Existing Treatment Plants and Dumping Sites

The document summarizes waste management plans in Ahmedabad, including: 1) There are several waste processing plants and landfill sites near the city, including large C&D and composting plants. 2) The old and new landfill sites are located southwest of the city to avoid prevailing westerly winds. 3) The AMC plans to set up two waste converter machines at Victoria Garden and Kankaria to produce compost from green waste and religious offerings, reducing dumping at Pirana landfill. 4) The machines would process 1-2 tons of waste per day into compost at a cost of Rs. 11-4.5 lakhs respectively. This would divert over
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
164 views2 pages

Existing Treatment Plants and Dumping Sites

The document summarizes waste management plans in Ahmedabad, including: 1) There are several waste processing plants and landfill sites near the city, including large C&D and composting plants. 2) The old and new landfill sites are located southwest of the city to avoid prevailing westerly winds. 3) The AMC plans to set up two waste converter machines at Victoria Garden and Kankaria to produce compost from green waste and religious offerings, reducing dumping at Pirana landfill. 4) The machines would process 1-2 tons of waste per day into compost at a cost of Rs. 11-4.5 lakhs respectively. This would divert over
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd

Landfill Sites – Comprehensive

Existing Treatment Plants and Dumping Sites Development Plan 2021


Type of Quantity Plant capacity Inferences:
Sno. Process technology Plant location
Waste (tpd) (TPD) • There is are Concentration of Three Processing plants Near to the Landfill Site- Gyaspur. Which are of Ahmedabad Enviro -
Material Recovery Nepra material Recovery Cand D waste -1000 TPD, Bharuch Enviro Infrastructure Ltd.- Windrow Composting- 300 TPD- Wet Type, Nepra material
1 Dry 100 100 Recovery Facility- Material Recovery Facility- 100 TPD , and Jindal Urban Waste Management Ltd.
Facility Facility
Material Recovery • The Old and the New Landfill sites are on the Southwest and South of AMC Boundary, as the city has south-west Monsoon
2 Dry 100 VASTRAL RTS 100
Facility wind Direction, The Prevailing wind is most often from the west for 7.0 months.
Material Recovery • In the Centre of the city Victoria Garden ; Waste to Compost of which Windrow Composting Processes wet type with 1 TPD
3 Dry 100 VATVA RTS 100
Facility capacity.
Material Recovery
4 Dry 100 SHAHWADI RTS 100
Facility
Material Recovery
5 Dry 100
Facility
SOLA RTS 100 Map of Plant location and Dumping sites
Material Recovery The Ahmedabad Municipal Corporation (AMC) has now come up with a novel solution to
6 Dry 100 KANKARIA RTS 100
Facility C and D WASTE reduce large quantities of green waste dumped at Pirana. The civic body will
Material Recovery Windrow Composting set up waste converter machines at Lokmanya Tilak Garden (Victoria
7 Dry 100 Naroda 100
Facility Garden) and Kankaria to produce compost out of green waste. The two
Material Recovery Facility
8 Wet 300 Windrow Composting Excel Industries 300 Dump Sites machines would be set up under a pilot project based on public private partnership
(PPP) model and the civic body would bear the maintenance cost.
Bharuch Enviro Around 40 tons of these religious offerings are generated and dumped and
9 Wet 300 Windrow Composting 300
Infrastructure Ltd.
would be used to make compost. Also, the garden waste collected from the
Creative Eco Recycle
10 Wet 400 Windrow Composting 400 city sums up to 600 kg daily. “The waste from gardens, religious offerings, Jamalpur
Port Pvt. Ltd.
11 Dry 1000 C and D WASTE Ahmedabad Enviro 1000 flower and vegetable market will be around 1.5 tons, which will not be
Victoria Garden ; Waste dumped at the Pirana landfill site, but will be processed”.
12 Wet 1 Windrow Composting 1
to Compost

