Quality & Supplier Management
Outline
History
Early Involvement
Proposal
ASMB
RFP
Source Selection
SDD
Production
1 Copyright 2005 Northrop Grumman Corporation
ICBMs – A continuing Success Story
1957 1957 1959 1961 1964 1968 1983 1989 2000
Atlas Thor Titan MM I MM II MM III PK SICBM MM III
SLE
1950s 1960s 1970s 1980s 1990s 2000+
•PK Go-Ahead (1972) •PK 1st Launch (1983) •REACT •MMP
•Atlas 1st Launch (1957) •MM I 1st Launch (1961) •SICBM Go-Ahead (1983) •GRP
•Thor 1st Launch (1957) •MM II 1st Launch (1964) •PSRE
•PKRG Go-Ahead (1986) •PRP •SERV
•Titan 1st Launch (1959) •MM III 1st Launch (1968)
•SICBM 1st Launch (1989) •ICBM Prime Award (1997) •REACT SLEP
•ECS
•ISMP
•ICU
A Hold Targets at Risk
Critical Provide Deterrence Against Attack
National Rapid Receipt and Response to Emergency Action Messages
Asset (EAMs)
Flexible Response Against Our Enemies Should Deterrence Fail
In An Uncertain World ICBMs Continue To Be
Important To Our National Defense
2 Copyright 2005 Northrop Grumman Corporation
Supplier Management
No quality escapes to the field
Objectives Quality is built-in, not
inspected-in
Over 3500 end items delivered
Results to field since 2002 with
essentially no quality issues
Key Features Benefits
Well established process to identify and Programs executed on plan with no
qualify new vendors substandard parts or components
delivered to field
Focus on developing and qualifying Understanding of our needs as a
vendors to meet our high standards customer and sound basis for
before production starts shared success
Monitor suppliers, during design and Ensures timely awareness of
production, for successful corrective difficulties and provides time to
actions addressing variances from plan correct without impact to customer
Multi-tier vendor audits and Reinforces commitment to quality
assessments products throughout supply chain
Suppliers evaluated for ability to Vendor oversight approach adapted
consistently produce quality products to needs of supplier
13 Copyright 2005 Northrop Grumman Corporation
Process for Supplier Management
Role of Program Manager and Engineers – Pre Award and Role of Program Manager and Engineers - Production
Design Conduct program reviews every 6-8 weeks
Conduct program reviews monthly Cost, Schedule, Technical, Risk and Corrective Actions
Cost, Schedule, Technical, Risk, and Corrective Actions to to Variances
Variances Approve Class I changes
Conduct independent technical review for design reviews/audits Review Class II changes
Establish Weapon System Integration test procedures Attend selected on-site joint reviews of sub-tier suppliers
Monitor progress toward production readiness
Functional and
Acquisition Critical Design Physical
Planning Review Configuration Audits Low Rate Full Rate
Production Production
Deliver Accepted Products
Contract/ Weapon System Production
Subcontract Integration Readiness Reviews
Awards Testing
Role of Quality Engineers – Pre Award and Design Role of Quality Engineers - Production
Qualify supplier for specific work scope Participate in on-site joint reviews of sub-tier suppliers
Monitor supplier processes for compliance Conduct on-site inspection of process compliance during each
Establish and monitor corrective actions when site visit
necessary Establish and monitor corrective actions when necessary
Team with first tier supplier on supply chain monitoring Conduct three-way (Government, Prime, Supplier) buy-off of
Establish baseline for production qualification products
As necessary, develop or disqualify supplier prior to Resolution of material & process discrepancies (MRB)
production readiness review
End Item Data Packet definition to ensure traceability to
requirements
24 Copyright 2005 Northrop Grumman Corporation
Early QA Involvement
Proposal Phase
Participate in Alpha Negotiations
QA Submits a Basis of Estimate
Participate in Supplier Proposal Evaluation
Approver of Contract Deliverables Definition
Participate in the Final Proposal Review
5 Copyright 2005 Northrop Grumman Corporation
Early QA Involvement
Acquisition Strategy Make Buy (ASMB)
SQE is a Signature
SEIT is a Participant
Request For Proposal (RFP)
Contains a Mission Assurance Requirements
Document Written by SQE in Concert With MA
Team
SQE Reviews the Request for Proposal
Supplier Selection
Pre-award Assessment
Participate in Source Selection
6 Copyright 2005 Northrop Grumman Corporation
Early QA Involvement
Review & approval of Supplier/Subcontractor QA Plans
Conduct Sub-tier Supplier Assessment
Support Formal Reviews
SRR
PDR
CDR
TRR
PRR
Qualification Testing
Support Functional and Physical Configuration Audits
