Electrificación Rural en Pachiza
Electrificación Rural en Pachiza
ITEM DESCRIPCION
INSTALACIÓN DEL SISTEMA DE ELECTRIFICACIÓN RURAL MEDIANTE REDES CONVENCIONALES EN LAS LOCALIDADES DE MARISOL Y NUEVO
PROYECTO :
CHIMBOTE, UBICADOS EN EL DISTRITO DE PACHIZA, PROVINCIA DE MARISCAL CACERES, DEPARTAMENTO DE SAN MARTÍN.
DEPARTAMENTO : SAN MARTIN
PROVINCIA : MARISCAL CACERES (1) LP DOS DE MAYO - NUEVO CHIMBOTE
DISTRITO : PACHIZA (2) LP DERIVACION A MARISOL Oct-16
METRADO PARCIAL METRADO COSTO
PROYECTO
INSTALACIÓN DEL SISTEMA DE ELECTRIFICACIÓN RURAL MEDIANTE REDES CONVENCIONALES EN LAS LOCALIDADES DE MARISOL Y NUEVO
CHIMBOTE, UBICADOS EN EL DISTRITO DE PACHIZA, PROVINCIA DE MARISCAL CACERES, DEPARTAMENTO DE SAN MARTÍN.
DEPARTAMENTO SAN MARTIN
PROVINCIA MARISCAL CACERES
DISTRITO PACHIZA
METRADO COSTO
S/.
3.01 AISLADOR DE PORCELANA TIPO PIN, CLASE ANSI 56-3 u 40 58.46 2,338.40
###
3.02 AISLADOR POLIMERICO CON CONEXIÓN HORQUILLA (ESTRUCTURA) Y LENGÜETA (LINEA) DE 36 KV, SEGÚN ESPECIFICACION TÉCNICA. u 43 198.52 8,536.36
###
3.03 ESPIGA DE AºGº DE 609 mm LONG.,PARA CABEZA DE POSTE Y AISLADOR ANSI 56-3 u 40 34.81 1,392.40
###
3.04 ESPIGA DE A° G° PARA CRUCETA Y AISLADOR ANSI 56-3, DE 381 mm LONGITUD u 0 30.97 0.00
###
5.01 VARILLA DE ARMAR PREFORMADA SIMPLE PARA CONDUCTOR DE 35 mm2 u 31 6.52 202.12
###
5.04 GRAPA DE DOBLE VIA DE ALUMINIO PARA CONDUCTOR DE 35 mm2 u 17 4.67 79.39
###
5.05 GRAPA DE DOBLE VIA DE ALUMINIO PARA CONDUCTOR DE 70 mm2 u 4 8.49 33.97
###
5.07 AMORTIGUADOR DE VIBRACION TIPO ESPIRAL PARA CONDUCTOR DE 35 mm2 u 48 40.97 1,966.56
###
5.08 AMORTIGUADOR DE VIBRACION TIPO ESPIRAL PARA CONDUCTOR DE 70 mm2 u 8 45.71 365.68
###
6.01 CONDUCTOR DE COBRE RECOCIDO, CABLEADO, DE 16 mm2, PARA PUESTA A TIERRA m 521 4.54 2,365.34
###
7.04 PERNO DE A°G° DE 16 mm ø x 305 mm, PROVISTO DE TUERCA Y CONTRATUERCA u 3 7.00 21.00
###
7.05 PERNO DE A°G° DE 16 mm ø x 254 mm, PROVISTO DE TUERCA Y CONTRATUERCA u 80 7.16 572.80
###
7.06 PERNO OJO DE A°G° DE 16 mm ø x 254 mm, PROVISTO DE TUERCA Y CONTRATUERCA u 30 7.16 214.80
###
7.07 PERNO DE A°G° DE 13 mm ø x 254 mm, PROVISTO DE TUERCA Y CONTRATUERCA u 3 4.73 14.19
###
7.08 SOPORTE SEPARADOR DE CABEZA DE POSTE DE AºGº, 110 mm SEPARACIÓN, PLATINA 76x6,4 mm SECC. u 0.00
###
7.11 PERNO COCHE DE AºGº, 13 mm Øx152 mm LONG., CON ARANDELA, TUERCA Y CONTRATUERCA u 3 3.60 10.80
###
7.12 BRAZO SOPORTE (RIOSTRA) DE PERFIL ANGULAR DE AºGº 38x38x5 mm; 710 mm LONG. u 3 22.24 66.73
###
7.14 ARANDELA CUADRADA CURVA DE A° G°, 57 x 57 x 5 mm, AGUJERO DE 18 mm ø u 134 1.41 188.94
###
7.15 PLANTILLAS PARA IDENTIFICACIÓN Y/O CODIFICACIÓN DE POSTES (PELIGRO, IDENTIFICACIÓN Y/O CODIFICACIÓN Y FASES) u 51 36.47 1,860.21
###
8.03 VARILLA DE ANCLAJE DE A° G° DE 19 mm ø x 2,40 m, PROVISTO DE OJAL GUARDACABO EN UN EXTREMO; TCA Y CTCA EN EL OTRO u 37 32.66 1,208.42
###
8.07 ARANDELA DE ANCLAJE, DE A° G°, 102 x 102 x 6,35 mm, AGUJERO DE 18 mmø u 37 4.11 152.25
###
ABRAZADERA DE 4 SECTORES PARA RETENIDA, DE 75 MM DE ALTURA, 6,35 MM DE ESPESOR Y 70 KN DE RESISTENCIA. DIÁMETRO SEGÚN
8.08 u 37 45.07 1,667.59
###
DIMENSIONES DEL POSTE, INCLUYE 4 PERNOS DE 12,7 MM Ø X 63,5 MM Y 4 ARANDELAS
8.09 BLOQUE DE CONCRETO DE 0,40 x 0,40 x 0,20 m u 37 32.52 1,203.24
###
8.10 AISLADOR POLIMERICO CON CONEXIÓN HORQUILLA (ESTRUCTURA) Y LENGÜETA (LINEA) DE 36 KV, SEGÚN ESPECIFICACION TÉCNICA. u 37 71.20 2,634.40
###
9.03 CAJA REGISTRO DE CONCRETO PARA PUESTA A TIERRA 0,50x0,50x0,45 m u 3 44.81 134.43
###
9.04 PLANCHA DOBLADA DE COBRE PARA TOMA A TIERRA DE ESPIGAS Y/ O PERNOS u 0 8.35 0.00
###
9.05 CONECTOR DE COBRE TIPO PERNO PARTIDO PARA CONDUCTOR 16 mm² u 8 5.22 41.76
###
9.07 CONECTOR DOBLE VIA BIMETALICO PARA CABLE DE ACERO DE 10 mmØ Y Cu DE 16 mm2 u 0 7.96 0.00
###
10.01 SECCIONADOR FUSIBLE UNIPOLAR TIPO EXPULSION (CUT-OUT) DE 27/38 KV, 100A, 150KV-BIL. u 3 333.36 1,000.08
###
1.01 REPLANTEO TOPOGRÁFICO, UBICACIÓN DE ESTRUCTURAS DE LINEAS PRIMARIAS. INCLUYE PLANOS DE CONCESIÓN RURAL km 10.55 793.11 8,368.10
###
1.03 ESTUDIO DE COORDINACION DE LA PROTECCIÓN Y BALANCE DE CARGAS glb 1.00 3,531.25 3,531.25
###
1.04 PROGRAMA DE MONITOREO AMBIENTAL (INCLUYE LP, RP Y RS) km 10.55 394.57 4,163.07
###
1.05 MONITOREO ARQUEOLÓGICO E INSPECCIÓN DEL INC (LP, RP, Y RS) km 10.55 355.34 3,749.20
###
PROYECTO
INSTALACIÓN DEL SISTEMA DE ELECTRIFICACIÓN RURAL MEDIANTE REDES CONVENCIONALES EN LAS LOCALIDADES DE MARISOL Y NUEVO
CHIMBOTE, UBICADOS EN EL DISTRITO DE PACHIZA, PROVINCIA DE MARISCAL CACERES, DEPARTAMENTO DE SAN MARTÍN.
DEPARTAMENTO SAN MARTIN
PROVINCIA MARISCAL CACERES
DISTRITO PACHIZA
METRADO COSTO
S/.
TRANSPORTE DE POSTE DE A° G° OCTOGONAL DE 12 - 300, EMBONABLE (02 MODULOS), DESDE ALMACEN (MARISOL) HASTA LUGAR CERCANO AL
2.05 u 12.00 133.31 1,599.72
###
PUNTO DE IZAJE, POR EL RIO HUAYABAMBA - E 01 HASTA E 31.
TRANSPORTE DE POSTE DE A° G° OCTOGONAL DE 12 - 300 DESDE ALMACEN (MARISOL) HASTA LUGAR CERCANO AL PUNTO DE IZAJE, POR TROCHA
2.06 u 12.00 161.25 1,935.00
###
CARROZABLE - E 32 HASTA E 45 Y LP DERIVACION A MARISOL
2.07 TRANSPORTE DE POSTE DE A° G° OCTOGONAL DE 12 - 200, EMBONABLE (02 MODULOS) A PUNTO DE IZAJE u 27.00 115.27 3,112.29
###
2.08 TRANSPORTE DE POSTE DE A° G° OCTOGONAL DE 12 - 300, EMBONABLE (02 MODULOS) A PUNTO DE IZAJE u 24.00 128.07 3,073.68
###
2.09 IZAJE, IDENTIFICACIÓN Y SEÑALIZACIÓN DE POSTE DE A° G° OCTOGONALES DE 12 - 200, EMBONABLES (02 MODULOS) u 27.00 159.69 4,311.63
###
2.10 IZAJE, IDENTIFICACIÓN Y SEÑALIZACIÓN DE POSTE DE A° G° OCTOGONALES DE 12 - 300, EMBONABLES (02 MODULOS) u 24.00 175.05 4,201.20
###
2.11 TRANSPORTE DE MATERIAL AGREGADO DE MARISOL A PUNTO DE IZAJE m3 51.40 116.08 5,966.74
###
2.13 CIMENTACIÓN CON CONCRETO CICLÓPEO DE POSTE 12M u 51.00 159.65 8,142.15
###
4.01 TRANSPORTE DE ALMACEN A PUNTO DE IZAJE DE ACCESORIOS DE FERRETERIA PARA POSTES Y CRUCETAS JGO 53.00 24.68 1,308.04
###
5.01 ALEACION DE ALUMINIO DE 35 mm2, POR FASE, INCLUYE INSTALACION DE AMORTIGUADORES km 9.93 1,426.81 14,170.54
###
5.02 ALEACION DE ALUMINIO DE 70 mm2, POR FASE, INCLUYE INSTALACION DE AMORTIGUADORES km 0.94 1,626.50 1,523.63
###
6.02 TRANSPORTE DE ALMACEN A PUNTO DE IZAJE DE CONDUCTOR DE CU RECOCIDO, CABLEADO DE 16 mm2 km 0.52 123.39 64.29
###
6.03 TRANSPORTE DE ALMACEN A PUNTO DE IZAJE DE ACCESORIOS DE FERRETERIA PARA PUESTAS A TIERRA JGO 3.00 30.96 92.88
###
6.04 INSTALACION DE PUESTA A TIERRA TIPO PAT-1, INCLUYE INSTALAC CAJA DE REGISTRO u 3.00 95.31 285.93
###
7.01 PRUEBAS Y PUESTA EN SERVICIO DE LAS LINEAS PRIMARIAS km 10.55 351.06 3,704.03
###
7.02 EXPEDIENTES TECNICOS FINAL CONFORME A OBRA (1 ORIGINAL + 3 COPIAS), DE LINEAS km 10.55 210.50 2,220.99
###
1.01 POSTE DE A° G° OCTOGONAL DE 12 - 200, EMBONABLE (02 MODULOS) Und 27 216.88 5,855.76
###
1.02 POSTE DE A° G° OCTOGONAL DE 12 - 300, EMBONABLE (02 MODULOS) Und 24 240.71 5,777.04
###
4.01 CONDUCTOR DE COBRE RECOCIDO, CABLEADO, DE 16 mm2, PARA PUESTA A TIERRA km 0.52 128.54 66.97
###
7.01 CAJA REGISTRO DE CONCRETO PARA PUESTA A TIERRA 0,50x0,50x0,45 m Und 3 17.37 52.11
###
8.01 SECCIONADOR FUSIBLE UNIPOLAR TIPO EXPULSION (CUT-OUT) DE 27/38 KV, 100A, 150KV-BIL. Und 3 12.35 37.05
###
8.02 PARARRAYOS DE OXIDO METALICO, 24 kV, 10 kA, CLASE 1 Und 3 12.35 37.05
###
1.04 PLATAFORMA PARTIDA DE C.A.V DE 1100 mm DE LONG (Incl. Accesorios para instalación) u - 200.00 0.00
###
2.01 POSTE DE A° G° OCTOGONAL DE 12 - 200, EMBONABLE (02 MODULOS) u 4.00 1,100.00 4,400.00
###
2.02 POSTE DE A° G° OCTOGONAL DE 12 - 300, EMBONABLE (02 MODULOS) u 10.00 1,300.00 13,000.00
###
2.03 POSTE DE CONCRETO DE 12 m/200 daN (INCLUYE PERILLA) SECCIONADO u - 1,045.00 0.00
###
2.03 POSTE DE CONCRETO DE 12 m/300 daN (INCLUYE PERILLA) SECCIONADO u - 1,082.91 0.00
###
3.01 AISLADOR DE PORCELANA TIPO PIN, CLASE ANSI 56-3 u 21.00 58.46 1,227.66
###
3.02 AISLADOR POLIMERICO CON CONEXIÓN HORQUILLA (ESTRUCTURA) Y LENGÜETA (LINEA) DE 36 KV, SEGÚN ESPECIFICACION TÉCNICA. u 6.00 198.52 1,191.12
###
3.03 ESPIGA DE Aº Gº DE 609 mm LONGITUD, PARA CABEZA DE POSTE Y AISLADOR ANSI 56-3 / 56-4 u 1.00 34.81 34.81
###
PRESUPUESO GENERAL
PROYECTO
INSTALACIÓN DEL SISTEMA DE ELECTRIFICACIÓN RURAL MEDIANTE REDES CONVENCIONALES EN LAS LOCALIDADES DE MARISOL Y NUEVO
CHIMBOTE, UBICADOS EN EL DISTRITO DE PACHIZA, PROVINCIA DE MARISCAL CACERES, DEPARTAMENTO DE SAN MARTÍN.
DEPARTAMENTO SAN MARTIN
PROVINCIA MARISCAL CACERES
DISTRITO PACHIZA
METRADO COSTO
S/.
3.04 ESPIGA DE A° G° PARA CRUCETA Y AISLADOR ANSI 56-3, DE 381 mm LONGITUD u 20.00 30.97 619.45
###
5.01 VARILLA DE ARMAR PREFORMADA SIMPLE PARA CONDUCTOR DE 35 mm2 u - 6.52 0.00
###
5.02 VARILLA DE ARMAR PREFORMADA DOBLE PARA CONDUCTOR DE 35 mm2 u 12.00 4.67 56.04
###
5.03 GRAPA DE DOBLE VIA DE ALUMINIO PARA CONDUCTOR DE 35 mm2 u 8.00 8.49 67.94
###
6.01 CONDUCTOR DE COBRE RECOCIDO, CABLEADO, DE 16 mm2, PARA PUESTA A TIERRA m 207.00 4.54 939.78
###
7.01 PERNO DOBLE ARMADO DE A°G° DE 16 MM Ø X 457 MM, PROVISTO DE 4 TUERCAS Y 4 CONTRATUERCAS u 21.00 11.05 232.05
###
7.02 PERNO DE A°G° DE 16 mm ø x 457 mm, PROVISTO DE TUERCA Y CONTRATUERCA u - 12.31 0.00
###
7.03 PERNO DE A°G° DE 16 mm ø x 406 mm, PROVISTO DE TUERCA Y CONTRATUERCA u - 11.37 0.00
###
7.04 PERNO DE A°G° DE 16 mm ø x 356 mm, PROVISTO DE TUERCA Y CONTRATUERCA u - 10.27 0.00
###
7.02 PERNO DE A°G° DE 16 mm ø x 305 mm, PROVISTO DE TUERCA Y CONTRATUERCA u 5.00 7.00 34.99
###
7.03 PERNO DE A°G° DE 16 mm ø x 254 mm, PROVISTO DE TUERCA Y CONTRATUERCA u 8.00 7.16 57.28
###
7.04 PERNO OJO DE A°G° DE 16 mm ø x 254 mm, PROVISTO DE TUERCA Y CONTRATUERCA u 9.00 7.16 64.44
###
7.05 PERNO DE A°G° DE 13 mm ø x 254 mm, PROVISTO DE TUERCA Y CONTRATUERCA u 17.00 4.73 80.41
###
7.10 SOPORTE SEPARADOR DE CABEZA DE POSTE DE AºGº, 110 mm SEPARACIÓN, PLATINA 76x6,4 mm SECCION u - 35.82 0.00
###
7.06 PERNO COCHE DE AºGº, 13 mm Øx152 mm LONG., CON ARANDELA, TUERCA Y CONTRATUERCA u 23.00 3.60 82.80
###
7.07 BRAZO SOPORTE (RIOSTRA) DE PERFIL ANGULAR DE AºGº 38x38x5 mm; 710 mm LONG. u 23.00 22.24 511.59
###
7.08 ARANDELA CUADRADA PLANA DE A° G°, 57 x 57 x 5 mm, AGUJERO DE 18 mm ø u 77.00 1.39 106.99
###
7.09 ARANDELA CUADRADA CURVA DE A° G°, 57 x 57 x 5 mm, AGUJERO DE 18 mm ø u 21.00 1.41 29.61
###
7.10 PLANTILLAS PARA IDENTIFICACIÓN Y/O CODIFICACIÓN DE POSTES (PELIGRO, IDENTIFICACIÓN Y/O CODIFICACIÓN Y FASES) u 14.00 36.47 510.65
###
8.03 VARILLA DE ANCLAJE DE A° G° DE 19 mm ø x 2,40 m, PROVISTO DE OJAL GUARDACABO EN UN EXTREMO; TCA Y CTCA EN EL OTRO u 9.00 32.66 293.94
###
8.07 ARANDELA DE ANCLAJE, DE A° G°, 102 x 102 x 6,35 mm, AGUJERO DE 18 mmø u 9.00 4.11 37.03
###
ABRAZADERA DE 4 SECTORES PARA RETENIDA, DE 75 MM DE ALTURA, 6,35 MM DE ESPESOR Y 70 KN DE RESISTENCIA. DIÁMETRO SEGÚN
8.08 u 9.00 45.07 405.63
###
DIMENSIONES DEL POSTE, INCLUYE 4 PERNOS DE 12,7 MM Ø X 63,5 MM Y 4 ARANDELAS
8.09 SOPORTE DE CONTRAPUNTA DE 51 MM Ø X 1200 MM DE LONGITUD, CON ABRAZADERA PARTIDA EN UN EXTREMO Y GRAPA DE AJUSTE PARA CABLE EN u 1.00 75.55 75.55
###
8.11 AISLADOR POLIMERICO CON CONEXIÓN HORQUILLA (ESTRUCTURA) Y LENGÜETA (LINEA) DE 36 KV, SEGÚN ESPECIFICACION TÉCNICA. u 9.00 71.20 640.80
###
9.02 CONECTOR DE BRONCE PARA ELECTRODO DE 16 MM Ø Y CONDUCTOR DE COBRE DE 16 MM² u 20.00 5.01 100.20
###
9.03 CAJA REGISTRO DE CONCRETO PARA PUESTA A TIERRA 0,50x0,50x0,45 m u 18.00 44.81 806.58
###
9.04 PLANCHA DOBLADA DE COBRE PARA TOMA A TIERRA DE ESPIGAS Y/ O PERNOS u 6.00 8.35 50.10
###
9.05 CONECTOR DE COBRE TIPO PERNO PARTIDO PARA CONDUCTOR 16 mm² u 37.00 5.22 193.14
###
9.06 PLANTILLA DE SEÑALIZACIÓN DE POSTE (PUESTA A TIERRA) bls 20.00 36.47 729.49
###
9.07 CONECTOR DOBLE VIA BIMETALICO PARA CABLE DE ACERO DE 10 mmØ Y Cu DE 16 mm2 u - 7.96 0.00
###
10.01 SECCIONADOR FUSIBLE UNIPOLAR TIPO EXPULSION (CUT-OUT) DE 27/38 KV, 100A, 150KV-BIL. u 3.00 333.36 1,000.08
###
12.01 TABLEROS DE DISTRIBUCIÓN COMPLETA PARA S.E. DE 5 kVA; 13,2/440-220V u 2.00 2,005.17 4,010.34
###
12.02 TABLEROS DE DISTRIBUCIÓN COMPLETA PARA S.E. DE 25 kVA; 13,2/440-220V u 1.00 2,165.12 2,165.12
###
1.01 REPLANTEO TOPOGRÁFICO Y UBICACIÓN DE ESTRUCTURAS EN REDES PRIMARIAS. INCLUYE ELABORACIÓN DE PLANOS DE CONCESIÓN RURAL Loc. 2.00 346.76 693.52
###
2.06 IZAJE, IDENTIFICACIÓN Y SEÑALIZACIÓN DE POSTE DE A° G° OCTOGONAL DE 12 - 300, EMBONABLE (02 MÓDULOS), INCLUYE NUMERACIÓN u 10.00 175.05 1,750.50
###
2.13 TRANSPORTE DE MATERIAL AGREGADO DE MARISOL A PUNTO DE IZAJE m3 14.88 116.08 1,727.04
###
2.14 CIMENTACIÓN CON CONCRETO CICLÓPEO DE POSTE 12M u 14.00 159.65 2,235.10
###
PROYECTO
INSTALACIÓN DEL SISTEMA DE ELECTRIFICACIÓN RURAL MEDIANTE REDES CONVENCIONALES EN LAS LOCALIDADES DE MARISOL Y NUEVO
CHIMBOTE, UBICADOS EN EL DISTRITO DE PACHIZA, PROVINCIA DE MARISCAL CACERES, DEPARTAMENTO DE SAN MARTÍN.
DEPARTAMENTO SAN MARTIN
PROVINCIA MARISCAL CACERES
DISTRITO PACHIZA
METRADO COSTO
S/.
