0% found this document useful (0 votes)
17 views3 pages

Estimate - HC-9R, QM-9R

Estimation
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views3 pages

Estimate - HC-9R, QM-9R

Estimation
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

PROJECT NAME : CONTRACT HC-9R, QM-9R

UNIT COST TOTAL ITEM COST


CSI DWG. QTY. W/ ITEM CREW UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST
ITEM # DESCRIPTION QTY. WASTE UNIT (MAT.+LAB.+ COST (MAT. +EQUIP. DIVISION COST
# # WASTE HRS. (MAT.) (MAT.) (LABOR) (LABOR) (EQUIP.)
EQUIP. ) (EQUIP.) +LAB.)
1 1000 DIVISION 01 - GENERAL REQUIREMENTS
2 MOBILIZATION 1.00 0% 1.00 LS 0.00 $ - $ - $ - $ - $ - $ - $ 10,000
3 BOND & INSURANCE 1.00 0% 1.00 LS 0.00 $ - $ - $ - $ - $ - $ - $ 8,000
4 SUPERVISION 1.00 0% 1.00 LS 0.00 $ - $ - $ - $ - $ - $ - $ 18,000
5 SUBMITTALS & SAMPLES 1.00 0% 1.00 LS 0.00 $ - $ - $ - $ - $ - $ - $ -
6 TEMPORARY FACILITIES & CONTROLS 1.00 0% 1.00 LS 0.00 $ - $ - $ - $ - $ - $ - $ 11,000
7 PROJECT SCHEDULE 1.00 0% 1.00 LS 0.00 $ - $ - $ - $ - $ - $ - $ -
8 OFFICE OVERHEADS 1.00 0% 1.00 LS 0.00 $ - $ - $ - $ - $ - $ - $ -
9 BACKGROUND CHECK 1.00 0% 1.00 LS 0.00 $ - $ - $ - $ - $ - $ - $ -
10 CLOSEOUT PROCEDURES 1.00 0% 1.00 LS 0.00 $ - $ - $ - $ - $ - $ - $ -
Subtotal = $ 47,000.00
02 00 00 DIVISION 02 – EXISTING CONDITIONS
DEMO-SOUTH TUNNEL-QMT
DEMO WATER STAND PIPE INSULATION
11 Demo 6" Water Stand Pipe Insulation 1774 0% 1774 LF 212.88 $ - $ - $ - $ 18.0 $ 31,932.0 $ - $ - $ 31,932
12 Demo 3" Water Stand Pipe Insulation 122 0% 122 LF 11.68 $ - $ - $ - $ 14.4 $ 1,751.3 $ - $ - $ 1,751
13 Demo 2-1/2" Water Stand Pipe Insulation 139 0% 139 LF 10.84 $ - $ - $ - $ 11.7 $ 1,625.9 $ - $ - $ 1,626

DEMO WATER STAND PIPE JACKETING


14 Demo 6" Water Stand Pipe Jacketing 1774 0% 1774 LF 170.30 $ - $ - $ - $ 14.4 $ 25,545.6 $ - $ - $ 25,546
15 Demo 3" Water Stand Pipe Jacketing 122 0% 122 LF 11.38 $ - $ - $ - $ 14.0 $ 1,707.5 $ - $ - $ 1,708
16 Demo 2-1/2" Water Stand Pipe Jacketing 139 0% 139 LF 12.51 $ - $ - $ - $ 13.5 $ 1,876.1 $ - $ - $ 1,876

DEMO VALVES TAGS


17 Demo 2-1/2" Duct Flushing Valve Tag 1 0% 1 EA 0.38 $ - $ - $ - $ 57.6 $ 57.6 $ - $ - $ 58
18 Demo 2-1/2" Fire Hose Valve Tag 8 0% 8 EA 3.07 $ - $ - $ - $ 57.6 $ 460.8 $ - $ - $ 461
19 Demo Fire Hose Valve Tag 3 0% 3 EA 1.15 $ - $ - $ - $ 57.6 $ 172.8 $ - $ - $ 173

DEMO SUPPORT AND ACCESSORIES


20 Demo Pipe Stand 8 0% 8 EA 10.56 $ - $ - $ - $ 198.0 $ 1,584.0 $ - $ - $ 1,584
21 Demo Pipe Guide 8 0% 8 EA 6.24 $ - $ - $ - $ 117.0 $ 936.0 $ - $ - $ 936
22 Demo Pipe Labels 41 0% 41 EA 27.06 $ - $ - $ - $ 99.0 $ 4,059.0 $ - $ - $ 4,059

DEMO-NORTH TUNNEL-QMT
DEMO WATER STAND PIPE INSULATION
23 Demo 6" Water Stand Pipe Insulation 1344 0% 1344 LF 161.30 $ - $ - $ - $ 18.0 $ 24,195.1 $ - $ - $ 24,195
24 Demo 3" Water Stand Pipe Insulation 121 0% 121 LF 11.59 $ - $ - $ - $ 14.4 $ 1,738.8 $ - $ - $ 1,739
25 Demo 2-1/2" Water Stand Pipe Insulation 111 0% 111 LF 8.65 $ - $ - $ - $ 11.7 $ 1,297.9 $ - $ - $ 1,298

