG

LADIES

FIRE
EXIT
TOILET

SERVICES INTO
TUNNEL
CUTOUT FOR
DIRECTING
UP

SLOPE-1:6
STEPS:27
RISER:148.14mm

RAMP
RA

BASIN

NO.OF

WIDTH:1500mm
TREAD:300mm
PLATFORM

GENT'S

SHED
(T3)
PANTRY

ADMIN

TOILET

CUTOUT FOR
EQUIPMENT

1.20

PUMP PANEL
X 3 LIB

PLATFORM
VENT. PANEL SLOPE-1:6
TRAINING

FIRE

UP
EXIT
CONFERANCE/

F.F.L.±00

RAMP
(F.C.)

MINI

122.350
ROOM

(Lvl. +123.280M)
STAFF

E
(F.C.) ROOM
CA

UNASSIGNED
(LVL -405)
GREEN
M)

ROOM
SOAK

SOAK

DN

UP

OFFICE
PIT

PIT
WID

CISF

1.50
(LVL -405)
GREEN

MAIN LT PANEL LIGHT & POWER PANEL


(3 TER

NO SMOKING
NO SMOKING
3500 MM WIDE

FRISKING
EXTINGUISHERS AREA ELECTRICAL
J.CLOSET
m

ROOM
PANTRY

& 2 NO. FOAM TYPE FIRE CL


MS GATE

NEW
4 NO. DRY POWDER TYPE
TOI(M)
2000 KVA, OIL TYPE WITH

CL

Service Tunnel
OLTC 11/0.433KV, Dyn

CL 5.0M WIDE LANE 5.0M WIDE LANE


4.5

Below
ME
M

11,TRAFO.-3

CAP.-3 CAP.-2 CAP.-1


NO SMOKING

STORE
UPS/BATT.

BMS/PLC
CONTROL
ROOM

ROOM

TOI(F)
AREA

OUTLET OUTLET

CARGO
PUMP-1

RETURN DIP HATCH DIP HATCH RETURN


AD

DFMD
MALE
BULK

DFMD
PUMP-2

HI SCAN
TANK HSD
20KL FUEL
INLET INLET SLOPE WIDE

ATC COMPLEX
PUMP-3

WITHBUCKET
FIRE STAND SLOPE-1:6
2000 KVA, OIL TYPE WITH

INLET INLET PASSAGE 4500


F.F.L.-405

OLTC 11/0.433KV, Dyn


ING

RAMP
F.F.L.±00
RO

11KV HVAC/ SERVICE YARD PANEL COVERED


Lvl.+122.530M

SHED
PUMP-4

11,TRAFO.-2

6.00
SPACE FOR CYLINDERS

Lvl.+122.530M
-

CISF BREAK
PARK

F.F.L.±00

SPARE MANHOLE SPARE MANHOLE ROOM

Lvl.+123.280M
NO SMOKING
F/A OPENING 2300X1100

F/A OPENING 2200X1000

F/A OPENING 2200X1000

F/A OPENING 2200X1000

F/A OPENING 2200X1000

11KV MAIN HT VCB PANEL


IN WALL (BELOW BEAM)

IN WALL (BELOW BEAM)

IN WALL (BELOW BEAM)

IN WALL (BELOW BEAM)

IN WALL (BELOW BEAM)