4.01 TRANSPORTE DE ALMACEN A PUNTO DE IZAJE DE ACCESORIOS DE FERRETERIA PARA POSTES Y CRUCETAS JGO 19.00 24.68 468.92
###
4.02 TRANSPORTE DE TRANSFORMADOR Y TABLERO DE DISTRIBUCION DESDE ALMACEN (MARISOL) HASTA LA LOCALIDAD DE NUEVO CHIMBOTE U 2.00 443.72 887.44
###
6.02 TRANSPORTE DE ALMACEN A PUNTO DE IZAJE DE CONDUCTOR DE CU RECOCIDO, CABLEADO DE 16 mm2 KM 0.21 123.39 25.54
###
6.03 TRANSPORTE DE ALMACEN A PUNTO DE IZAJE DE ACCESORIOS DE FERRETERIA PARA PUESTAS A TIERRA JGO 2.00 30.96 61.92
###
6.04 INSTALACION DE PUESTA A TIERRA TIPO PAT-1, INCLUYE INSTALAC CAJA DE REGISTRO u 12.00 89.65 1,075.80
###
6.05 INSTALACION DE PUESTA A TIERRA TIPO PAT-2, INCLUYE INSTALAC CAJA DE REGISTRO u - 140.11 0.00
###
6.06 INSTALACION DE PUESTA A TIERRA TIPO PAT-3, INCLUYE INSTALAC CAJA DE REGISTRO u 2.00 153.61 307.22
###
7.01 PRUEBAS Y PUESTA EN SERVICIO DE REDES PRIMARIAS Localid 2.00 388.38 776.76
###
7.02 EXPEDIENTES TECNICOS FINAL CONFORME A OBRA (1 ORIGINAL + 3 COPIAS), DE REDES Localid 2.00 924.02 1,848.04
###
1.01 POSTE DE A° G° OCTOGONAL DE 12 - 200, EMBONABLE (02 MODULOS) u 4.00 216.88 867.52
###
1.02 POSTE DE A° G° OCTOGONAL DE 12 - 300, EMBONABLE (02 MODULOS) u 10.00 240.71 2,407.10
###
4.01 CONDUCTOR DE COBRE RECOCIDO, CABLEADO, DE 16 mm2, PARA PUESTA A TIERRA Km 0.21 128.54 26.61
###
5.01 MATERIAL DE FERRETERIA PARA POSTES Y CRUCETAS GLOB. 1.00 323.34 323.34
###
6.02 BLOQUE DE CONCRETO DE 0,40 x 0,40 x 0,20 m Und. 9.00 29.96 269.64
###
7.01 CAJA REGISTRO DE CONCRETO PARA PUESTA A TIERRA 0,50x0,50x0,45 m Und 18.00 17.37 312.66
###
9.01 SECCIONADOR FUSIBLE UNIPOLAR TIPO EXPULSION (CUT-OUT) DE 27/38 KV, 100A, 150KV-BIL. u 3.00 12.35 37.05
###
9.02 PARARRAYOS DE OXIDO METALICO, 24 kV, 10 kA, CLASE 1 u 3.00 12.35 37.05
###
1.01 POSTE DE C.A.C. DE 8 M/200 DAN (INCLUYE PERILLA) u 121.00 351.20 42,495.20
###
1.02 POSTE DE CAC 8m/200 daN SECCIONADO(INCLUYE PERILLA) u 0.00 450.00 0.00
###
3.01 GRAPA DE SUSPENSION ANGULAR PARA CONDUCTOR DE ALEACION DE ALUMINIO DE 25 mm² u 70.00 6.05 423.30
###
3.02 GRAPA DE ANCLAJE PARA CONDUCTOR DE ALEACION DE ALUMINIO DE 25 mm² u 109.00 11.21 1,221.89
###
3.03 CONECTOR BIMETÁLICO , PARA Al 25mm²/Cu 4-10 mm², PARA NEUTRO DESNUDO, TIPO CUÑA u 9.00 3.14 28.26
###
3.04 CONECTOR BIMETÁLICO AISLADO, PARA Al 16mm²/Cu 4-10 mm², PARA FASE AISLADA, TIPO PERFORACIÓN u 9.00 5.95 53.59
###
3.05 CONECTOR, PARA Al 25mm², PARA NEUTRO DESNUDO, TIPO CUÑA u 24.00 4.23 101.45
###
3.06 CONECTOR AISLADO, PARA Al 25mm², PARA FASE AISLADA, TIPO PERFORACIÓN u 46.00 7.89 362.94
###
3.08 CINTA AUTOFUNDANTE PARA EXTREMO DE CABLE Roll 16.00 4.40 70.42
###
4.01 CONDUCTOR DE Cu RECOCIDO, TIPO N2XY, BIPOLAR, 2x10 mm2, CUBIERTA NEGRA m 10.80 8.45 91.26
###
4.02 CONDUCTOR DE Cu RECOCIDO, TIPO N2XY, BIPOLAR, 2x2,5 mm2 m 82.50 3.25 268.13
###
4.03 CONDUCTOR DE COBRE CONCENTRICO, 2 x 4 mm² , CON AISLAMIENTO Y CUBIERTA DE PVC m 3,750.00 5.68 21,300.00
###
4.04 CONDUCTOR DE COBRE RECOCIDO, CABLEADO, DESNUDO DE 16 mm² m 346.00 5.06 1,750.76
###
5.01 PASTORAL TUBO A°G° 38 MM Ø INTERIOR, 500 MM AVANCE HORIZONTAL, 720 MM ALTURA Y 20° INCLINACIÓN, PROVISTO DE 2 ABRAZADERAS DOBLES u 55.00 47.12 2,591.60
###
PRESUPUESO GENERAL
PROYECTO
INSTALACIÓN DEL SISTEMA DE ELECTRIFICACIÓN RURAL MEDIANTE REDES CONVENCIONALES EN LAS LOCALIDADES DE MARISOL Y NUEVO
CHIMBOTE, UBICADOS EN EL DISTRITO DE PACHIZA, PROVINCIA DE MARISCAL CACERES, DEPARTAMENTO DE SAN MARTÍN.
DEPARTAMENTO SAN MARTIN
PROVINCIA MARISCAL CACERES
DISTRITO PACHIZA
METRADO COSTO
S/.
5.03 LUMINARIA COMPLETA CON EQUIPO PARA LÁMPARA DE VAPOR DE SODIO DE 50 W u 55.00 220.11 12,106.05
###
5.04 PORTAFUSIBLE UNIPOLAR 220 V, DE 5 A, PROVISTO CON FUSIBLE DE 1 A u 55.00 10.01 550.55
###
5.05 CONECTOR BIMETÁLICO FORRADO PARA Al 16 mm² /Cu 4-10 mm², PARA FASE AISLADA TIPO PERFORACIÓN u 55.00 3.14 172.70
###
5.06 CONECTOR BIMETÁLICO PARA Al 25 mm² /Cu 4-10 mm², PARA NEUTRO DESNUDO TIPO CUÑA u 55.00 5.95 327.51
###
6.01 CABLE DE ACERO GRADO SIEMENS MARTIN, DE 10 mm ø, 7 HILOS m 443.00 4.28 1,896.04
###
6.02 PERNO ANGULAR CON OJAL-GUARDACABO DE A°G°, 16 mm ø x 203 mm, PROVISTO DE TUERCA Y CONTRATUERCA u 46.00 19.65 904.08
###
6.03 VARILLA DE ANCLAJE DE A° G° DE 16 mm ø x 2.40 m, PROV. DE OJAL GUARD. EN UN EXTREMO; TCA Y CTCA EN EL OTRO u 46.00 32.66 1,502.36
###
6.04 ARANDELA DE ANCLAJE, DE A° G°, 102 x 102 x 6,35 mm, AGUJERO DE 18 mmø u 46.00 8.32 382.72
###
6.06 ARANDELA CUADRADA CURVA DE A° G°, 57 x 57 x 5 mm, AGUJERO DE 18 mmø u 92.00 0.64 58.88
###
6.07 SOPORTE DE CONTRAPUNTA DE 51 mmØx1000mm DE LONG. CON ABRAZADERA PARTIDA EN UN EXTREMO u 17.00 75.55 1,284.35
###
6.10 CONECTOR BIMETÁLICO PARA AL 25 MM2 Y COBRE DE 16 MM2, TIPO CUÑA u 46.00 5.95 273.70
###
7.01 PERNO CON GANCHO DE 16mm Ø, PROVISTO DE ARANDELA, TUERCA Y CONTRAT., LONG. 203 mm u 66.00 7.21 475.86
###
7.02 PERNO CON GANCHO DE 16mm Ø, PROVISTO DE ARANDELA, TUERCA Y CONTRAT., LONG. 305 mm u 4.00 9.84 39.36
###
7.03 PERNO DE AºGº DE 13mm Ø, PROVISTO DE TUERCA Y CONTRAT., LONG. 203 mm u 92.00 3.71 341.32
###
7.04 PERNO DE AºGº DE 13mm Ø, PROVISTO DE TUERCA Y CONTRAT., LONG. 305 mm u 8.00 5.01 40.08
###
7.05 PERNO CON OJAL, DE AºGº DE 16mm Ø, PROVISTO DE TUERCA Y CONTRAT., LONG. 203 mm u 67.00 6.66 445.98
###
7.06 PERNO CON OJAL, DE AºGº DE 16mm Ø, PROVISTO DE TUERCA Y CONTRAT., LONG. 305 mm u 8.00 9.10 72.77
###
7.09 ARANDELA CUADRADA CURVA DE 57x57 mm, AGUJERO DE 18mmØ u 290.00 1.40 404.66
###
7.10 CAJA DE DERIVACION PARA ACOMETIDAS, SISTEMA 440-22O V (10 BORNERAS EN CADA BARRA DE Cu) u 9.00 73.00 657.03
###
8.02 CONECTOR BIMETÁLICO PARA Al 25 mm² Y COBRE DE 16mm², TIPO CUÑA u 30.00 5.95 178.50
###
8.03 CONECTOR DE BRONCE PARA ELECTRODO DE 16 MM Ø Y CONDUCTOR DE COBRE DE 16 MM² u 30.00 5.01 150.30
###
8.04 PLANTILLA DE SEÑALIZACIÓN DE POSTE (PUESTA A TIERRA) bls 30.00 36.47 1,094.24
###
8.05 CONECTOR DOBLE VIA BIMETÁLICO PARA CABLE DE ACERO DE 10mmØ Y COBRE DE 16 mm² u 46.00 5.72 263.06
###
9.01 TUBO DE AºGº STANDARD / REDONDO DE 19mm Ø x 1,5mm x 6,0m, PROVISTO DE CODO u 58.00 56.31 3,266.26
###
9.02 TUBO DE AºGº STANDARD / REDONDO DE 19mm Ø x 1,5mm x 4,0m, PROVISTO DE CODO 134.00 39.32 5,269.49
###
9.03 TUBO PLASTICO DE PVC SAP DE 19 MM Ø X 3,0 M, CON CURVA DE PLASTICO DE 19 MM Ø X 180º u 192.00 5.86 1,124.46
###
9.05 CONECTOR BIMETÁLICO AISLADO, PARA Al 25 mm²/Cu 4-10 mm², PARA FASE AISLADA, TIPO PERFORACIÓN u 153.00 5.95 911.08
###
9.06 CONECTOR BIMETÁLICO, PARA Al 25 mm²/Cu 4-10 mm², PARA NEUTRO DESNUDO, TIPO CUÑA u 153.00 5.95 911.08
###
9.09 CAJA METÁLICA PORTAMEDIDOR, EQUIPADO CON INTERRUPTOR TERMOMAGNETICO 10A u 192.00 54.00 10,368.00
###
9.10 MEDIDOR MONOF. DE ENERGIA ACTIVA, TIPO ELECTRONICO CON MICRO PROCESADOR DE 220 V; 10-40 A; 60 Hz; CLASE 1. u 192.00 60.22 11,562.24
###
1.01 REPLANTEO TOPOGRÁFICO Y UBICACIÓN DE ESTRUCTURAS EN REDES PRIMARIAS. INCLUYE ELABORACIÓN DE PLANOS DE CONCESIÓN RURAL Local 2.00 543.38 1,086.76
###
2.01 TRANSPORTE DE POSTE DE C.A.C DE 8 - 200, DE MARISOL A NUEVO CHIMBOTE u 68.00 305.54 20,776.72
###
2.02 TRANSPORTE DE POSTE DE C.A.C DE 8 - 200, ALMACEN DE OBRA A PUNTO DE IZAJE u 121.00 55.92 6,766.32
###
2.06 TRANSPORTE DE MATERIAL AGREGADO DE MARISOL A NUEVO CHIMBOTE m3 46.48 86.08 4,000.94
###
2.07 IZAJE, IDENTIFICACIÓN Y SEÑALIZACIÓN DE POSTE DE CAC 8/200 (*) u 121.00 109.66 13,268.86
###
4.01 ARMADO TIPO E1 y/o E1', CON CAJA DE DERIVACIÓN PARA ACOMETIDA u 6.00 22.52 135.12
###
4.02 ARMADO TIPO E1/S y/o E1'/S, SIN CAJA DE DERIVACIÓN PARA ACOMETIDA u 66.00 17.19 1,134.54
###
4.03 ARMADO TIPO E2 y/o E2', SIN CAJA DE DERIVACIÓN PARA ACOMETIDA u 1.00 19.54 19.54
###
4.04 ARMADO TIPO E2/S y/o E2'/S, SIN CAJA DE DERIVACIÓN PARA ACOMETIDA u 5.00 18.45 92.25
###
4.05 ARMADO TIPO E3 y/o E3', CON CAJA DE DERIVACIÓN PARA ACOMETIDA u 2.00 21.89 43.78
###
4.06 ARMADO TIPO E3/S y/o E3'/S, SIN CAJA DE DERIVACIÓN PARA ACOMETIDA u 25.00 16.71 417.75
###
4.07 ARMADO TIPO E4 y/o E4', CON CAJA DE DERIVACIÓN PARA ACOMETIDA u 21.25 0.00
###
4.08 ARMADO TIPO E4/S y/o E4'/S, SIN CAJA DE DERIVACIÓN PARA ACOMETIDA u 26.00 18.29 475.54
###
4.09 ARMADO TIPO E5 y/o E5', CON CAJA DE DERIVACIÓN PARA ACOMETIDA u 4.00 25.75 103.00
###
4.10 ARMADO TIPO E5/S y/o E5'/S, SIN CAJA DE DERIVACIÓN PARA ACOMETIDA u - 20.31 0.00
###
4.11 ARMADO TIPO E6 y/o E6', CON CAJA DE DERIVACIÓN PARA ACOMETIDA u - 28.06 0.00
###
4.12 ARMADO TIPO E6/S y/o E6'/S,SIN CAJA DE DERIVACIÓN PARA ACOMETIDA u - 20.15 0.00
###
6.04 INSTALACION DE PUESTA A TIERRA TIPO PAT-1 EN POSTE DE CONCRETO u 30.00 53.08 1,592.40
###
PRESUPUESO GENERAL
PROYECTO
INSTALACIÓN DEL SISTEMA DE ELECTRIFICACIÓN RURAL MEDIANTE REDES CONVENCIONALES EN LAS LOCALIDADES DE MARISOL Y NUEVO
CHIMBOTE, UBICADOS EN EL DISTRITO DE PACHIZA, PROVINCIA DE MARISCAL CACERES, DEPARTAMENTO DE SAN MARTÍN.
DEPARTAMENTO SAN MARTIN
PROVINCIA MARISCAL CACERES
DISTRITO PACHIZA
METRADO COSTO
S/.
8.01 CONEXIÓN DE ACOMETIDAS DOMICILIARIAS, CONFIGURACIÓN: CORTA EN MURETE u 135.00 34.38 4,641.30
###
8.02 CONEXIÓN DE ACOMETIDA DOMICILIARIAS, CONFIGURACIÓN: LARGA EN MURETE u 57.00 38.07 2,169.99
###
8.04 MURETE DE CONCRETO DE 1,65m DE ALTURA LIBRE Y 0,3 DE PROFUNDIDAD (**) u 192.00 95.02 18,243.84
###
9.02 EXPEDIENTE TECNICO FINALES CONFORME A OBRA (1 ORIGINAL + 3 COPIAS) DE REDES 0.00
###
SECUNDARIAS, INCLUYE LA PRESENTACIÓN DIGITALIZADA DEL EXPEDIENTE EN UN CD Loc 2.00 567.02 1,134.04
###
3.01 CONDUCTOR DE Cu RECOCIDO, TIPO N2XY, BIPOLAR, 2x10 mm2, CUBIERTA NEGRA Km 0.01 379.59 4.10
###
3.02 CONDUCTOR DE Cu RECOCIDO, TIPO N2XY, BIPOLAR, 2x2,5 mm2 Km 0.08 196.74 16.23
###
3.03 CONDUCTOR DE COBRE CONCENTRICO, 2 x 4 mm² , CON AISLAMIENTO Y CUBIERTA DE PVC Km 3.75 171.13 641.74
###
3.04 CONDUCTOR DE COBRE RECOCIDO, CABLEADO, DESNUDO DE 16 mm² Km 0.35 176.57 61.09
###
4.01 LUMINARIA COMPLETA CON EQUIPO PARA LAMPARA DE 50 W u 55.00 6.14 337.70
###
5.02 CAJA DE DERIVACION PARA ACOMETIDAS, SISTEMA 440-22O V (10 BORNERAS EN CADA BARRA DE Cu) u 9.00 6.49 58.41
###
5.02 BLOQUE DE CONCRETO DE 0,40 x 0,40 x 0,20 m Glb 46.00 29.96 1,378.16
###
5.01 CAJA REGISTRO DE CONCRETO PARA PUESTA A TIERRA 0,50x0,50x0,45 m Und 30.00 17.37 521.10
###
6.01 CAJA METÁLICA PORTAMEDIDOR, EQUIPADO CON INTERRUPTOR TERMOMAGNETICO 10A u 192.00 4.29 823.68
###
6.02 MEDIDOR MONOF. DE ENERGIA ACTIVA, TIPO ELECTRONICO CON MICRO PROCESADOR DE 220 V; 10-40 A; 60 Hz; CLASE 1. u 192.00 7.23 1,388.16
###
Monto Val. Acum. % Avance Valorización % Avance Val. Acum. % Acum. Saldo por % Saldo
ITEM DESCRIPCION
Contratado Anterior Anterior Actual Actual Actual Actual Valorizar Valorizar
100.00%
100.00%
94.84%
90.00%
80.00%
73.95%
ESCALA PORCENTUAL
77.11%
70.00%
63.76% 69.22%
60.00% 58.19% 63.51%
54.94% 55.42% 55.42%
59.25%
50.17% 54.94% 54.94% 54.94%
50.00% 46.62%
44.46% 44.46% 45.29% 45.29% 45.29% 50.17%
45.29% 45.29% 45.29% 46.62%
40.00% 36.92% 44.46% 44.46%
30.05% 36.92%
30.00%
30.05%
20.68%
20.00%
14.72% 20.68%
14.72%
10.00%
3.74%
0.00%
0.00% 3.74%
43273
- 43273 43303 43334 43364 43395 43425 Sus- May-19 Jun-19 OBRA Set-19 Oct-19 Nov-19 Dic-19 OBRA Jul-20 Ago-20 Set-20 Oct-20 Nov-20
pensión PARAL- PARAL-
N° 01 IZADA IZADA
PERÍODOS DE CONTROL
“MEJORAMIENTO Y REHABILITACIÓN DEL CAMINO VECINAL SAN RAFAEL - CHACATAMA - HUANCABAMBA - CASHAYOG - HUILLAPARAC, DISTRITO DE SAN RAFAEL, PROVINCIA DE AMBO, DEPARTAMENTO DE HUÁNUCO”
COSTO VALORIZACIÓN 01 ( VALORIZACION ACTUAL VALORIZACION ACTUAL VALORIZACION ACUM ACTUAL SALDO POR VALORIZAR
ITEM DESCRIPCION UNID. CANTIDAD PARCIAL
UNITARIO S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
01 TRABAJOS PRELIMINARES 187,522.86 121,610.34 64.85% 0.00 0.00% 121,610.34 64.85% 65,912.53 35.15%
01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO glb 1.00 119,898.71 119,898.71 0.50 59,949.36 50.00% 0.00 0.00% 0.50 59,949.36 50.00% 0.50 59,949.36 50.00%
01.02 TOPOGRAFIA Y GEOREFERENCIACION km 18.30 761.19 13,929.78 17.52 13,336.05 95.74% 0.00 0.00% 17.52 13,336.05 95.74% 0.78 593.73 4.26%
01.03 MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL glb 1.00 16,500.37 16,500.37 0.90 14,850.33 90.00% 0.00 0.00% 0.90 14,850.33 90.00% 0.10 1,650.04 10.00%
01.04 CAMPAMENTO glb 1.00 37,194.00 37,194.00 0.90 33,474.60 90.00% 0.00 0.00% 0.90 33,474.60 90.00% 0.10 3,719.40 10.00%
02 MOVIMIENTO DE TIERRAS 834,710.56 0.00 757,454.74 90.74% 0.00 0.00% 0.00 757,454.74 90.74% 77,255.83 9.26%
02.01 DESBROCE Y LIMPIEZA DE TERRENO Ha 1.83 1,977.93 3,619.61 1.83 3,619.61 100.00% 0.00 0.00% 1.83 3,619.61 100.00% 0.00 0.00 0.00%
02.02 EXCAVACION PARA EXPLANACIONES EN MATERIAL SUELTO m3 85,111.48 4.55 387,257.23 80,090.46 364,411.59 94.10% 0.00 0.00% 80,090.46 364,411.59 94.10% 5,021.02 22,845.64 5.90%
02.03 EXCAVACION PARA EXPLANACIONES EN ROCA FRACTURADA m3 38,854.96 4.15 161,248.08 37,556.56 155,859.72 96.66% 0.00 0.00% 37,556.56 155,859.72 96.66% 1,298.40 5,388.36 3.34%
02.04 CONFORMACION DE TERRAPLEN CON MATERIAL DE CANTERA m3 4,666.39 25.18 117,499.70 3,210.00 80,827.80 68.79% 0.00 0.00% 3,210.00 80,827.80 68.79% 1,456.39 36,671.90 31.21%
02.05 PERFILADO Y COMPACTACION DE SUBRASANTE EN ZONAS DE CORTE m2 99,736.80 1.33 132,649.94 95,979.08 127,652.18 96.23% 0.00 0.00% 95,979.08 127,652.18 96.23% 3,757.72 4,997.77 3.77%
02.06 MEJORAMIENTO DE SUELOS A NIVEL DE SUBRASANTE m3 1,800.00 18.02 32,436.00 1,392.00 25,083.84 77.33% 0.00 0.00% 1,392.00 25,083.84 77.33% 408.00 7,352.16 22.67%
03 AFIRMADO 1,454,459.30 0.00 939,039.40 26.32% 424,325.60 29.17% 0.00 1,363,365.00 93.74% 91,094.30 6.26%
03.01 AFIRMADO ESTABILIZADO CON ADITIVO POLYCOM 2KG/50 M3 DE AFIRMADO m3 13,093.80 111.08 1,454,459.30 8,453.72 939,039.40 26.32% 3,820.00 424,325.60 29.17% 12,273.72 1,363,365.00 93.74% 820.08 91,094.30 6.26%
04 DRENAJE 3,494,284.99 0.00 2,050,377.48 57.75% 0.00 0.00% 0.00 2,050,377.48 58.68% 1,443,907.49 41.32%
04.01 ALCANTARILLAS TIPO TMC 862,656.35 0.00 662,938.29 76.85% 0.00 0.00% 0.00 662,938.29 76.85% 199,718.04 23.15%
04.01.01 EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN SECO m3 4,184.14 14.75 61,716.07 2,805.82 41,385.85 67.06% 0.00 0.00% 2,805.82 41,385.85 67.06% 1,378.32 20,330.22 32.94%
04.01.02 RELLENO PARA ESTRUCTURAS m3 992.72 44.97 44,642.62 696.20 31,308.11 70.13% 0.00 0.00% 696.20 31,308.11 70.13% 296.52 13,334.50 29.87%
04.01.03 CONCRETO CLASE E (F'C=175 KG/CM2) m3 589.18 319.41 188,189.98 407.08 130,025.42 69.09% 0.00 0.00% 407.08 130,025.42 69.09% 182.10 58,164.56 30.91%
04.01.04 CONCRETO CLASE E (F'C=175 KG/CM2) + 30% PM m3 271.40 324.80 88,150.72 120.18 39,034.46 44.28% 0.00 0.00% 120.18 39,034.46 44.28% 151.22 49,116.26 55.72%
04.01.05 CONCRETO CLASE H (F'C=100 KG/CM2) PARA SOLADOS m3 80.86 297.25 24,035.64 57.78 17,175.11 71.46% 0.00 0.00% 57.78 17,175.11 71.46% 23.08 6,860.53 28.54%
04.01.06 ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS m2 3,034.18 57.31 173,888.86 2,128.37 121,976.88 70.15% 0.00 0.00% 2,128.37 121,976.88 70.15% 905.81 51,911.97 29.85%
04.01.07 TUBERIA CORRUGADA DE ACERO GALVANIZADO CIRCULAR DE DIÁMETRO 0.90 M m 564.60 425.02 239,966.29 564.60 239,966.29 100.00% 0.00 0.00% 564.60 239,966.29 100.00% 0.00 0.00 0.00%
04.01.08 TUBERIA CORRUGADA DE ACERO GALVANIZADO CIRCULAR DE DIÁMETRO 1.20 M m 53.79 631.34 33,959.78 53.79 33,959.78 100.00% 0.00 0.00% 53.79 33,959.78 100.00% 0.00 0.00 0.00%
04.01.09 TUBERIA CORRUGADA DE ACERO GALVANIZADO CIRCULAR DE DIÁMETRO 1.50 M m 9.00 900.71 8,106.39 9.00 8,106.39 100.00% 0.00 0.00% 9.00 8,106.39 100.00% 0.00 0.00 0.00%
04.02 ALCANTARILLAS TIPO MARCO-CAJÓN 81,783.59 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 81,783.59 100.00%
