A B C
Plastico 13.3 12.4 11.2
Colorante 0.01 0.08 0.09
Vidrio 0.12 0.21 0.41
MATRIZ CANONICA
C1 C2 C3
Plastico Colorante Vidrio
R1 A 13.3 0.01 0.12
R2 B 12.4 0.08 0.21
R3 C 11.2 0.09 0.41
T1) VS/C1 0.10526316
T2) VS/C1 0.17741935
T3) VS/C1 0.25
c1 c2 c3
r1 1 0.0007518797 0.00902256
r2 0 0.07067669173 0.0981203
r3 0 0.08157894737 0.30894737
t1 140
t2 12.6595744681
t3 19.8709677419
C1 C2 C3
1 0 0.00797872
0 1 1.38829787
0 0 0.19569149
t1 12
t2 9.11877394636
t3 3.00625169883
PRODUCTO A 1 0 0
PRODUCTO B 0 1 0
PRODUCTO C 0 0 1
X 0.071758630063
Y 8.486001630878
Z 3.006251698831
Paso 1) Determinar función objetivo
0.071 x+8.48 y+3.006 z
Paso 2) Formular la matriz canonica
MATERIA PRIMA MATERIA MATERIA
A PRIMA B PRIMA C
Plastico Colorante Vidrio
A 17.29 0.0115 0.1416
B 16.12 0.092 0.2478
C 14.56 0.1035 0.4838
PASO 3) Resolucion de problema/planteamiento a traves de programación por metas
C1 C2 C3
x y z vs
FUNCION OBJETIVO 0.071 8.48 3.06
A 17.29 0.0115 0.1416 1.4
B 16.12 0.092 0.2478 2.2
C 14.56 0.1035 0.4838 2.8
PASO 4) DETERMINAR COLUMNA PIBOTE
MAXIMIZACIÓN= VALOR PARA DETERMINAR LA COLUMNA DE ENTRADA/PIBOTE DEBE SER EL MENOR
MINIMIZACION= VALOR PARA DETERMINAR LA COLUMNA DE ENTRADA/PIBOTE DEBE SER LA MAYOR
**NOTA LA DECISIÓN DE LA COLUMNA DE ENTRADA SE TOMA CON RESPECTO A LA FUNCION OBJETIVO
PASO 5) DETERMINAR EL RENGLON PIBOTE
MAXIMIZACIÓN= VALOR PARA DETERMINAR LA COLUMNA DE ENTRADA/PIBOTE DEBE SER EL MENOR
MINIMIZACION= VALOR PARA DETERMINAR LA COLUMNA DE ENTRADA/PIBOTE DEBE SER LA MAYOR
T1= 0.080971659919
T2= 0.136476426799
T3= 0.192307692308
F.O 0.071 8.48 3.06
R1 17.29 0.0115 0.1416 1.4
R2 16.12 0.092 0.2478 2.2
R3 14.56 0.1035 0.4838 2.8
** EL PUNTO PIBOTE (PUNTO DONDE SE INTERSECTAN LA COLUMNA DE ENTRADA Y EL
RENGLON DE ENTRADA) SE PROCEDE A TRASFORMARLO ALA UNIDAD
** LOS VALORES QUE SE ENCUENTRAN ARRIBA/ABAJO DEL PUNTO PIBOTE DEBEN TRASFORMASE A CE
F.O 0.071 8.48 3.06 VS
R1 1 0.000665124349 0.00818970503 0.08097166
R2 0 0.081278195489 0.11578195489 0.89473684
R3 0 0.093815789474 0.36455789474 1.62105263
T1= 9.887005649718
T2= 7.727774530814
T3= 4.446626050299
C1 C2 C3
F.O 0.071 8.48 3.06 VS
R1 1 -0.001442424696 0 0.0445551
R2 0 0.051482720857 0 0.37989779
R3 0 0.257341264112 1 4.44662605
R1 1 0 0 0.05519895
R2 0 1 0 7.37913185
R3 0 0 1 2.54767093
PROGRAMACION POR METAS PROGRAMACIÓN LINEAL
PRODUCTO A 0.0551989462019361 0.071758630063
PRODUCTO B 7.37913185293736 8.486001630878
PRODUCTO C 2.54767093121288 3.006251698831
CONCLUSIÓN: LA META PLANTEADA OCASIONARA LA
DISMINUCIÓN DE LA PRODUCIÓN DEL PRODUCTO A.B C. , SE
RECOMIENDA SEGUIR TRABAJANDO CON LA ASIGNACIÓN DE
MATERIA PRIMA INICIAL.
