Technical Data Sheet For 2520V-2520VQ PVV Hydraulics Vane Pump
Technical Data Sheet For 2520V-2520VQ PVV Hydraulics Vane Pump
if not 2, 3, 4
required 21, 25, 30 5, 6, 7 B- 90° SAH from the entrance Viewed from
3520V
32, 35, 38 8, 9, 10 Omit shaft end
11, 12, 14 if I don't know -1 C- online with input of pump
35, 42, 45 2, 3, 4 requires Key handle
F3- 50, 57, 60 Brida 5, 6, 7 Omit strkey D- 90° SH from the entrance
4520V
Together 66, 75 SAE 8, 9, 10 if not R-SH
Vitón 11, 12, 14 required -86 (I turn to
22
10, 12, 14 Key. Chaveta rights)
F3- 21, 25, 30 SAE 15, 17, 19 Reinforced R-CW
3525V
Viton 32, 35, 38 Flange 21, 25 Hdstrkey A- opposite inlet port
Seals
35, 42, 45 10, 12, 14 F- -11 B- 90° CCW from inlet L-SAH
50, 57, 60 15, 17, 19 Assembly Striped (Turn to
4525V
66, 75 21, 25 with foot Spline C- inline with inlet left
F- L-CCW
35, 42, 45 Foot D- 90° CW from inlet
50, 57, 60 21, 25, 30 mounting
4535V
66, 75 32, 35, 38
7
SV Series Paddle Pumps SV Series Vane Pumps
Entry
Exit No. 1
Exit No. 2
8
SV Series Paddle Pumps SV Series Vane Pumps
S2520V
Optional Axes Optional Shafts Cylindrical shaft with keyway Straight key shaft type
Modelo Código Eje F(key)longchave
A B C ØD E
Model Shaft code F(key)widthxlength
1 59 9.53 11.1 22.23/22.20 24.5/24.4 4.75x32
S2520V
86 78 9.53 11.1 25.37/25.35 28.3/28.1 6.36x50.8
Optional Axes Optional Shafts Serrated axle type Splined shaft type
Striated Data Table Spline data table
S2520V 11 44.5 9.53 11.1 --- 27.8 13 16/32 22.17/22.15 19.03 18.63/18.35
9
SV Series Pallet Pumps SV Series Vane Pumps
(F3)-PC-S25V-21-10 R
(F3-) PC S**V ** 10 *
Marking Kit Cartridge Designation Series Flow Code Design number Rotation
Cartridge kit mark Series designation Flow code Design number Rotation
19
Installation and Application Installation and Application
Hoses for Pump Inlet and Outlet Flange for Inlet and Outlet of Pump
Model Entry Exit Output No. 1 (side axis) Exit No. 2 (side axle)
Model Inlet Outlet No. 1 Outlet (shaft end) No. 2 Outlet (shaft end)
S20V (Q) F-12-* F-06-*
S25V (Q) F-12-* F-08-*
S35V (Q) F-16-* F-10-*
S45V (Q) F-24-* F12-*
S2520V (Q) F-20-* F-08-* F-06-*
S3520V (Q) F-24-* F-10-* F-06-*
S3525V (Q) F-24-* F-10-* F-08-*
S4520V (Q) F-28-* F-12-* F-06-*
S4525V (Q) F-28-* F-12-* F-08-*
S4535V (Q) F-32-* F-12-* F-10-*
Hydraulic Oil
● Anti-wear hydraulic oil is recommended. Viscosity range 10 ~ 100 cSt (1.8 ~ 13° C), recommended viscosity 24 cSt (50° C).
● Filtration: the filtration ratio should not be less than a 25 μm filter, a filter with a filtration ratio must be incorporated at the inlet.
70 ~ 150 μm and with a flow rate ratio of twice that of the pump.
● Rango de temperatura: temperatura ambiente -20 ~ +70° C; Temperatura de trabajo 10 ~ 60° C.
● Fire-resistant fluid: special seals must be used if fire-resistant fluid is employed; for pressure ratios and maximum
pump speed, taking the performance data table as a reference.
2. Installation
● The support and structure for the pump must be reliable, solid, and a good absorber of vibrations.