DEMO WATER STAND PIPE JACKETING


26 Demo 6" Water Stand Pipe Jacketing 1344 0% 1344 LF 129.04 $ - $ - $ - $ 14.4 $ 19,356.0 $ - $ - $ 19,356
27 Demo 3" Water Stand Pipe Jacketing 217 0% 217 LF 20.27 $ - $ - $ - $ 14.0 $ 3,040.4 $ - $ - $ 3,040
28 Demo 2-1/2" Water Stand Pipe Jacketing 111 0% 111 LF 9.98 $ - $ - $ - $ 13.5 $ 1,497.6 $ - $ - $ 1,498

DEMO VALVES TAGS


29 Demo Gate Valve Tag 1 0% 1 EA 0.38 $ - $ - $ - $ 57.6 $ 57.6 $ - $ - $ 58
30 Demo 2-1/2" Duct Flushing Valve Tag 1 0% 1 EA 0.38 $ - $ - $ - $ 57.6 $ 57.6 $ - $ - $ 58
31 Demo 2-1/2" Fire Hose Valve Tag 4 0% 4 EA 1.54 $ - $ - $ - $ 57.6 $ 230.4 $ - $ - $ 230
32 Demo Fire Hose Valve Tag 7 0% 7 EA 2.69 $ - $ - $ - $ 57.6 $ 403.2 $ - $ - $ 403

DEMO SUPPORT AND ACCESSORIES


33 Demo Pipe Stand 8 0% 8 EA 10.56 $ - $ - $ - $ 198.0 $ 1,584.0 $ - $ - $ 1,584
34 Demo Pipe Guide 8 0% 8 EA 6.24 $ - $ - $ - $ 117.0 $ 936.0 $ - $ - $ 936
35 Demo Pipe Labels 34 0% 34 EA 22.44 $ - $ - $ - $ 99.0 $ 3,366.0 $ - $ - $ 3,366
$ - $ 129,469.2
Subtotal = $ 129,469
21000 DIVISION 21 – FIRE SUPPRESSION
SOUTH TUNNEL-QMT
WATER STAND PIPE JACKETING
-0.016" STAINLESS STEEL WEATHER JACKET
36 6" Water Stand Pipe Jacketing 1774 12% 1987 LF 532.20 $ - $ 11.7 $ 23,246.5 $ 45.0 $ 79,830.0 $ - $ - $ 103,076
37 3" Water Stand Pipe Jacketing 122 12% 136 LF 32.11 $ - $ 8.2 $ 1,117.0 $ 39.6 $ 4,816.2 $ - $ - $ 5,933
38 2-1/2" Water Stand Pipe Jacketing 139 12% 156 LF 25.01 $ - $ 6.2 $ 965.0 $ 27.0 $ 3,752.2 $ - $ - $ 4,717

VALVES TAGS
-BRASS TAG WITH STAMPED BLACK LETTERS – REPLACE
IN KIND
39 2-1/2" Duct Flushing Valve Tag 1 0% 1 EA 0.48 $ - $ 11.0 $ 11.0 $ 72.0 $ 72.0 $ - $ - $ 83
40 2-1/2" Fire Hose Valve Tag 8 0% 8 EA 3.84 $ - $ 11.0 $ 87.9 $ 72.0 $ 576.0 $ - $ - $ 664
41 Fire Hose Valve Tag 3 0% 3 EA 1.44 $ - $ 11.0 $ 33.0 $ 72.0 $ 216.0 $ - $ - $ 249

SUPPORT AND ACCESSORIES


Pipe Stand
42 8 0% 8 EA 10.56 $ - $ 110.3 $ 882.0 $ 198.0 $ 1,584.0 $ - $ - $ 2,466
-W/Type 316 SS Stainless Steel
Pipe Guide
43 8 0% 8 EA 8.16 $ - $ 50.1 $ 400.4 $ 153.0 $ 1,224.0 $ - $ - $ 1,624
-W/Type 316 SS Stainless Steel
Pipe Labels
44 41 0% 41 EA 22.14 $ - $ 11.0 $ 451.0 $ 81.0 $ 3,321.0 $ - $ - $ 3,772
-Identification Marker @50ft

NORTH TUNNEL-QMT
WATER STAND PIPE JACKETING
-0.016" STAINLESS STEEL WEATHER JACKET
45 6" Water Stand Pipe Jacketing 1344 12% 1505 LF 403.25 $ - $ 11.7 $ 17,614.0 $ 45.0 $ 60,487.7 $ - $ - $ 78,102
46 3" Water Stand Pipe Jacketing 217 12% 243 LF 57.17 $ - $ 8.2 $ 1,988.8 $ 39.6 $ 8,575.4 $ - $ - $ 10,564
47 2-1/2" Water Stand Pipe Jacketing 111 12% 124 LF 19.97 $ - $ 6.2 $ 770.3 $ 27.0 $ 2,995.1 $ - $ - $ 3,765