Costo Total
de
producción A
Paso 1) Determinar matriz canonica
VS
Costo Total
de
producción B
1.4 1 **Dividir el renglon entre el valor del punto pibote
2.2 0 **(-12.4*R1)+R2 ARREGLO 1
2.8 0 *(-11.2*R1)+ R3 ARREGLO 2
ARREGLO 1
-12.4 1 0.0007518797 0.00902256
12.4 0.08 0.21
0 0.0706766917 0.0981203
ARREGLO 2
vs
0.10526316 -11.2 1 0.0007518797 0.00902256
0.89473684 11.2 0.09 0.41
1.62105263 0 0.0815789474 0.30894737
r1 0 (-0.00075188*R2)+(R1) ARREGLO 1
r2 1 ** Dividir el valor entre si mismo, y aplicar la división para t
r3 0 (-0.08157895*R2)+(R3) ARREGLO 2
VS ARREGLO 1
0.09574468 -0.00075188 0 1 1.38829787
12.6595745 1 0.0007518797 0.00902256
0.58829787 1 0 0.00797872
ARREGLO 2
-0.08157895 0 1 1.38829787
0 0.0815789474 0.30894737
0 0 0.19569149
0.07175863 0 (-0.00797872*r3)+(r1)
8.48600163 0 (-1.38829787*r3)+(r2)
3.0062517 1 ** Dividir el valor entre si mismo, y aplicar la división para todos los valor
ARREGLO 1)
-0.00797872 0 0 1
1 0 0.00797872
1 0 0
ARREGLO 2
-1.38829787 0 0 1
Costo Total
de
producción
0 1 1.38829787
1.4 0 1 0
2.2
2.8
ción por metas
T1
T2
T3
A/PIBOTE DEBE SER EL MENOR
A/PIBOTE DEBE SER LA MAYOR
SPECTO A LA FUNCION OBJETIVO
A/PIBOTE DEBE SER EL MENOR
A/PIBOTE DEBE SER LA MAYOR
ARREGLO 1
-16.12 R1+ R2=R2
T1 ARREGLO 2
T2 -14.56 R1 +R3= R3
T3
DE ENTRADA Y EL
OTE DEBEN TRASFORMASE A CERO
-16.12 1 0.00066512 0.00818971 0.08097166
16.12 0.092 0.2478 2.2
0 0.0812782 0.11578195 0.89473684 R2
-14.56 1 0.00066512 0.00818971 0.08097166
14.56 0.1035 0.4838 2.8
0 0.09381579 0.36455789 1.62105263 R3
ARREGLO 1)
-0.008 R3+R1=R1
ARREGLO 2)
-0.11 R3+R2= R2
-0.00818971 0 0.25734126 1 4.44662605
1 0.00066512 0.00818971 0.08097166
1 -0.00144242 0 0.0445551
-0.11578195 0 0.25734126 1 4.44662605
0 0.0812782 0.11578195 0.89473684
0 0.05148272 0 0.37989779
ARREGLO 1)
0.0014424 R2+R1=R1
ARREGLO 2)
-0.25734126 R2+R3= R3
0.00144242 0 1 0 7.37913185
1 -0.00144242 0 0.0445551
1 0 0 0.05519895
-0.25734126 0 1 0 7.37913185
0 0.25734126 1 4.44662605
0 0 1 2.54767093
lor del punto pibote
0.10526316 R1
2.2 R2
0.89473684 Renglon2
0.10526316 R1
2.8 R3
1.62105263 Renglon 3
mo, y aplicar la división para todos los valores
12.6595745 R2
0.10526316 R1
0.09574468
12.6595745 R2
1.62105263 R3
0.58829787 Renglon 3
a división para todos los valores
3.0062517
0.09574468
0.07175863 RENGLON 1
3.0062517 R1
12.6595745 R2
8.48600163 RENGLON 2
MATRIZ CANONICA
C1 C2 C3
Plastico Colorante Vidrio
R1 A 13.3 0.01 0.12
R2 B 12.4 0.08 0.21
R3 C 11.2 0.09 0.41
T1) VS/C1 0.10526316
T2) VS/C1 0.17741935
T3) VS/C1 0.25
c1 c2 c3
r1 1 0.0007518797 0.00902256
r2 0 0.07067669173 0.0981203
r3 0 0.08157894737 0.30894737
t1 140
t2 12.6595744681
t3 19.8709677419
C1 C2 C3
1 0 0.00797872
0 1 1.38829787
0 0 0.19569149
t1 12
t2 9.11877394636
t3 3.00625169883
PRODUCTO A 1 0 0
PRODUCTO B 0 1 0
PRODUCTO C 0 0 1
X 0.071758630063
Y 8.486001630878
Z 3.006251698831
Paso 1) Determinar función objetivo
0.071 x+8.48 y+3.006 z
Paso 2) Formular la matriz canonica
MATERIA PRIMA MATERIA MATERIA
A PRIMA B PRIMA C
Plastico Colorante Vidrio
A 17.29 0.0115 0.1416
B 16.12 0.092 0.2478
C 14.56 0.1035 0.4838
PASO 3) Resolucion de problema/planteamiento a traves de programación por metas
C1 C2 C3
x y z vs
FUNCION OBJETIVO 0.071 8.48 3.06
A 17.29 0.0115 0.1416 1.4
B 16.12 0.092 0.2478 2.2
C 14.56 0.1035 0.4838 2.8