04.02.01 EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN SECO m3 272.80 14.75 4,023.80 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 272.80 4,023.80 100.00%
04.02.02 RELLENO PARA ESTRUCTURAS m3 73.76 44.97 3,316.99 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 73.76 3,316.99 100.00%
04.02.03 CONCRETO CLASE D (F'C=210 KG/CM2) m3 62.53 384.28 24,029.03 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 62.53 24,029.03 100.00%
04.02.04 CONCRETO CLASE E (F'C=175 KG/CM2) +30% PM m3 29.69 324.80 9,643.31 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 29.69 9,643.31 100.00%
04.02.05 CONCRETO CLASE H (PC=100 KG/CM2) PARA SOLADOS m3 7.08 297.25 2,104.53 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.08 2,104.53 100.00%
04.02.06 ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS m2 301.98 57.31 17,306.47 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 301.98 17,306.47 100.00%
04.02.07 ACERO DE REFUERZO FY=4200 KG/CM2 kg 5,562.36 3.84 21,359.46 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5,562.36 21,359.46 100.00%
04.03 BADENES 213,236.56 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 213,236.56 100.00%
04.03.01 EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN SECO m3 369.17 14.75 5,445.26 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 369.17 5,445.26 100.00%
04.03.02 RELLENO PARA ESTRUCTURAS m3 61.62 44.97 2,771.05 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 61.62 2,771.05 100.00%
04.03.03 RELLENO CON PIEDRA GRANDE m3 48.06 78.80 3,787.13 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 48.06 3,787.13 100.00%
04.03.04 CONCRETO CLASE D (PC=210 KG/CM2) + 30% P.M. m3 345.54 370.21 127,922.36 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 345.54 127,922.36 100.00%
04.03.05 CONCRETO CLASE E (F'C=175 KG/CM2) +30% PM m3 94.01 324.80 30,534.45 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 94.01 30,534.45 100.00%
04.03.06 ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS m2 711.90 57.31 40,798.99 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 711.90 40,798.99 100.00%
04.03.07 JUNTA DE POLIESTIRENO EXPANDIDO E=1" B=0.25 M m 301.42 6.56 1,977.32 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 301.42 1,977.32 100.00%
04.04 CONFORMACION DE CUNETAS 2,042,299.97 0.00 1,336,584.63 63.85% 0.00 0.00% 0.00 1,336,584.63 65.45% 705,715.34 34.55%
04.04.01 CONFORMACION DE CUNETAS TERRENO NATURAL m 18,447.00 1.24 22,874.28 16,727.00 20,741.48 90.68% 0.00 0.00% 16,727.00 20,741.48 90.68% 1,720.00 2,132.80 9.32%
04.04.02 CUNETAS REVESTIDAS C/PIEDRA EMBOQUILLADA m 14,780.00 135.34 2,000,325.20 9,722.50 1,315,843.15 64.16% 0.00 0.00% 9,722.50 1,315,843.15 65.78% 5,057.50 684,482.05 34.22%
04.04.03 MANDIL DE PIEDRA EMBOQUILLADA E=15 CM m2 319.62 59.76 19,100.49 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 319.62 19,100.49 100.00%
“MEJORAMIENTO Y REHABILITACIÓN DEL CAMINO VECINAL SAN RAFAEL - CHACATAMA - HUANCABAMBA - CASHAYOG - HUILLAPARAC, DISTRITO DE SAN RAFAEL, PROVINCIA DE AMBO, DEPARTAMENTO DE HUÁNUCO”
COSTO VALORIZACIÓN 01 ( VALORIZACION ACTUAL VALORIZACION ACTUAL VALORIZACION ACUM ACTUAL SALDO POR VALORIZAR
ITEM DESCRIPCION UNID. CANTIDAD PARCIAL
UNITARIO S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
04.05 CUNETAS DE CONCRETO 209,713.92 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 209,713.92 100.00%
04.05.01 EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN SECO m3 60.26 14.75 888.84 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 60.26 888.84 100.00%
04.05.02 RELLENO PARA ESTRUCTURAS m3 15.39 44.97 692.09 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.39 692.09 100.00%
04.05.03 CONCRETO CLASE C (F'C=280 KG/CM2) m3 8.41 447.25 3,761.37 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.41 3,761.37 100.00%
04.05.04 CONCRETO CLASE D (F'C=210 KG/CM2) m3 137.03 384.28 52,657.89 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 137.03 52,657.89 100.00%
04.05.05 CONCRETO CLASE H (F'C=100 KG/CM2) m3 16.28 297.25 4,839.23 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.28 4,839.23 100.00%
04.05.06 ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS m2 1,246.04 57.31 71,410.55 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,246.04 71,410.55 100.00%
04.05.07 ACERO DE REFUERZO FY=4200 KG/CM2 kg 11,115.59 3.84 42,683.87 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11,115.59 42,683.87 100.00%
04.05.08 TAPA PREFABRICADA DE CONCRETO 1.00X0.60M und 377.00 84.47 31,845.19 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 377.00 31,845.19 100.00%
04.05.09 PREPARACION DE TERRENO DE FUNDACION PARA ESTRUCTURAS m2 363.77 2.57 934.89 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 363.77 934.89 100.00%
04.06 SUBDREN 5,420.70 0.00 5,244.98 96.76% 0.00 0.00% 0.00 5,244.98 96.76% 175.72 3.24%
04.06.01 EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN SECO m3 33.00 14.75 486.75 33.00 486.75 100.00% 0.00 0.00% 33.00 486.75 100.00% 0.00 0.00 0.00%
04.06.02 RELLENO PARA ESTRUCTURAS m3 14.76 44.97 663.76 14.76 663.76 100.00% 0.00 0.00% 14.76 663.76 100.00% 0.00 0.00 0.00%
04.06.03 CONCRETO CLASE E (F'C=175 KG/CM2) m3 0.22 319.41 70.27 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.22 70.27 100.00%
04.06.04 ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS m2 1.84 57.31 105.45 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.84 105.45 100.00%
04.06.05 GEOTEXTIL NO TEJIDO CLASE 2 m2 94.00 9.93 933.42 94.00 933.42 100.00% 0.00 0.00% 94.00 933.42 100.00% 0.00 0.00 0.00%
04.06.06 TUBERIA PVC SAP 8" m 7.50 73.55 551.63 7.50 551.63 100.00% 0.00 0.00% 7.50 551.63 100.00% 0.00 0.00 0.00%
04.06.07 TUBERIA PVC SAP 8" PERFORADA m 20.00 80.65 1,613.00 20.00 1,613.00 100.00% 0.00 0.00% 20.00 1,613.00 100.00% 0.00 0.00 0.00%
04.06.08 TUBERIA DE VENTILACION FIERRO GALVANIZADO D= 1 1/2' m 3.60 33.40 120.24 3.60 120.24 100.00% 0.00 0.00% 3.60 120.24 100.00% 0.00 0.00 0.00%
04.06.09 SUBDREN PROFUNDO m3 17.35 50.50 876.18 17.35 876.18 100.00% 0.00 0.00% 17.35 876.18 100.00% 0.00 0.00 0.00%
04.07 CUNETA DE CORONACIÓN 79,173.90 0.00 45,609.58 57.61% 0.00 0.00% 0.00 45,609.58 57.61% 33,564.32 42.39%
04.07.01 CUNETA DE CORONACIÓN m 585.00 135.34 79,173.90 337.00 45,609.58 57.61% 0.00 0.00% 337.00 45,609.58 57.61% 248.00 33,564.32 42.39%
05 OBRAS COMPLEMENTARIAS 211,308.20 0.00 204,713.96 96.88% 0.00 0.00% 0.00 204,713.96 96.88% 6,594.25 3.12%
05.01 MUROS DE CONCRETO 211,308.20 0.00 204,713.96 96.88% 0.00 0.00% 0.00 204,713.96 96.88% 6,594.25 3.12%
05.01.01 EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN SECO m3 872.48 14.75 12,869.08 872.48 12,869.08 100.00% 0.00 0.00% 872.48 12,869.08 100.00% 0.00 0.00 0.00%
05.01.02 RELLENO PARA ESTRUCTURAS m3 515.56 44.97 23,184.73 438.12 19,702.26 84.98% 0.00 0.00% 438.12 19,702.26 84.98% 77.44 3,482.48 15.02%
05.01.03 CONCRETO CLASE E (F'C=175 KGICM2) +30% P.G. m3 302.11 324.80 98,125.33 302.11 98,125.33 100.00% 0.00 0.00% 302.11 98,125.33 100.00% 0.00 0.00 0.00%
05.01.04 ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS m2 977.02 57.31 55,993.02 977.02 55,993.02 100.00% 0.00 0.00% 977.02 55,993.02 100.00% 0.00 0.00 0.00%
05.01.05 GEOTEXTIL NO TEJIDO CLASE 2 m2 393.16 9.93 3,904.08 329.14 3,268.36 83.72% 0.00 0.00% 329.14 3,268.36 83.72% 64.02 635.72 16.28%
05.01.06 FILTRO DRENANTE m3 83.99 41.96 3,524.22 70.90 2,974.96 84.41% 0.00 0.00% 70.90 2,974.96 84.41% 13.09 549.26 15.59%
05.01.07 JUNTA DE POLIESTIRENO EXPANDIDO E=2" m2 19.52 12.26 239.32 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.52 239.32 100.00%
05.01.08 TUBERIA PVC 3" PARA DRENAJE m 112.98 36.24 4,094.40 112.98 4,094.40 100.00% 0.00 0.00% 112.98 4,094.40 100.00% 0.00 0.00 0.00%
05.01.09 TUBERIA PVC PERFORADA D=6" m 188.65 49.69 9,374.02 154.69 7,686.55 82.00% 0.00 0.00% 154.69 7,686.55 82.00% 33.96 1,687.47 18.00%
06 TRANSPORTES 2,003,037.94 0.00 1,691,087.35 83.42% 199,279.18 9.95% 0.00 1,890,366.53 94.37% 112,671.41 5.63%
06.01 TRANSPORTE DE MATERIALES GRANULARES PARA DISTANCIAS ENTRE 120 M Y 1000 M m3k 17,665.59 6.95 122,775.85 10,243.79 71,194.34 47.57% 7,200.00 50,040.00 40.76% 17,443.79 121,234.34 98.74% 221.80 1,541.51 1.26%
06.02 TRANSPORTE DE MATERIALES GRANULARES PARA DISTANCIAS MAYORES DE 1000 M m3k 140,246.52 1.93 270,675.78 61,499.04 118,693.15 41.11% 77,326.00 149,239.18 55.14% 138,825.04 267,932.33 98.99% 1,421.48 2,743.46 1.01%
06.03 TRANSPORTE DE MATERIALES EXCEDENTES PARA DISTANCIAS ENTRE 120 M Y 1000 M m3k 97,924.76 7.31 715,830.00 90,444.24 661,147.39 92.36% 0.00 0.00% 90,444.24 661,147.39 92.36% 7,480.52 54,682.60 7.64%
06.04 TRANSPORTE DE MATERIALES EXCEDENTES PARA DISTANCIAS MAYORES DE 1000 M m3k 291,540.31 2.05 597,657.64 265,343.32 543,953.80 91.01% 0.00 0.00% 265,343.32 543,953.80 91.01% 26,197.00 53,703.84 8.99%
06.05 TRANSPORTE DE AGREGADOS PARA DISTANCIAS ENTRE 120 M Y 1000 M m3k 3,088.59 5.79 17,882.94 3,088.59 17,882.94 100.00% 0.00 0.00% 3,088.59 17,882.94 100.00% 0.00 0.00 0.00%
06.06 TRANSPORTE DE AGREGADOS PARA DISTANCIAS MAYORES DE 1000 M m3k 124,722.28 1.61 200,802.87 124,722.28 200,802.87 100.00% 0.00 0.00% 124,722.28 200,802.87 100.00% 0.00 0.00 0.00%
06.07 TRANSPORTE DE PIEDRA PARA DISTANCIAS ENTRE 120 M Y 1000 M m3k 2,629.44 8.34 21,929.53 2,629.44 21,929.53 100.00% 0.00 0.00% 2,629.44 21,929.53 100.00% 0.00 0.00 0.00%
06.08 TRANSPORTE DE PIEDRA PARA DISTANCIAS MAYORES DE 1000 M m3k 26,547.05 2.09 55,483.33 26,547.05 55,483.33 100.00% 0.00 0.00% 26,547.05 55,483.33 100.00% 0.00 0.00 0.00%
07 SEÑALIZACIÓN Y SEGURIDAD VIAL 526,593.59 0.00 278,072.29 0.00% 77,865.68 14.79% 0.00 355,937.97 67.59% 170,655.62 32.41%
07.01 SEÑALES PREVENTIVAS (0.60M x 0.60M) und 307.00 896.27 275,154.89 307.00 275,154.89 0.00% 0.00 0.00% 307.00 275,154.89 100.00% 0.00 0.00 0.00%
07.02 SEÑAL REGLAMENTARIA: OCTOGONAL, RECTANGULAR, CUADRADA, TRIANGULAR Y OTRO und 6.00 1,041.04 6,246.24 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 6,246.24 100.00%
07.03 SEÑAL INFORMATIVA ( 1.43X1.20 M) und 9.00 5,136.49 46,228.41 0.00 0.00 0.00% 9.00 46,228.41 100.00% 9.00 46,228.41 100.00% 0.00 0.00 0.00%
07.04 SEÑAL INFORMATIVA ( 2.30X0.65 M) und 7.00 4,519.61 31,637.27 0.00 0.00 0.00% 7.00 31,637.27 100.00% 7.00 31,637.27 100.00% 0.00 0.00 0.00%
07.05 GUARDAVIAS METAUCO (TIPO I) m 937.50 175.37 164,409.38 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 937.50 164,409.38 100.00%
07.06 POSTES DE KILOMETRAJE und 20.00 145.87 2,917.40 20.00 2,917.40 0.00% 0.00 0.00% 20.00 2,917.40 100.00% 0.00 0.00 0.00%
08 PROTECCION AMBIENTAL 177,933.14 0.00 111,576.81 62.71% 0.00 0.00% 0.00 111,576.81 62.71% 66,356.33 37.29%
08.01 REVEGETACION Ha 3.40 4,321.62 14,693.51 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.40 14,693.51 100.00%
08.02 ACONDICIONAMIENTO DE MATERIAL EXCEDENTE EN DME m3 125,214.19 0.77 96,414.93 114,549.00 88,202.73 91.48% 0.00 0.00% 114,549.00 88,202.73 91.48% 10,665.19 8,212.20 8.52%
08.03 RESTAURACIÓN DE AREAS DISTURBADAS EN CANTERAS Ha 0.21 8,585.36 1,802.93 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.21 1,802.93 100.00%
08.04 RESTAURACION DE AREA UTILIZADA PARA CAMPAMENTO Y PATIO DE MAQUINAS Ha 0.50 18,872.09 9,436.05 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.50 9,436.05 100.00%
08.05 MONITOREO DE LA CALIDAD DEL AIRE pto 2.00 8,052.16 16,104.32 1.00 8,052.16 50.00% 0.00 0.00% 1.00 8,052.16 50.00% 1.00 8,052.16 50.00%
08.06 MONITOREO DEL NIVEL SONORO pto 2.00 3,040.56 6,081.12 1.00 3,040.56 50.00% 0.00 0.00% 1.00 3,040.56 50.00% 1.00 3,040.56 50.00%
08.07 MONITOREO DE LA CALIDAD DEL AGUA pto 2.00 3,443.80 6,887.60 1.00 3,443.80 50.00% 0.00 0.00% 1.00 3,443.80 50.00% 1.00 3,443.80 50.00%
08.08 MONITOREO DE LA CALIDAD DEL SUELO pto 3.00 8,837.56 26,512.68 1.00 8,837.56 33.33% 0.00 0.00% 1.00 8,837.56 33.33% 2.00 17,675.12 66.67%
COSTO DIRECTO 8,889,850.58 6,153,932.37 701,470.46 6,855,402.83 2,034,447.76
GASTOS GENERALES (11.80% C.D) 1,049,002.37 726,164.02 82,773.51 808,937.53 240,064.84
UTILIDADES (5% C.D) 444,492.53 307,696.62 35,073.52 342,770.14 101,722.39
SUB TOTAL 10,383,345.48 7,187,793.01 819,317.49 8,007,110.50 2,376,234.99
“MEJORAMIENTO Y REHABILITACIÓN DEL CAMINO VECINAL SAN RAFAEL - CHACATAMA - HUANCABAMBA - CASHAYOG - HUILLAPARAC, DISTRITO DE SAN RAFAEL, PROVINCIA DE AMBO, DEPARTAMENTO DE HUÁNUCO”
COSTO VALORIZACIÓN 01 ( VALORIZACION ACTUAL VALORIZACION ACTUAL VALORIZACION ACUM ACTUAL SALDO POR VALORIZAR
ITEM DESCRIPCION UNID. CANTIDAD PARCIAL
UNITARIO S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
I.G.V. (18%) 1,869,002.19 1,293,802.74 147,477.15 1,441,279.89 427,722.30
TOTAL PRESUPUESTO 12,252,347.67 8,481,595.75 69.22% 966,794.64 7.89% 9,448,390.39 77.11% 2,803,957.29 22.89%
“MEJORAMIENTO Y REHABILITACIÓN DEL CAMINO VECINAL SAN RAFAEL - CHACATAMA - HUANCABAMBA - CASHAYOG - HUILLAPARAC, DISTRITO DE SAN RAFAEL, PROVINCIA DE AMBO, DEPARTAMENTO DE HUÁNUCO”
K = 0.258*(Mr / Mo) + 0.068*(CMAr / CMAo) + 0.066*(AAPr / AAPo) + 0.341*(MMFr / MMFo) + 0.109*(Dr / Do) + 0.158*(Ir / Io)
Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 N May-19
Indice Base S
SIMBOLO CONCEPTO I.U. INCIDENCIA % (Io) Mar. Indice (Ir) Coef. Indice (Ir) Coef. Indice (Ir) Coef. Indice (Ir) Coef. Indice (Ir) Coef. Indice (Ir) Coef. Indice (Ir) Coef.
I
2017 Jun-18 (k) Jul-18 (k) Aug-18 (k) Sep-18 (k) Oct-18 (k) Nov-18 (k) Ó May-19 (k)
M MANO DE OBRA INC. LEYES SOCIALES 47 0.258 100.00 563.25 582.520 0.267 582.52 0.267 582.52 0.267 602.11 0.276 602.11 0.276 602.11 0.276 N 600.40 0.275
ACERO DE CONSTRUCCION CORRUGADO 03 0.068 16.18 453.51 513.580 0.012 508.81 0.012 512.37 0.012 525.48 0.013 527.89 0.013 531.71 0.013 529.91 0.013
D
CMA CEMENTO PORTLAND TIPO I 21 58.82 426.29 449.560 0.042 449.56 0.042 449.56 0.042 449.56 0.042 449.56 0.042 449.56 0.042 E 449.56 0.042
MADERA NACIONAL PARA ENCOF. Y CARPINT. 43 25.00 872.50 900.760 0.018 903.70 0.018 914.43 0.018 919.11 0.018 921.95 0.018 928.45 0.018 933.84 0.018
0.066 O
PLANCHA GALVANIZADA 61 24.24 231.02 253.460 0.018 260.82 0.018 266.57 0.018 267.64 0.019 269.51 0.019 271.30 0.019 259.54 0.018
B
AAP AGREGADO GRUESO 05 48.49 417.07 422.120 0.032 423.80 0.033 425.85 0.033 425.00 0.033 426.88 0.033 424.45 0.033 R 424.81 0.033
ALCANTARILLA METALICA 09 27.27 236.97 249.310 0.019 250.85 0.019 251.38 0.019 252.23 0.019 253.99 0.019 273.04 0.021 A 277.63 0.021
MAQUINARIA Y EQUIPO NACIONAL 48 0.341 6.45 365.31 368.950 0.022 368.82 0.022 369.08 0.022 369.15 0.022 372.23 0.022 370.70 0.022 369.76 0.022
N
MMF MAQUINARIA Y EQUIPO IMPORTADO 49 90.32 293.92 298.680 0.313 298.83 0.313 299.69 0.314 302.20 0.317 304.74 0.319 307.20 0.322 ° 309.08 0.324
FLETE TERRESTRE 32 3.23 465.79 468.410 0.011 470.47 0.011 470.47 0.011 470.47 0.011 468.39 0.011 468.39 0.011 0 471.42 0.011
D DOLAR (GENERAL PONDERADO) 30 0.109 100.00 463.36 478.040 0.112 479.58 0.113 481.37 0.113 483.02 0.114 486.67 0.114 490.47 0.115 1 489.59 0.115
I INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 0.158 100.00 444.52 445.610 0.158 447.10 0.159 448.81 0.160 449.40 0.160 450.26 0.160 450.63 0.160 Y 457.08 0.162
1.0000 1.024 1.027 1.029 1.044 1.046 1.052 1.054
K = 0.258*(Mr / Mo) + 0.068*(CMAr / CMAo) + 0.066*(AAPr / AAPo) + 0.341*(MMFr / MMFo) + 0.109*(Dr / Do) + 0.158*(Ir / Io)
P Sep-19 Oct-19 Nov-19 P Jul-20 Aug-20 Sep-20
Indice Base A A
SIMBOLO CONCEPTO I.U. INCIDENCIA % (Io) Mar. R Indice (Ir) Coef. Indice (Ir) Coef. Indice (Ir) Coef. Indice (Ir) Coef. Indice (Ir) Coef. Indice (Ir) Coef.