VALVES TAGS
-BRASS TAG WITH STAMPED BLACK LETTERS – REPLACE
IN KIND
48 Gate Valve Tag 1 0% 1 EA 0.48 $ - $ 11.0 $ 11.0 $ 72.0 $ 72.0 $ - $ - $ 83
49 2-1/2" Duct Flushing Valve Tag 1 0% 1 EA 0.48 $ - $ 11.0 $ 11.0 $ 72.0 $ 72.0 $ - $ - $ 83
50 2-1/2" Fire Hose Valve Tag 4 0% 4 EA 1.92 $ - $ 11.0 $ 44.0 $ 72.0 $ 288.0 $ - $ - $ 332
51 Fire Hose Valve Tag 7 0% 7 EA 3.36 $ - $ 11.0 $ 76.9 $ 72.0 $ 504.0 $ - $ - $ 581

SUPPORT AND ACCESSORIES


Pipe Stand
52 8 0% 8 EA 10.56 $ - $ 110.3 $ 882.0 $ 198.0 $ 1,584.0 $ - $ - $ 2,466
-W/Type 316 SS Stainless Steel
Pipe Guide
53 8 0% 8 EA 8.16 $ - $ 50.1 $ 400.4 $ 153.0 $ 1,224.0 $ - $ - $ 1,624
-W/Type 316 SS Stainless Steel
Pipe Labels
54 34 0% 34 EA 18.36 $ - $ 11.0 $ 374.0 $ 81.0 $ 2,754.0 $ - $ - $ 3,128
-Identification Marker @50ft
$ 49,366.1 $ 173,947.5
Subtotal = $ 223,314
21000 DIVISION 21 – FIRE SUPPRESSION - INSULATION
SOUTH TUNNEL-QMT
WATER STAND PIPE INSULATION
-3" THICK ELASTOMERIC CLOSED-CELL FOAM
55 6" Water Stand Pipe Insulation 1774 12% 1987 LF 255.46 $ - $ 4.1 $ 8,146.2 $ 21.6 $ 38,318.4 $ - $ - $ 46,465
56 3" Water Stand Pipe Insulation 122 12% 136 LF 14.59 $ - $ 2.9 $ 395.0 $ 18.0 $ 2,189.2 $ - $ - $ 2,584
57 2-1/2" Water Stand Pipe Insulation 139 12% 156 LF 16.68 $ - $ 2.1 $ 326.9 $ 18.0 $ 2,501.5 $ - $ - $ 2,828

NORTH TUNNEL-QMT
WATER STAND PIPE INSULATION
-3" THICK ELASTOMERIC CLOSED-CELL FOAM
58 6" Water Stand Pipe Insulation 1344 12% 1505 LF 193.56 $ - $ 4.1 $ 6,172.4 $ 21.6 $ 29,034.1 $ - $ - $ 35,207
59 3" Water Stand Pipe Insulation 217 12% 243 LF 25.99 $ - $ 2.9 $ 703.4 $ 18.0 $ 3,897.9 $ - $ - $ 4,601
60 2-1/2" Water Stand Pipe Insulation 111 12% 124 LF 13.31 $ - $ 2.1 $ 260.9 $ 18.0 $ 1,996.7 $ - $ - $ 2,258
$ 16,004.8 $ 77,937.7
Subtotal = $ 93,943
SUBTOTAL $ 493,725
OVERHEAD 20% $ 98,745
PROFIT 30% $ 148,118
TOTAL BASE BID $ 740,588

NOTE: PLEASE NOTE THIS PRICE IS LABOR ONLY FOR INSTALLATION OF FIXTURES. 0.00 0.00 0.00 0.00
NOTE II: PRICE GIVEN ABOVE IS BASED ON DAY TIME WORK. 0.00

MATERIAL FIXTURES COUNT QTY UNIT 0.00 DAYS


WATER CLOSET EA
LAVATORY EA
Bathtub EA
PROJECT NAME: CONTRACT HC-9R, QM-9R
DATE: 10/30/2025
BID RECAP

SR. # DESCRIPTION DEMO FS MATERIAL FS LABOR COST INSULATION INSULATION TOTAL COST
COST MATERIAL COST LABOR COST
1 QMT (South + North) $129,469.22 $49,366.11 $173,947.48 $ 16,004.78 $ 77,937.73 $ 493,725.32

COST SUBTOTAL:

BID SUMMARY
SR. # DESCRIPTION TOTAL MATERIAL COST

1 Cost Subtotal: $ 493,725.32


1.1 Shop Drawings/Coordination 1 $ 0.00
Total Costs Without O&P: $ 493,725.32
2.1 OVERHEADS @ 20% $ 98,745.06
2.2 PROFIT @ 30% $ 148,117.60
3 TOTAL COST: $ 740,587.98
3.1 Control Panel Build Allowance 1 $ 0.00