KPI Review Activity Plan April 2021
KPI Review Activity Plan April 2021
INDICATOR
PLANT DEPT MELAK JOBSITE
Week
…
25April-01 Mei ‘21
17
REVIEW ACTIVITY PLAN
Apr-21
No Unit CN Detail Progress Est RFU Status PIC Perform
25 26 27 28 29 30 1
Apr-21
No DETAIL PROGRES Est RFU Status PIC Perform
25 26 27 28 29 30 1
Tri Nuryanto Plan X X X
1 Preventive Maintanance HD465-7R 27-Apr-21 OPEN
Joko Wahono Act O O O
Tri Nuryanto Plan X X X
2 Training Product Knowledge HD465-7R 01-Mei-21 OPEN
Joko Wahono Act O O
Purnomo Plan X X X X X X X
3 Penyusunan & Evaluasi QCC Over-Dump Langkah 1,2,3,4 01-Mei-21 OPEN
Eko Prastyo Act
Ivan Plan X X X X X X X
4 OJI Cek Tyre Pressure ke mekanik 22-Apr-21 OPEN
Fahrudin Act O O O O O O
EXECUTIVE SUMMARY
ACHIEVEMENT
PA PROJECT
Equipment Series Target PA Project Ach PA Plant Populasi Plan Run Act. RFU
DX800 -DX800 90% 96,1% 100,0% 96,1% 1 1 1,0
P C400 -P C400 90% 89,5% 99,4% 89,5% 5 5 4,5
P C300 -P C300 90% 65,9% 73,3% 65,9% 2 2 1,3
P C200 -P C200 90% 58,4% 64,9% 58,4% 2 2 1,2
GR ADER -Grader 90% 90,0% 100,0% 90,0% 2 2 1,8
D6R -D6R 90% 60,4% 67,1% 60,4% 4 4 2,4
D375 -D375 90% 0,0% 0,0% 0,0% 1 1 0,0
-Drilling 90% 98,0% 100,0% 92,7% 2 1 1,9
B lasting Eqp
-Anfo Mixer 90% 98,0% 100,0% 98,7% 2 1 2,0
HD465 -HD465 90% 82,0% 91,1% 71,3% 23 20 16,4
DT C OAL -Coal Hauler 90% 98,0% 100,0% 87,3% 11 7 9,6
-Water P ump 90% 98,0% 100,0% 99,2% 4 2 4,0
-Tower L amp 90% 98,0% 100,0% 98,3% 6 6 5,9
S uport Eqp
-Water Truck 90% 98,0% 100,0% 69,4% 3 2 2,1
-F uel Truck 90% 84,2% 93,6% 84,2% 3 3 2,5
OB LOADER
CN Number Target 25-Apr-21 26-Apr-21 27-Apr-21 28-Apr-21 29-Apr-21 30-Apr-21 1-May-21 Weekly
EX701 90% 97,8% 98,6% 98,6% 97,9% 97,9% 83,0% 83,1% 93,9%
EX437 90% 94,3% 98,6% 99,0% 98,9% 99,1% 99,0% 99,0% 98,3%
EX438 90% 99,0% 95,0% 68,8% 99,3% 80,2% 96,5% 41,0% 82,8%
EX439 90% 98,9% 99,0% 99,0% 99,0% 12,5% 16,3% 100,0% 74,9%
EX442 90% 99,0% 97,9% 99,6% 99,0% 91,7% 94,8% 97,8% 97,1%
EX446 90% 98,7% 99,0% 99,0% 36,8% 98,6% 88,1% 98,8% 88,4%
AVERAGE 90% 97,9% 98,0% 94,0% 88,5% 80,0% 79,6% 86,6% 89,2%
Plan Running OB LOADER 6,0 6,0 6,0 6,0 6,0 6,0 6,0 6,0
Actual RFU OB LOADER 5,9 5,9 5,6 5,3 4,8 4,8 5,2 5,4
Ach 98% 98% 94% 88% 80% 80% 87% 89%
400.0 80%
Brake 3
60%
300.0 55% 60%
51%
AC 6 525.0
42% 42% 42%
200.0 35% 40%
Engine 10
106.9
100.0 11% 20%
Wheel 13 136.1 111.4
93.9 86.5 60.0 54.8 50.5 35.0 41.5 41.5 41.5
0.0 10.5 0%
0 2 4 6 8 10 12 14
60
100% 100% 100% 100% 100% 100% 100% 100% 100% 98% 100%
Brake 3 100%
50
80%
AC 6 40
51% 72 60%
30 45%
Engine 10 40%
20
10 14%
Wheel 13 10 20 22 20%
0 0 0 5 9 10
0 1 2 2 4 0%
0 2 4 6 8 10 12 14 fo
M.
..
we
r ...
- PC
20
0
- PC
30
0
-PC
4 00
ate
r ...
- DX
80
0
Gra
de
r
al H
a...
- Dr
illin
g
- D6
R
el T
...
- HD
4 65
ter
T...
