1. INTRODUCTION
The purpose of this AIP Supplement is to inform the stakeholders (Airlines, ANSP,
regulator etc.) likely to use the information, about the schedule of work activities that
will be carried out at Chaudhary Charan Singh International Airport, Lucknow.
1.1 This AIP supplement shall be valid from 1630 UTC of 18th April 2024 up to 0030 UTC
of 30th OCTOBER 2024.
1.2 All works / construction activities planned on portion of runway strip within 105m from
centre line of runway and North of Runway End Safety Area (RESA) shall be carried
out during time limited closure of Runway 09-27, the details of work activities have
been enumerated in Annexure 1.
1.2.1 Runway 09-27 is not available for landing and take-off from 18th April 2024 to 15th July
2024, daily, between 1630 UTC to 0030 UTC.
1.2.3 Runway 09-27 shall not be available for emergency landings and diversions during the
closure.
1.3 All works / construction activities, within the runway strip between 105m up to 140m
from centre line of runway 09/27 has been enumerated in Annexure 2.
1.3.1 The work activities planned will be carried out on watch and ward basis, H24, from
1630 UTC of 18th April 2024 up to 0030 UTC of 30th October 2024.
1.4 Annexure I – Work activities on portion of runway strip (up to 105m from centre line
of runway 09-27),
1.4.1 Refer part -1 for construction of portion of 02 new (entry / exit) taxiways (proposed
designation P1 and P3) from edge of existing full-strength pavement of the runway up
to 105m from runway centre line towards North located at the beginning of runway 09.
1.4.2 Refer part 2 for construction of 01 link taxiway (from edge of existing full-strength
pavement of the runway up to 105 m from runway centre line towards North) located
East of existing taxiway A (proposed designation P6).
1.4.3 Refer part 3 for refurbishment of portion of taxiway A (from edge of existing full-
strength pavement of the runway up to 105 m from runway centre line towards North).
1.4.4 Refer part 4 for upgradation of Runway graded strip from edge of paved runway
shoulder up to 105m towards North & South of centreline runway 09-27.
1.4.5 Refer part 5 for Construction of emergency road and fire approach road towards North
at end of RWY 09-27 and at 100m East of proposed taxiway P6 up to 105m from
runway centre line.
1.5 Annexure-II: Work activities on portion of runway strip (between 105m up to 140m
from centreline of runway 09-27) will be carried out on watch and ward basis, H24,
from 1630 UTC of 18th April 2024 to 0030 UTC of 30th October 2024.
1.5.1 Refer Part 1 for Construction of 02 no. of entry / exit taxiways (proposed designation
P1 and P3) and 01 link taxiway (proposed designation P6) for portion of taxiways
falling within runway strip beyond 105 m up to 140m from centre line of runway 09-
27 (in Zone-2 and zone-3).
1.5.3 Refer part 3 for aeronautical ground lights (AGL) related works such as:
1.5.4 Refer part 4 for Construction emergency road and fire approach road at 100m East of
proposed taxiway P6 between 105m and 140m from runway centreline.
1.5.5 Refer Part 5 for refurbishment of portion of taxiway A from 105m up to 140m towards
North of centreline runway 09-27.
2. Any change to the contents of this AIP Supplement will be notified through NOTAM.
1. Runway 09-27 not available for landing and take-off from 18th April 2024 to 15th July
2024 (except on 1st May 2024 due Labor Day) daily, between 1630 UTC to 0030 UTC
for work activities on portion of runway strip up to 105m from centreline for runway
09-27 and on RESA.
1.1.1 Work shall be carried out during time limited closure of runway 09-27 (Refer Sl No 1
above).
1.1.3 The location of work area is from edge of existing full-strength pavement of the runway
towards North. Distance of the work area from edge of the runway up to 105m from
centreline of runway.
1.1.4 Approximately 150mm level difference shall exist during construction of the pavement.
1.1.5 Compliant slope for ramp is provided between the existing runway surface and newly
constructed surface of shoulder / portion of taxiway.
1.1.6 Level difference between existing and newly laid surface will be backfilled by laying
sandbags up to top level.
1.1.8 The work area shall be marked and lighted by placing unserviceability / obstruction
light for easy identification.
1.1.9 Refer chart-1 for location of work area for construction of 02 entry / exit taxiways at
the beginning of runway 09.
1.2 Part 2: Construction of portion of link taxiway (proposed designation P6) from
edge of existing full-strength pavement of the runway up to 105m from centre line
1.2.1 Work shall be carried out during time limited closure of runway 09-27 (Refer Sl No 1
above).
1.2.3 Location of work area is from edge of existing full-strength pavement of the runway
and towards North. Distance of the work area from edge of the runway up to 105m from
centreline of runway.
1.2.4 Approximately 150mm level difference shall exist during construction of the pavement.
1.2.5 Compliant slope for ramp is provided between the existing runway and newly
constructed surface of portion of taxiway.
1.2.6 Level difference between existing and newly laid surface will be backfilled by laying
sandbags up to top level.
1.2.8 The work area shall be marked and lighted by placing unserviceability / obstruction
light for easy identification.
1.2.9 Refer Chart - 2 for location of work area for construction of entry / exit (link taxiway)
(proposed designation P6) located at a distance of 554m East of taxiway A.
1.3.1 Taxiway A is not available for taxiing of aircraft from 18th April 2024 to 15th July 2024,
daily, between 1630 UTC to 0030 UTC.
1.3.2 Construction work activity for refurbishment of portion of taxiway A shall be carried
out during time limited closure of runway 09-27 (Refer Sl. No 1 above).
1.3.3 Taxiway closure marking and unserviceability / obstruction lights (at every 3m) across
the width of taxiway shall be deployed for indicating the closure of taxiway A.
1.3.4 Pilot(s) operating to and from UP state Apron / hangar shall coordinate with ATC for
taxiing instructions. Follow Me service shall be available on request.
1.3.5 Work for refurbishment of portion of taxiway A shall be undertaken from edge of
runway up to 105m from centre line of runway and towards North of runway 09-27.
1.3.6 Refer Chart -3 for location of work area of refurbishment of portion of taxiway A.
1.4.1 Work for upgradation on graded strip of runway 09-27 shall be carried out during time
limited closure of runway 09-27 (Refer Sl No 1 above).
1.4.2 Approximately 150 - 200mm level difference shall exist during upgradation of Runway
grading strip.
1.4.3 The level difference between existing top surface of strip and excavated surface will be
backfilled by laying sandbags.
1.4.4 Refer Chart - 4 for location of work area of graded strip of runway 09-27.
1.5 Part 5: Construction of portion of fire approach access road connecting with
proposed fire station approximately at a distance 650m East of TWY A and
emergency fire access road at North of RESA of RWY 09-27 to provide connection
with runway and perimeter road.
