Digital 4.
0 & MES system
Saut
Digital 4.0 & MES system
Signal tower control box introduction
1. How the network scheme being setup from each station for
the MES?
It can set the IP of each work table and
IPC Touch Win7
communicate with MES automatically.
(Use pre-heating IPC)
Digital 4.0 & MES system
Signal tower wiring schematic
1. How the network scheme being setup from each station for
the MES?
Digital 4.0 & MES system
MES with production line communication
1. How the MES able to get all data from Hi-Pot, Pre-heating,
FT, Final Visual, and Rubber Checking? What is the software
developed?
MES server
Network Network Network Network
Network wire wire wire wire
wire
Network
wire
Auto pre- Weighing
Hi-pot tester Function tester Final check Packing system
heating system
Remark:
[Link] automatic machines have software that can upload the data to MES server.
2. The final check would get the test result of hi-pot, pre-heating & function test from MES server.
3. The MES software have been developed by supplier in Factory.
4. For further software information, you need to contact PIC.
Digital 4.0 & MES system
1. What is the hardware that you use for WI Display? Are you
using a Computer or Visual Desktop? (1 server for few
clients)
We use IPC: integrated personal computer at WIK SZ.
Digital 4.0 & MES system
MES WMS
server
KANBAN
Line Line Hi-pot Auto pre- Function Final Weighing Packing
status status tester heating tester check system system
Digital 4.0 & MES system
Line Status
A system with an interface module installed in key process station to indicate the status of the station and material’s status.
Material status is integrated with the KANBAN system which is came along with the MES server. Line status equipped with 2 LED
light installed on top of the station, red and green.
Station run normally
MES
Station abnormal due
to quality issue
Station running out KANBA
of material (shortage) N