● Horizontal mounting is recommended to maintain the necessary fluid level in the pump. To extend the life of the pump, it is important
the concentricity of the pump and motor shafts, which should be within a Ø0.1mm. Radial or axial loads should not be applied.
about the shaft of the pump. An elastic coupling must be used, and a rigid coupling is not allowed.
● All joints and hoses must be perfectly sealed to prevent noises and vibrations caused by air that could enter.
through the suction flange.
● Before the pump is put into service, make sure that both the inlet and outlet are correctly connected and that the rotation
the pump is the right one. To prevent cavitation in the pump caused by the first use or by startup
after a long period of inactivity, it is advisable to purge the pump.
When the pump is started, it should be operated without load repeatedly. When the pump is functioning normally
it will be ready to use.
● The suction height of the pump should not exceed 500 mm.
The cartridge kit design of the SV and SVQ series Gear Pumps provides a fast and efficient field of application. When the kit is replaced
cartridge, the seals inside the pump must be checked to ensure they are not crushed. When tightening the fastening screws,
It must be done with a constant force and diagonally.
1. Operating Oil
● Anti-wear hydraulic oil is recommended. Its viscosity range: 10 ~ 100 cSt (1.8 ~ 13° C), recommended viscosity 24 cSt (50° C).
● Filtration: the filtration rating shouldn't be lower than 25 μm, a filter with a filtration rating of 70 ~ 150 μm should be fitted at the inlet port.
and its rated flow is more than twice that of the pump.
68
Installation and Application Installation and Application
Hoses for Pump Inlet and Outlet Flange for Inlet and Outlet of Pump
2. Installation
● Foot and frame for pump must be reliable, solid and good in vibration absorption.
● Horizontal mounting is recommended to maintain necessary case fluid level. Concentricity of shafts between pump and motor is important for
Pump life and should be within Ø0.1mm. Radial or axial load cannot be applied on pump shaft and flexible coupling should be used and rigid.
linkage is not permitted.
● To reduce noise and vibration of the system caused by trapped air, the attachment flange at the inlet port, along with all fittings and pipelines, must be strictly sealed.
● Before starting the pump, you should check if the inlet and outlet have been correctly connected and the rotation of the pump is in line with
the arrow on the nameplate. To prevent the pump from cavitation caused by the first starting or stopping run for a long time, air should be
bled from the pump delivery line. This may be accomplished by loosening a connection in the delivery line close to the pump. An air bleed valve
is available for this purpose. When starting, the pump should be repeatedly jogged without any load. After the pump may normally run, it can be
actually primed.
● Suction lift of pump shouldn't be higher than 500 mm.
Industrial Applications Mobile Machinery Ports and vessels Water Conservation Project Others
Industrial Applications Mobile machinery Port and Ship Water Conservancy Project. Others
Machine tool Construction Excavator Drilling platform
Machine-tool Building Excavator Drilling Platform Dam and Gate Equipment Weapon Building
Hydraulic presses Loader Dragados Aerospace equipment
Hydraulic Press Loader Dredger Reservoir Sluice Aerospace Equipment
Chemical Machinery Forklift Steering systems Recreational machinery
Chemical Machinery Fork Lifter Steering Systems Headstock Gear Recreation Machine
Rubber Machinery Crane Dredging Engineering Sanitary machinery
Rubber Machinery Crane Dredge Engineering Hydroelectric Equipment Sanitary Machinery
Plastic Machinery Hydraulic Crane Propulsion systems Firefighter equipment
Plastics Machinery Hydraulic Crane Propeller Systems Ship Locks Fire-fighting Equipment
Metallurgical Machinery Road roller Boat elevation
Metallurgical Machinery Road Roller Ship Lifter Tide-block Dam Official Truck
Mining Machinery Spreader Port Machinery
Mining Machinery Spreader Deck Machinery Movable Bridge Obstacle Eliminating Mach.