1.5.1 Work shall be carried out during the time limited closure of runway 09-27 (Refer Sl.
No 1 above).
1.5.2 Location of work area for fire approach access road from edge of shoulder of runway
towards North from edge of the paved runway shoulder up to 105m from centre line of
runway.
1.5.3 The emergency fire access road connecting runway and perimeter road is clear of
declared dimensions of RESA for runway 09 towards North located at a distance of
52m from extended centre line of runway.
1.5.4 The emergency fire access road connecting runway and perimeter road is clear of
declared dimensions of RESA for runway 27 towards North located at a distance of
50m from extended centre line of runway.
1.5.6 Level difference between existing and newly laid surface will be backfilled by laying
sandbags up to top level.
1.5.8 The work area shall be marked and lighted by placing unserviceability / obstruction
light for easy identification.
1.5.9 Refer Chart - 5 for location of work area for portion of fire approach access road
connecting with proposed fire station approximately at a distance 650m East of TWY
A and emergency fire access road at North of RESA of 09-27.
Note: Construction works activity located beyond 140m from centre line of runway
(out of runway strip) and work activities which do not have any impact on aircraft
operations are not considered for promulgation in AIP Supplement.
1.1.1 Construction work will be carried out for 03 new taxiways (proposed designations P1,
P3 and P6). (Refer Sl. No 1 above).
1.1.2 The illumination of the work area during the night shall be done by deploying portable
lights which shall be facing downwards to avoid glare to the Pilots.
1.1.3 The work area and deployed machinery will be marked and lighted as per DGCA CAR
4B1.
1.1.4 Machinery deployed shall remain clear of Obstacle Free Zone (OFZ) of runway 09/27.
1.1.5 Refer Chart – 1 and chart 2 for location of work area for construction of 02 entry / exit
taxiways at the beginning of runway 09 and 01 Link Taxiway respectively.
1.2 Part 2: Grading of runway strip from 105m up to 140m from runway centre line
at North and South of runway 09-27 will be carried out on watch and ward basis.
(Refer Sl. No 1 above).
1.2.2 Compliant slope will be provided in the graded and leveled portion of runway strip and
will be merged with the slope of existing runway strip.
1.2.4 The work area and deployed machinery will be marked and lighted as per DGCA CAR
4B1.
1.2.5 Machinery deployed shall remain clear of Obstacle Free Zone (OFZ) of runway 09/27.
1.2.6 Refer Chart -4 for location of work area of graded strip of runway.
1.3 Part 3: AGL Duct bank & Associate chambers work at 105m from runway centre
line at North & South of runway 09-27. (Refer Sl. No 1 above).
1.3.1 Construction of AGL Duct bank & Associate chambers works shall be carried out.
1.3.2 The illumination of the work area during the night shall be done by deploying portable
lights which shall be facing downwards to avoid glare to the Pilots.
1.3.3 The work area and deployed machinery will be marked and lighted as per DGCA CAR
4B1.
1.3.4 Machinery deployed shall remain clear of Obstacle Free Zone (OFZ) of runway 09/27.
1.3.5 Refer Chart -6 for location of work area of AGL Duct bank & associate chambers.
1.4 Part 4: Emergency fire approach road from 105m up to 140m from runway
centreline at North of runway 09-27 carried out on watch and ward basis from
1630 UTC of 18th April 2024 up to 0030 UTC 15th July 2024, H24.
1.4.2 Compliant slope of ramp is provided between the existing and newly constructed
surface.
1.4.3 The illumination of the work area during the night shall be done by deploying portable
lights which shall be facing downwards to avoid glare at the Pilots.
1.4.4 The work area and deployed machinery will be marked and lighted as per DGCA CAR
4B1.
1.4.5 Machinery deployed shall remain clear of Obstacle Free Zone (OFZ) of runway 09/27.
1.4.6 Refer Chart -5 for location of work area of Emergency & fire approach road.
1.5 Part 5: Refurbishment of taxiway A from 105m to 140m from runway centreline
at North of runway 09-27 will be carried out from 18th April 2024 to 15th July 2024,
daily, between 1630 UTC to 0030 UTC.
1.5.2 Taxiway A shall be available for operations on 1st May 2024 (Wednesday), on the
1.5.3 Construction work activity for refurbishment of portion of taxiway A shall be carried
1.5.4 Taxiway closure marking and unserviceability / obstruction lights (at every 3m) across
the width of taxiway shall be deployed for indicating the closure of taxiway A.
1.5.5 Pilot(s) operating to and from the UP-state Apron / hangar shall coordinate with ATC
1.5.6 The illumination of the work area during night shall be done by deploying portable
lights which shall be facing downwards to avoid glare to the Pilots and vehicle
operating at airside.
1.5.7 The work area and deployed machinery will be marked and lighted as per DGCA CAR
4B1.
1.5.8 Refer Chart -3 for location of work area of refurbishment of portion of taxiway A
CA RITY
R3
BIN
.00
D1
DOT DOT DOT
CU
DOT
DOT DOT DOT
DOT DOT
GATE
GA CK
Entry
SLOPE-1:6
SLOPE-1:6
SE
SLOPE-1:6
TE
SLOPE-1:6
PUMP HOUSE
RAMP
RAMP
RAMP
RAMP
SLOPE-1:6
SLOPE-1:6
SLOPE-1:6
EA
an
SLOPE-1:6
UP
Pedestri
RAMP
RAMP
RAMP
RAMP
EX TRU
AR
LANE
WIDE
LEGENDS:
UP
NK
5.0M
M.S FRAME
UPTO 30M
2.60
SUPPORT
1IN10
LANE
0.70
TA
RAMP
WID
UP
WIDE
UP
2.92CLMS 3.15
UPSDB-
1.83
ELDB-3
STORE
UG
IT
1.50
K
5.0M
5.67
Entry
TR TAN
3.38
SLDB
an
EMLDB
Pedestri
MCC-3
630A
VCB
UP
BUILDING
MLDB
m
MPDB
GATE
3.30 RAMP
OLTCER
ELECTRICAL
MODB-3
KVA
11KV/433V
TRANSFORM
DOWN TO BASEMENT
1000
D5
MODB-4
Y/
ION
WITH
LEVEL
11.75
APFC
n
MCC-2
WTMD
Pedestria
LOCAT
CISF
above
SCREENING
SECURITY
Exit
16.35
ND
Canopy
AREA
GROU
HA
N
P
MORC
ETD
GATE
UP
8.78
A
AIRS GREEN AREA
P
x 1000
6000PANEL
RO
TOILET (F)
IDE
PTA-01
TURNSTILE
LT
EN
MCC-1
4.75
1.46
SHED ELECTRICAL
1.29
6.67
Canopy
ROOM
ROOM
JANITOR
DUCT
above
D2
UP
DG
CON
PANEL1
900x1000 DG
.00
D2
PANEL2
CON MAINTENANCE SHAFT
D4
900x1000
(H/C)
SET
(DG-2)DG
W.B.