R
2017 A Aug-19 (k) Sep-19 (k) Oct-19 (k) A Jul-20 (k) Jul-20 (k) Aug-20 (k)
M MANO DE OBRA INC. LEYES SOCIALES 47 0.258 100.00 563.25 L 619.76 0.284 619.76 0.284 619.76 0.284 L 619.99 0.284 619.99 0.284 619.99 0.284
I I
ACERO DE CONSTRUCCION CORRUGADO 03 0.068 16.18 453.51 Z 541.62 0.013 538.41 0.013 538.89 0.013 561.72 0.014 561.72 0.014 571.93 0.014
Z
CMA CEMENTO PORTLAND TIPO I 21 58.82 426.29 A 449.56 0.042 449.56 0.042 449.56 0.042 A 449.56 0.042 449.56 0.042 449.56 0.042
MADERA NACIONAL PARA ENCOF. Y CARPINT. 43 25.00 872.50 C 936.28 0.018 932.30 0.018 938.95 0.018 C 953.97 0.019 953.97 0.019 972.80 0.019
0.066 I I
PLANCHA GALVANIZADA 61 24.24 231.02 233.71 0.016 232.33 0.016 232.54 0.016 252.03 0.017 252.03 0.017 255.39 0.018
Ó Ó
AAP AGREGADO GRUESO 05 48.49 417.07 N 434.38 0.033 434.86 0.033 434.66 0.033 N 433.06 0.033 433.06 0.033 432.03 0.033
ALCANTARILLA METALICA 09 27.27 236.97 283.76 0.022 282.08 0.021 282.33 0.021 295.51 0.022 295.51 0.022 299.46 0.023
MAQUINARIA Y EQUIPO NACIONAL 48 0.341 6.45 365.31 D 374.19 0.023 373.24 0.022 373.56 0.022 D 380.15 0.023 380.15 0.023 382.27 0.023
E E
MMF MAQUINARIA Y EQUIPO IMPORTADO 49 90.32 293.92 317.45 0.333 315.57 0.331 316.07 0.331 333.13 0.349 333.13 0.349 337.82 0.354
FLETE TERRESTRE 32 3.23 465.79 O 472.50 0.011 474.11 0.011 474.11 0.011 O 479.33 0.011 479.33 0.011 479.33 0.011
D DOLAR (GENERAL PONDERADO) 30 0.109 100.00 463.36 B 505.07 0.119 502.06 0.118 502.90 0.118 B 528.51 0.124 528.51 0.124 538.27 0.127
R R
I INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 0.158 100.00 444.52 A 458.56 0.163 458.59 0.163 459.10 0.163 A 466.82 0.166 466.82 0.166 466.30 0.166
1.0000 1.077 1.072 1.072 1.104 1.104 1.114
“MEJORAMIENTO Y REHABILITACIÓN DEL CAMINO VECINAL SAN RAFAEL - CHACATAMA - HUANCABAMBA - CASHAYOG - HUILLAPARAC, DISTRITO DE SAN RAFAEL, PROVINCIA DE AMBO, DEPARTAMENTO DE HUÁNUCO”
K = 0.258*(Mr / Mo) + 0.068*(CMAr / CMAo) + 0.066*(AAPr / AAPo) + 0.341*(MMFr / MMFo) + 0.109*(Dr / Do) + 0.158*(Ir / Io)
Indice Base Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 May-21
SIMBOLO CONCEPTO I.U. INCIDENCIA % (Io) Mar. Indice (Ir) Coef. Indice (Ir) Coef. Indice (Ir) Coef. Indice (Ir) Coef. Indice (Ir) Coef. Indice (Ir) Coef. Indice (Ir) Coef.
2017 Sep-20 (k) Oct-20 (k) Nov-20 (k) Dec-20 (k) Jan-21 (k) Feb-21 (k) Mar-21 (k)
M MANO DE OBRA INC. LEYES SOCIALES 47 0.258 100.00 563.25 619.990 0.284 0.000 0.000 0.000 0.000 0.000 633.53 0.290
ACERO DE CONSTRUCCION CORRUGADO 03 0.068 16.18 453.51 571.930 0.014 765.25 0.019 0.000 0.000 0.000 0.000 765.25 0.019
CMA CEMENTO PORTLAND TIPO I 21 58.82 426.29 449.560 0.042 0.000 0.000 0.000 0.000 0.000 449.56 0.042
MADERA NACIONAL PARA ENCOF. Y CARPINT. 43 25.00 872.50 972.800 0.019 0.000 0.000 0.000 0.000 0.000 1080.59 0.021
PLANCHA GALVANIZADA 61 0.066 24.24 231.02 255.390 0.018 0.000 0.000 0.000 0.000 0.000 320.31 0.022
AAP AGREGADO GRUESO 05 48.49 417.07 432.030 0.033 0.000 0.000 0.000 0.000 0.000 445.67 0.034
ALCANTARILLA METALICA 09 27.27 236.97 299.460 0.023 0.000 0.000 0.000 0.000 0.000 314.12 0.024
MAQUINARIA Y EQUIPO NACIONAL 48 0.341 6.45 365.31 382.270 0.023 0.000 0.000 0.000 0.000 0.000 389.47 0.023
MMF MAQUINARIA Y EQUIPO IMPORTADO 49 90.32 293.92 337.820 0.354 0.000 0.000 0.000 0.000 0.000 354.37 0.371
FLETE TERRESTRE 32 3.23 465.79 479.330 0.011 0.000 0.000 0.000 0.000 0.000 495.98 0.012
D DOLAR (GENERAL PONDERADO) 30 0.109 100.00 463.36 538.270 0.127 0.000 0.000 0.000 0.000 0.000 568.46 0.134
I INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 0.158 100.00 444.52 466.300 0.166 0.000 0.000 0.000 0.000 0.000 476.54 0.169
1.0000 1.114 0.019 0.000 0.000 0.000 0.000 1.161
Indice Base (Io): Marzo 2017, según Resolución Directoral Nº 183-2017-MTC/21, del 15 de Junio del 2017
Area 3: Huánuco, Pasco, Junín, Huancavelica, Ayacucho y Ucayali
“MEJORAMIENTO Y REHABILITACIÓN DEL CAMINO VECINAL SAN RAFAEL - CHACATAMA - HUANCABAMBA - CASHAYOG - HUILLAPARAC, DISTRITO DE SAN RAFAEL, PROVINCIA DE AMBO, DEPARTAMENTO DE HUÁNUCO”
CONTRATISTA : CONSORCIO VIRGEN DE LA PUERTA
SUPERVISOR : CONSORCIO BAÑOS DEL INCA
ENTIDAD : MTC - PROVÍAS DESCENTRALIZADO
CALCULO DE REINTEGROS
S/. 12,252,347.67
AVANCE PROGRAMADO AVANCE REAL COEFICIENTE REINTEGRO PROGRAMADO REINTEGRO EJECUTADO REINTEGRO RECONOCIDO
VALORIZACION
% MENSUAL % ACUMULADO % MENSUAL % ACUMULADO DE REAJUSTE MENSUAL ACUMULADO MENSUAL
ACUMULADO MENSUAL ACUMULADO
Nº MES MENSUAL A ACUMULADO S/. MENSUAL B ACUMULADO S/. K (C = A * (K - 1)) (C = B * (K - 1))
01 Jun-18 3.74% 458,087.35 3.74% 458,087.35 3.74% 458,087.35 3.74% 458,087.35 1.024 10,994.10 10,994.10 2,748.52 2,748.52 2,748.52 2,748.52
02 Jul-18 10.98% 1,345,736.64 14.72% 1,803,823.99 10.98% 1,345,736.64 14.72% 1,803,823.99 1.027 36,334.89 47,328.99 36,334.89 39,083.41 36,334.89 39,083.41
03 Aug-18 5.96% 729,731.05 20.68% 2,533,555.04 5.96% 729,731.05 20.68% 2,533,555.04 1.029 21,162.20 68,491.19 21,162.20 60,245.61 21,162.20 60,245.61
04 Sep-18 9.37% 1,148,541.72 30.05% 3,682,096.76 9.37% 1,148,541.72 30.05% 3,682,096.76 1.044 50,535.84 119,027.03 50,535.84 110,781.45 50,535.84 110,781.45
05 Oct-18 6.87% 841,624.71 36.92% 4,523,721.47 6.87% 841,624.71 36.92% 4,523,721.47 1.046 38,714.74 157,741.77 38,714.74 149,496.19 38,714.74 149,496.19
06 Nov-18 7.54% 923,653.50 44.46% 5,447,374.97 7.54% 923,653.50 44.46% 5,447,374.97 1.052 48,029.98 205,771.75 48,029.98 197,526.17 48,029.98 197,526.17
Suspensión N° 01 y N°02 - 5,447,374.97
07 May-19 0.83% 101,248.44 45.29% 5,548,623.41 0.83% 101,248.44 45.29% 5,548,623.41 1.054 5,467.42 211,239.17 5,467.42 202,993.59 5,467.42 202,993.59
Paralización de Obra 5,548,623.41
08 Sep-19 1.33% 163,066.54 46.62% 5,711,689.95 1.33% 163,066.54 46.62% 5,711,689.95 1.077 12,556.12 223,795.29 12,556.12 215,549.71 12,556.12 215,549.71
09 Oct-19 3.55% 435,083.56 50.17% 6,146,773.51 3.55% 435,083.56 50.17% 6,146,773.47 1.072 31,326.02 255,121.31 31,326.02 246,875.73 31,326.02 246,875.73
10 Nov-19 4.77% 584,743.54 54.9% 6,731,517.04 4.77% 584,743.52 54.94% 6,731,516.95 1.072 42,101.53 297,222.84 42,101.53 288,977.26 42,101.53 288,977.26
Paralización de Obra 6,789,807.98
11 Jul-20 2.78% 340,361.61 57.72% 7,130,169.59 4.31% 527,603.30 59.25% 7,259,120.25 1.104 35,397.61 332,620.45 54,870.74 343,848.00 54,870.74 343,848.00
12 Aug-20 5.57% 682,375.95 63.29% 7,812,545.54 4.26% 521,954.52 63.51% 7,781,074.77 1.104 70,967.10 403,587.55 54,283.27 398,131.27 54,283.27 398,131.27
13 Sep-20 10.19% 1,248,621.91 73.48% 9,061,167.44 5.72% 700,520.99 69.23% 8,481,595.76 1.114 142,342.90 545,930.45 79,859.39 477,990.66 79,859.39 477,990.66
14 Oct-20 20.89% 2,559,137.25 94.37% 11,620,304.69 7.89% 966,794.64 77.12% 9,448,390.40 1.114 291,741.65 837,672.10 110,214.59 588,205.25 110,214.59 588,205.25
15 Nov-20 5.16% 632,042.99 99.53% 12,252,347.67 0.00%
“MEJORAMIENTO Y REHABILITACIÓN DEL CAMINO VECINAL SAN RAFAEL - CHACATAMA - HUANCABAMBA - CASHAYOG - HUILLAPARAC, DIS
DE HUÁNUCO”
CONTRATISTA : CONSORCIO VIRGEN DE LA PUERTA
SUPERVISOR : CONSORCIO BAÑOS DEL INCA
ENTIDAD : MTC - PROVÍAS DESCENTRALIZADO
MONTO DEL CONTRATO CON IGV 12,252,347.67
1. MONTO DE VALORIZACIÓN
VALORIZACIÓN SIN REJUSTE 12,252,347.67 9,448,390.48
POR ADICIONALES 544,547.36 544 547.36
2. REAJUSTE DE LA VALORIZACIÓN
MONTO DE REAJUSTE
RETENCIÓN POR RETRASO DE OBRA
REINTEGROS (Otros) 647,188.34 588,205.25
6. AMORTIZACIÓN DE ADELANTOS
ADELANTO EN EFECTIVO
ADELANTO PARA MATERIALES
7. OTROS
MAYORES GASTOS GENERALES AMPL. DE PLAZO
INTERES POR MORA EN PAGOS
OTROS CONCEPTOS
9. MONTO RETENIDO
VARIOS
10. MULTAS Y OBLIGACIONES VARIAS
MULTA POR ATRASO EN LA ENTREGA DE OBRA
OTROS
SALDO A PAGAR
(S/.)
2,803,957.19
0.00
58,983.09
“MEJORAMIENTO Y REHABILITACIÓN DEL CAMINO VECINAL SAN RAFAEL - CHACATAMA - HUANCABAMBA - CASHAYOG - HUILLAPARAC, DISTRITO DE SAN RAFAEL, PROVINCIA DE AMBO,
DEPARTAMENTO DE HUÁNUCO”
REFERENCIA
MONTO MONTO
I.G.V.
Nº CONCEPTO PARCIAL TOTAL LIQUIDA. COMPRO. FECHA DE FACTURA
(S/.)
(S/.) (S/.) Nº Nº PAGO Nº
ADELANTO DIRECTO
01 ADELANTO DIRECTO 01 S/ 1,038,334.54 S/ 186,900.22 S/ 1,225,234.76 C/P 2018-01624 21-Jun-18 F0001-000001
TOTAL ADELANTO EN EFECTIVO
01 PRINCIPAL
Adelanto de materiales 01 S/ 1,038,334.55 S/ 186,900.22 S/ 1,225,234.77 C/P 2018-02081 25-Jul-18 F0001-000007
Adelanto de materiales 02 S/ 1,038,334.54 S/ 186,900.22 S/ 1,225,234.76 C/P 2018-02932 29-Sep-18 E001-1
TOTAL ADELANTO PARA MATERIALES
ITEM DESCRIPCION
UNID.
01 TRABAJOS PRELIMINARES
01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO glb
01.02 TOPOGRAFIA Y GEOREFERENCIACION km
01.03 MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL glb
01.04 CAMPAMENTO glb
02 MOVIMIENTO DE TIERRAS
02.01 DESBROCE Y LIMPIEZA DE TERRENO Ha
02.02 EXCAVACION PARA EXPLANACIONES EN MATERIAL SUELTO m3
02.03 EXCAVACION PARA EXPLANACIONES EN ROCA FRACTURADA m3
02.04 CONFORMACION DE TERRAPLEN CON MATERIAL DE CANTERA m3
02.05 PERFILADO Y COMPACTACION DE SUBRASANTE EN ZONAS DE CORTE m2
02.06 MEJORAMIENTO DE SUELOS A NIVEL DE SUBRASANTE m3
03 AFIRMADO
03.01 AFIRMADO ESTABILIZADO CON ADITIVO POLYCOM 2KG/50 M3 DE AFIRMADO m3
04 DRENAJE
04.01 ALCANTARILLAS TIPO TMC
04.01.01 EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN SECO m3
04.01.02 RELLENO PARA ESTRUCTURAS m3
04.01.03 CONCRETO CLASE E (F'C=175 KG/CM2) m3
04.01.04 CONCRETO CLASE E (F'C=175 KG/CM2) + 30% PM m3
04.01.05 CONCRETO CLASE H (F'C=100 KG/CM2) PARA SOLADOS m3
04.01.06 ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS m2
04.01.07 TUBERIA CORRUGADA DE ACERO GALVANIZADO CIRCULAR DE DIÁMETRO 0.90 M m
04.01.08 TUBERIA CORRUGADA DE ACERO GALVANIZADO CIRCULAR DE DIÁMETRO 1.20 M m
04.01.09 TUBERIA CORRUGADA DE ACERO GALVANIZADO CIRCULAR DE DIÁMETRO 1.50 M m
04.02 ALCANTARILLAS TIPO MARCO-CAJÓN
04.02.01 EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN SECO m3
04.02.02 RELLENO PARA ESTRUCTURAS m3
04.02.03 CONCRETO CLASE D (F'C=210 KG/CM2) m3
04.02.04 CONCRETO CLASE E (F'C=175 KG/CM2) +30% PM m3
04.02.05 CONCRETO CLASE H (PC=100 KG/CM2) PARA SOLADOS m3
04.02.06 ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS m2
04.02.07 ACERO DE REFUERZO FY=4200 KG/CM2 kg
04.03 BADENES
04.03.01 EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN SECO m3
04.03.02 RELLENO PARA ESTRUCTURAS m3
04.03.03 RELLENO CON PIEDRA GRANDE m3
04.03.04 CONCRETO CLASE D (PC=210 KG/CM2) + 30% P.M. m3
04.03.05 CONCRETO CLASE E (F'C=175 KG/CM2) +30% PM m3
04.03.06 ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS m2
04.03.07 JUNTA DE POLIESTIRENO EXPANDIDO E=1" B=0.25 M m
04.04 CONFORMACION DE CUNETAS
04.04.01 CONFORMACION DE CUNETAS TERRENO NATURAL m
04.04.02 CUNETAS REVESTIDAS C/PIEDRA EMBOQUILLADA m
04.04.03 MANDIL DE PIEDRA EMBOQUILLADA E=15 CM m2
04.05 CUNETAS DE CONCRETO
04.05.01 EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN SECO m3
04.05.02 RELLENO PARA ESTRUCTURAS m3
04.05.03 CONCRETO CLASE C (F'C=280 KG/CM2) m3
04.05.04 CONCRETO CLASE D (F'C=210 KG/CM2) m3
04.05.05 CONCRETO CLASE H (F'C=100 KG/CM2) m3
04.05.06 ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS m2
04.05.07 ACERO DE REFUERZO FY=4200 KG/CM2 kg
04.05.08 TAPA PREFABRICADA DE CONCRETO 1.00X0.60M und
04.05.09 PREPARACION DE TERRENO DE FUNDACION PARA ESTRUCTURAS m2
04.06 SUBDREN
04.06.01 EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN SECO m3
04.06.02 RELLENO PARA ESTRUCTURAS m3
04.06.03 CONCRETO CLASE E (F'C=175 KG/CM2) m3
04.06.04 ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS m2
04.06.05 GEOTEXTIL NO TEJIDO CLASE 2 m2
04.06.06 TUBERIA PVC SAP 8" m
04.06.07 TUBERIA PVC SAP 8" PERFORADA m
04.06.08 TUBERIA DE VENTILACION FIERRO GALVANIZADO D= 1 1/2' m
04.06.09 SUBDREN PROFUNDO m3
04.07 CUNETA DE CORONACIÓN
04.07.01 CUNETA DE CORONACIÓN m
05 OBRAS COMPLEMENTARIAS
05.01 MUROS DE CONCRETO
05.01.01 EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN SECO m3
05.01.02 RELLENO PARA ESTRUCTURAS m3
05.01.03 CONCRETO CLASE E (F'C=175 KGICM2) +30% P.G. m3
05.01.04 ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS m2
05.01.05 GEOTEXTIL NO TEJIDO CLASE 2 m2
05.01.06 FILTRO DRENANTE m3
05.01.07 JUNTA DE POLIESTIRENO EXPANDIDO E=2" m2
05.01.08 TUBERIA PVC 3" PARA DRENAJE m
05.01.09 TUBERIA CORRUGADA PERFORADA HDPE D=6" m
06 TRANSPORTES
06.01 TRANSPORTE DE MATERIALES GRANULARES PARA DISTANCIAS ENTRE 120 M Y 1000 M m3k
06.02 TRANSPORTE DE MATERIALES GRANULARES PARA DISTANCIAS MAYORES DE 1000 M m3k
06.03 TRANSPORTE DE MATERIALES EXCEDENTES PARA DISTANCIAS ENTRE 120 M Y 1000 M m3k
06.04 TRANSPORTE DE MATERIALES EXCEDENTES PARA DISTANCIAS MAYORES DE 1000 M m3k
06.05 TRANSPORTE DE AGREGADOS PARA DISTANCIAS ENTRE 120 M Y 1000 M m3k
06.06 TRANSPORTE DE AGREGADOS PARA DISTANCIAS MAYORES DE 1000 M m3k
06.07 TRANSPORTE DE PIEDRA PARA DISTANCIAS ENTRE 120 M Y 1000 M m3k
06.08 TRANSPORTE DE PIEDRA PARA DISTANCIAS MAYORES DE 1000 M m3k
07 SEÑALIZACIÓN Y SEGURIDAD VIAL
07.01 SEÑALES PREVENTIVAS (0.60M x 0.60M) und
07.02 SEÑAL REGLAMENTARIA: OCTOGONAL, RECTANGULAR, CUADRADA, TRIANGULAR Y OTROS und
07.03 SEÑAL INFORMATIVA ( 1.43X1.20 M) und
07.04 SEÑAL INFORMATIVA ( 2.30X0.65 M) und
07.05 GUARDAVIAS METAUCO (TIPO I) m
07.06 POSTES DE KILOMETRAJE und
08 PROTECCION AMBIENTAL
08.01 REVEGETACION Ha
08.02 ACONDICIONAMIENTO DE MATERIAL EXCEDENTE EN DME m3
08.03 RESTAURACIÓN DE AREAS DISTURBADAS EN CANTERAS Ha
08.04 RESTAURACION DE AREA UTILIZADA PARA CAMPAMENTO Y PATIO DE MAQUINAS Ha
08.05 MONITOREO DE LA CALIDAD DEL AIRE pto
08.06 MONITOREO DEL NIVEL SONORO pto
08.07 MONITOREO DE LA CALIDAD DEL AGUA pto
08.08 MONITOREO DE LA CALIDAD DEL SUELO pto
COSTO DIRECTO
GASTOS GENERALES (11.80% C.D)
UTILIDADES (5% C.D)
SUB TOTAL
I.G.V. (18%)
TOTAL PRESUPUESTO
“MEJORAMIENTO Y REHABILITACIÓN DEL CAMINO VECINAL SAN RAFAEL - CHACATAMA - HUANCABAMBA - CASHAYOG - HUILLAPARAC, DISTRITO DE
SAN RAFAEL
AMBO
HUÁNUCO
CONSORCIO BAÑOS DEL INCA
ING. ALBERTO RAFAEL DIAZ RÍOS, CIP Nº 050977
VALORIZACIONES CALCULADAS