The machine to be set up at the garden will have the


Victoria Garden capacity to process two tons of waste at a
Inferences: time at a cost of Rs11 lakh. On the other hand,
• The Red Highlighted are Not Spatially Found and the Highest Capacity the machine to be set up at Kankaria will
KANKARIA cost Rs4.5 lakh, which will have the capacity of a
Processing Plants. ton. The civic body plans to process 1,300 kg
RTS
• There is one C and D waste Processing Plant by Ahmedabad Enviro in the South of waste a day, out of which the output will
West of the AMC. VASTRAL RTS be 35 per cent.
AMC Dump Yard “They intend to have 7-8 batches in a day, • Dnaindia
each processing 150 kg. Each batch will take • Timesofindia.
35 minutes to produce compost,” • CEPT Portfolio M 2017
• Smart city- Ahmedabad
• Solid Waste
SOLA RTS
Management System in
Naranpura Dump Yard
Ahmedabad City – 2013
VATVA • Ahmedabad Municipal
RTS Corporation- Sanitary
Landfill Site
Ahmedabad Enviro Aslali Ambuja Dump • Google Earth
Bharuch Enviro Infrastructure Ltd.
Nepra material Recovery Facility
Jindal Urban Waste Management Ltd.
Existing Treatment
Plants and Dumping
Land Fill Site- Gyaspur Excel Industries Sites
• Capacity = 11.50 Lacs Metric Tones (i.e. 1.15
million tones), where daily off load 500 metric
Pirana Landfill Site KANKARIA RTS
tones of inert waste from waste processing
plants for coming 6 years.
• Total area used is 12.88 Hectares (32.8271 Kankaria Lake was constructed in 1451 by Sultan Qutb-
acres). ud-Din. The lake has a circumference of around 1.4 miles. A
• Total construction cost of this site is Rs 13 lakefront was developed in 2008 by spending Rs 36 Crore
Crores (i.e. Rs 130 million / i.e. $ 2.796 million which has many public attractions like Zoo, Toy Train,
1$=Rs 46.50). Kids City, Tethered Balloon Ride, Water Rides and Water
• Average size of shell = 262 m x 239 m = Park, Food Stalls and entertainment facilities.
62,618 Sq. M. (redesigned).
• Height of shell = 21.0 m – 8.0 m below G/L • Legacy Solid Waste is
(clear depth) + – 6.0 m above G/L in earthen being disposed &
bunds + – 7.0 m above earthen bunds in heap accumulated at Pirana
form HDPE Liner 1.5 mm thick. dumping site having total
• Air Space volume available for waste
area of about 84 acres for Geddam Renuka Sai
• accommodation = 13.45 Lacs CMT GuruCharan Chhabra
a long back.
• Density of compacted waste = 0.85 MT/CMT.
Matta Arunima Rao
• 65 acres of land is accumulated with heaps of garbage having 15-20 meter height at various Shreya Singhal
locations.
Steps involved in developing an Infrastructure Plan Key Components of an Infrastructure Plan – SWM. Components of Detailed Project Report for Key Components of Detailed Project Report
Step 1: Assessment of current situation – City Profile SWM project INTRODUCTION
• Location, Demography, Economic drivers, MSWM process/cycle, Socio-Spatial Analysis, • PROBLEM, STATUS, PRESENT, CONTEXT
Current status of disposal/landfill/WTE Plant sites, Technology being used, ongoing All infrastructure-based facilities require the preparation of a DPR • OBJECTIVES, SCOPE
initiatives, Technology being used, Characteristic features of the city. Secondary, Primary with sufficient details to ensure appraisal, approval, and subsequent • AREA
and Ward level Data analysis. implementation of the project in a timely and efficient manner. The
major sections that should be covered in a DPR are: PROFILE OF IEEJA ULB
• Aligned to other Plans of the city – CDP, Master Plan, etc.
• LOCATION, CLIMATE, PHYSIOGRAPHY
• Institutional and Financial Setup- Agencies, Functions and Roles, Municipal Finances – Cost
• PLANNING AREA, DEMOGRAPHIC PROFILE, TRADE AND COMMERCE,
Recovery Assessment SECTOR BACKGROUND, CONTEXT, AND BROAD PROJECT PHYSICAL PLANNING AND GROWTH ASPECTS
RATIONALE; ASSESSMENT OF EXISTING SWM
Step 2: Service Delivery and Performance Gap Assessment – Identification of problem areas PROJECT DEFINITION, CONCEPT, AND SCOPE; • SOURCES OF MSW, MSW CYCLE- COMPONENTS
• Identify stakeholders, indicators and examine present condition against SLBs/URDPFI • INSTITUTIONAL PROFILE
norms, Issues, Potentials, and Constraints INSTITUTIONAL FRAMEWORK FOR IMPLEMENTATION; • DEFICIENCY ANALYSIS
• Identification of critical problem areas WASTE QUANTIFICATION AND CHARACTERIZATION
• Environmental, Social and Cultural Concerns RESOURCE REQUIREMENTS – LAND, CAPITAL, MACHINERY,
• QUANTIFICATION OF WASTE – SURVEY, LANDUSE WISE, SUMMARY,
AND STAFFING; EFFICIENCY, FUTURE TRENDS, COMPOSITION OF WASTE
Step 3: Projections and Vision setting, Strategies and Recommendations
PROJECT COST – LIFECYCLE COST ASSESSMENT; PLANNING FOR IMSWM SYSTEM IN THE ULB
• Future Projections – Population forecast, Change in socio-economic status Organizations
• Institutional and Financial structuring/Models • POPULATION PROJECTIONS, PERCAPITA WASTE GENERATION AND
FINANCIAL STRUCTURING; PROJECTION Academic/ Private
• Assess various Technological solutions- Material Recovery Facility, Composting, Waste to ThinkTank Government NGOs Compani
• MSWM PLAN, CLUSTER APPROACH – WASTE QUANTITY AND QUALITY,
Energy, Incineration, Bio methanation, RDF, Sanitary Landfill, etc s es
PROJECT PHASING; TRANSPORTATION, AREA AVAILABILITY, NIMBY, OWNERSHIP, FORM OF
• Availability and Suitability of Land for Processing and Disposal or other alternative WASTE TRANSPORTED, CONCEPT PLANNING – GADWAL CLUSTER Municipal
strategies IIM, SAAT Smart
PROPOSED SW COLLECTION AND TRANSPORTATION PLAN Commissioner
OPERATION AND MAINTENANCE (O&M) FRAMEWORK AND Ahmedabad H City Ltd
• Short term and Long term plans and strategies to improve service delivery , AMC
FINANCIAL IMPLICATION; DESIGN AND PLANNING OF TREATMENT PLANT KKPK EcoSkipp
PROJECT FINANCIAL VIABILITY; CEPT CEA, AUDA
P er
Step 4: Implementation and Financial Phasing Plan PLANNING AND DESIGN OF SANITARY LANDFILL
Amdavad
• Critical problem areas PROJECT SUSTAINABILITY – SOCIAL AND PROJECT COSTING AILSG CCP, AMC SEWA Enviro
• Short term, Mid term and Long term strategies ENVIRONMENTAL; AND Pvt Ltd
IEC
Data Required for the preparation of a of Detailed Project Report PROJECT BENEFITS ASSESSMENT – ENVIRONMENTAL AND HOD of Solid
SOCIO-ECONOMIC ENVIRONMENTAL MONITORING PLAN Waste
NSWA
for SWM Project BENEFITS, RESOURCE INTENSITY, ETC. • AIR POLLUTION, ODOR CONTROL, FLORA AND FAUNA, SLUDGE NEERI Management
I
UMC
Department,
MANAGEMENT, LANDFILL CAPPING, OCCUPATIONAL HEALTH MANAGEMENT,
AMC
FIRE PROTECTION SYSTEM, GREEN BELT DEVELOPMENT,
IIT CPCB/SPCB    
DATA CHECKLIST NIUA
CGWB/
SGWB
   