RELL I HC
KVA
TOILET (M)
1010
PTA-02
R6
WID
HANUMAN&SHIVA
TEMPLE
DE SET
(DG-1)DG
KVA
CA
1010
CL
CL
CL
CL
C
NT
(15
ING
GN I DL I UB
EXISTING
M PUMP
m
X5
M) HO
4.5
US
E
STORE ROOM
CABIN
AD
STORE ROOM
NEW STORE ROOM
ROOM
RAMP
STORE
CANTEEN
RO
BUILDING
OPERATIONAL AREA
HOUSE KEEPING MATERIAL YARD
OP
Y1
ROOM
M)
STAFF
SH
BA
12
RK
MX
Y2
WO
(24
BA
SHED
Y3
GA CY
BA
TE
INDIAN POST
Y4
HOUSE KEEPING MATERIAL
GE
BA
ER
Y5
BA
EM
RWY CENTER LINE
Y6
HINDUSTAN
BA
PETROLEUM
)
HT
E
Y7
US
Ø X1 KL
-2
2M
HO
BA
M 1000
AVIATION
1.45x1.6
TOILET
FW
1.45x1.6
MP
TOILET
X 8 FICE MIRROR
M)
1.45x1.6
TOILET
(25 R PU
Y8
X5
M)
(12 P :
ROOM
OF
STORE
CA
BA
M
TE
CABIN OFFICER
SHIFT
E WA
IFT
M
LINE 140M FROM RWY
SH
(10
FIR
WORKSTAT
ION
)
HT
UP
Ø X100 KL
WA RY
2M
(12 P : 10 - 1
LL
CA FW
CENTER LINE
DA
M
UN
BO
REQUIRED RUNWAY
CLOSURE
WORK ON WATCH & WARD
BASIS (Beyond 105M)
TWY D & E
TWY - C TWY - B
140 MTR. FROM THE RUNWAY CENTER LINE
02 02 23.00
279.50
23.00
140.00
7.50 7.50
95.00
224.50
105
01 01
7.50
22.50
60.00
RESA 27
22.50
22.50
7.50
AIRSIDE IMPROVEMENT WORKS AT LUCKNOW INTERNATIONAL AIRPORT LEGENDS TIME LINE FOR RUNWAY CLOSURE
ENTRY/EXIT TWYs
ENTRY/EXIT TWYs 01 (P1,P3)(UP TO 105M 18 Apr 2024 TO 15 July 2024
ENTRY/EXIT TWYS
01 (P1,P3)(UP TO 105M 02 (P1,P3) (Beyond 105M
FROM RWY C/L)
FROM RWY C/L)
ENTRY/EXIT TWYS
02 (P1,P3) (Beyond 105M) 18 Apr 2024 TO 30 Oct 2024
CAR PARKING
SECURITY CABIN
LEGENDS:
EXISTING
TOILET VISTARA CARGO OFFICE
OPERATIONAL AREA
SHED
0
122.35
UNASSIGNED
ROOM
OFFICE
CISF
FRISKING
AREA ELECTRICAL
ROOM
NEW
CARGO
DFMD
MALE
DFMD
HI SCAN
Lvl.+122.530M SHED ATC COMPLEX
6.00
CISF BREAK
ROOM
GATE GATE
OFFICE
COMPRESSOR
TOILET (M)
ROOM
0-09 11 m²
PARKING
POWER
HOUSE
RCC CARGO
ATC BLD HI
LINE 140M FROM RWY
CENTER LINE
134.557
PUMP HOUSE
ATC TOWER
ATC HI
151.659
SHED
BUILDING
ELECTRICAL
RE L L I HC
ROOM
SHED ELECTRICAL
HANUMAN&SHIVA
TEMPLE
STATE STATE
REQUIRED RUNWAY
GN I DL I UB HANGAR HANGAR
CLOSURE
STORE ROOM
STORE ROOM
NEW STORE ROOM
CANTEEN
BUILDING HOUSE KEEPING MATERIAL YARD
SHED
LODGED
HOUSE KEEPING MATERIAL
HINDUSTAN
PETROLEUM
BHARAT
PETROLEUM
BLD BASIS (Beyond105M )
AVIATION AVIATION
TWY - C TWY - B
TWY - A TWY - P6
7.50
23.00
7.50
LINE 105M FROM
RWY CENTER LINE 554.65
02
279.50 7.50 7.50
23.00
140.00
140.00
01
105
7.50
105
7.50
22.50
22.50
LINE 105M FROM
RWY CENTER LINE
DVOR MONITOR
ANTENNA, 432 ft.
DVOR/DME
AIRSIDE IMPROVEMENT WORKS AT LUCKNOW INTERNATIONAL AIRPORT LEGENDS TIME LINE FOR RUNWAY CLOSURE
____________________________________________________________________________________________________________________________________________________________________________
Airports Authority of India AIP Supplement 42/2024 Page 11 of 15
BIKE PARKING
CHART -3
Lvl.+123.280M 7M WIDE VIP ROAD
CAR PARKING
SECURITY CABIN
LEGENDS:
EXISTING
TOILET VISTARA CARGO OFFICE
OPERATIONAL AREA
SHED
0
122.35
UNASSIGNED
ROOM
OFFICE
CISF
FRISKING
AREA ELECTRICAL
ROOM
NEW
CARGO
DFMD
MALE
DFMD
HI SCAN
Lvl.+122.530M SHED ATC COMPLEX
6.00
CISF BREAK
ROOM
GATE GATE
OFFICE
COMPRESSOR
TOILET (M)
ROOM
0-09 11 m²
PARKING
POWER
HOUSE
RCC CARGO
ATC BLD HI
LINE 140M FROM RWY
CENTER LINE
134.557
PUMP HOUSE
ATC TOWER
ATC HI
151.659
SHED
BUILDING
ELECTRICAL
RE L L I HC
ROOM
SHED ELECTRICAL
HANUMAN&SHIVA
TEMPLE
STATE STATE
REQUIRED RUNWAY
GN I DL I UB HANGAR HANGAR
CLOSURE
STORE ROOM
STORE ROOM
NEW STORE ROOM
CANTEEN
BUILDING HOUSE KEEPING MATERIAL YARD
SHED
LODGED
HOUSE KEEPING MATERIAL
HINDUSTAN
PETROLEUM
BHARAT
PETROLEUM
BLD BASIS (Beyond105M )
AVIATION AVIATION
TWY - C TWY - B 02
TWY - A TWY - P6
23.00 LINE 105M FROM
7.50 7.50 RWY CENTER LINE 554.65
7.50
279.50 7.50
23.00
140.00
140.00
01
105
7.50
105
7.50
22.50
22.50
LINE 105M FROM
RWY CENTER LINE
DVOR MONITOR
ANTENNA, 432 ft.