Conduct First Article Acceptance
Incoming Inspection Verification
In-Process Audit and Inspection Verification
7 Copyright 2005 Northrop Grumman Corporation
Supplier Development
Process Owner Reviews Supplier Monitoring
Sub Quality Current Mitigation
Failure Modes and Effects
Subcontractor Comment Mitigation Plan
Tier Survey Rating Rating
Analysis (FMEA)
Supplier A 1 Date Y G
Develop/Review Work
Supplier B 2 Y G
Instructions
3 R G
3 Y G
Define/Develop/Document 2
3
Y
Y
G
Critical Processes 3 R G
Assist in Obtaining ISO
R Major Compliance Issues Y Minor Compliance Issues G ISO Compliant
Supplier Audit IAW ISO9000/AS9100
Compliance Supplier Assessment and Certification
Revision: Initial Release
Section:
Overview
NGMS Certification
Supplier Name :
Date: March 10-11, 2004 Supplier Site :
Review and Verification
Audit Date
Total Possible
Supplier Self-
Assessment
NGMS Audit
NGMS Audit
Points
Points
Points
Points
Prime 19160 Form 260 Green Yellow Red
of Audit Results/Findings 4.0
5.0
6.0
Quality Management System
Management Responsibility
Resource Management
13
10
6
2
6
2
0
1
0
54
63
30
43
43
23
60
68
32
71.7%
63.2%
71.9%
7.0
Product Realization 10 1 0 41 32 44 72.7%
7.3
Design and Development 6 6 3 54 33 60 55.0%
7.4
Purchasing 11 3 3 56 42 68 61.8%
7.5
Production & Service Provision 15 1 2 60 50 72 69.4%
7.6
Control of Monitoring Measuring 8 1 1 40 27 40 67.5%
8.0
Measurement, analysis and improvement 16 1 2 71 52 76 68.4%
8.3
Control of Nonconforming Product 3 2 3 29 16 32 50.0%
8.4
Analysis of Data 3 0 0 12 9 12 75.0%
8.5
Improvement 7 2 3 44 28 48 58.3%
N/A
Foreign Object Elimination 0 0 0 0 0 N/A
ESD Program 17 0 1 72 66 72 91.7%
N/A
Software 0 0 0 0 0 N/A
Total Points
554 398 612
Scores = Total Points / Total Available Points 90.5% 65.0% 65.0%
Notes:
Suppliers Quality Management System has been properly documented in accordance with ISO 9001:2000
standards. Necessary Processes have been identified which pertain to their application throughout the
organization. Assessment results indicate several major and minor deficiencies in understanding and
meeting requirements, obtaining results of process improvement and effectiveness, and continual
improvement of process based on objective measurement.
NGMS Approval
8 Copyright 2005 Northrop Grumman Corporation
Supplier Monitoring
Surveillance Plan
Defines the Surveillance Program
Enforces the Mission Assurance Requirements
Surveillance Includes Mandatory Inspection Points
Production Processes
Focus on Process Improvement
Lean/Six Sigma
Quarterly Scorecard Input
Corrective Action
9 Copyright 2005 Northrop Grumman Corporation
Supplier Surveillance
•Surveillance Includes Periodic Audits
Periodic Audits Development Production
F = Frequent S = Seldom
Calibration System S S
Tool Control S S
Internal/External QA Audit results F F
Data Management S F
Configuration Management F F
Product Identification S S
Metrics and Metrics Analysis S F
Training Records S F
Procurement System F S
Corrective Action System F F
Supplier Management F F
MRB S F
10 Copyright 2005 Northrop Grumman Corporation
Supply Chain Management
Product Acceptance
Verification That All Items Are Being Delivered
Hardware, Software, Documentation, Test
Results, Spares, Data and Records
Verification That All Items Meet Contractual
Requirements
Item Built IAW the Documented System
All Requirements Are Verified
Records Are Available
As-Built Configuration Is Controlled
11 Copyright 2005 Northrop Grumman Corporation
Supply Chain Management
Product Acceptance Continued
Define Data Package
As-Built Configuration (Indentured Parts List)
Proof of Traceability Requirements Having Been Met
Open Action Items Are Documented
Non-Conformances are Properly Corrected
Waivers and Deviations are Documented
Incorporated ECP’s Are Listed
Review Build Paper
Recording of Critical Parameters
Certificate of Conformance Accompanied With Objective
Evidence
Incident Reports
12 Copyright 2005 Northrop Grumman Corporation
Supplier Management Works at IPIC
•
•
•• • •• ••• ••
•• • • ••
•••
• • •
••
~ 650 Prime WAWF Sell-offs per
year (multiple items & locations)
Summary
Early Participation in a Program
Mission Assurance Requirements
Document Accompanies Every RFP
Assessments are Accomplished Upfront
Surveillance Plans are Defined and
Followed
Product Acceptance/Delivery is Exhaustive
and is Unacceptable Without Objective
Evidence
Early Recognition of Supplier Development
Requirements
Manage the Complete Supply Chain
Lessons Learned are Liberally
Incorporated
IPIC SQA Provides High Confidence in Fielded Product
13 Copyright 2005 Northrop Grumman Corporation