Key Components of Detailed Project Report, IEEJA NP, Gadwal, Telangana Type of data Data
  Ward Offices    
S.No. Indicators Data available
existing
Format Maps Will be used for the Analysis of-
Availability

Journal/ Waste generation (Land use CDP 2021 draft / Percapita waste generation/ Growth
Latest data
S.No. Paper/Report Year Case Study Source 1 2011 Zone wise   2022 not
Website wise) (Waste typology) CSP 2012 Report pattern
DPRs available
Draft DPR on Feedback IEEJA Nagar Panchayat, Gadwal https://tspcb.cgg.gov.in/
1 2017
MSWM Infra District Telangana DPRs/Ieeja%20Draft%2
0DPR%20(27.10.17).pdf Require
Waste collection and CDP 2021 draft / Frequency of cleaning, methods, permission to • MSWM Manual, SBM, Ministry
2 2011 Zone wise  
Segregation CSP 2012 Report coverage and Strategies access the data of Urban Development, 2016
online.
• Dpr, Ieeja, Gadwal, Telangana,
Require
2017, Feedback Infra.
CDP 2021 draft / permission to
3 Storage and Transportation 2011 Zone wise
CSP 2012 Report
  Gap b/w demand and supply service
access the data
online.

Latest data
Handling waste (Processing, CDP 2021 draft /
4 Dumping, Disposal etc)
2011 Zone wise
CSP 2012 Report
  Gap b/w collection and processing. 2022 not
available

CDP 2021 draft / latest technologies, investments,


5 Treatment methods 2011 Zone wise
CSP 2012 Report
 
management models, outcomes
 

Equipment availability, Vehicles used, Latest data


6
Staffing, Equipments, Finance
2011 Zone wise
CDP 2021 draft /
  Staff reuirements, Revenue and 2022 not Steps Involved in Infrastructure
and Management CSP 2012 Report
Expenditures. available Plan and DPR’S and Their
Government
Components, Data check List
reports and
7 New initiatives - R & D 2022 city
Ministries
na future development  
Websites
existing and projected gaps and
8 issues
2011 Zone wise Report na    

Government
reports and current status, impact, gaps, issue
9 ongoing inititives and proposals 2022 city
Ministries
na
identification
 
Websites

performance as per norms. Latest data not


10 (SLBs, CPHEEO)
2011 Zone wise Report na  
available

Identify the capacity of the existing


Location and features of landfill, impact on the surroundings,
11 Landfill sites
2022 city Report  
economic value associated with, suggest
 
alternatives if required

12 Pollution Data 2022 city Report na Impact on Environment  


Landuse Map - Slums, Natural AUDA/AMC
13 2022 city   Impact on Lived and Built Space  
features website Geddam Renuka Sai
Area 8 sq.km
SDGs, Swach Sarvekshan,
Ministries Understand city's performance in SWM,
GuruCharan Chhabra
14 Liveability Index, Quality of 2022 city na  
Population 27921 Life Index
Websites Quality of life in land fill vicinity Matta Arunima Rao
Prominence Heritage site
Shreya Singhal
SWM specific DPRs of Understand the critical areas to resolve
15 Ahmedabad
na na Report na
issues and improve SWM
Not Available