LEU stands for _____________________
Low Enriched Uranium
3/9/2012
Enrichment of LEU fuel at PARR-1 is ______________
19.99 %
3/9/2012
Strength of neutron source being used at PARR-1 is ______________
107 n/sec
3/9/2012
Thermal column is an assembly of ______ Stacked in ___________
Graphite slabs Aluminum chamber
3/9/2012
The rabbit travel speed to and from the reactor is ____________.
10-13 m/sec
3/9/2012
The max. weight of the sample including the rabbit is limited to ___________.
400 g
3/9/2012
Max. neutron flux is available at ______________
C-7
3/9/2012
Drainage of beam tube from filled position Adds _________ reactivity to the core.
Negative
3/9/2012
Radial beam tubes terminate at about ____ from the reactor core.
7 mm
3/9/2012
No of beam tubes installed in the stall end ________ .
3/9/2012
10
When not in use, the beam tubes are plugged with __________ and filled with __________.
Sheilding blocks (Plugs) water
3/9/2012
11
PARR-1 achieved first criticality on ______________
Dec 21, 1965
3/9/2012
12
The coolant at PARR-1 is ______________.
Demineralized water
3/9/2012
13
The top of the reactor core is shielded by
Water which is ______ m thick above the fuel elements.
3/9/2012
14
Primary purpose of Hold-up tank is :
Decay of short-lived activity
3/9/2012
15
How many control rods are present in PARR-1 and what are they made of?
FIVE, Ag-In-Cd
3/9/2012
16
Safety flapper opens at flow rate ____.
200
m3/h
3/9/2012
17
At PARR-1, at what condition, ECCS
starts ?
When
pool level drops by 1 m
3/9/2012
18
Primary coolant flow-rate for full power operation
950 m3 /hr
3/9/2012
19
Shutdown Margin ________ towards the end of cycle.
INCREASES
3/9/2012
20
Speed of the rabbit sample depends upon
Weight of the sample
3/9/2012
21
Volume of Reactor Pool is approximately
500 m3
3/9/2012
22
During full power operation, T across the core is maintained at ______ C
8.5
3/9/2012
23
Amount of Uranium in one S.F.E
1450 gm
3/9/2012
24
U-235 content of each fuel plate
12.6 gm
3/9/2012
25
Energy produced in 24 hours operation at full power is __________ MWd.
10
3/9/2012
26
A core just critical in open end will be _________ in the stall end.
supercritical
3/9/2012
27
All fuel plates have same clad thickness.
False
3/9/2012
28
Neutron source is taken away from the core when reactor power reaches ____ .
10 kW
3/9/2012
29
First high power core _______ Fuel elements.
consisted
of
22
3/9/2012
30
Irradiation time of rabbit sample is limited to _____________ minutes.
60
3/9/2012
31
In-core irradiation sites are located at Grid positions _________ & _________.
C-7 & C-4
3/9/2012
32
Experimental facilities available at PARR-1 For Neutron Irradiation are:
Beam Tubes Thermal column Pneumatic rabbit systems In-core irradiation sites
3/9/2012 33
Safety flapper is kept ___________ during Reactor operation at power < 100 kW
OPEN
3/9/2012
34
Coolant velocity through the fuel elements ________ as more fuel elements are added in the core.
decreases
3/9/2012
35
Burn-up of a fuel element is defined as:
% U235 consumed of the Initial content.
3/9/2012
36
Amount of U-235 consumed in one fuel cycle is _____________.
520 g
3/9/2012
37
Average burn-up of the equilibrium core at BOC is approx. _____________.
22 %
3/9/2012
38
Hot cell is designed for handling of ______ radioactivity.
1000 Ci-Mev
3/9/2012
39
Up-to _______ fuel elements can be placed in front of the window of gamma cell.
3/9/2012
40
Excess reactivity in the core is zero when reactor is in critical state.
False
3/9/2012
41
Amount of U235 in the equilibrium core of PARR-1 at BOC is approximately __________ grams.
7200
3/9/2012
42
Amount of U235 in the equilibrium core of PARR-1 at EOC is approximately .__________ grams.
6680
3/9/2012
43
Major components of PCS are:
Reactor Pool Core Outlet piping & valves Hold-up Tank Primary Pumps Heat Exchangers Inlet Piping & valves
3/9/2012 44