TANK LORRY
NO SMOKING PLATFORM
DECANTING 11KV NIC PANEL GATE GATE
SLOPE-1:6

Dn Slope
LER

OFFICE
RAMP COMPRESSOR
ROOM TOILET (M)
2000 KVA, OIL TYPE WITH

0-09 11 m²
OLTC 11/0.433KV, Dyn

RTCC PANEL

33 KV ROOM
RE-FU

11,TRAFO.-1

33 KV RMU
11 KV ROOM

GROUNDING PANEL
11KV DG. NEUTRAL
PANEL
CHANGEOVER PARKING
(LVL -405)
GREEN

DG AUXILIARY PANEL
UP

CARGO
BOARD
11KV DG. SYNCH. PANEL
33 KV HT PANEL

POWER R C C
DG. SET FUTURE

LANDSIDE
DG. SET-6

DG. SET-5

DG. SET-4

DG. SET-3

DG. SET-2

DG. SET-1
F.F.L.±00

HOUSE
SOAK
PIT

SOAK

6.25MVA 6.25MVA 6.25MVA


PIT

GATE
F.F.L.±00

W1 POWER TRF.-3 POWER TRF.-2 POWER TRF.-1


TRF. FUTURE
SOAK

SOAK
RITY

33/11KV ONAN 33/11KV ONAN 33/11KV ONAN


R3
PIT

PIT

ATC BLD HI

134.557
CABIN

.00
D1

DOT DOT
DOT DOT DOT
DOT DOT DOT DOT
SECU
T GA CK

GATE

SLOPE-1:6

SLOPE-1:6
Entry

SLOPE-1:6

SLOPE-1:6

PUMP HOUSE
TE

AREA

RAMP

RAMP
SLOPE-1:6

SLOPE-1:6

SLOPE-1:6

RAMP

RAMP
Pedestrian

UP
SLOPE-1:6
RAMP

RAMP

RAMP

RAMP
/ EXIK TRU

LANE

ATC TOWER SHED


WIDE
TANK

UP
E

5.0M

M.S FRAME
2.60

UPTO 30M
SUPPORT

1IN10
0.70
LANE
WID

RAMP
UP
2.92
UP
UPSDB-3

WIDE

1.83
ELDB-3

CLMS

3.15
UG

STORE
1.50
5.0M

ATC HI
5.67
Entry

151.659
TRY TAN

3.38
SLDB

Pedestrian
630A
EMLDB

MCC-3

VCB

UP
MLDB

BUILDING
5m

MPDB

GATE
RAMP
KVA

3.30
MODB-3

TRANSFORMER
11KV/433V

OLTC

ELECTRICAL
1000

DOWN TO BASEMENT
MODB-4

WITH

LOCATION

11.75
APFC

LEVEL

Pedestrian

WTMD
MCC-2

CISF

above

SCREENING
SECURITY
AD

Exit

16.35

AREA
GROUND

Canopy
MORCHA

P
N
ETD
UP

GATE
8.78

P
AIRSIDE GREEN AREA
LT PANEL

x 1000
RO

PTA-01
TOILET (F)
6000

TURNSTILE
MCC-1
EN

SHED ELECTRICAL
4.75

1.46
1.29

Canopy 6.67
ROOM
ROOM
JANITOR

above
DUCT
D2

UP
DG
CON
PANEL1
900x1000 DG MAINTENANCE SHAFT
.00
PANEL2

CON
D2

D4

900x1000
SET

(H/C)
DG
(DG-2)

R E L L I H C
KVA

W.B.
E
1010

TOILET (M)
PTA-02
R6

STATE
WID

HANUMAN&SHIVA

STATE
SET TEMPLE
(DG-1)

DECAN
DG
KVA
1010
C L C L CL CL CL

TING
(15
M PUMP G N I D L I U B HANGAR HANGAR
m

X5
M) HOUSE
4.5

STORE ROOM
CABIN

STORE ROOM
AD

NEW STORE ROOM


ROOM
RAMP

STORE

CANTEEN
RO

BUILDING HOUSE KEEPING MATERIAL YARD


12M) P
1

(24MX KSHO

ROOM
BAY

STAFF
WOR
2
BAY

SHED

VIP
3
BAY
GA Y

INDIAN POST
TE
NC

HOUSE KEEPING MATERIAL


LODGED
BAY
GE
ER

5
BAY

BLD
EM

HINDUSTAN BHARAT
BAY

PETROLEUM PETROLEUM
HT)
HOUSE
7

Ø X12 KL
-2
8 BAY

AVIATION AVIATION
M 1000
1.45x1.6
TOILET

FW
PUMP
1.45x1.6
TOILET

E
MIRROR

M)
1.45x1.6
TOILET
OFFIC

X5

:
M)

CAP
BAY

WATER
ROOM
STORE

M
X8

(25

(12
CABIN OFFICER
SHIFT

SHIFT
M

FIRE
(10

WORKSTATION
HT)

UP
Ø X12 KL
: 1000 1
WA RY

M
-
LL

CAP FW
DA

M
UN

(12
BO

GLIDE PATH

TWY - C TWY - B
TWY D & E TWY - A GLIDE PATH CRITICAL AREA

DUCT BANK PULL PIT DUCT BANK PULL PIT


DUCT BANK PULL PIT TRANSFORMER PIT 3 x 3 DUCTBANK (OD 140)

105
105
105

105
105
105

3 x 3 DUCTBANK (OD 140)

DUCT BANK PULL PIT DUCT BANK


DUCT BANK PULL PIT
PULL PIT
DVOR, 439 ft.

DVOR MONITOR
ANTENNA, 432 ft.
DVOR/DME
LKN 117.4
CH 121X
ELEV. 424 ft.

ISOLATION BAY

AIRSIDE IMPROVEMENT WORKS AT LUCKNOW INTERNATIONAL AIRPORT


AGL DUCT BANK &
01 ASSOCIATE CHAMBER
LEGENDS TIME LINE FOR RUNWAY CLOSURE

AGL DUCT BANK &


TIME LINE-18 APR 2024 TO 30 OCT 2024, H24, ON WATCH & WARD 21 Mar 2024 TO 30 OCT 2024
ASSOCIATE
01 CHAMBER

I G SSOCI EC E
____________________________________________________________________________________________________________________________________________________________________________
Airports Authority of India AIP Supplement 42/2024 Page 15 of 15