24-Week EMR Project Plan
This document outlines a detailed 24-week plan for the development of an Electronic
Medical Record (EMR) system. The project is structured into distinct phases: database
design, form creation, data integration, AI model development, and dashboard visualization,
culminating in final testing and documentation.
Weeks 1–4: Foundation and Database Design
Week 1: Introduction to EHR data, understanding requirements, and planning the
database schema.
Week 2: Designing and creating the initial database tables in MySQL or Snowflake.
Week 3: Data modeling, defining relationships, and normalizing the data.
Week 4: Testing database integrity, refining the schema, and setting up initial data.
Weeks 5–8: Form Creation and Backend Integration
Week 5: Developing basic front-end forms using React.
Week 6: Setting up the backend with Node.js, connecting it to the database, and
implementing CRUD operations.
Week 7: Integrating the forms with the backend and testing data submission.
Week 8: Refining form validation, error handling, and user experience.
Weeks 9–12: Data Integration and Tool Setup
Week 9: Importing and integrating external data sources into the database.
Week 10: Using DBeaver or Snowflake tools to ensure data consistency and quality.
Week 11: Building ETL pipelines for data migration and transformation.
Week 12: Validating integrated data and ensuring accuracy.
Weeks 13–16: AI Prediction and Model Development
Week 13: Introduction to AI/ML concepts and selecting the right datasets.
Week 14: Preprocessing data and feature engineering using Python.
Week 15: Building and training predictive models with scikit-learn or TensorFlow.
Week 16: Evaluating model performance and fine-tuning.
Weeks 17–20: Dashboard Creation and Visualization
Week 17: Designing dashboard layouts and selecting visualization tools.
Week 18: Building interactive dashboards using Tableau or Power BI.
Week 19: Integrating AI predictions into the dashboards.
Week 20: Testing dashboards, refining visuals, and ensuring user accessibility.
Weeks 21–26: Finalization and Review
Week 21: Conducting thorough testing of the entire system (database, forms, AI models,
dashboards).
Week 22: Gathering feedback from stakeholders and making improvements.
Week 23: Final refinements, documentation, and knowledge transfer.
Week 24: Final review, project wrap-up, and presentation.