DVOR/DME
AIRSIDE IMPROVEMENT WORKS AT LUCKNOW INTERNATIONAL AIRPORT LEGENDS TIME LINE FOR RUNWAY CLOSURE
REFURBISHMENT OF
REFURBISHMENT OF REFURBISHMENT OF 01 TWY 'A' (UP TO 105M 18 Apr 2024 TO 15 July 2024
01 TWY 'A' (UP TO 105M 02 TWY 'A' (Beyond 105M)
FROM RWY C/L)
FROM RWY C/L)
____________________________________________________________________________________________________________________________________________________________________________
Airports Authority of India AIP Supplement 42/2024 Page 12 of 15
QUARTERS
CHART -4
P0-07
CSD - 02
27.000
KENDRIYA POLICE
KALYAN BHANDAR
14532.477 Sqm
LEGENDS:
DOG
P0-08
KENNEL
27.000
CISE AIRPORT
POLICE STATION
AIRPORT
P0-09
POLICE STATION
0
27.00
O
PROPOSED
P0-10
000
ION TR
27.
1
TP0-1
AT E
OPERATIONAL
ST SI M
ELEVATED ROAD FROM
SHAHEED PATH BOUNDARY WALL
AU
ENCROACHMENT
AM
RUNWAY STRIP
2
TP0-1
UPGRADATION (UP TO
P0-13
P0-14
CHILLAWAN VILLAGE 105m FROM RWY C/L)
15
P0-
CHILLAWAN VILLAGE
P0-16
GUARD ROOM
RUNWAY BASIC STRIP
P0-17
LANDSCAPE
AREA
8.1
EXIT
9.5
6.0
6.0
LAND SWAP OF
EQUIVALENT AREA
GUARD
(1701 SQM.)
LOW HT. ROOM
LIGHT MAST
P0-18
2 NOS.
GRADING (105 to 140
9 NOS.
4 NOS.
6.0 M WIDE DRIVEWAY
66.0
5 NOS.
7 NOS.
9 NOS. TOTAL 48
6.0 M WIDE DRIVEWAY NOS. NEW
LANDSCAPE CAR PARKING
11 NOS.
AREA
52.7
TOILET
HOUSE
R
POWE
TANK
1C
4.437M Clear Ht.
7.560M Clear Ht.
Ht.
Clear
4.730M
Ridg 6.514M Clear Ht.
E3
Line e LINE
PLINTH
LINE
ROOF
+010
LVL
LADIES
D1
EPOLS 21:1
TOILET
D2
D1
V3
SKY
WIDE
J.
TO
OPEN
1800
V2
ELECTRICAL
HANDWASH
GENT'S
FD1
PASSAGE
TOILET
D1
Clear Ht.
ROOM
M.H
V1
SHOWER
+150
LVL
KITCHEN
SHAFT
WIDE
W.C
4.022M
V1
1800
W.C
KD1
URINALS
PASSAGE
W.C
W.C
BUILDING
SHOPS
E1
6.788M Clear Ht.
SEATING
TO
CANTEEN
ENT.
y
ewa
LVL
LINE
PLINTH
LINE
+010LVL
ROOF
Wid
Mt
6.948M
6.00
Clear Ht.
1.67
y
ewa
e Driv
Wid
POWER HOUSE
Mt
6.00
7.108M Clear Ht.
DELL
X 12'-6"
8'-3" HEAD DELL
CIVIL
DELL
X 12'6"
8'1"
CABIN-01
12'6"
X
8'4" X 12'6"
CABIN-03
CABIN-02 11'6"
DELL
14'-0"
DELL
X
DELL
14'-0"
DELL
HEAD
PROJECTS
DELL
5'0" X 12'6"
X DELL 11'4"
X 9'-4"
ROOM
X 4'-2"
TOI.
X 12'6"
4'-0" 7'6"
X
4'-9
4'6"
X 4'3"
X 4'-2"
3'-4"
3'-3"
X
ROOM
7'-0" 6'-2"
14'-0"
X 6'0"
STORE X 4'3"
10'-0"
DELL
DELL
X 6'0"
GENTS
SAFETY
H.O.D 9'0"
DELL
WORK
TOI.-01 STN.-02
11'-3"
H.O.DC.A.D
X
10'-0"
WORK
DELL STN.-01
X 9'6"
9'6"
DELL
9'6"
14'-0"
X 9'10"
X
X
9'6"
9'11"
28'-0"
ROOM M.E.P CABIN-06
WORK
STN.-03 HEAD
X 29'0"
CONFERENCE 21'2" DELL
WORK
WORK
WORK
DELL
STN.-09
WORK
WORK 21'6"
X 5'0" X
WORK
9'7" 9'6"
STN.-06 WORK
STN.-08 STN.-13
CPAD
9'6"
X
9'10"
TERMINALDESIGN STN.-14
WORK
HEAD
WORK
WORK
STN.-07
WORK
STN.-15
STN.-20
X 8'0"
STN.-19 5'5" 3'10"
X 9'6" X
DELL WORK 19'6" TOI.-02 3'9"
WORK
3'10"
X
WORK
STN.-17 3'9"
DELL STN.-16 X 9'6"
10'0"
PLANNING
MASTER
HEAD
DELL
SHED
WATER
TANK
EMERGENCY
PARKING BAY
4.00
4.00
11 10 3.50 3.50 3.50
09
06
AUTO Pick Up
W
nm
at
05
ent
er
Green
Ta
04
nk
03
01
Mango
Tree
+900 IMD
entS ±0.0
R22
Green IMD
SPACE FOR
±0.0 +450
Green Area
OFFICE DEPARTMENT
5.8
ANODE WELL
CENTRE
5M
Cle
CL CL CL CL CL
ME
ar
Event Arena
W.B.