-An -To -W - - Co -Fu - Wa
97 % KEY CONCERN :
1. DZ310 Inpeksi kebocoran coolant, unit moving B.7
2. Progres re-o ring control valve EX442 – PIC Budi Santosa
KEY CONCERN :
SPEED UP INSTALL PART
85 %
DT415 Rp 2.095.000 HOSE DEMAND VALVE 2600 720000000508 810000000824 WAIT INSTALL
DT424 Rp 445.050 HOSE DEMAND VALVE WAIT INSTALL
DT426 Rp 125.000.000 OVERHOUL TORQUE ROD WAIT INSTALL
34 %
DT401 Rp 2.705.000 HOSE GREASE TENSIONER 5630 1000000369 8000000396 WAIT INSTALL
DT402 Rp 7.195.000 BUSHING SUSPENSI REAR 5333 1000000324 8000000319 WAIT INSTALL
DT405 Rp 1.000.000 GLASS LEVEL COOLANT 5357 1000000328 8000000294 WAIT INSTALL
DT405 Rp 4.390.000 WIPER TANK ASSY 5383 1000000379 8000000350 WAIT INSTALL
DT411 Rp 83.810.000 RESEAL REAR SUSPENSION 3378 1000000203 8000000167 WAIT INSTALL
DT413 Rp 81.352.000 RESEAL FRONT SUSPENSION 3382 1000000204 8000000168 WAIT INSTALL
DT413 Rp 4.390.000 WIPPER TANK ASSY 5957 1000000395 8000000410 WAIT INSTALL
DT418 Rp 3.420.000 HOSE OIL ENGINE FILTER 3511 1000000399 8000000378 WAIT INSTALL
MEI
No Unit CN Detail Progress Est RFU Status PIC Perform
2 3 4 5 6 7 8
EX437 PS1000, RESEAL TRACK ADJUSTER Purnomo Plan X
1 CLOSE OPEN
Fajar TU Act O
EX701 PS250, REPLACE HORN Purnomo Plan X
2 02-Mei-21 CLOSE
Fajar TU Act O
EX217 PS500, RESEAL TRACK ADJUSTER Purnomo Plan X
3 04-Mei-21 OPEN
Fajar TU Act
DZ033 PS1000 Purnomo Plan X
4 05-Mei-21 OPEN
Fajar TU Act
EX442 PS500, RESEAL TRACK ADJUSTER 06-Mei-21 Purnomo Plan X
5 OPEN
Fajar TU Act
EX217 PS500, RESEAL TRACK ADJUSTER 07-Mei-21 Purnomo Plan X
6 OPEN
Fajar TU Act
DZ033 PS1000 07-Mei-21 Purnomo Plan X
7 OPEN
Fajar TU Act
DZ028 PS750 Purnomo Plan X
8 08-Mei-21 OPEN
Fajar TU Act
DT415 PS1000, FLUSHING HYDRAULIC Purnomo Plan X
9 04-Mei-21 OPEN
Fajar TU Act
DT410 PS1000, REPLACE HOSE CYLINDER Purnomo Plan X
10 05-Mei-21 OPEN
Fajar TU Act
ACTIVITY PROGRESS
DT414 DT426
Repair bracket torque rod RLH ~ RFU 30 April ‘21 OVH Final Drive RH&LH ~ ERFU 10 Mei ‘21
ACTIVITY PROGRESS
Detail:
1 2 3
ACTIVITY PROGRESS
DT415
Flushing oil hydraulic
TYRE REPORT
10
24.00-35 24.00R35
TYRE SCRAP
LIFETIME
Key Finding
• Lokasi unit di BK 30 menjadi kendala tidak tercapainya DM Tyre
• Pencapaian tertinggi DM tyre : 125% pada tanggal 29 April 2021
• Pencapaian terendah DM tyre : 50% pada tanggal 28 April 2021
• Achievement Monthly DM tyre dari segi kualitas pressure yaitu
92.83%
Key Concern
• DT415 Pos 4
27 April 21 • Goodyear 0417JC060
• Hm Tyre 6589
• Km Tyre 72479
• Problem : Sidewall Cut
Key Finding
• Analysis : Cut akibat material tajam dan
terus melebar akibat over flexing
• Kasus scrap terbanyak adalah sidewall cut
• Sidewall cut banyak terjadi di tyre radial
Key Concern
• DT416 Pos 4
28 April 21 • Bridgestone S5k1F0025
• • Hm Tyre 9390
Meningkatkan qualiatas DM tyre
• • Km Tyre 103290
Melaksanakan schedule rolling tyre untuk mengantisipasi unscheduled
• Problem : Separation to explotion
B/D tyre
• • Analysis : Over Speed Travel
Road Patrol
TYRE PICA
PICA
Problem Cause Corrective - Preventive Action PIC Do Date Status
HD Menginjak bolder
MAN Operator tidak memperhatikan kondisi jalan Training untuk meningkatkan kesadaran akan
Pengereman mendadak sering terjadi TDC 1-May-21 Open
kondisi jalan dan tyre
Memaksakan Slip saat manufer Kurangnya kesadaran akan kondisi tyre
Pengajuan 2 MP Tyre untuk Daily pressure
Manpower backup Unschedule Riawan 1-May-21 Open
check
METHODE Daily Pressure Check tidak tercapai
Pengalokasian CP dan CT untuk Daily pressure
Ketercapaian Daily Pressure check blok 16 rendah Ivan A 1-May-21 Open
check
Tyre premature Scrap Karakteristik tyre bias yang getas Analysis brand dan jenis tyre yang efisien 1-May-21 Open
Fakhrudin A
MATERIAL
Rolling menggunakan tyre baru melebihi plan Stategi repair baru dieksekusi tanggal 9 April 2021 Pelaksanaan Repair Tyre oleh BJS Ivan A 9-Apr-21 Close