Time and Cost Management in Construction

Adequate pressure should be available in distribution mains at all points located even at the most

Uploaded by

myarlay17
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views12 pages

Time and Cost Management in Construction

Adequate pressure should be available in distribution mains at all points located even at the most

Uploaded by

myarlay17
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd

1

WELCOME TO MY PRESENTATION
2
TECHNOLOGICAL UNIVERSITY ( TAUNGGYI )
DEPARTMENT OF CIVIL ENGINEERING

TIME AND COST MANAGEMENTS FOR


TWO UNITS FIVE STORIED R.C BUILDING

Title Defense
Graduation Thesis
Presented By
1 Ma
Aye Aye Soe
6C-29
3

Title - Time and Cost Management of Two Units Five Storied


R.C Building

Option - Construction Management


4 OUTLINE OF PRESENTATION

 Introduction
 Objectives
 Scope
 Methodology
 Outline of Thesis
 Implementation Plan
Introduction
5
 A construction project contain great deals, times and expense, so close
management is required if they are to be completed within a time and cost
constrains.

 A construction project is called a successful if it fulfils the requirement


regarding fitness for purpose completed on time, within budget,
profitability of contractor, absence of claim and court proceedings.

 In construction industry the main use of time cost management is to


ensure the project complete on time within budge and achieve other
project objectives.
6
Objectives

 To improve management control system of a construction project by


keeping the project on time and on budget.

 To enable one to know beforehand the cost of work.

 To manage proper planning of funds for construction.

 To reduce time & cost of construction project and help the project
to reach their predefined time and cost.
7 Scope
The purposed building is considered only the civil work of two
units five storied R.C building.

In this thesis for management is considered for foundation to


finishing work and is not included mechanical, electrical and
plumbing work.

Detailed of measurements, builder’s estimate, bill of quantity


and abstract of cost is calculated based on the local current
price.
8

Time and cost management by using Critical Path Method


(CPM) and Gantt Chart (or) Bar Chart Method by using Microsoft
Project Software.
9 Methodology
Estimating by
- Detailed of measurements,
- Builder’s estimate,
- Bill of quantity &
- Abstract of cost
Time and Cost Management by
- Critical Path Method (CPM) &
- Gantt Chart (or) Bar Chart Method by using Microsoft Project
Software
10 Outline of Thesis

CHAPTER (1) - INTRODUCTION

CHAPTER (2) - BACKGROUND THEORY

CHAPTER (3) - DATA PREPARATION AND PROCEDURES

CHAPTER (4) - ESTIMATING AND PLANNING MANAGEMENT

CHAPTER (5) - DISCUSSION, CONCLUSION AND

RECOMMENDATION
11
Implementation Plan

 Study on background theories


 Data collection and preparation
 Estimating
 Time and cost planning
 Discussions and conclusions
12

THANK YOU