IMD BUILDING
(Plin TE +300
th Lvl. R R3.00
+12 RM IMD BUILDING
3.63
0M)
. F&B 6
F&B 5 TICKETING GRAB GRAB GRAB GRAB FLOWER FLOWER CHICKEN CHICKEN AVADH AVADH AVADH AVADH HEALTH HEALTH GRAB GRAB GRAB GRAB
& GO 7 & GO 6 & GO 5 & GO 4 & GIFTS 1 & GIFTS KARI 1 KARI HOLIDAYS 1 HOLIDAYS PERFUME PERFUME & CARE 1 & CARE & GO 3 & GO 2 & GO 1 & GO F&B 1 F&B R1
1
GRAB & GO
HT)
T
X12 KL
UR
:1250T-2
CO
E
Ø
M
OD
F&B 7
(12
FO
HT)
m
WATER FEATURE
X12 KL
:1250T-4
F&B 4
4.5
F&B 3 F&B 2
W
R5 R4
CAP ATF
NO
AD
CK
M
HT)
GREEN
(12
RO
GREEN
CARGO
LU
:1250T-1
X12 KL
M
122.294
ICONIC BAR
R3
CAP ATF
STP (T3)
M
R2
X 5 HOUSE
(12
00 GREEN
M)
(25 PUMP
(12 :1250T-3
X12 KL
(Lvl. +122.700M)
M
BIKE PARKING
CAP ATF
M
NT
Ø
HYDRA
Lvl.+123.280M Lvl.+123.280M
M
749.9998
280.0000
1315.0000
EXIT GATE
2.0
1365.0000
915.0000
R1
2000.0000
RO
AD 2000.0000
2560.0000
CAR PARKING
5m
SECURITY
125
WID
ISMC
SECURITY CABIN
200
ISMC
125
ISMC
D1
W1
ISMC
125
E
125
MANHOLES
ISMC
TANK ACCESS
FOR WATER
125
ISMC 200
ISMC
(LVL -405)
GREEN
(LVL -405)
GREEN
WATERTANK
TOP OF
BASIN
TEST
CUTOUT (150X150)MM IN
FLOOR
LABORATORY
RIG
(F.C.)
ROOM
ELECTRICAL
ROOM
Fuel Farm
S2
(150X150)MM
8130 X 5070
CUTOUT
F.F.L.±00 OFFICE-1
IN FLOOR
ROOM
RECORD
OL
Fuel Farm
F.F.L.±00
(F.C.)
STAFF
FINANCE
PLINTH PROTECTION
& CONTR
WAITING
AREA OFFICERS
SAFETY
CABIN
N
(F.C.)
2
ENTRANCE
FINANCE
OFFICERS
CABIN
SUBSTATION
TIO
1 (F.C.)
UP
BUILDG
LADIES
FIRE
EXIT
TOILET
SLOPE-1:6
SERVICES INTO
TUNNEL
CUTOUT FOR
DIRECTING
UP
STEPS:27
RISER:148.14mm
TREAD:300mm
RAMP
PLATFORM
BASIN
NO.OF
WIDTH:1500mm
M) RA
GENT'S
SHED
PANTRY
(T3)
ADMIN
TOILET
CUTOUT FOR
EQUIPMENT
1.20
PUMP PANEL
X 3 LIB
FIRE
UP
EXIT
(F.C.)
CONFERANCE/
F.F.L.±00
RAMP
MINI
122.350
STAFF
ROOM
(Lvl. +123.280M)
(F.C.)
CA
UNASSIGNED
ROOM
(LVL -405)
GREEN
ROOM
SOAK
SOAK
WID
DN
UP
OFFICE
PIT
PIT
CISF
1.50
(LVL -405)
GREEN
NO SMOKING
NO SMOKING
3500 MM WIDE
FRISKING
AREA
m
EXTINGUISHERS ELECTRICAL
ROOM
J.CLOSET
PANTRY
NEW
4 NO. DRY POWDER TYPE
TOI(M)
OLTC 11/0.433KV, Dyn
CL
Below
11,TRAFO.-3
ME
M
STORE
UPS/BATT.
BMS/PLC
CONTROL
ROOM
ROOM
TOI(F)
OUTLET
AREA
RETURN RETURN
OUTLET
CARGO
PUMP-1
DFMD
DFMD
MALE
HI SCAN
BULK
PUMP-2
TANK HSD
20KL FUEL
INLET INLET SLOPE WIDE
ATC COMPLEX
PUMP-3
STAND
WITHBUCKET
FIRE SLOPE-1:6
2000 KVA, OIL TYPE WITH
RO
RAMP
F.F.L.±00
PUMP-4
SHED
11,TRAFO.-2
Lvl.+122.530M
6.00
SPACE FOR CYLINDERS
-
CISF BREAK
PARK
F.F.L.±00
Lvl.+123.280M
NO SMOKING
F/A OPENING 2300X1100
TANK LORRY
NO SMOKING PLATFORM
DECANTING 11KV NIC PANEL GATE GATE
SLOPE-1:6
Dn Slope
LER
OFFICE
RAMP COMPRESSOR
2000 KVA, OIL TYPE WITH
0-09 11 m²
RTCC PANEL
11,TRAFO.-1
33 KV ROOM
RE-FU
33 KV RMU
11 KV ROOM
GROUNDING PANEL
11KV DG. NEUTRAL
PANEL
CHANGEOVER
PARKING
(LVL -405)
GREEN
DG AUXILIARY PANEL
UP
CARGO
BOARD
11KV DG. SYNCH. PANEL
R C C
33 KV HT PANEL
POWER
DG. SET FUTURE
LANDSIDE
DG. SET-6
DG. SET-5
DG. SET-4
DG. SET-3
DG. SET-2
DG. SET-1
F.F.L.±00
HOUSE
SOAK
SOAK
PIT
PIT
GATE
F.F.L.±00
SOAK
RITY
PIT
ATC BLD HI
134.557
CABIN
.00
D1
DOT DOT
DOT DOT DOT
DOT DOT DOT DOT
SECU
T GA CK
GATE
SLOPE-1:6
SLOPE-1:6
Entry
TE
SLOPE-1:6
SLOPE-1:6
PUMP HOUSE
RAMP
RAMP
SLOPE-1:6
SLOPE-1:6
SLOPE-1:6
AREA
RAMP
RAMP
Pedestrian
UP
SLOPE-1:6
RAMP
RAMP
RAMP
RAMP
/ EXIK TRU
LANE
UP
TANK
5.0M
M.S FRAME
2.60
UPTO 30M
SUPPORT
1IN10
RAMP
0.70
LANE
WID
UP
UPSDB-3
WIDE
3.15
UP
CLMS
1.83
2.92
UG
ELDB-3
STORE
1.50
5.0M
ATC HI
5.67
Entry
151.659
TRY TAN
3.38
Pedestrian
EMLDBSLDB
630A
MCC-3
VCB
UP
BUILDING
MLDB
5m
MPDB
GATE
RAMP
MODB-3
TRANSFORMERKVA
3.30
11KV/433V
ELECTRICAL
OLTC
1000
DOWN TO BASEMENT
MODB-4
LOCATION
11.75
WITH
APFC
MCC-2
LEVEL
Pedestrian
WTMD
above
CISF
Exit
SCREENING
SECURITY
AD
AREA
Canopy
GROUND
16.35
MORCHA
GATE P
N
ETD
8.78
UP
P
AIRSIDE GREEN AREA
LT PANEL
x 1000
RO
PTA-01
TOILET (F)
6000
MCC-1
TURNSTILE
EN
4.75
SHED ELECTRICAL
1.46
1.29
Canopy DUCT
above
ROOM
6.67
ROOM
JANITOR
D2
UP
DG
900x1000
PANEL1
CON
D2
DG
00
MAINTENANCE SHAFT
PANEL2
CON
D4
900x1000
(H/C)
(DG-2)DG SET
R E L L I H C
W.B.