Linber Machinery Earth Moving Machinery Port Machinery Medical machinery
Linber Machinery Earth-moving Machines Port Machinery Desalting Equipment Medical Machinery
Automotive Industry Road Construction Equipment Loaders Mach. Fabric. Bridges Garbage collection trucks
Automobile Manufacturing Road-building Machines Loader and Unloader Bridge-building Machinery Garbage Truck
Skin Machinery
Leather Machinery Grader Bert Building Berth Cracker Pile Driver
Ceramic Machinery Excavation Rock drilling Trams
Ceramic Machinery Digger Reclaiming Engineering Rock Drill Cable Car
Paper Machinery Drilling machinery Concrete pumps Fire Trucks
Paper Machinery Piping Machinery Pushing-up System Concrete Pump Fire Truck
Tunnel Boring Machine Agricultural Machinery Concrete mixers Oil production machinery
Tunneling Machinery Agricultural Machinery Offset Device Concrete Mixer Oil Producing Machinery
Steel Rolling Mills Forest machinery Transport Packaging Machine
Steel Rolling Mill Forest Machinery Mud Barge Conveyor Packing Machine
69
SVQ Series Paddle Pumps SVQ Series Vane Pumps
Double Pump - Model Codes Double Pump - Model Code
if not 2, 3, 4
25
SVQ Series Paddle Pumps SVQ Series Vane Pumps
Entry
S4535VQ
Exit No. 1
Exit No. 2
View from the side cover Viewed from cover end of pump
26
SVQ Series Paddle Pumps SVQ Series Vane Pumps
S252VQ
Optional Axes Optional Shafts Cylindrical shaft type with key Straight key shaft type
Model Code Axis F(key)longanchox
A B C ØD E
Model Shaft code F(key)widthxlength
1 59 9.53 11.1 22.23/22.20 24.5/24.4 4.75x32
S2520VQ
86 78 9.53 11.1 25.37/25.35 28.3/28.1 6.36x50.8
S2520VQ 11 44.5 9.53 11.1 --- 27.8 13 16/32 22.17/22.15 19.03 18.63/18.35
27
Installation and Application Installation and Application
Hoses for Pump Inlet and Outlet Flange for Inlet and Outlet of Pump
Model Entry Exit Output No. 1 (side axis) Exit No. 2 (side axis)
Model Inlet Outlet No. 1 Outlet (shaft end) No. 2 Outlet (shaft end)
S20V (Q) F-12-* F-06-*
S25V (Q) F-12-* F-08-*
S35V (Q) F-16-* F-10-*
S45V (Q) F-24-* F12-*
S2520V (Q) F-20-* F-08-* F-06-*
S3520V (Q) F-24-* F-10-* F-06-*
S3525V (Q) F-24-* F-10-* F-08-*
S4520V (Q) F-28-* F-12-* F-06-*
S4525V (Q) F-28-* F-12-* F-08-*
S4535V (Q) F-32-* F-12-* F-10-*
Hydraulic Oil
● Anti-wear hydraulic oil is recommended. Viscosity range 10 ~ 100 cSt (1.8 ~ 13° C), recommended viscosity 24 cSt (50° C).
● Filtration: the filtration ratio should not be less than a 25 μm filter; a filter with a filtration ratio should be incorporated at the inlet.
70 ~ 150 μm and with a flow rate ratio twice that of the pump.
● Rango de temperatura: temperatura ambiente -20 ~ +70° C; Temperatura de trabajo 10 ~ 60° C.
● Fire-resistant fluid: special seals must be used if fire-resistant fluid is employed; for pressure ratios and maximum
pump speed, take as reference the performance data table.
2. Installation
● The support and structure for the pump must be reliable, solid, and a good absorber of vibrations.
● Horizontal mounting is recommended to maintain the necessary fluid level in the pump. To extend the life of the pump, it is important
the concentricity of the pump and motor shafts, which should be within a Ø0.1mm. Radial or axial loads should not be applied
about the pump shaft. An elastic coupling must be used, and a rigid coupling is not allowed.
● All connections and hoses must be perfectly sealed to prevent noise and vibrations caused by air that could enter.
through the suction flange.
● Before putting the pump into service, ensure that both the inlet and outlet are properly connected and that the rotation
The pump is the right one. To prevent cavitation in the pump caused by initial use or by startup.
After a long period of inactivity, it is advisable to purge the pump.
When the pump is started, it should be operated without load in a repetitive manner. When the pump is functioning normally
It will be ready for use.
● The suction height of the pump should not exceed 500 mm.