VALORIZACIÓN 07 (Mayo 2019) VALORIZACIÓN 08 (Setiembre 2019) VALORIZACIÓN 09 (Oc
METRADO PARCIAL %
65,912.53 35.15%
0.50 59,949.36 50.00%
0.78 593.73 4.26%
0.10 1,650.04 10.00%
0.10 3,719.40 10.00%
77,255.83 9.26%
0.00 0.00%
5,021.02 22,845.64 5.90%
1,298.40 5,388.36 3.34%
1,456.39 36,671.90 31.21%
3,757.72 4,997.77 3.77%
408.00 7,352.16 22.67%
91,094.30 6.26%
820.08 91,094.30 6.26%
1,443,907.49 41.32%
199,718.04 23.15%
1,378.32 20,330.22 32.94%
296.52 13,334.50 29.87%
182.10 58,164.56 30.91%
151.22 49,116.26 55.72%
23.08 6,860.53 28.54%
905.81 51,911.97 29.85%
0.00 0.00%
0.00 0.00%
0.00 0.00%
81,783.59 100.00%
272.80 4,023.80 100.00%
73.76 3,316.99 100.00%
62.53 24,029.03 100.00%
29.69 9,643.31 100.00%
7.08 2,104.53 100.00%
301.98 17,306.47 100.00%
5,562.36 21,359.46 100.00%
213,236.56 100.00%
369.17 5,445.26 100.00%
61.62 2,771.05 100.00%
48.06 3,787.13 100.00%
345.54 127,922.36 100.00%
94.01 30,534.45 100.00%
711.90 40,798.99 100.00%
301.42 1,977.32 100.00%
705,715.34 34.55%
1,720.00 2,132.80 9.32%
5,057.50 684,482.05 34.22%
319.62 19,100.49 100.00%
209,713.92 100.00%
60.26 888.84 100.00%
15.39 692.09 100.00%
8.41 3,761.37 100.00%
137.03 52,657.89 100.00%
16.28 4,839.23 100.00%
1,246.04 71,410.55 100.00%
11,115.59 42,683.87 100.00%
377.00 31,845.19 100.00%
363.77 934.89 100.00%
175.72 3.24%
0.00 0.00%
0.00 0.00%
0.22 70.27 100.00%
1.84 105.45 100.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
33,564.32 42.39%
248.00 33,564.32 42.39%
6,594.25 3.12%
6,594.25 3.12%
0.00 0.00%
77.44 3,482.48 15.02%
0.00 0.00 0.00%
0.00 0.00 0.00%
64.02 635.72 16.28%
13.09 549.26 15.59%
19.52 239.32 100.00%
0.00 0.00%
33.96 1,687.47 18.00%
112,671.41 5.63%
221.80 1,541.51 1.26%
1,421.48 2,743.46 1.01%
7,480.52 54,682.60 7.64%
26,197.00 53,703.84 8.99%
0.00 0.00%
0.00 0.00%
0.00 0.00%
0.00 0.00%
170,655.62 32.41%
0.00 0.00%
6.00 6,246.24 100.00%
0.00 0.00 0.00%
0.00 0.00 0.00%
937.50 164,409.38 100.00%
0.00 0.00%
66,356.33 37.29%
3.40 14,693.51 100.00%
10,665.19 8,212.20 8.52%
0.21 1,802.93 100.00%
0.50 9,436.05 100.00%
1.00 8,052.16 50.00%
1.00 3,040.56 50.00%
1.00 3,443.80 50.00%
2.00 17,675.12 66.67%
2,034,447.76
240,064.84
101,722.39
2,376,234.99
427,722.30
2,803,957.29 22.89%
“MEJORAMIENTO Y REHABILITACIÓN DEL CAMINO VECINAL SAN RAFAEL - CHAC
CONTRATISTA : CONSORCIO VIRGEN DE LA PUERTA
SUPERVISOR : CONSORCIO BAÑOS DEL INCA
ENTIDAD : MTC - PROVÍAS DESCENTRALIZADO
CALCULO DEL C
Indice Base (Io): Marzo 2017, según Resolución Directoral Nº 183-2017-MTC/21, del 15 de Junio del 2017
Area 3: Huánuco, Pasco, Junín, Huancavelica, Ayacucho y Ucayali
AMINO VECINAL SAN RAFAEL - CHACATAMA - HUANCABAMBA - CASHAYOG - HUILLAPARAC, DISTRITO DE SAN RAFAEL, PROVINCIA DE AMBO, DEPARTAME
CALCULO DE REINTEGROS
S/. 12,252,347.67
AVANCE PROGRAMADO AVANCE REAL COEFICIENTE REINTEGRO PROGRAMADO REINTEGRO EJECUTADO REINTEGRO RECONOCIDO
VALORIZACION
% MENSUAL % ACUMULADO % MENSUAL % ACUMULADO DE REAJUSTE MENSUAL ACUMULADO MENSUAL
ACUMULADO MENSUAL ACUMULADO
Nº MES MENSUAL A ACUMULADO S/. MENSUAL B ACUMULADO S/. K (C = A * (K - 1)) (C = B * (K - 1))
01 Jun-18 3.74% 458,087.35 3.74% 458,087.35 3.74% 458,087.35 3.74% 458,087.35 1.027 12,368.36 12,368.36 12,368.36 12,368.36 2,748.52 2,748.52
02 Jul-18 10.98% 1,345,736.64 14.72% 1,803,823.99 10.98% 1,345,736.64 14.72% 1,803,823.99 1.029 39,026.36 51,394.72 39,026.36 51,394.72 36,334.89 39,083.41
03 Aug-18 5.96% 729,731.05 20.68% 2,533,555.04 5.96% 729,731.05 20.68% 2,533,555.04 1.044 32,108.17 83,502.89 32,108.17 83,502.89 21,162.20 60,245.61
04 Sep-18 9.37% 1,148,541.72 30.05% 3,682,096.76 9.37% 1,148,541.72 30.05% 3,682,096.76 1.046 52,832.92 136,335.81 52,832.92 136,335.81 50,535.84 110,781.45
05 Oct-18 6.87% 841,624.71 36.92% 4,523,721.47 6.87% 841,624.71 36.92% 4,523,721.47 1.052 43,764.48 180,100.29 43,764.48 180,100.29 38,714.74 149,496.19
06 Nov-18 7.54% 923,653.50 44.46% 5,447,374.97 7.54% 923,653.50 44.46% 5,447,374.97 1.058 53,571.90 233,672.19 53,571.90 233,672.19 48,029.98 197,526.17
Suspensión N° 01 y N°02 - 5,447,374.97
07 May-19 0.83% 101,248.44 45.29% 5,548,623.41 0.83% 101,248.44 45.29% 5,548,623.41 1.058 5,872.41 239,544.60 5,872.41 239,544.60 5,467.42 202,993.59
Paralización de Obra 5,548,623.41
08 Sep-19 1.33% 163,066.54 46.62% 5,711,689.95 1.33% 163,066.54 46.62% 5,711,689.95 1.072 11,740.79 251,285.39 11,740.79 251,285.39 12,556.12 215,549.71
09 Oct-19 3.55% 435,083.56 50.17% 6,146,773.51 3.55% 435,083.56 50.17% 6,146,773.47 1.072 31,326.02 282,611.41 31,326.02 282,611.41 31,326.02 246,875.73
10 Nov-19 4.77% 584,743.54 54.9% 6,731,517.04 4.77% 584,743.52 54.94% 6,731,516.95 1.077 45,025.25 327,636.66 45,025.25 327,636.66 42,101.53 288,977.26
Dec-19 0.48% 58,290.94 55.4% 6,789,807.98
Paralización de Obra 6,789,807.98
11 Jul-20 2.78% 340,361.61 57.72% 7,130,169.59 4.31% 527,603.30 59.25% 7,259,120.25 1.104 35,397.61 363,034.27 54,870.74 382,507.40 54,870.74 343,848.00
12 Aug-20 5.57% 682,375.95 63.29% 7,812,545.54 4.26% 521,954.52 63.51% 7,781,074.77 1.114 77,790.86 440,825.13 59,502.82 442,010.22 54,283.27 398,131.27
13 Sep-20 10.19% 1,248,621.91 73.48% 9,061,167.44 5.72% 700,520.99 69.23% 8,481,595.76 1.119 148,586.01 589,411.14 83,362.00 525,372.22 79,859.39 477,990.66
14 Oct-20 20.89% 2,559,137.25 94.37% 11,620,304.69 7.89% 966,794.64 77.12% 9,448,390.40 1.126 322,451.29 911,862.43 121,816.12 647,188.34 110,214.59 588,205.25
OBRA “MEJORAMIENTO Y REHABIL
PROPIETARIO MTC - PROVÍAS DESCENTRA
FECHA DE PRESENTACIÓN 44,621.00
CONTRATISTA CONSORCIO VIRGEN DE LA P
MONTO DEL CONTRATO
PLAZO DE EJECUCION 180 DÍAS CALENDARIOS
FECHA DE INICIO DE OBRA 6/22/2018
FECHA DE TERMINO DE OBRA 12/18/2018
01 TRABAJOS PRELIMINARES
01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO glb
01.02 TOPOGRAFIA Y GEOREFERENCIACION km
01.03 MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL glb
01.04 CAMPAMENTO glb
02 MOVIMIENTO DE TIERRAS
02.01 DESBROCE Y LIMPIEZA DE TERRENO Ha
02.02 EXCAVACION PARA EXPLANACIONES EN MATERIAL SUELTO m3
02.03 EXCAVACION PARA EXPLANACIONES EN ROCA FRACTURADA m3
02.04 CONFORMACION DE TERRAPLEN CON MATERIAL DE CANTERA m3
02.05 PERFILADO Y COMPACTACION DE SUBRASANTE EN ZONAS DE CORTE m2
02.06 MEJORAMIENTO DE SUELOS A NIVEL DE SUBRASANTE m3
03 AFIRMADO
03.01 AFIRMADO ESTABILIZADO CON ADITIVO POLYCOM 2KG/50 M3 DE AFIRMADO m3
04 DRENAJE
04.01 ALCANTARILLAS TIPO TMC
04.01.01 EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN SECO m3
04.01.02 RELLENO PARA ESTRUCTURAS m3
04.01.03 CONCRETO CLASE E (F'C=175 KG/CM2) m3
04.01.04 CONCRETO CLASE E (F'C=175 KG/CM2) + 30% PM m3
04.01.05 CONCRETO CLASE H (F'C=100 KG/CM2) PARA SOLADOS m3
04.01.06 ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS m2
04.01.07 TUBERIA CORRUGADA DE ACERO GALVANIZADO CIRCULAR DE DIÁMETRO 0.90 M m
04.01.08 TUBERIA CORRUGADA DE ACERO GALVANIZADO CIRCULAR DE DIÁMETRO 1.20 M m
04.01.09 TUBERIA CORRUGADA DE ACERO GALVANIZADO CIRCULAR DE DIÁMETRO 1.50 M m
04.02 ALCANTARILLAS TIPO MARCO-CAJÓN
04.02.01 EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN SECO m3
04.02.02 RELLENO PARA ESTRUCTURAS m3
04.02.03 CONCRETO CLASE D (F'C=210 KG/CM2) m3
04.02.04 CONCRETO CLASE E (F'C=175 KG/CM2) +30% PM m3
04.02.05 CONCRETO CLASE H (PC=100 KG/CM2) PARA SOLADOS m3
04.02.06 ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS m2
04.02.07 ACERO DE REFUERZO FY=4200 KG/CM2 kg
04.03 BADENES
04.03.01 EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN SECO m3
04.03.02 RELLENO PARA ESTRUCTURAS m3
04.03.03 RELLENO CON PIEDRA GRANDE m3
04.03.04 CONCRETO CLASE D (PC=210 KG/CM2) + 30% P.M. m3
04.03.05 CONCRETO CLASE E (F'C=175 KG/CM2) +30% PM m3
04.03.06 ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS m2
04.03.07 JUNTA DE POLIESTIRENO EXPANDIDO E=1" B=0.25 M m
04.04 CONFORMACION DE CUNETAS
04.04.01 CONFORMACION DE CUNETAS TERRENO NATURAL m
04.04.02 CUNETAS REVESTIDAS C/PIEDRA EMBOQUILLADA m
04.04.03 MANDIL DE PIEDRA EMBOQUILLADA E=15 CM m2
04.05 CUNETAS DE CONCRETO
04.05.01 EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN SECO m3
04.05.02 RELLENO PARA ESTRUCTURAS m3
04.05.03 CONCRETO CLASE C (F'C=280 KG/CM2) m3
04.05.04 CONCRETO CLASE D (F'C=210 KG/CM2) m3
04.05.05 CONCRETO CLASE H (F'C=100 KG/CM2) m3
04.05.06 ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS m2
04.05.07 ACERO DE REFUERZO FY=4200 KG/CM2 kg
04.05.08 TAPA PREFABRICADA DE CONCRETO 1.00X0.60M und
04.05.09 PREPARACION DE TERRENO DE FUNDACION PARA ESTRUCTURAS m2
04.06 SUBDREN
04.06.01 EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN SECO m3
04.06.02 RELLENO PARA ESTRUCTURAS m3
04.06.03 CONCRETO CLASE E (F'C=175 KG/CM2) m3
04.06.04 ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS m2
04.06.05 GEOTEXTIL NO TEJIDO CLASE 2 m2
04.06.06 TUBERIA PVC SAP 8" m
04.06.07 TUBERIA PVC SAP 8" PERFORADA m
04.06.08 TUBERIA DE VENTILACION FIERRO GALVANIZADO D= 1 1/2' m
04.06.09 SUBDREN PROFUNDO m3
04.07 CUNETA DE CORONACIÓN
04.07.01 CUNETA DE CORONACIÓN m
05 OBRAS COMPLEMENTARIAS
05.01 MUROS DE CONCRETO
05.01.01 EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN SECO m3
05.01.02 RELLENO PARA ESTRUCTURAS m3
05.01.03 CONCRETO CLASE E (F'C=175 KGICM2) +30% P.G. m3
05.01.04 ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS m2
05.01.05 GEOTEXTIL NO TEJIDO CLASE 2 m2
05.01.06 FILTRO DRENANTE m3
05.01.07 JUNTA DE POLIESTIRENO EXPANDIDO E=2" m2
05.01.08 TUBERIA PVC 3" PARA DRENAJE m
05.01.09 TUBERIA CORRUGADA PERFORADA HDPE D=6" m
06 TRANSPORTES
06.01 TRANSPORTE DE MATERIALES GRANULARES PARA DISTANCIAS ENTRE 120 M Y 1000 M m3k
06.02 TRANSPORTE DE MATERIALES GRANULARES PARA DISTANCIAS MAYORES DE 1000 M m3k
06.03 TRANSPORTE DE MATERIALES EXCEDENTES PARA DISTANCIAS ENTRE 120 M Y 1000 M m3k
06.04 TRANSPORTE DE MATERIALES EXCEDENTES PARA DISTANCIAS MAYORES DE 1000 M m3k
06.05 TRANSPORTE DE AGREGADOS PARA DISTANCIAS ENTRE 120 M Y 1000 M m3k
06.06 TRANSPORTE DE AGREGADOS PARA DISTANCIAS MAYORES DE 1000 M m3k
06.07 TRANSPORTE DE PIEDRA PARA DISTANCIAS ENTRE 120 M Y 1000 M m3k
06.08 TRANSPORTE DE PIEDRA PARA DISTANCIAS MAYORES DE 1000 M m3k
07 SEÑALIZACIÓN Y SEGURIDAD VIAL
07.01 SEÑALES PREVENTIVAS (0.60M x 0.60M) und
07.02 SEÑAL REGLAMENTARIA: OCTOGONAL, RECTANGULAR, CUADRADA, TRIANGULAR Y OTROS und
07.03 SEÑAL INFORMATIVA ( 1.43X1.20 M) und
07.04 SEÑAL INFORMATIVA ( 2.30X0.65 M) und
07.05 GUARDAVIAS METAUCO (TIPO I) m
07.06 POSTES DE KILOMETRAJE und
08 PROTECCION AMBIENTAL
08.01 REVEGETACION Ha
08.02 ACONDICIONAMIENTO DE MATERIAL EXCEDENTE EN DME m3
08.03 RESTAURACIÓN DE AREAS DISTURBADAS EN CANTERAS Ha
08.04 RESTAURACION DE AREA UTILIZADA PARA CAMPAMENTO Y PATIO DE MAQUINAS Ha
08.05 MONITOREO DE LA CALIDAD DEL AIRE pto
08.06 MONITOREO DEL NIVEL SONORO pto
08.07 MONITOREO DE LA CALIDAD DEL AGUA pto
08.08 MONITOREO DE LA CALIDAD DEL SUELO pto
PLANILLAS DE METRADOS VALORIZADOS
“MEJORAMIENTO Y REHABILITACIÓN DEL CAMINO VECINAL SAN RAFAEL - CHACATAMA - HUANCABAMBA - CASHAYOG - HUILLAPARAC, DISTRITO DE
MTC - PROVÍAS DESCENTRALIZADO DISTRITO SAN RAFAEL
44,621.00 PROVINCIA AMBO
CONSORCIO VIRGEN DE LA PUERTA DEPARTAMENTO HUÁNUCO
SUPERVISA CONSORCIO BAÑOS DEL INCA
180 DÍAS CALENDARIOS RESIDENTE ING. ALBERTO RAFAEL DIAZ RÍOS, CIP Nº 050977
6/22/2018
12/18/2018
METRADO
METRADO BASE VAL 01 VAL 02 VAL 03 VAL 04 VAL 05
Jun-18 Jul-18 Aug-18 Sep-18 Oct-18
1.00 0.40
18.30 7.32 2.20 3.00
1.00 0.10 0.10 0.10 0.10 0.10
1.00 0.40 0.10 0.20
1.83 1.83
85,111.48 10,806.74 68,187.95 1,095.77
38,854.96 12,959.54 22,746.47 1,850.55
4,666.39 0.00 3,210.00
99,736.80 89,912.57
1,800.00 0.00
13,093.80
272.80
73.76
62.53
29.69
7.08
301.98
5,562.36
369.17
61.62
48.06
345.54
94.01
711.90
301.42
18,447.00 16,727.00
14,780.00
319.62
60.26
15.39
8.41
137.03
16.28
1,246.04
11,115.59
377.00
363.77
33.00
14.76
0.22
1.84
94.00
7.50
20.00
3.60
17.35
872.48 266.74
515.56
302.11 87.23
977.02 267.63
393.16
83.99
19.52
112.98 32.35
188.65
17,665.59 2,655.67 548.12
140,246.52 23,100.41 4,390.63
97,924.76 17,987.12 40,143.31 27,557.25 1,566.43 3,190.13
291,540.31 11,831.22 134,142.19 110,743.14 3,176.57 5,450.20
3,088.59 3,088.59
124,722.28 124,722.28
2,629.44 2,629.44
26,547.05 26,547.05
307.00
6.00
9.00
7.00
937.50
20.00
3.40
125,214.19 114,549.00
0.21
0.50
2.00 1.00
2.00 1.00
2.00 1.00
3.00 1.00
OS VALORIZADOS
- CASHAYOG - HUILLAPARAC, DISTRITO DE SAN RAFAEL, PROVINCIA DE AMBO, DEPARTAMENTO DE HUÁNUCO”
METRADOS VALORIZADOS
VAL 06 VAL 07 VAL 08 VAL 09 VAL 10 VAL 11 VAL 12
Nov-18 May-19 Sep-19 Oct-19 Nov-19 Jul-20 Aug-20
0.10
2.00 1.50 1.50
0.10 0.15 0.15
0.10 0.10
3,446.25 1,761.40
3,965.00 400.00 820.00 2,332.50 1,965.00 240.00
33.00
14.76
94.00
7.50
20.00
3.60
17.35
0.00
168.00
ACUMULADO SALDO POR
VAL 13 VAL 14
ACTUAL VALORIZAR
Sep-20 Oct-20
0.50 0.50
17.52 0.78
0.90 0.10
0.90 0.10
1.83
80,090.46 5,021.02
37,556.56 1,298.40
3,210.00 1,456.39
95,979.08 3,757.72
1,392.00 408.00
2,805.82 1,378.32
696.20 296.52
407.08 182.10
120.18 151.22
57.78 23.08
2,128.37 905.81
564.60
53.79
9.00
272.80
73.76
62.53
29.69
7.08
301.98
5,562.36
369.17
61.62
48.06
345.54
94.01
711.90
301.42
16,727.00 1,720.00
9,722.50 5,057.50
319.62
60.26
15.39
8.41
137.03
16.28
1,246.04
11,115.59
377.00
363.77
33.00
14.76
0.22
1.84
94.00
7.50
20.00
3.60
17.35
337.00 248.00
872.48
438.12 77.44
302.11 0.00
977.02 0.00
329.14 64.02
70.90 13.09
19.52
112.98
154.69 33.96
1,840.00 7,200.00 17,443.79 221.80
3,840.00 77,326.00 138,825.04 1,421.48
90,444.24 7,480.52
265,343.32 26,197.00
3,088.59
124,722.28
2,629.44
26,547.05
139.00 307.00
6.00
9.00 9.00 0.00
7.00 7.00 0.00
937.50
20.00 20.00
3.40
114,549.00 10,665.19
0.21
0.50
1.00 1.00
1.00 1.00
1.00 1.00
1.00 2.00
“MEJORAMIENTO Y REHABILITACIÓN DEL CAMINO VECINAL SAN RAFAEL - CHACATAMA - HUANCABAMBA - CASHAYOG - HUILLAPARAC, DISTRITO DE SAN
RAFAEL, PROVINCIA DE AMBO, DEPARTAMENTO DE HUÁNUCO”
FORMULA GENERAL D = ( A x V / C ) x ( Kr / Ka - 1 )
AMORTIZA (A)
UT MATERIAL UNIDAD ADELANTO (S/.) SALDO (S/.) Dm (S/.)
(S/.)