KVA
E
1010
TOILET (M)
R6.
PTA-02
STATE
WID
HANUMAN&SHIVA
STATE
TEMPLE
DECAN
SET
DG
KVA(DG-1)
1010
CL CL CL CL CL
TING
(15
M PUMP G N I D L I U B HANGAR HANGAR
m
X5
M) HOUSE
4.5
STORE ROOM
CABIN
STORE ROOM
AD
STORE
CANTEEN
RO
ROOM
BAY
12M)
STAFF
WORK
2
BAY
SHED
VIP
3
BAY
GA Y
INDIAN POST
ENC
TE
5
BAY
BLD
EM
HINDUSTAN BHARAT
BAY
PETROLEUM PETROLEUM
HT)
HOUSE
KL
7
-2
8 BAY
AVIATION AVIATION
: 1000
1.45x1.6
X12
TOILET
FW
PUMP
1.45x1.6
TOILET
E MIRROR
M)
1.45x1.6
TOILET
OFFIC
X5
Ø
M)
CAP
BAY
WATER
ROOM
STORE
M
M
X8
(25
(12
CABIN OFFICER
SHIFT
SHIFT
FIRE
(10
WORKSTATION
HT)
UP
Ø X12 KL
WA RY
: 1000- 1
M
LL
CAP FW
DA
M
UN
(12
BO
GLIDE PATH
TWY - C TWY - B 02
TWY D & E
01 TWY - A GLIDE PATH CRITICAL AREA
300.00
75.00
105.00
75.00
RESA 09
75.00
RESA 27
105.00
75.00
150.00
150.00
01 300.00
DVOR MONITOR
ANTENNA, 432 ft.
DVOR/DME
LKN 117.4
CH 121X
ELEV. 424 ft.
ISOLATION BAY
____________________________________________________________________________________________________________________________________________________________________________
Airports Authority of India AIP Supplement 42/2024 Page 13 of 15
CHART-5
Y3
GA CY
BA
TE
N
LEGENDS:
Y4
GE
BA
ER
Y5
BA
EM
Y6
BA
)
HT
USE
Y7
Ø X1 0 KL
(12 P : 100 2
2M
5 M) HO
BA
-
1.45x1.6
TOILET
FW
1.45x1.6
P
TOILET
MIRROR
X 8 FICE
PUM
1.45x1.6
TOILET
Y8
M)
X
ROOM
TER
STORE
OF
M
CA
BA
M
(25
CABIN OFFICER
SHIFT
E WA
IFT
M
SH
(10
FIR
WORKSTATI
EXISTING
ON
)
UP
HT
X1 KL
WA RY
(12 P : 100 - 1
2M
0
LL
CA FW
DA
Ø
M
UN
BO
OPERATIONAL AREA
LINE 105M FROM
RWY CENTER LINE
LINE 140M FROM RWY
CENTER LINE
REQUIRED RUNWAY
CLOSURE
WORK ON WATCH &
WARD BASIS (Beyond
105M)
319.14
TWY - P3
5.50
TWY - P1
140.00
223.62
52.0
RESA 09
5.50
50.0
7.50
TWY - P6
0
140.00
7. 7.5
50
90.00
140.00
50.88 98.70
90.00
140.00
EMERGENCY ROAD AT RWY 27
FIRE ACCESS ROAD
DVOR MONITOR
ANTENNA, 432 ft.
DVOR/DME
LKN 117.4
CH 121X
AIRSIDE IMPROVEMENT WORKS AT LUCKNOW INTERNATIONAL AIRPORT
EMERGENCY & FIRE EMERGENCY & FIRE LEGENDS TIME LINE FOR RUNWAY CLOSURE
01 APPROACH ROAD 02 APPROACH ROAD
EMERGENCY & FIRE
01 18 Apr 2024 TO 15 July 2024
APPROACH ROAD (UP TO
105M FROM RWY C/L)
TIME LINE FOR RUNWAY CLOSURE - 18 Apr 2024 TO 15 July 2024
____________________________________________________________________________________________________________________________________________________________________________
Airports Authority of India AIP Supplement 42/2024 Page 14 of 15
QUARTERS
CHART-6
P0-07
CSD - 02
27.000
KENDRIYA POLICE
KALYAN BHANDAR
14532.477 Sqm
LEGENDS:
DOG
P0-08
KENNEL
000
CISE
27.
AIRPORT
POLICE STATION
AIRPORT
P0-09
POLICE STATION
000
27.
O
10
000
P0-
EXISTING
ION TR
27.
1
TP0-1
AT E
ST SI M
ELEVATED ROAD FROM OPERATIONAL AREA
SHAHEED PATH
AU
ENCROACHMENT
DUCT BANK
AM
2
TP0-1
13
P0-
PULL PIT
P0-14
CHILLAWAN VILLAGE
15
P0-
CHILLAWAN VILLAGE
P0-16
GUARD ROOM
P0-17
LANDSCAPE
AREA
8.1
9.5
EXIT
TRANSFORMER PIT
6.0
6.0
LAND SWAP OF
EQUIVALENT AREA
GUARD
(1701 SQM.)
LOW HT. ROOM
LIGHT MAST
P0-18
2 NOS.
9 NOS.
4 NOS.
6.0 M WIDE DRIVEWAY
66.0
5 NOS.
7 NOS.
9 NOS. TOTAL 48
6.0 M WIDE DRIVEWAY NOS. NEW
LANDSCAPE CAR PARKING
11 NOS.
AREA
52.7
TOILET
PROPOSED
HOUSE
R
POWE
TANK
1C
4.437M Clear Ht.
OPERATIONAL
BOUNDARY WALL
7.560M Clear Ht.
Ht.
Clear
4.730M
Ridg 6.514M Clear Ht.