The design of the cartridge kit for the SV and SVQ Pump series offers a quick and efficient field of application. When the kit is replaced
cartridge, the seals inside the pump should be checked to ensure they are not compressed. When tightening the securing screws,
it should be done with a constant force and diagonally.
Operating Oil
● Anti-wear hydraulic oil is recommended. It's viscosity range: 10 ~ 100 cSt (1.8 ~ 13° C), recommended viscosity 24 cSt (50° C).
● Filtration: the filtration rating shouldn't be lower than 25 μm, a filter with filtration rating of 70 ~ 150 μm should be fitted at the inlet port
and its rated flow is more than twice that of the pump.
68
Installation and Application Installation and Application
Brackets for Inlet and Outlet of the Pump Flange for Inlet and Outlet of Pump
2. Installation
● Foot and frame for pump must be reliable, solid and good in vibration absorption.
● Horizontal mounting is recommended to maintain necessary case fluid level. Concentricity of shafts between pump and motor is important for
Pump life and should be within Ø0.1mm. Radial or axial load cannot be applied on pump shaft and flexible coupling should be used and rigid.
linkage is not permitted.
● To reduce noise and vibration of the system caused by trapped air, the attachment flange at the inlet port, all fittings and pipelines must be strictly sealed.
● Before starting the pump, you should check if the inlet and outlet have been correctly connected and the rotation of the pump is in line with
the arrow on the nameplate. To prevent the pump from cavitation caused by the first starting or stopping run for a long time, air should be
bled from the pump delivery line. This may be accomplished by loosening a connection in the delivery line close to the pump. An air bleed valve
is available for this purpose. When starting, the pump should be repeatly jogged without any load. After the pump may normally run, it can be
actually primed.
● Suction lift of pump shouldn't be higher than 500 mm.
Industrial Applications Mobile Machinery Ports and vessels Water Conservation Project Others
Industrial Applications Mobile machinery Port and Ship Water Conservancy Project. Others
Machine tool construction Excavator Drilling platform
Machine-tool Building Excavator Drilling Platform Dam and Gate Equipment Weapon Building
Hydraulic presses Loader Dragados Aerospace equipment
Hydraulic Press Loader Dredger Reservoir Sluice Aerospace Equipment
Chemical Machinery Forklift Steering systems Recreational machinery
Chemical Machinery Fork Lifter Steering Systems Headstock Gear Recreation Machine
Rubber Machinery Crane Dredging Engineering Sanitary machinery
Rubber Machinery Crane Dredge Engineering Hydroelectric Equipment Sanitary Machinery
Plastic Machinery Hydraulic Crane Propulsion systems Firefighters equipment
Plastics Machinery Hydraulic Crane Propeller Systems Ship Locks Fire-fighting Equipment
Metallurgical Machinery Steamroller Boat elevation
Metallurgical Machinery Road Roller Ship Lifter Tide-block Dam Official Truck
Mining Machinery Spreader Port Machinery
Mining Machinery Spreader Deck Machinery Movable Bridge Obstacle Eliminating Machine.
Linber Machinery Earth movements machinery Port Machinery Medical machinery
Linber Machinery Earth-moving Machines Port Machinery Desalting Equipment Medical Machinery
Automobile Industry Road Construction Machinery Loaders Maq. Fabric. Bridges Garbage collection trucks
Automobile Making Road-building Machines Loader and Unloader Bridge-building Machinery Garbage Truck
Skin Machinery
Leather Machinery Grader Bert Building Berth Cracker Pile Driver
Ceramic Machinery Excavation Rock drilling Trams
Ceramic Machinery Digger Reclaiming Engineering Rock Drill Cable Car
Paper Machinery Drilling machinery Concrete pumps Fire Trucks
Paper Machinery Piping Machinery Pushing-up System Concrete Pump Fire Truck
Tunnel Boring Machine Agricultural Machinery Concrete mixers Oil production machinery
Tunneling Machinery Agricultural Machinery Offset Device Concrete Mixer Oil Producing Machinery
Steel Rolling Mills Forest machinery Transport Packaging Machine
Steel Rolling Mill Forest Machinery Mud Barge Conveyor Packing Machine
69