3 ACERO DE CONSTRUCCION CORRUGADO S/ 32,175.27 -S/ 9,706.75 S/ 34,612.53
ACERO CORRUGADO FY=4200 KGICM2 GRADO 60 kg S/ 19,791.33 -S/ 5,970.72 S/ 25,762.05
ALAMBRE NEGRO RECOCIDO # 16 kg S/ 416.89 -S/ 125.77 S/ 542.66
ALAMBRE NEGRO RECOCIDO # 8 kg S/ 1,821.44 -S/ 549.50 S/ 2,370.94
CLAVOS CON CABEZA DE 2%", 3", 4" kg S/ 4,560.93 -S/ 1,375.96 S/ 5,936.89
PERNOS 3/8' X 8 " +2A+T pza S/ 63.81 -S/ 19.25 S/ 83.06
PERNOS 5/8' X 14" +2A+T pza S/ 569.01 -S/ 171.66 S/ 740.67
PERNOS 1/4' X 3" pza S/ 54.23 -S/ 16.36 S/ 70.59
ANGULO DE ACERO 1" X 1" X 3/16' X 6 m pza S/ 3,784.17 -S/ 1,141.62 S/ 4,925.79
TEE DE ACERO 1 1/2' X 1 1/2" X 3/16" X 6 re pza S/ 433.88 -S/ 130.89 S/ 564.77
PLATINA DE ACERO 1/8- X 1" X 6 m pza S/ 455.83 -S/ 137.52 S/ 593.35
PLATINA DE ACERO 1/8' X 2" X 6 m. pza S/ 223.75 -S/ 67.50 S/ 291.25
FECHA Oct-20
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 26-Jul-18 INCIDENCI
A DEL
MATERIAL
SOLICITA
ADELANTO INCIDENCIA DEL DO CON
I.U MATERIAL SOLICITADO UND CANTIDAD P.UNIT. FECHA
OTORGADO ADELANTO RESPECT
O AL
PRESUPU
03 ACERO DE CONSTRUCCION CORRUGADO S/. 32,175.27 ESTO
TOTAL
ACERO CORRUGADO FY=4200 KGICM2 GRADO 60 kg 8,315.69 2.38 S/. 19,791.33 7/26/2018 61.51% 1.615%
ALAMBRE NEGRO RECOCIDO # 16 kg 174.43 2.39 S/. 416.89 7/26/2018 1.30% 0.034%
ALAMBRE NEGRO RECOCIDO # 8 kg 762.11 2.39 S/. 1,821.44 7/26/2018 5.66% 0.149%
CLAVOS CON CABEZA DE 2%", 3", 4" kg 1,452.53 3.14 S/. 4,560.93 7/26/2018 14.18% 0.372%
PERNOS 3/8' X 8 " +2A+T pza 51.05 1.25 S/. 63.81 7/26/2018 0.20% 0.005%
PERNOS 5/8' X 14" +2A+T pza 97.60 5.83 S/. 569.01 7/26/2018 1.77% 0.046%
PERNOS 1/4' X 3" pza 319.00 0.17 S/. 54.23 7/26/2018 0.17% 0.004%
ANGULO DE ACERO 1" X 1" X 3/16' X 6 m pza 156.50 24.18 S/. 3,784.17 7/26/2018 11.76% 0.309%
TEE DE ACERO 1 1/2' X 1 1/2" X 3/16" X 6 re pza 12.50 34.71 S/. 433.88 7/26/2018 1.35% 0.035%
PLATINA DE ACERO 1/8- X 1" X 6 m pza 57.77 7.89 S/. 455.83 7/26/2018 1.42% 0.037%
PLATINA DE ACERO 1/8' X 2" X 6 m. pza 12.50 17.90 S/. 223.75 7/26/2018 0.70% 0.018%
FECHA Oct-20
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 26-Jul-18 INCIDENCI
A DEL
MATERIAL
SOLICITA
ADELANTO INCIDENCIA DEL DO CON
I.U MATERIAL SOLICITADO UND CANTIDAD P.UNIT. FECHA
OTORGADO ADELANTO RESPECT
O AL
PRESUPU
03 ACERO DE CONSTRUCCION CORRUGADO S/. 32,175.27 ESTO
TOTAL
ACERO CORRUGADO FY=4200 KGICM2 GRADO 60 kg 8,315.69 2.38 S/. 19,791.33 7/26/2018 61.51% 1.615%
ALAMBRE NEGRO RECOCIDO # 16 kg 174.43 2.39 S/. 416.89 7/26/2018 1.30% 0.034%
ALAMBRE NEGRO RECOCIDO # 8 kg 762.11 2.39 S/. 1,821.44 7/26/2018 5.66% 0.149%
CLAVOS CON CABEZA DE 2%", 3", 4" kg 1,452.53 3.14 S/. 4,560.93 7/26/2018 14.18% 0.372%
PERNOS 3/8' X 8 " +2A+T pza 51.05 1.25 S/. 63.81 7/26/2018 0.20% 0.005%
PERNOS 5/8' X 14" +2A+T pza 97.60 5.83 S/. 569.01 7/26/2018 1.77% 0.046%
PERNOS 1/4' X 3" pza 319.00 0.17 S/. 54.23 7/26/2018 0.17% 0.004%
ANGULO DE ACERO 1" X 1" X 3/16' X 6 m pza 156.50 24.18 S/. 3,784.17 7/26/2018 11.76% 0.309%
TEE DE ACERO 1 1/2' X 1 1/2" X 3/16" X 6 re pza 12.50 34.71 S/. 433.88 7/26/2018 1.35% 0.035%
PLATINA DE ACERO 1/8- X 1" X 6 m pza 57.77 7.89 S/. 455.83 7/26/2018 1.42% 0.037%
PLATINA DE ACERO 1/8' X 2" X 6 m. pza 12.50 17.90 S/. 223.75 7/26/2018 0.70% 0.018%
FECHA Oct-20
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 26-Jul-18 INCIDENCI
A DEL
MATERIAL
SOLICITA
ADELANTO INCIDENCIA DEL DO CON
I.U MATERIAL SOLICITADO UND CANTIDAD P.UNIT. FECHA
OTORGADO ADELANTO RESPECT
O AL
PRESUPU
03 ACERO DE CONSTRUCCION CORRUGADO S/. 32,175.27 ESTO
TOTAL
ACERO CORRUGADO FY=4200 KGICM2 GRADO 60 kg 8,315.69 2.38 S/. 19,791.33 7/26/2018 61.51% 1.615%
ALAMBRE NEGRO RECOCIDO # 16 kg 174.43 2.39 S/. 416.89 7/26/2018 1.30% 0.034%
ALAMBRE NEGRO RECOCIDO # 8 kg 762.11 2.39 S/. 1,821.44 7/26/2018 5.66% 0.149%
CLAVOS CON CABEZA DE 2%", 3", 4" kg 1,452.53 3.14 S/. 4,560.93 7/26/2018 14.18% 0.372%
PERNOS 3/8' X 8 " +2A+T pza 51.05 1.25 S/. 63.81 7/26/2018 0.20% 0.005%
PERNOS 5/8' X 14" +2A+T pza 97.60 5.83 S/. 569.01 7/26/2018 1.77% 0.046%
PERNOS 1/4' X 3" pza 319.00 0.17 S/. 54.23 7/26/2018 0.17% 0.004%
ANGULO DE ACERO 1" X 1" X 3/16' X 6 m pza 156.50 24.18 S/. 3,784.17 7/26/2018 11.76% 0.309%
TEE DE ACERO 1 1/2' X 1 1/2" X 3/16" X 6 re pza 12.50 34.71 S/. 433.88 7/26/2018 1.35% 0.035%
PLATINA DE ACERO 1/8- X 1" X 6 m pza 57.77 7.89 S/. 455.83 7/26/2018 1.42% 0.037%
PLATINA DE ACERO 1/8' X 2" X 6 m. pza 12.50 17.90 S/. 223.75 7/26/2018 0.70% 0.018%
FECHA Oct-20
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 26-Jul-18 INCIDENCI
A DEL
MATERIAL
SOLICITA
ADELANTO INCIDENCIA DEL DO CON
I.U MATERIAL SOLICITADO UND CANTIDAD P.UNIT. FECHA
OTORGADO ADELANTO RESPECT
O AL
PRESUPU
03 ACERO DE CONSTRUCCION CORRUGADO S/. 32,175.27 ESTO
TOTAL
ACERO CORRUGADO FY=4200 KGICM2 GRADO 60 kg 8,315.69 2.38 S/. 19,791.33 7/26/2018 61.51% 1.615%
ALAMBRE NEGRO RECOCIDO # 16 kg 174.43 2.39 S/. 416.89 7/26/2018 1.30% 0.034%
ALAMBRE NEGRO RECOCIDO # 8 kg 762.11 2.39 S/. 1,821.44 7/26/2018 5.66% 0.149%
CLAVOS CON CABEZA DE 2%", 3", 4" kg 1,452.53 3.14 S/. 4,560.93 7/26/2018 14.18% 0.372%
PERNOS 3/8' X 8 " +2A+T pza 51.05 1.25 S/. 63.81 7/26/2018 0.20% 0.005%
PERNOS 5/8' X 14" +2A+T pza 97.60 5.83 S/. 569.01 7/26/2018 1.77% 0.046%
PERNOS 1/4' X 3" pza 319.00 0.17 S/. 54.23 7/26/2018 0.17% 0.004%
ANGULO DE ACERO 1" X 1" X 3/16' X 6 m pza 156.50 24.18 S/. 3,784.17 7/26/2018 11.76% 0.309%
TEE DE ACERO 1 1/2' X 1 1/2" X 3/16" X 6 re pza 12.50 34.71 S/. 433.88 7/26/2018 1.35% 0.035%
PLATINA DE ACERO 1/8- X 1" X 6 m pza 57.77 7.89 S/. 455.83 7/26/2018 1.42% 0.037%
PLATINA DE ACERO 1/8' X 2" X 6 m. pza 12.50 17.90 S/. 223.75 7/26/2018 0.70% 0.018%
FECHA Oct-20
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 26-Jul-18 INCIDENCI
A DEL
MATERIAL
SOLICITA
ADELANTO INCIDENCIA DEL DO CON
I.U MATERIAL SOLICITADO UND CANTIDAD P.UNIT. FECHA
OTORGADO ADELANTO RESPECT
O AL
PRESUPU
03 ACERO DE CONSTRUCCION CORRUGADO S/. 32,175.27 ESTO
TOTAL
ACERO CORRUGADO FY=4200 KGICM2 GRADO 60 kg 8,315.69 2.38 S/. 19,791.33 7/26/2018 61.51% 1.615%
ALAMBRE NEGRO RECOCIDO # 16 kg 174.43 2.39 S/. 416.89 7/26/2018 1.30% 0.034%
ALAMBRE NEGRO RECOCIDO # 8 kg 762.11 2.39 S/. 1,821.44 7/26/2018 5.66% 0.149%
CLAVOS CON CABEZA DE 2%", 3", 4" kg 1,452.53 3.14 S/. 4,560.93 7/26/2018 14.18% 0.372%
PERNOS 3/8' X 8 " +2A+T pza 51.05 1.25 S/. 63.81 7/26/2018 0.20% 0.005%
PERNOS 5/8' X 14" +2A+T pza 97.60 5.83 S/. 569.01 7/26/2018 1.77% 0.046%
PERNOS 1/4' X 3" pza 319.00 0.17 S/. 54.23 7/26/2018 0.17% 0.004%
ANGULO DE ACERO 1" X 1" X 3/16' X 6 m pza 156.50 24.18 S/. 3,784.17 7/26/2018 11.76% 0.309%
TEE DE ACERO 1 1/2' X 1 1/2" X 3/16" X 6 re pza 12.50 34.71 S/. 433.88 7/26/2018 1.35% 0.035%
PLATINA DE ACERO 1/8- X 1" X 6 m pza 57.77 7.89 S/. 455.83 7/26/2018 1.42% 0.037%
PLATINA DE ACERO 1/8' X 2" X 6 m. pza 12.50 17.90 S/. 223.75 7/26/2018 0.70% 0.018%
FECHA Oct-20
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 26-Jul-18 INCIDENCI
A DEL
MATERIAL
SOLICITA
ADELANTO INCIDENCIA DEL DO CON
I.U MATERIAL SOLICITADO UND CANTIDAD P.UNIT. FECHA
OTORGADO ADELANTO RESPECT
O AL
PRESUPU
03 ACERO DE CONSTRUCCION CORRUGADO S/. 32,175.27 ESTO
TOTAL
ACERO CORRUGADO FY=4200 KGICM2 GRADO 60 kg 8,315.69 2.38 S/. 19,791.33 7/26/2018 61.51% 1.615%
ALAMBRE NEGRO RECOCIDO # 16 kg 174.43 2.39 S/. 416.89 7/26/2018 1.30% 0.034%
ALAMBRE NEGRO RECOCIDO # 8 kg 762.11 2.39 S/. 1,821.44 7/26/2018 5.66% 0.149%
CLAVOS CON CABEZA DE 2%", 3", 4" kg 1,452.53 3.14 S/. 4,560.93 7/26/2018 14.18% 0.372%
PERNOS 3/8' X 8 " +2A+T pza 51.05 1.25 S/. 63.81 7/26/2018 0.20% 0.005%
PERNOS 5/8' X 14" +2A+T pza 97.60 5.83 S/. 569.01 7/26/2018 1.77% 0.046%
PERNOS 1/4' X 3" pza 319.00 0.17 S/. 54.23 7/26/2018 0.17% 0.004%
ANGULO DE ACERO 1" X 1" X 3/16' X 6 m pza 156.50 24.18 S/. 3,784.17 7/26/2018 11.76% 0.309%
TEE DE ACERO 1 1/2' X 1 1/2" X 3/16" X 6 re pza 12.50 34.71 S/. 433.88 7/26/2018 1.35% 0.035%
PLATINA DE ACERO 1/8- X 1" X 6 m pza 57.77 7.89 S/. 455.83 7/26/2018 1.42% 0.037%
PLATINA DE ACERO 1/8' X 2" X 6 m. pza 12.50 17.90 S/. 223.75 7/26/2018 0.70% 0.018%
FECHA Oct-20
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 26-Jul-18 INCIDENCI
A DEL
MATERIAL
SOLICITA
ADELANTO INCIDENCIA DEL DO CON
I.U MATERIAL SOLICITADO UND CANTIDAD P.UNIT. FECHA
OTORGADO ADELANTO RESPECT
O AL
PRESUPU
03 ACERO DE CONSTRUCCION CORRUGADO S/. 32,175.27 ESTO
TOTAL
ACERO CORRUGADO FY=4200 KGICM2 GRADO 60 kg 8,315.69 2.38 S/. 19,791.33 7/26/2018 61.51% 1.615%
ALAMBRE NEGRO RECOCIDO # 16 kg 174.43 2.39 S/. 416.89 7/26/2018 1.30% 0.034%
ALAMBRE NEGRO RECOCIDO # 8 kg 762.11 2.39 S/. 1,821.44 7/26/2018 5.66% 0.149%
CLAVOS CON CABEZA DE 2%", 3", 4" kg 1,452.53 3.14 S/. 4,560.93 7/26/2018 14.18% 0.372%
PERNOS 3/8' X 8 " +2A+T pza 51.05 1.25 S/. 63.81 7/26/2018 0.20% 0.005%
PERNOS 5/8' X 14" +2A+T pza 97.60 5.83 S/. 569.01 7/26/2018 1.77% 0.046%
PERNOS 1/4' X 3" pza 319.00 0.17 S/. 54.23 7/26/2018 0.17% 0.004%
ANGULO DE ACERO 1" X 1" X 3/16' X 6 m pza 156.50 24.18 S/. 3,784.17 7/26/2018 11.76% 0.309%
TEE DE ACERO 1 1/2' X 1 1/2" X 3/16" X 6 re pza 12.50 34.71 S/. 433.88 7/26/2018 1.35% 0.035%
PLATINA DE ACERO 1/8- X 1" X 6 m pza 57.77 7.89 S/. 455.83 7/26/2018 1.42% 0.037%
PLATINA DE ACERO 1/8' X 2" X 6 m. pza 12.50 17.90 S/. 223.75 7/26/2018 0.70% 0.018%
FECHA Oct-20
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 26-Jul-18 INCIDENCI
A DEL
MATERIAL
SOLICITA
ADELANTO INCIDENCIA DEL DO CON
I.U MATERIAL SOLICITADO UND CANTIDAD P.UNIT. FECHA
OTORGADO ADELANTO RESPECT
O AL
PRESUPU
03 ACERO DE CONSTRUCCION CORRUGADO S/. 32,175.27 ESTO
TOTAL
ACERO CORRUGADO FY=4200 KGICM2 GRADO 60 kg 8,315.69 2.38 S/. 19,791.33 7/26/2018 61.51% 1.615%
ALAMBRE NEGRO RECOCIDO # 16 kg 174.43 2.39 S/. 416.89 7/26/2018 1.30% 0.034%
ALAMBRE NEGRO RECOCIDO # 8 kg 762.11 2.39 S/. 1,821.44 7/26/2018 5.66% 0.149%
CLAVOS CON CABEZA DE 2%", 3", 4" kg 1,452.53 3.14 S/. 4,560.93 7/26/2018 14.18% 0.372%
PERNOS 3/8' X 8 " +2A+T pza 51.05 1.25 S/. 63.81 7/26/2018 0.20% 0.005%
PERNOS 5/8' X 14" +2A+T pza 97.60 5.83 S/. 569.01 7/26/2018 1.77% 0.046%
PERNOS 1/4' X 3" pza 319.00 0.17 S/. 54.23 7/26/2018 0.17% 0.004%
ANGULO DE ACERO 1" X 1" X 3/16' X 6 m pza 156.50 24.18 S/. 3,784.17 7/26/2018 11.76% 0.309%
TEE DE ACERO 1 1/2' X 1 1/2" X 3/16" X 6 re pza 12.50 34.71 S/. 433.88 7/26/2018 1.35% 0.035%
PLATINA DE ACERO 1/8- X 1" X 6 m pza 57.77 7.89 S/. 455.83 7/26/2018 1.42% 0.037%
PLATINA DE ACERO 1/8' X 2" X 6 m. pza 12.50 17.90 S/. 223.75 7/26/2018 0.70% 0.018%
FECHA Oct-20
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 26-Jul-18 INCIDENCI
A DEL
MATERIAL
SOLICITA
ADELANTO INCIDENCIA DEL DO CON
I.U MATERIAL SOLICITADO UND CANTIDAD P.UNIT. FECHA
OTORGADO ADELANTO RESPECT
O AL
PRESUPU
03 ACERO DE CONSTRUCCION CORRUGADO S/. 32,175.27 ESTO
TOTAL
ACERO CORRUGADO FY=4200 KGICM2 GRADO 60 kg 8,315.69 2.38 S/. 19,791.33 7/26/2018 61.51% 1.615%
ALAMBRE NEGRO RECOCIDO # 16 kg 174.43 2.39 S/. 416.89 7/26/2018 1.30% 0.034%
ALAMBRE NEGRO RECOCIDO # 8 kg 762.11 2.39 S/. 1,821.44 7/26/2018 5.66% 0.149%
CLAVOS CON CABEZA DE 2%", 3", 4" kg 1,452.53 3.14 S/. 4,560.93 7/26/2018 14.18% 0.372%
PERNOS 3/8' X 8 " +2A+T pza 51.05 1.25 S/. 63.81 7/26/2018 0.20% 0.005%
PERNOS 5/8' X 14" +2A+T pza 97.60 5.83 S/. 569.01 7/26/2018 1.77% 0.046%
PERNOS 1/4' X 3" pza 319.00 0.17 S/. 54.23 7/26/2018 0.17% 0.004%
ANGULO DE ACERO 1" X 1" X 3/16' X 6 m pza 156.50 24.18 S/. 3,784.17 7/26/2018 11.76% 0.309%
TEE DE ACERO 1 1/2' X 1 1/2" X 3/16" X 6 re pza 12.50 34.71 S/. 433.88 7/26/2018 1.35% 0.035%
PLATINA DE ACERO 1/8- X 1" X 6 m pza 57.77 7.89 S/. 455.83 7/26/2018 1.42% 0.037%
PLATINA DE ACERO 1/8' X 2" X 6 m. pza 12.50 17.90 S/. 223.75 7/26/2018 0.70% 0.018%
FECHA Oct-20
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 26-Jul-18 INCIDENCI
A DEL
MATERIAL
SOLICITA
ADELANTO INCIDENCIA DEL DO CON
I.U MATERIAL SOLICITADO UND CANTIDAD P.UNIT. FECHA
OTORGADO ADELANTO RESPECT
O AL
PRESUPU
03 ACERO DE CONSTRUCCION CORRUGADO S/. 32,175.27 ESTO
TOTAL
ACERO CORRUGADO FY=4200 KGICM2 GRADO 60 kg 8,315.69 2.38 S/. 19,791.33 7/26/2018 61.51% 1.615%
ALAMBRE NEGRO RECOCIDO # 16 kg 174.43 2.39 S/. 416.89 7/26/2018 1.30% 0.034%
ALAMBRE NEGRO RECOCIDO # 8 kg 762.11 2.39 S/. 1,821.44 7/26/2018 5.66% 0.149%
CLAVOS CON CABEZA DE 2%", 3", 4" kg 1,452.53 3.14 S/. 4,560.93 7/26/2018 14.18% 0.372%
PERNOS 3/8' X 8 " +2A+T pza 51.05 1.25 S/. 63.81 7/26/2018 0.20% 0.005%
PERNOS 5/8' X 14" +2A+T pza 97.60 5.83 S/. 569.01 7/26/2018 1.77% 0.046%
PERNOS 1/4' X 3" pza 319.00 0.17 S/. 54.23 7/26/2018 0.17% 0.004%
ANGULO DE ACERO 1" X 1" X 3/16' X 6 m pza 156.50 24.18 S/. 3,784.17 7/26/2018 11.76% 0.309%
TEE DE ACERO 1 1/2' X 1 1/2" X 3/16" X 6 re pza 12.50 34.71 S/. 433.88 7/26/2018 1.35% 0.035%
PLATINA DE ACERO 1/8- X 1" X 6 m pza 57.77 7.89 S/. 455.83 7/26/2018 1.42% 0.037%
PLATINA DE ACERO 1/8' X 2" X 6 m. pza 12.50 17.90 S/. 223.75 7/26/2018 0.70% 0.018%
FECHA Oct-20
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 26-Jul-18 INCIDENCI
A DEL
MATERIAL
SOLICITA
ADELANTO INCIDENCIA DEL DO CON
I.U MATERIAL SOLICITADO UND CANTIDAD P.UNIT. FECHA
OTORGADO ADELANTO RESPECT
O AL
PRESUPU
03 ACERO DE CONSTRUCCION CORRUGADO S/. 32,175.27 ESTO
TOTAL
ACERO CORRUGADO FY=4200 KGICM2 GRADO 60 kg 8,315.69 2.38 S/. 19,791.33 7/26/2018 61.51% 1.615%
ALAMBRE NEGRO RECOCIDO # 16 kg 174.43 2.39 S/. 416.89 7/26/2018 1.30% 0.034%
ALAMBRE NEGRO RECOCIDO # 8 kg 762.11 2.39 S/. 1,821.44 7/26/2018 5.66% 0.149%
CLAVOS CON CABEZA DE 2%", 3", 4" kg 1,452.53 3.14 S/. 4,560.93 7/26/2018 14.18% 0.372%
PERNOS 3/8' X 8 " +2A+T pza 51.05 1.25 S/. 63.81 7/26/2018 0.20% 0.005%
PERNOS 5/8' X 14" +2A+T pza 97.60 5.83 S/. 569.01 7/26/2018 1.77% 0.046%
PERNOS 1/4' X 3" pza 319.00 0.17 S/. 54.23 7/26/2018 0.17% 0.004%
ANGULO DE ACERO 1" X 1" X 3/16' X 6 m pza 156.50 24.18 S/. 3,784.17 7/26/2018 11.76% 0.309%
TEE DE ACERO 1 1/2' X 1 1/2" X 3/16" X 6 re pza 12.50 34.71 S/. 433.88 7/26/2018 1.35% 0.035%
PLATINA DE ACERO 1/8- X 1" X 6 m pza 57.77 7.89 S/. 455.83 7/26/2018 1.42% 0.037%
PLATINA DE ACERO 1/8' X 2" X 6 m. pza 12.50 17.90 S/. 223.75 7/26/2018 0.70% 0.018%
FECHA Oct-20
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 26-Jul-18 INCIDENCI
A DEL
MATERIAL
SOLICITA
ADELANTO INCIDENCIA DEL DO CON
I.U MATERIAL SOLICITADO UND CANTIDAD P.UNIT. FECHA
OTORGADO ADELANTO RESPECT
O AL
PRESUPU
03 ACERO DE CONSTRUCCION CORRUGADO S/. 32,175.27 ESTO
TOTAL
ACERO CORRUGADO FY=4200 KGICM2 GRADO 60 kg 8,315.69 2.38 S/. 19,791.33 7/26/2018 61.51% 1.615%
ALAMBRE NEGRO RECOCIDO # 16 kg 174.43 2.39 S/. 416.89 7/26/2018 1.30% 0.034%
ALAMBRE NEGRO RECOCIDO # 8 kg 762.11 2.39 S/. 1,821.44 7/26/2018 5.66% 0.149%
CLAVOS CON CABEZA DE 2%", 3", 4" kg 1,452.53 3.14 S/. 4,560.93 7/26/2018 14.18% 0.372%
PERNOS 3/8' X 8 " +2A+T pza 51.05 1.25 S/. 63.81 7/26/2018 0.20% 0.005%
PERNOS 5/8' X 14" +2A+T pza 97.60 5.83 S/. 569.01 7/26/2018 1.77% 0.046%
PERNOS 1/4' X 3" pza 319.00 0.17 S/. 54.23 7/26/2018 0.17% 0.004%
ANGULO DE ACERO 1" X 1" X 3/16' X 6 m pza 156.50 24.18 S/. 3,784.17 7/26/2018 11.76% 0.309%
TEE DE ACERO 1 1/2' X 1 1/2" X 3/16" X 6 re pza 12.50 34.71 S/. 433.88 7/26/2018 1.35% 0.035%
PLATINA DE ACERO 1/8- X 1" X 6 m pza 57.77 7.89 S/. 455.83 7/26/2018 1.42% 0.037%
PLATINA DE ACERO 1/8' X 2" X 6 m. pza 12.50 17.90 S/. 223.75 7/26/2018 0.70% 0.018%
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 01
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67 0
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 26-Jul-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 01
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67 0
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 26-Jul-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 01
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67 0
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 26-Jul-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 01
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67 0
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 26-Jul-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 01
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67 0
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 26-Jul-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 01
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67 0
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 26-Jul-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 01