E3
Line e LINE
LINE
ROOF
+010LVL
PLINTH
D1
LADIES
TOILET
EPOLS 21:1
D1 D2
V3
SKY
WIDE
J.
TO
OPEN
V2
1800
ELECTRICAL
HANDWASH
Ht.
FD1
GENT'S
PASSAGE
D1
TOILET
ROOM
M.H
Clear
V1
+150
SHOWER
LVL
KITCHEN
SHAFT
WIDE
4.022M
W.C
V1
1800
KD1
W.C
URINALS
W.C
PASSAGE
W.C
BUILDING
SHOPS
E1
6.788M Clear Ht.
SEATING
CANTEENTO
ENT.
y
ewa
LVL
LINE
PLINTH
LINE
LVL
+010
ROOF
Wid
Mt
6.948M
6.00
Clear Ht.
1.67
y
ewa
e Driv
Wid
POWER HOUSE
Mt
6.00
7.108M Clear Ht.
DELL
X 12'-6"
8'-3" DELL
HEAD
CIVIL
12'6" DELL
X
8'1"
CABIN-01
X 12'6"
CABIN-02
8'4" 12'6"
X DELL
11'6"
CABIN-03
DELL
X 14'-0" DELL
HEAD
14'-0" DELL
SECRETARY
ADANI SITE OFFICE 12'6"
X 6'0"
TOI.12
"
4'-9
CABIN-05
X 4'-2" X X 12'6"
4'-0" 7'6" 4'6" LADIES
PANTRY
2'-9"
STORE X 4'-2"
X 6'0"
3'-4" X 3'-3" 4'3"
7'-0"
X
ROOM 6'-2" 6'0"
14'-0"
X
X 4'3"
DELL 10'-0"SAFETY X
6'0" DELL
STN.-02
H.O.D 9'0" TOI.-01 DELL
X
DELL 10'-0"
C.A.D STN.-01
X 9'6"
H.O.D WORK 9'6"
DELL
9'10"
14'-0"
X
X 9'6" 9'6"
X M.E.P
STN.-03
28'-0"ROOM HEAD
9'11" CABIN-06
CONFERENCE 29'0"
X DELL
WORK 21'2"
STN.-11
DELL
STN.-04
WORK STN.-10
WORK WORK
WORK
STN.-05 DELL
WORK
STN.-12 DELL
STN.-09WORK
X 5'0" X 21'6"
9'7" WORK 9'6"
STN.-08
WORK
STN.-13WORK
TERMINAL
STN.-06
WORK
X 9'6"
STN.-14
CPAD
9'10"
DESIGN
HEAD
STN.-20
STN.-07
WORK STN.-15
WORK
3'10"
WORK
X 9'6" X 8'0"
GENTS
STN.-19 19'6" 5'5"
X
3'9"
DELL WORK TOI.-02
DELL STN.-18
STN.-16
X 3'10"
STN.-17 WORK 3'9"
WORK
DELL WORK 9'6"
X
MASTER 10'0"
HEAD
PLANNING
DELL
SHED
WATER
TANK
EMERGENCY
PARKING BAY
4.00
4.00
11 10 3.50 3.50 3.50
09
nm
W
at
05
ent
er
Green
Ta
04
nk
03
02
Green Area AUTO Drop Off
01
Mango
Tree
IMD
2.0
+900
entS ±0.0 Green Green Area IMD
OFFICE
R2
ANODE WELL
CENTRE
5M
Cle
CL CL CL CL CL
ME
ar
W.B.
(Plin TE +300
IMD BUILDING
th Lvl. R R3.0
0
+12 RM IMD BUILDING
3.63 . F&B 6
GRAB GRAB GRAB GRAB
0M) F&B 5 TICKETING GRAB GRAB GRAB GRAB FLOWER FLOWER CHICKEN CHICKEN AVADH AVADH AVADH AVADH HEALTH HEALTH
& GO 6 & GO 4 HOLIDAYS 1 HOLIDAYS PERFUME PERFUME & CARE 1 & GO 3 & GO 2 & GO 1 & GO
& GO 7 & GO 5 & GIFTS 1 & GIFTS KARI 1 KARI
1
& CARE F&B 1 F&B R1
GRAB & GO
HT)
T
X12 KL
UR
:1250T-2
CO
Retail Designer
WID
Retail Designer
M
OD
F&B 7
(12
R3.00
4.5m
FO
WATER FEATURE
X12 KL
F&B 4
:1250T-4
F&B 3 F&B 2 R5 R4
W
CAP ATF
NO
AD
Ø
M
CK
HT)
GREEN
RO
(12
GREEN
CARGO
LU
X12 KL
:1250T-1
ICONIC BAR
R3
122.294
CAP ATF
STP (T3) R2
X 5 HOUSE
(12
00 GREEN
M)
(25NT PUMP
(Lvl. +122.700M)
:1250T-3
X12 KL
M
BIKE PARKING
CAP ATF
M
HYDRA
Ø
Lvl.+123.280M Lvl.+123.280M
M
749.9998
280.0000
1315.0000
2.0
EXIT GATE
1365.0000
915.0000
R1
2000.0000
RO
AD 2000.0000
2560.0000
CAR PARKING
5m
SECURITY
WID
125
ISMC
125
ISMC
D1
W1
ISMC
125
MANHOLES
TANK ACCESS
125
FOR WATER
ISMC
125
E
200
ISMC
TOC LVL.-300
(LVL -405)
GREEN
(LVL -405)
GREEN
WATERTANK
TOP OF
BASIN
TEST
CUTOUT (150X150)MM IN
FLOOR
LABORATORY
RIG
(F.C.)
ROOM
ELECTRICAL
ROOM
Fuel Farm
S2
(150X150)MM
8130 X 5070
CUTOUT
F.F.L.±00 OFFICE-1
IN FLOOR
ROOM
RECORD
OL
Fuel Farm
F.F.L.±00
(F.C.)
STAFF
FINANCE
PLINTH PROTECTION
& CONTR
WAITING
SAFETY
AREA
CABIN
OFFICERS
N
(F.C.)
2
ENTRANCE
FINANCE
OFFICERS
CABIN
SUBSTATION
TIO
1
UP
(F.C.)
BUILDG
LADIES
FIRE
EXIT
TOILET
SERVICES INTO
TUNNEL
CUTOUT FOR
DIRECTING
UP
SLOPE-1:6
STEPS:27
RISER:148.14mm
RAMP
RA
BASIN
NO.OF
WIDTH:1500mm
TREAD:300mm
PLATFORM
GENT'S
SHED
(T3)
PANTRY
ADMIN
TOILET
CUTOUT FOR
EQUIPMENT
1.20
PUMP PANEL
X 3 LIB
PLATFORM
VENT. PANEL SLOPE-1:6
TRAINING
FIRE
UP
EXIT
CONFERANCE/
F.F.L.±00
RAMP
(F.C.)