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67 0
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 26-Jul-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 01
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67 0
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 26-Jul-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 01
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67 0
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 26-Jul-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 01
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67 0
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 26-Jul-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 01
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67 0
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 26-Jul-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 01
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67 0
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 26-Jul-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 01
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67 0
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 26-Jul-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 01
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67 0
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 26-Jul-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 01
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67 0
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 26-Jul-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 01
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67 0
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 26-Jul-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 01
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67 0
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 26-Jul-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 01
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67 0
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 26-Jul-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 01
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67 0
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 26-Jul-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 01
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67 0
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 26-Jul-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 01
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67 0
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 26-Jul-18
FECHA Oct-20
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 20-Sep-18
INCIDENCIA
DEL
MATERIAL
SOLICITAD
INCIDENCIA DEL
I.U MATERIAL SOLICITADO UND CANTIDAD P.UNIT. ADELANTO OTORGADO FECHA O CON
ADELANTO
RESPECTO
AL
PRESUPUE
03 ACERO DE CONSTRUCCION CORRUGADO S/. 24,884.73 STO TOTAL
ACERO CORRUGADO FY=4200 KGICM2 GRADO 60 kg 10,000.00 2.38 S/. 23,800.00 9/20/2018 95.64% 1.94%
SOLDADURA kg 10.99 11.47 S/. 1.00 9/20/2018 0.00% 0.00%
PLATINA DE ACERO 1/8- X 1" X 6 m pza 43.33 7.89 S/. 341.87 9/20/2018 1.37% 0.03%
BARRENO DE 718" X 5 p und 2.35 315.08 S/. 741.85 9/20/2018 2.98% 0.06%
FECHA Oct-20
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 20-Sep-18
INCIDENCIA
DEL
MATERIAL
SOLICITAD
INCIDENCIA DEL
I.U MATERIAL SOLICITADO UND CANTIDAD P.UNIT. ADELANTO OTORGADO FECHA O CON
ADELANTO
RESPECTO
AL
PRESUPUE
03 ACERO DE CONSTRUCCION CORRUGADO S/. 24,884.73 STO TOTAL
ACERO CORRUGADO FY=4200 KGICM2 GRADO 60 kg 10,000.00 2.38 S/. 23,800.00 9/20/2018 95.64% 1.94%
SOLDADURA kg 10.99 11.47 S/. 1.00 9/20/2018 0.00% 0.00%
PLATINA DE ACERO 1/8- X 1" X 6 m pza 43.33 7.89 S/. 341.87 9/20/2018 1.37% 0.03%
BARRENO DE 718" X 5 p und 2.35 315.08 S/. 741.85 9/20/2018 2.98% 0.06%
FECHA Oct-20
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 20-Sep-18
INCIDENCIA
DEL
MATERIAL
SOLICITAD
INCIDENCIA DEL
I.U MATERIAL SOLICITADO UND CANTIDAD P.UNIT. ADELANTO OTORGADO FECHA O CON
ADELANTO
RESPECTO
AL
PRESUPUE
03 ACERO DE CONSTRUCCION CORRUGADO S/. 24,884.73 STO TOTAL
ACERO CORRUGADO FY=4200 KGICM2 GRADO 60 kg 10,000.00 2.38 S/. 23,800.00 9/20/2018 95.64% 1.94%
SOLDADURA kg 10.99 11.47 S/. 1.00 9/20/2018 0.00% 0.00%
PLATINA DE ACERO 1/8- X 1" X 6 m pza 43.33 7.89 S/. 341.87 9/20/2018 1.37% 0.03%
BARRENO DE 718" X 5 p und 2.35 315.08 S/. 741.85 9/20/2018 2.98% 0.06%
FECHA Oct-20
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 20-Sep-18
INCIDENCIA
DEL
MATERIAL
SOLICITAD
INCIDENCIA DEL
I.U MATERIAL SOLICITADO UND CANTIDAD P.UNIT. ADELANTO OTORGADO FECHA O CON
ADELANTO
RESPECTO
AL
PRESUPUE
03 ACERO DE CONSTRUCCION CORRUGADO S/. 24,884.73 STO TOTAL
ACERO CORRUGADO FY=4200 KGICM2 GRADO 60 kg 10,000.00 2.38 S/. 23,800.00 9/20/2018 95.64% 1.94%
SOLDADURA kg 10.99 11.47 S/. 1.00 9/20/2018 0.00% 0.00%
PLATINA DE ACERO 1/8- X 1" X 6 m pza 43.33 7.89 S/. 341.87 9/20/2018 1.37% 0.03%
BARRENO DE 718" X 5 p und 2.35 315.08 S/. 741.85 9/20/2018 2.98% 0.06%
FECHA Oct-20
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 20-Sep-18
INCIDENCIA
DEL
MATERIAL
SOLICITAD
INCIDENCIA DEL
I.U MATERIAL SOLICITADO UND CANTIDAD P.UNIT. ADELANTO OTORGADO FECHA O CON
ADELANTO
RESPECTO
AL
PRESUPUE
03 ACERO DE CONSTRUCCION CORRUGADO S/. 24,884.73 STO TOTAL
ACERO CORRUGADO FY=4200 KGICM2 GRADO 60 kg 10,000.00 2.38 S/. 23,800.00 9/20/2018 95.64% 1.94%
SOLDADURA kg 10.99 11.47 S/. 1.00 9/20/2018 0.00% 0.00%
PLATINA DE ACERO 1/8- X 1" X 6 m pza 43.33 7.89 S/. 341.87 9/20/2018 1.37% 0.03%
BARRENO DE 718" X 5 p und 2.35 315.08 S/. 741.85 9/20/2018 2.98% 0.06%
FECHA Oct-20
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 20-Sep-18
INCIDENCIA
DEL
MATERIAL
SOLICITAD
INCIDENCIA DEL
I.U MATERIAL SOLICITADO UND CANTIDAD P.UNIT. ADELANTO OTORGADO FECHA O CON
ADELANTO
RESPECTO
AL
PRESUPUE
03 ACERO DE CONSTRUCCION CORRUGADO S/. 24,884.73 STO TOTAL
ACERO CORRUGADO FY=4200 KGICM2 GRADO 60 kg 10,000.00 2.38 S/. 23,800.00 9/20/2018 95.64% 1.94%
SOLDADURA kg 10.99 11.47 S/. 1.00 9/20/2018 0.00% 0.00%
PLATINA DE ACERO 1/8- X 1" X 6 m pza 43.33 7.89 S/. 341.87 9/20/2018 1.37% 0.03%
BARRENO DE 718" X 5 p und 2.35 315.08 S/. 741.85 9/20/2018 2.98% 0.06%
FECHA Oct-20
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 20-Sep-18
INCIDENCIA
DEL
MATERIAL
SOLICITAD
INCIDENCIA DEL
I.U MATERIAL SOLICITADO UND CANTIDAD P.UNIT. ADELANTO OTORGADO FECHA O CON
ADELANTO
RESPECTO
AL
PRESUPUE
03 ACERO DE CONSTRUCCION CORRUGADO S/. 24,884.73 STO TOTAL
ACERO CORRUGADO FY=4200 KGICM2 GRADO 60 kg 10,000.00 2.38 S/. 23,800.00 9/20/2018 95.64% 1.94%
SOLDADURA kg 10.99 11.47 S/. 1.00 9/20/2018 0.00% 0.00%
PLATINA DE ACERO 1/8- X 1" X 6 m pza 43.33 7.89 S/. 341.87 9/20/2018 1.37% 0.03%
BARRENO DE 718" X 5 p und 2.35 315.08 S/. 741.85 9/20/2018 2.98% 0.06%
FECHA Oct-20
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 20-Sep-18
INCIDENCIA
DEL
MATERIAL
SOLICITAD
INCIDENCIA DEL
I.U MATERIAL SOLICITADO UND CANTIDAD P.UNIT. ADELANTO OTORGADO FECHA O CON
ADELANTO
RESPECTO
AL
PRESUPUE
03 ACERO DE CONSTRUCCION CORRUGADO S/. 24,884.73 STO TOTAL
ACERO CORRUGADO FY=4200 KGICM2 GRADO 60 kg 10,000.00 2.38 S/. 23,800.00 9/20/2018 95.64% 1.94%
SOLDADURA kg 10.99 11.47 S/. 1.00 9/20/2018 0.00% 0.00%
PLATINA DE ACERO 1/8- X 1" X 6 m pza 43.33 7.89 S/. 341.87 9/20/2018 1.37% 0.03%
BARRENO DE 718" X 5 p und 2.35 315.08 S/. 741.85 9/20/2018 2.98% 0.06%
FECHA Oct-20
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 20-Sep-18
INCIDENCIA
DEL
MATERIAL
SOLICITAD
INCIDENCIA DEL
I.U MATERIAL SOLICITADO UND CANTIDAD P.UNIT. ADELANTO OTORGADO FECHA O CON
ADELANTO
RESPECTO
AL
PRESUPUE
03 ACERO DE CONSTRUCCION CORRUGADO S/. 24,884.73 STO TOTAL
ACERO CORRUGADO FY=4200 KGICM2 GRADO 60 kg 10,000.00 2.38 S/. 23,800.00 9/20/2018 95.64% 1.94%
SOLDADURA kg 10.99 11.47 S/. 1.00 9/20/2018 0.00% 0.00%
PLATINA DE ACERO 1/8- X 1" X 6 m pza 43.33 7.89 S/. 341.87 9/20/2018 1.37% 0.03%
BARRENO DE 718" X 5 p und 2.35 315.08 S/. 741.85 9/20/2018 2.98% 0.06%
AMORTIZA (A)
UT MATERIAL UNIDAD ADELANTO (S/.) SALDO (S/.) Dm (S/.)
(S/.)
3 ACERO DE CONSTRUCCION CORRUGADO S/ 24,884.73 S/ 3,391.10 S/ 21,493.63
ACERO CORRUGADO FY=4200 KGICM2 GRADO 60 kg S/ 23,800.00 S/ 3,243.28 S/ 20,556.72
SOLDADURA kg S/ 1.00 S/ 0.14 S/ 0.86
PLATINA DE ACERO 1/8- X 1" X 6 m pza S/ 341.87 S/ 46.59 S/ 295.28
BARRENO DE 718" X 5 p und S/ 741.85 S/ 101.09 S/ 640.76
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 02
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 20-Sep-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 02
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 20-Sep-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 02
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 20-Sep-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 02
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 20-Sep-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 02
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 20-Sep-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 02
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 20-Sep-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 02
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 20-Sep-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 02
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 20-Sep-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 02
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 20-Sep-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 02
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 20-Sep-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 02
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 20-Sep-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 02
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 20-Sep-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 02
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 20-Sep-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 02
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 20-Sep-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 02
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 20-Sep-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 02
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 20-Sep-18
DEDUCCION DEL REAJUSTE QUE NO CORRESPONDE POR ADELANTO ESPECIFICO PARA MATERIALES Nº 02
FECHA Oct-20
PRESUPUESTO CONTRATADO 12,252,347.67
ADELANTO P/MATER. S/. 1,225,234.77 10.00% MC
FECHA ADELANTO 20-Sep-18
PROYECTO
INSTALACIÓN DEL SISTEMA DE ELECTRIFICACIÓN RURAL MEDIANTE REDES CONVENCIONALES EN LAS LOCALIDADES DE MARISOL Y NUEVO CHIMBOTE, UBICADOS EN EL DISTRITO DE PACHIZA, PROVINCIA DE
MARISCAL CACERES, DEPARTAMENTO DE SAN MARTÍN.
DEPARTAMENTO SAN MARTIN
PROVINCIA MARISCAL CACERES
DISTRITO PACHIZA
COSTO
ITEM DESCRIPCION UNID. CANTIDAD UNITARIO PARCILAL MES 1 MES 2 MES 3 MES 4 MES 5 MES 6
S/.
LINEA PRIMARIA
SUMINISTRO DE MATERIALES
1 CRUCETAS DE MADERA
1.01 CRUCETA DE MADERA TRATADA DE 90 x 115 mm x1,20 m u 3.00 68.90 206.70 165.36 41.34
2 POSTES DE ACERO GALVANIZADO
2.01 POSTE DE A° G° OCTOGONAL DE 12 - 200, EMBONABLE (02 MODULOS) u 27.00 1,100.00 29,700.00 19,800.00 9,900.00
2.02 POSTE DE A° G° OCTOGONAL DE 12 - 300, EMBONABLE (02 MODULOS) u 24 1,300.00 31,200.00 20,800.00 10,400.00
3 AISLADORES Y ACCESORIOS
3.01 AISLADOR DE PORCELANA TIPO PIN, CLASE ANSI 56-3 u 40.00 58.46 2,338.40 2,338.40
3.02 AISLADOR POLIMERICO CON CONEXIÓN HORQUILLA (ESTRUCTURA) Y LENGÜETA (LINEA) DE 36 KV, SEGÚN ESPECIFICACION TÉCNICA. u 43.00 198.52 8,536.36 8,536.36
3.03 ESPIGA DE AºGº DE 609 mm LONG.,PARA CABEZA DE POSTE Y AISLADOR ANSI 56-3 u 40 34.81 1,392.40 1,392.40
4 CONDUCTOR DE ALEACIÓN DE ALUMINIO
4.01 CONDUCTOR DE ALEACION DE ALUMINIO DE 35 mm2 kM 9.9316205 1,400.00 13,904.27 13,904.27
4.02 CONDUCTOR DE ALEACION DE ALUMINIO DE 70 mm2 kM 0.9367541 3,462.92 3,243.91 3,243.91
5 ACCESORIOS PARA CONDUCTOR DE ALEACION ALUMINIO
5.01 VARILLA DE ARMAR PREFORMADA SIMPLE PARA CONDUCTOR DE 35 mm2 u 31.00 6.52 202.12 202.12
5.02 GRAPA DE DOBLE VIA DE ALUMINIO PARA CONDUCTOR DE 35 mm2 u 17 4.67 79.39 79.39
5.03 GRAPA DE DOBLE VIA DE ALUMINIO PARA CONDUCTOR DE 70 mm2 u 4.00 8.49 33.97 33.97
5.04 ALAMBRE DE AMARRE ALUMINIO RECOCIDO DE 16 mm2 m 100.00 1.02 102.00 102.00
5.05 AMORTIGUADOR DE VIBRACION TIPO ESPIRAL PARA CONDUCTOR DE 35 mm2 u 48.00 40.97 1,966.56 1,966.56
5.06 AMORTIGUADOR DE VIBRACION TIPO ESPIRAL PARA CONDUCTOR DE 70 mm2 u 8.00 45.71 365.68 365.68
5.07 GRAPA DE ANGULO PARA CONDUCTOR DE 35 mm2 u 5.00 27.09 135.45 135.45
5.08 GRAPA DE ANCLAJE PARA CONDUCTOR DE 35 mm2 u 34.00 23.25 790.50 790.50
5.09 GRAPA DE ANCLAJE PARA CONDUCTOR DE 70 mm2 u 4.00 27.04 108.16 108.16
5.1 CINTA PLANA DE ARMAR DE ALUMINIO (m) m 38.00 0.86 32.60 32.60
6 CONDUCTOR DE COBRE
6.01 CONDUCTOR DE COBRE RECOCIDO, CABLEADO, DE 16 mm2, PARA PUESTA A TIERRA m 521 4.54 2,365.34 2,365.34
7 MATERIAL DE FERRETERIA PARA POSTES Y CRUCETAS
7.01 PERNO DE A°G° DE 16 mm ø x 305 mm, PROVISTO DE TUERCA Y CONTRATUERCA u 3.00 7.00 21.00 21.00
7.02 PERNO DE A°G° DE 16 mm ø x 254 mm, PROVISTO DE TUERCA Y CONTRATUERCA u 80.00 7.16 572.80 572.80
7.03 PERNO OJO DE A°G° DE 16 mm ø x 254 mm, PROVISTO DE TUERCA Y CONTRATUERCA u 30.00 7.16 214.80 214.80
7.04 PERNO DE A°G° DE 13 mm ø x 254 mm, PROVISTO DE TUERCA Y CONTRATUERCA u 3.00 4.73 14.19 14.19
7.05 TUERCA-OJO PARA PERNO DE 16 mm f u 13.00 7.24 94.12 94.12
7.06 PERNO COCHE DE AºGº, 13 mm Øx152 mm LONG., CON ARANDELA, TUERCA Y CONTRATUERCA u 3 3.60 10.80 10.80
7.07 BRAZO SOPORTE (RIOSTRA) DE PERFIL ANGULAR DE AºGº 38x38x5 mm; 710 mm LONG. u 3.00 22.24 66.73 66.73
7.08 ARANDELA CUADRADA PLANA DE A° G°, 57 x 57 x 5 mm, AGUJERO DE 18 mm ø u 3.00 1.39 4.17 4.17
7.09 ARANDELA CUADRADA CURVA DE A° G°, 57 x 57 x 5 mm, AGUJERO DE 18 mm ø u 134.00 1.41 188.94 188.94
7.1 PLANTILLAS PARA IDENTIFICACIÓN Y/O CODIFICACIÓN DE POSTES (PELIGRO, IDENTIFICACIÓN Y/O CODIFICACIÓN Y FASES) u 51.00 36.47 1,860.21 1,860.21
8 RETENIDAS Y ANCLAJES
8.01 CABLE DE ACERO GRADO SIEMENS MARTIN, DE 10 mm ø m 518.00 4.28 2,217.04 2,217.04
8.02 ENLACE METÁLICO, DE 254 MM X 75 MM X 38 MM, DE 70 KN DE RESISTENCIA u 74.00 19.65 1,454.39 1,454.39
8.03 VARILLA DE ANCLAJE DE A° G° DE 19 mm ø x 2,40 m, PROVISTO DE OJAL GUARDACABO EN UN EXTREMO; TCA Y CTCA EN EL OTRO u 37.00 32.66 1,208.42 1,208.42
8.04 MORDAZA PREFORMADA DE A° G° PARA CABLE DE 10 mm ø u 74.00 8.32 615.68 615.68
8.05 GRILLETE DE ACERO GALVANIZADO DE 70 KN u 37.00 9.93 367.41 367.41
8.06 ALAMBRE DE ACERO N° 12; PARA ENTORCHADO m 111.00 0.64 71.04 71.04
8.07 ARANDELA DE ANCLAJE, DE A° G°, 102 x 102 x 6,35 mm, AGUJERO DE 18 mmø u 37.00 4.11 152.25 152.25
ABRAZADERA DE 4 SECTORES PARA RETENIDA, DE 75 MM DE ALTURA, 6,35 MM DE ESPESOR Y 70 KN DE RESISTENCIA. DIÁMETRO SEGÚN DIMENSIONES DEL POSTE,
8.08 u 37.00 45.07 1,667.59 1,667.59
INCLUYE 4 PERNOS DE 12,7 MM Ø X 63,5 MM Y 4 ARANDELAS
8.09 BLOQUE DE CONCRETO DE 0,40 x 0,40 x 0,20 m u 37.00 32.52 1,203.24 1,203.24
8.1 AISLADOR POLIMERICO CON CONEXIÓN HORQUILLA (ESTRUCTURA) Y LENGÜETA (LINEA) DE 36 KV, SEGÚN ESPECIFICACION TÉCNICA. u 37.00 71.20 2,634.40 2,634.40
9 MATERIAL PARA PUESTA A TIERRA
9.01 ELECTRODO DE ACERO RECUBIERTO DE COBRE DE 16 mm ø x 2,40 m u 3.00 40.27 120.81 120.81
9.02 CONECTOR TIPO AB PARA ELECTRODO DE 16 mm u 3.00 5.01 15.03 15.03
9.03 CAJA REGISTRO DE CONCRETO PARA PUESTA A TIERRA 0,50x0,50x0,45 m u 3.00 44.81 134.43 134.43
9.04 CONECTOR DE COBRE TIPO PERNO PARTIDO PARA CONDUCTOR 16 mm² u 8.00 5.22 41.76 41.76
9.05 PLANTILLA DE SEÑALIZACIÓN DE POSTE (PUESTA A TIERRA) u 3.00 36.47 109.42 109.42
9.06 TUBO DE PVC DE 25 mm Ø x 3 m LONG. u 2.00 6.00 12.00 12.00
10 EQUIPO DE PROTECCION Y MANIOBRA
10.01 SECCIONADOR FUSIBLE UNIPOLAR TIPO EXPULSION (CUT-OUT) DE 27/38 KV, 100A, 150KV-BIL. u 3.00 333.36 1,000.08 1,000.08
10.02 FUSIBLE TIPO EXPULSION DE 2 A, TIPO K u 3.00 7.28 21.84 21.84
CALENDARIO DE ADQUISICION DE MATERIALES
PROYECTO
INSTALACIÓN DEL SISTEMA DE ELECTRIFICACIÓN RURAL MEDIANTE REDES CONVENCIONALES EN LAS LOCALIDADES DE MARISOL Y NUEVO CHIMBOTE, UBICADOS EN EL DISTRITO DE PACHIZA, PROVINCIA DE
MARISCAL CACERES, DEPARTAMENTO DE SAN MARTÍN.
DEPARTAMENTO SAN MARTIN
PROVINCIA MARISCAL CACERES
DISTRITO PACHIZA
COSTO
ITEM DESCRIPCION UNID. CANTIDAD UNITARIO PARCILAL MES 1 MES 2 MES 3 MES 4 MES 5 MES 6
S/.
10.03 PARARRAYOS DE OXIDO METALICO, 24 kV, 10 kA, CLASE 1 u 3 356.43 1,069.29 1,069.29
RED PRIMARIA
SUMINISTRO DE MATERIALES
1 CRUCETAS DE MADERA
1.01 CRUCETA DE MADERA TRATADA DE 90 x 115 mm x1,20 m u 23.00 68.90 1,584.70 950.82 633.88
2 POSTES DE CONCRETO
2.01 POSTE DE A° G° OCTOGONAL DE 12 - 200, EMBONABLE (02 MODULOS) u 4.00 1,100.00 4,400.00 4,400.00
2.02 POSTE DE A° G° OCTOGONAL DE 12 - 300, EMBONABLE (02 MODULOS) u 10.00 1,300.00 13,000.00 13,000.00
3 AISLADORES Y ACCESORIOS
3.01 AISLADOR DE PORCELANA TIPO PIN, CLASE ANSI 56-3 u 21.00 58.46 1,227.66 1,227.66
3.02 AISLADOR POLIMERICO CON CONEXIÓN HORQUILLA (ESTRUCTURA) Y LENGÜETA (LINEA) DE 36 KV, SEGÚN ESPECIFICACION TÉCNICA. u 6.00 198.52 1,191.12 1,191.12
3.03 ESPIGA DE Aº Gº DE 609 mm LONGITUD, PARA CABEZA DE POSTE Y AISLADOR ANSI 56-3 / 56-4 u 1.00 34.81 34.81 34.81
3.04 ESPIGA DE A° G° PARA CRUCETA Y AISLADOR ANSI 56-3, DE 381 mm LONGITUD u 20.00 30.97 619.45 619.45
4 CONDUCTOR DE ALEACIÓN DE ALUMINIO
4.01 CONDUCTOR DE ALEACION DE ALUMINIO DE 35 mm2 km 0.93 1,400.00 1,299.10 1,299.10
5 ACCESORIOS PARA CONDUCTOR DE ALEACION ALUMINIO
5.01 VARILLA DE ARMAR PREFORMADA DOBLE PARA CONDUCTOR DE 35 mm2 u 12 4.67 56.04 56.04
5.02 GRAPA DE DOBLE VIA DE ALUMINIO PARA CONDUCTOR DE 35 mm2 u 8 8.49 67.94 67.94
5.03 ALAMBRE DE AMARRE ALUMINIO RECOCIDO DE 16 mm2 m 72.50 1.02 73.95 73.95
5.04 GRAPA DE ANCLAJE PARA CONDUCTOR DE 35 mm2 u 6.00 23.25 139.50 139.50
5.05 CINTA PLANA DE ARMAR DE ALUMINIO m 3 0.86 2.57 2.57
6 CONDUCTOR DE COBRE
6.01 CONDUCTOR DE COBRE RECOCIDO, CABLEADO, DE 16 mm2, PARA PUESTA A TIERRA m 207.00 4.54 939.78 939.78
7 MATERIAL DE FERRETERIA PARA POSTES Y CRUCETAS
7.01 PERNO DOBLE ARMADO DE A°G° DE 16 MM Ø X 457 MM, PROVISTO DE 4 TUERCAS Y 4 CONTRATUERCAS u 21.00 11.05 232.05 232.05
7.02 PERNO DE A°G° DE 16 mm ø x 305 mm, PROVISTO DE TUERCA Y CONTRATUERCA u 5 7.00 34.99 34.99
7.03 PERNO DE A°G° DE 16 mm ø x 254 mm, PROVISTO DE TUERCA Y CONTRATUERCA u 8.00 7.16 57.28 57.28
7.04 PERNO OJO DE A°G° DE 16 mm ø x 254 mm, PROVISTO DE TUERCA Y CONTRATUERCA u 9.00 7.16 64.44 64.44
7.05 PERNO DE A°G° DE 13 mm ø x 254 mm, PROVISTO DE TUERCA Y CONTRATUERCA u 17.00 4.73 80.41 80.41
7.06 PERNO COCHE DE AºGº, 13 mm Øx152 mm LONG., CON ARANDELA, TUERCA Y CONTRATUERCA u 23.00 3.60 82.80 82.80
7.07 BRAZO SOPORTE (RIOSTRA) DE PERFIL ANGULAR DE AºGº 38x38x5 mm; 710 mm LONG. u 23.00 22.24 511.59 511.59
7.08 ARANDELA CUADRADA PLANA DE A° G°, 57 x 57 x 5 mm, AGUJERO DE 18 mm ø u 77.00 1.39 106.99 106.99
7.09 ARANDELA CUADRADA CURVA DE A° G°, 57 x 57 x 5 mm, AGUJERO DE 18 mm ø u 21.00 1.41 29.61 29.61
7.1 PLANTILLAS PARA IDENTIFICACIÓN Y/O CODIFICACIÓN DE POSTES (PELIGRO, IDENTIFICACIÓN Y/O CODIFICACIÓN Y FASES) u 14.00 36.47 510.65 510.65
8 RETENIDAS Y ANCLAJES
8.01 CABLE DE ACERO GRADO SIEMENS MARTIN, DE 10 mm ø m 124 4.28 530.72 530.72
8.02 ENLACE METÁLICO, DE 254 MM X 75 MM X 38 MM, DE 70 KN DE RESISTENCIA u 18.00 19.65 353.77 353.77
8.03 VARILLA DE ANCLAJE DE A° G° DE 19 mm ø x 2,40 m, PROVISTO DE OJAL GUARDACABO EN UN EXTREMO; TCA Y CTCA EN EL OTRO u 9.00 32.66 293.94 293.94
8.04 MORDAZA PREFORMADA DE A° G° PARA CABLE DE 10 mm ø u 18 8.32 149.76 149.76
8.05 GRILLETE DE ACERO GALVANIZADO DE 70 KN u 9.00 9.93 89.37 89.37
8.06 ALAMBRE DE ACERO N° 12; PARA ENTORCHADO m 27.00 0.64 17.28 17.28
8.07 ARANDELA DE ANCLAJE, DE A° G°, 102 x 102 x 6,35 mm, AGUJERO DE 18 mmø u 9.00 4.11 37.03 37.03
ABRAZADERA DE 4 SECTORES PARA RETENIDA, DE 75 MM DE ALTURA, 6,35 MM DE ESPESOR Y 70 KN DE RESISTENCIA. DIÁMETRO SEGÚN DIMENSIONES DEL POSTE,
8.08 u 9 45.07 405.63 405.63
INCLUYE 4 PERNOS DE 12,7 MM Ø X 63,5 MM Y 4 ARANDELAS
8.09 SOPORTE DE CONTRAPUNTA DE 51 MM Ø X 1200 MM DE LONGITUD, CON ABRAZADERA PARTIDA EN UN EXTREMO Y GRAPA DE AJUSTE PARA CABLE EN EL OTRO u 1.00 75.55 75.55 75.55
8.1 BLOQUE DE CONCRETO DE 0,40 x 0,40 x 0,15 m u 9.00 32.52 292.68 292.68
8.11 AISLADOR POLIMERICO CON CONEXIÓN HORQUILLA (ESTRUCTURA) Y LENGÜETA (LINEA) DE 36 KV, SEGÚN ESPECIFICACION TÉCNICA. u 9.00 71.20 640.80 640.80
9 MATERIAL PARA PUESTA A TIERRA
9.01 ELECTRODO DE ACERO RECUBIERTO DE COBRE DE 16 mm ø x 2,40 m u 20.00 40.27 805.40 805.40
9.02 CONECTOR DE BRONCE PARA ELECTRODO DE 16 MM Ø Y CONDUCTOR DE COBRE DE 16 MM² u 20.00 5.01 100.20 100.20
9.03 CAJA REGISTRO DE CONCRETO PARA PUESTA A TIERRA 0,50x0,50x0,45 m u 18.00 44.81 806.58 806.58
9.04 PLANCHA DOBLADA DE COBRE PARA TOMA A TIERRA DE ESPIGAS Y/ O PERNOS u 6 8.35 50.10 50.10
9.05 CONECTOR DE COBRE TIPO PERNO PARTIDO PARA CONDUCTOR 16 mm² u 37 5.22 193.14 193.14
9.06 PLANTILLA DE SEÑALIZACIÓN DE POSTE (PUESTA A TIERRA) bls 20.00 36.47 729.49 729.49
9.07 TUBO DE PVC DE 25 mm Ø x 3 m LONG. u 5.00 6.00 30.00 30.00
10 EQUIPO DE PROTECCION Y MANIOBRA
10.01 SECCIONADOR FUSIBLE UNIPOLAR TIPO EXPULSION (CUT-OUT) DE 27/38 KV, 100A, 150KV-BIL. u 3.00 333.36 1,000.08 1,000.08
10.02 FUSIBLE TIPO EXPULSION DE 1 A, TIPO K u 1.00 5.99 5.99 5.99
10.03 FUSIBLE TIPO EXPULSION DE 2 A, TIPO K u 2.00 7.28 14.56 14.56
10.04 PARARRAYOS DE OXIDO METALICO, 24 kV, 10 kA u 3 356.43 1,069.29 1,069.29
CALENDARIO DE ADQUISICION DE MATERIALES
PROYECTO
INSTALACIÓN DEL SISTEMA DE ELECTRIFICACIÓN RURAL MEDIANTE REDES CONVENCIONALES EN LAS LOCALIDADES DE MARISOL Y NUEVO CHIMBOTE, UBICADOS EN EL DISTRITO DE PACHIZA, PROVINCIA DE
MARISCAL CACERES, DEPARTAMENTO DE SAN MARTÍN.
DEPARTAMENTO SAN MARTIN
PROVINCIA MARISCAL CACERES
DISTRITO PACHIZA
COSTO
ITEM DESCRIPCION UNID. CANTIDAD UNITARIO PARCILAL MES 1 MES 2 MES 3 MES 4 MES 5 MES 6
S/.
11 TRANSFORMADORES DE DISTRIBUCIÓN
11.01 TRANSFORMADOR MONOFÁSICO DE 5 kVA; 13,2/0,46-0,23 kV u 1 3,258.00 3,258.00 3,258.00
11.02 TRANSFORMADOR MONOFÁSICO DE 25 kVA; 13,2/0,46-0,23 kV u 2 5,230.00 10,460.00 10,460.00
12 TABLEROS DE DISTRIBUCIÓN u
12.01 TABLEROS DE DISTRIBUCIÓN COMPLETA PARA S.E. DE 5 kVA; 13,2/440-220V u 2.00 2,005.17 4,010.34 4,010.34
12.02 TABLEROS DE DISTRIBUCIÓN COMPLETA PARA S.E. DE 25 kVA; 13,2/440-220V u 1 2,165.12 2,165.12 2,165.12
13 CABLES DE ENERGÍA DE BAJA TENSIÓN
13.01 CABLE NYY, 1 KV, 1x16 mm² m 5.00 5.51 27.55 27.55
13.02 CABLE NYY, 1 KV, 1x25 mm² m 20.00 9.21 184.20 184.20
13.03 CABLE NYY, 1 KV, 1x35 mm² m 20 12.28 245.60 245.60
RED SECUNDARIA
SUMINISTRO DE MATERIALES
1 POSTES DE CONCRETO ARMADO CENTRIFUGADO
1.01 POSTE DE C.A.C. DE 8 M/200 DAN (INCLUYE PERILLA) u 121.00 351.20 42,495.20 21,247.60 21,247.60
2 CABLES Y CONDUCTORES DE ALUMINIO
2.01 CONDUCTOR AUTOPORTANTE DE ALUMINIO 2X25+16/25 MM² km 2.88 6,383.25 18,359.45 18,359.45
2.02 CONDUCTOR AUTOPORTANTE DE ALUMINIO 2X16+16/25 MM² km 1.34 5,430.23 7,295.21 7,295.21
3 ACCESORIOS DE CABLES AUTOPORTANTES
3.01 GRAPA DE SUSPENSION ANGULAR PARA CONDUCTOR DE ALEACION DE ALUMINIO DE 25 mm² u 70 6.05 423.30 423.30
3.02 GRAPA DE ANCLAJE PARA CONDUCTOR DE ALEACION DE ALUMINIO DE 25 mm² u 109 11.21 1,221.89 1,221.89
3.03 CONECTOR BIMETÁLICO , PARA Al 25mm²/Cu 4-10 mm², PARA NEUTRO DESNUDO, TIPO CUÑA u 9.00 3.14 28.26 28.26
3.04 CONECTOR BIMETÁLICO AISLADO, PARA Al 16mm²/Cu 4-10 mm², PARA FASE AISLADA, TIPO PERFORACIÓN u 9.00 5.95 53.59 53.59
3.05 CONECTOR, PARA Al 25mm², PARA NEUTRO DESNUDO, TIPO CUÑA u 24 4.23 101.45 101.45
3.06 CONECTOR AISLADO, PARA Al 25mm², PARA FASE AISLADA, TIPO PERFORACIÓN u 46.00 7.89 362.94 362.94
3.07 CORREA PLASTICA DE AMARRE COLOR NEGRO u 578.00 0.18 105.85 105.85
3.08 CINTA AUTOFUNDANTE PARA EXTREMO DE CABLE Roll 16.00 4.40 70.42 70.42
3.09 CINTA AISLANTE Roll 23 0.60 13.76 13.76
4 CABLES Y CONDUCTORES DE COBRE
4.01 CONDUCTOR DE Cu RECOCIDO, TIPO N2XY, BIPOLAR, 2x10 mm2, CUBIERTA NEGRA m 10.8 8.45 91.26 91.26
4.02 CONDUCTOR DE Cu RECOCIDO, TIPO N2XY, BIPOLAR, 2x2,5 mm2 m 82.5 3.25 268.13 268.13
4.03 CONDUCTOR DE COBRE CONCENTRICO, 2 x 4 mm² , CON AISLAMIENTO Y CUBIERTA DE PVC m 3750.00 5.68 21,300.00 21,300.00
4.04 CONDUCTOR DE COBRE RECOCIDO, CABLEADO, DESNUDO DE 16 mm² m 346.00 5.06 1,750.76 1,750.76
5 LUMINARIAS, LAMPARAS Y ACCESORIOS
5.01 PASTORAL TUBO A°G° 38 MM Ø INTERIOR, 500 MM AVANCE HORIZONTAL, 720 MM ALTURA Y 20° INCLINACIÓN, PROVISTO DE 2 ABRAZADERAS DOBLES PARA POSTE u 55.00 47.12 2,591.60 2,591.60
5.02 LÁMPARA DE VAPOR DE SODIO DE ALTA PRESIÓN DE 50 W 55.00 31.33 1,723.15 1,723.15
5.03 LUMINARIA COMPLETA CON EQUIPO PARA LÁMPARA DE VAPOR DE SODIO DE 50 W u 55.00 220.11 12,106.05 12,106.05
5.04 PORTAFUSIBLE UNIPOLAR 220 V, DE 5 A, PROVISTO CON FUSIBLE DE 1 A u 55.00 10.01 550.55 550.55
5.05 CONECTOR BIMETÁLICO FORRADO PARA Al 16 mm² /Cu 4-10 mm², PARA FASE AISLADA TIPO PERFORACIÓN u 55.00 3.14 172.70 172.70
5.06 CONECTOR BIMETÁLICO PARA Al 25 mm² /Cu 4-10 mm², PARA NEUTRO DESNUDO TIPO CUÑA u 55.00 5.95 327.51 327.51
6 RETENIDAS Y ANCLAJES
6.01 CABLE DE ACERO GRADO SIEMENS MARTIN, DE 10 mm ø, 7 HILOS m 443.00 4.28 1,896.04 1,896.04
6.02 PERNO ANGULAR CON OJAL-GUARDACABO DE A°G°, 16 mm ø x 203 mm, PROVISTO DE TUERCA Y CONTRATUERCA u 46.00 19.65 904.08 904.08
6.03 VARILLA DE ANCLAJE DE A° G° DE 16 mm ø x 2.40 m, PROV. DE OJAL GUARD. EN UN EXTR EMO; TCA Y CTCA EN EL OTRO u 46.00 32.66 1,502.36 1,502.36
6.04 ARANDELA DE ANCLAJE, DE A° G°, 102 x 102 x 6,35 mm, AGUJERO DE 18 mmø u 46.00 8.32 382.72 382.72
6.05 MORDAZA PREFORMADA DE A° G° PARA CABLE DE 10 mm Ø u 92.00 9.93 913.56 913.56
6.06 ARANDELA CUADRADA CURVA DE A° G°, 57 x 57 x 5 mm, AGUJERO DE 18 mmø u 92.00 0.64 58.88 58.88
6.07 SOPORTE DE CONTRAPUNTA DE 51 mmØx1000mm DE LONG. CON ABRAZADERA PARTIDA EN UN EXTREMO u 17 75.55 1,284.35 1,284.35
6.08 ALAMBRE DE ACERO N° 12; PARA ENTORCHADO m 138 4.11 567.85 567.85
6.09 BLOQUE DE CONCRETO DE 0,40 x 0,40 x 0,15 m u 46.00 32.52 1,495.92 1,495.92
6.1 CONECTOR BIMETÁLICO PARA AL 25 MM2 Y COBRE DE 16 MM2, TIPO CUÑA u 46.00 5.95 273.70 273.70
7 ACCESORIOS DE FERRETERIA PARA ESTRUCTURAS
7.01 PERNO CON GANCHO DE 16mm Ø, PROVISTO DE ARANDELA, TUERCA Y CONTRAT., LONG. 203 mm u 66.00 7.21 475.86 475.86
7.02 PERNO CON GANCHO DE 16mm Ø, PROVISTO DE ARANDELA, TUERCA Y CONTRAT., LONG. 305 mm u 4.00 9.84 39.36 39.36
7.03 PERNO DE AºGº DE 13mm Ø, PROVISTO DE TUERCA Y CONTRAT., LONG. 203 mm u 92.00 3.71 341.32 341.32
7.04 PERNO DE AºGº DE 13mm Ø, PROVISTO DE TUERCA Y CONTRAT., LONG. 305 mm u 8.00 5.01 40.08 40.08
7.05 PERNO CON OJAL, DE AºGº DE 16mm Ø, PROVISTO DE TUERCA Y CONTRAT., LONG. 203 mm u 67 6.66 445.98 445.98
7.06 PERNO CON OJAL, DE AºGº DE 16mm Ø, PROVISTO DE TUERCA Y CONTRAT., LONG. 305 mm u 8 9.10 72.77 72.77
7.07 TUERCA-OJAL DE AºGº PARA PERNO DE 16 mmØ u 34.00 6.67 226.89 226.89
7.08 FLEJE DE ACERO INOXIDABLE DE 19 mm PROVISTO DE HEBILLA m 9.00 5.22 46.95 46.95
7.09 ARANDELA CUADRADA CURVA DE 57x57 mm, AGUJERO DE 18mmØ u 290 1.40 404.66 404.66
CALENDARIO DE ADQUISICION DE MATERIALES
PROYECTO
INSTALACIÓN DEL SISTEMA DE ELECTRIFICACIÓN RURAL MEDIANTE REDES CONVENCIONALES EN LAS LOCALIDADES DE MARISOL Y NUEVO CHIMBOTE, UBICADOS EN EL DISTRITO DE PACHIZA, PROVINCIA DE
MARISCAL CACERES, DEPARTAMENTO DE SAN MARTÍN.
DEPARTAMENTO SAN MARTIN
PROVINCIA MARISCAL CACERES
DISTRITO PACHIZA
COSTO
ITEM DESCRIPCION UNID. CANTIDAD UNITARIO PARCILAL MES 1 MES 2 MES 3 MES 4 MES 5 MES 6
S/.
7.1 CAJA DE DERIVACION PARA ACOMETIDAS, SISTEMA 440-22O V (10 BORNERAS EN CADA BARRA DE Cu) u 9.00 73.00 657.03 657.03
7.11 PORTALINEA UNIPOLAR DE AºGº, PROVISTO DE PIN DE 10 mm Ø u 109.00 3.74 407.23 407.23
8 PUESTA A T IERRA
8.01 ELECTRODO DE ACERO RECUBIERTO DE COBRE DE 16 mm ø x 2,40 m u 30 40.27 1,208.10 1,208.10
8.02 CONECTOR BIMETÁLICO PARA Al 25 mm² Y COBRE DE 16mm², TIPO CUÑA u 30.00 5.95 178.50 178.50
8.03 CONECTOR DE BRONCE PARA ELECTRODO DE 16 MM Ø Y CONDUCTOR DE COBRE DE 16 MM² u 30.00 5.01 150.30 150.30
8.04 PLANTILLA DE SEÑALIZACIÓN DE POSTE (PUESTA A TIERRA) bls 30 36.47 1,094.24 1,094.24
8.05 CONECTOR DOBLE VIA BIMETÁLICO PARA CABLE DE ACERO DE 10mmØ Y COBRE DE 16 mm² u 46 5.72 263.06 263.06
8.06 CAJA DE REGISTRO u 30.00 44.81 1,344.30 1,344.30
9 CONEXIONES DOMICILIARIAS
9.01 TUBO DE AºGº STANDARD / REDONDO DE 19mm Ø x 1,5mm x 6,0m, PROVISTO DE CODO u 58 56.31 3,266.26 3,266.26
9.02 TUBO DE AºGº STANDARD / REDONDO DE 19mm Ø x 1,5mm x 4,0m, PROVISTO DE CODO 134.00 39.32 5,269.49 5,269.49
9.03 TUBO PLASTICO DE PVC SAP DE 19 MM Ø X 3,0 M, CON CURVA DE PLASTICO DE 19 MM Ø X 180º u 192.00 5.86 1,124.46 1,124.46
9.04 ALAMBRE GALVANIZADO N° 12 m 232.00 0.51 118.32 118.32
9.05 CONECTOR BIMETÁLICO AISLADO, PARA Al 25 mm²/Cu 4-10 mm², PARA FASE AISLADA, TIPO PERFORACIÓN u 153 5.95 911.08 911.08
9.06 CONECTOR BIMETÁLICO, PARA Al 25 mm²/Cu 4-10 mm², PARA NEUTRO DESNUDO, TIPO CUÑA u 153.00 5.95 911.08 911.08
9.07 TEMPLADOR DE AºGº u 384.00 1.90 729.81 729.81
9.08 ARMELLA TIRAFONDO DE 10 MM Ø X 64 MM DE LONGITUD u 134 0.82 109.54 109.54
9.09 CAJA METÁLICA PORTAMEDIDOR, EQUIPADO CON INTERRUPTOR TERMOMAGNETICO 10A u 192 54.00 10,368.00 10,368.00
9.1 MEDIDOR MONOF. DE ENERGIA ACTIVA, TIPO ELECTRONICO CON MICRO PROCESADOR DE 220 V; 10-40 A; 60 Hz; CLASE 1. u 192.00 60.22 11,562.24 11,562.24
COSTO DIRECTO 330,716.69 21,247.60 142,162.62 94,204.14 73,102.33 - -
GASTOS GENERALES (18.18430571735%CD) 60,138.53 3,863.73 25,851.29 17,130.37 13,293.14 - -
UTILIDAD (8.00% CD) 26,457.34 1,699.81 11,373.01 7,536.33 5,848.19 - -
SUB TOTAL 417,312.56 26,811.14 179,386.92 118,870.84 92,243.66 - -
FACTOR DE RELACION 1.099700439 1.099700439 1.099700439 1.099700439 1.099700439 1.099700439 1.099700439
TOTAL PRESUPUESTO 458,918.81 29,484.22 197,271.87 130,722.31 101,440.39 - -
CALENDARIO DE UTILIZACION DE EQUIPOS
PROYECTO
INSTALACIÓN DEL SISTEMA DE ELECTRIFICACIÓN RURAL MEDIANTE REDES CONVENCIONALES EN LAS LOCALIDADES DE MARISOL Y NUEVO CHIMBOTE, UBICADOS EN EL DISTRITO DE PACHIZA, PROVINCIA DE
MARISCAL CACERES, DEPARTAMENTO DE SAN MARTÍN.
DEPARTAMENTO SAN MARTIN
PROVINCIA MARISCAL CACERES
DISTRITO PACHIZA
COSTO
ITEM DESCRIPCION UNID. CANTIDAD UNITARIO PARCIAL MES 1 MES 2 MES 3 MES 4 MES 5 MES 6
S/.
COMPRESOR MEUMATICO PETROLERO HM 95.38 114.50 10,921.01 1,638.15 2,730.25 4,368.40 2,184.21
COCHE CHASIS DOS RUEDAS HM 350.00 6.50 2,275.00 341.25 568.75 910.00 455.00