MINI
122.350
ROOM
(Lvl. +123.280M)
STAFF
E
(F.C.) ROOM
CA
UNASSIGNED
(LVL -405)
GREEN
M)
ROOM
SOAK
SOAK
DN
UP
OFFICE
PIT
PIT
WID
CISF
1.50
(LVL -405)
GREEN
NO SMOKING
NO SMOKING
3500 MM WIDE
FRISKING
EXTINGUISHERS AREA ELECTRICAL
J.CLOSET
m
ROOM
PANTRY
NEW
4 NO. DRY POWDER TYPE
TOI(M)
2000 KVA, OIL TYPE WITH
CL
Service Tunnel
OLTC 11/0.433KV, Dyn
Below
ME
M
11,TRAFO.-3
STORE
UPS/BATT.
BMS/PLC
CONTROL
ROOM
ROOM
TOI(F)
AREA
OUTLET OUTLET
CARGO
PUMP-1
DFMD
MALE
BULK
DFMD
PUMP-2
HI SCAN
TANK HSD
20KL FUEL
INLET INLET SLOPE WIDE
ATC COMPLEX
PUMP-3
WITHBUCKET
FIRE STAND SLOPE-1:6
2000 KVA, OIL TYPE WITH
RAMP
F.F.L.±00
RO
SHED
PUMP-4
11,TRAFO.-2
6.00
SPACE FOR CYLINDERS
Lvl.+122.530M
-
CISF BREAK
PARK
F.F.L.±00
Lvl.+123.280M
NO SMOKING
F/A OPENING 2300X1100
TANK LORRY
NO SMOKING PLATFORM
DECANTING 11KV NIC PANEL GATE GATE
SLOPE-1:6
Dn Slope
LER
OFFICE
RAMP COMPRESSOR
ROOM TOILET (M)
2000 KVA, OIL TYPE WITH
0-09 11 m²
OLTC 11/0.433KV, Dyn
RTCC PANEL
33 KV ROOM
RE-FU
11,TRAFO.-1
33 KV RMU
11 KV ROOM
GROUNDING PANEL
11KV DG. NEUTRAL
PANEL
CHANGEOVER PARKING
(LVL -405)
GREEN
DG AUXILIARY PANEL
UP
CARGO
BOARD
11KV DG. SYNCH. PANEL
33 KV HT PANEL
POWER R C C
DG. SET FUTURE
LANDSIDE
DG. SET-6
DG. SET-5
DG. SET-4
DG. SET-3
DG. SET-2
DG. SET-1
F.F.L.±00
HOUSE
SOAK
PIT
SOAK
GATE
F.F.L.±00
SOAK
RITY
PIT
ATC BLD HI
134.557
CABIN
.00
D1
DOT DOT
DOT DOT DOT
DOT DOT DOT DOT
SECU
T GA CK
GATE
SLOPE-1:6
SLOPE-1:6
Entry
SLOPE-1:6
SLOPE-1:6
PUMP HOUSE
TE
AREA
RAMP
RAMP
SLOPE-1:6
SLOPE-1:6
SLOPE-1:6
RAMP
RAMP
Pedestrian
UP
SLOPE-1:6
RAMP
RAMP
RAMP
RAMP
/ EXIK TRU
LANE
UP
E
5.0M
M.S FRAME
2.60
UPTO 30M
SUPPORT
1IN10
0.70
LANE
WID
RAMP
UP
2.92
UP
UPSDB-3
WIDE
1.83
ELDB-3
CLMS
3.15
UG
STORE
1.50
5.0M
ATC HI
5.67
Entry
151.659
TRY TAN
3.38
SLDB
Pedestrian
630A
EMLDB
MCC-3
VCB
UP
MLDB
BUILDING
5m
MPDB
GATE
RAMP
KVA
3.30
MODB-3
TRANSFORMER
11KV/433V
OLTC
ELECTRICAL
1000
DOWN TO BASEMENT
MODB-4
WITH
LOCATION
11.75
APFC
LEVEL
Pedestrian
WTMD
MCC-2
CISF
above
SCREENING
SECURITY
AD
Exit
16.35
AREA
GROUND
Canopy
MORCHA
P
N
ETD
UP
GATE
8.78
P
AIRSIDE GREEN AREA
LT PANEL
x 1000
RO
PTA-01
TOILET (F)
6000
TURNSTILE
MCC-1
EN
SHED ELECTRICAL
4.75
1.46
1.29
Canopy 6.67
ROOM
ROOM
JANITOR
above
DUCT
D2
UP
DG
CON
PANEL1
900x1000 DG MAINTENANCE SHAFT
.00
PANEL2
CON
D2
D4
900x1000
SET
(H/C)
DG
(DG-2)
R E L L I H C
KVA
W.B.
E
1010
TOILET (M)
PTA-02
R6
STATE
WID
HANUMAN&SHIVA
STATE
SET TEMPLE
(DG-1)
DECAN
DG
KVA
1010
C L C L CL CL CL
TING
(15
M PUMP G N I D L I U B HANGAR HANGAR
m
X5
M) HOUSE
4.5
STORE ROOM
CABIN
STORE ROOM
AD
STORE
CANTEEN
RO
(24MX KSHO
ROOM
BAY
STAFF
WOR
2
BAY
SHED
VIP
3
BAY
GA Y
INDIAN POST
TE
NC
5
BAY
BLD
EM
HINDUSTAN BHARAT
BAY
PETROLEUM PETROLEUM
HT)
HOUSE
7
Ø X12 KL
-2
8 BAY
AVIATION AVIATION
M 1000
1.45x1.6
TOILET
FW
PUMP
1.45x1.6
TOILET
E
MIRROR
M)
1.45x1.6
TOILET
OFFIC
X5
:
M)
CAP
BAY
WATER
ROOM
STORE
M
X8
(25
(12
CABIN OFFICER
SHIFT
SHIFT
M
FIRE
(10
WORKSTATION
HT)
UP
Ø X12 KL
: 1000 1
WA RY
M
-
LL
CAP FW
DA
M
UN
(12
BO
GLIDE PATH
TWY - C TWY - B
TWY D & E TWY - A GLIDE PATH CRITICAL AREA
105
105
105
105
105
105
DVOR MONITOR
ANTENNA, 432 ft.
DVOR/DME
LKN 117.4
CH 121X
ELEV. 424 ft.
ISOLATION BAY
I G SSOCI EC E
____________________________________________________________________________________________________________________________________________________________________________
Airports Authority of India AIP Supplement 42/2024 Page 15 of 15