PASO 4) DETERMINAR COLUMNA PIBOTE
MAXIMIZACIÓN= VALOR PARA DETERMINAR LA COLUMNA DE ENTRADA/PIBOTE DEBE SER EL MENOR
MINIMIZACION= VALOR PARA DETERMINAR LA COLUMNA DE ENTRADA/PIBOTE DEBE SER LA MAYOR
**NOTA LA DECISIÓN DE LA COLUMNA DE ENTRADA SE TOMA CON RESPECTO A LA FUNCION OBJETIVO
PASO 5) DETERMINAR EL RENGLON PIBOTE
MAXIMIZACIÓN= VALOR PARA DETERMINAR LA COLUMNA DE ENTRADA/PIBOTE DEBE SER EL MENOR
MINIMIZACION= VALOR PARA DETERMINAR LA COLUMNA DE ENTRADA/PIBOTE DEBE SER LA MAYOR
T1= 0.080971659919
T2= 0.136476426799
T3= 0.192307692308
F.O 0.071 8.48 3.06
R1 17.29 0.0115 0.1416 1.4
R2 16.12 0.092 0.2478 2.2
R3 14.56 0.1035 0.4838 2.8
** EL PUNTO PIBOTE (PUNTO DONDE SE INTERSECTAN LA COLUMNA DE ENTRADA Y EL
RENGLON DE ENTRADA) SE PROCEDE A TRASFORMARLO ALA UNIDAD
** LOS VALORES QUE SE ENCUENTRAN ARRIBA/ABAJO DEL PUNTO PIBOTE DEBEN TRASFORMASE A CE
F.O 0.071 8.48 3.06 VS
R1 1 0.000665124349 0.00818970503 0.08097166
R2 0 0.081278195489 0.11578195489 0.89473684
R3 0 0.093815789474 0.36455789474 1.62105263
T1= 9.887005649718
T2= 7.727774530814
T3= 4.446626050299
C1 C2 C3
F.O 0.071 8.48 3.06 VS
R1 1 -0.001442424696 0 0.0445551
R2 0 0.051482720857 0 0.37989779
R3 0 0.257341264112 1 4.44662605
R1 0 0 0 0
R2 0 1 0 7.37913185
R3 0 0 0 0
PROGRAMACION POR METAS PROGRAMACIÓN LINEAL
PRODUCTO A 0 0.071758630063
PRODUCTO B 7.37913185293736 8.486001630878
PRODUCTO C 0 3.006251698831
CONCLUSIÓN: LA META PLANTEADA OCASIONARA LA
DISMINUCIÓN DE LA PRODUCIÓN DEL PRODUCTO A.B C. , SE
RECOMIENDA SEGUIR TRABAJANDO CON LA ASIGNACIÓN DE
MATERIA PRIMA INICIAL.
PROGRAMACION DE META 2
META DOS
La materia prima A aumenta en un 3%
La materia prima B aumenta en un 8%
La materia prima C aumenta en un 10%
META TRES EXÁMEN 15%
La materia prima A disminuye un -11%
La materia prima B disminuye un -3%
La materia prima C aumenta un 12%
Plastico Colorante Vidrio
A 13.699 0.0108 0.132
B 12.772 0.0864 0.231
C 11.536 0.0972 0.451
X 0.071758630063
Y 8.486001630878
Z 3.006251698831
F.O 0.071 8.48 3.06 VS
13.699 0.000665124349 0.00818970503 0.08097166
12.772 0.081278195489 0.11578195489 0.89473684
11.536 0.093815789474 0.36455789474 1.62105263
T1 0.005910771583
T2 0.07005456014
T3 0.140521205927
Paso 1) Determinar matriz canonica
VS
Costo Total
de
producción B
1.4 1 **Dividir el renglon entre el valor del punto pibote
2.2 0 **(-12.4*R1)+R2 ARREGLO 1
2.8 0 *(-11.2*R1)+ R3 ARREGLO 2
ARREGLO 1
-12.4 1 0.0007518797 0.00902256
12.4 0.08 0.21
0 0.0706766917 0.0981203
ARREGLO 2
vs
0.10526316 -11.2 1 0.0007518797 0.00902256
0.89473684 11.2 0.09 0.41
1.62105263 0 0.0815789474 0.30894737
r1 0 (-0.00075188*R2)+(R1) ARREGLO 1
r2 1 ** Dividir el valor entre si mismo, y aplicar la división para
r3 0 (-0.08157895*R2)+(R3) ARREGLO 2
VS ARREGLO 1
0.09574468 -0.00075188 0 1 1.38829787
12.6595745 1 0.0007518797 0.00902256
0.58829787 1 0 0.00797872
ARREGLO 2
-0.08157895 0 1 1.38829787
0 0.0815789474 0.30894737
0 0 0.19569149
0.07175863 0 (-0.00797872*r3)+(r1)
8.48600163 0 (-1.38829787*r3)+(r2)
3.0062517 1 ** Dividir el valor entre si mismo, y aplicar la división para todos los va
ARREGLO 1)
-0.00797872 0 0 1
1 0 0.00797872
1 0 0
ARREGLO 2
-1.38829787 0 0 1
Costo Total
de
producción
0 1 1.38829787
1.4 0 1 0
2.2
2.8
ción por metas
T1
T2
T3
A/PIBOTE DEBE SER EL MENOR
A/PIBOTE DEBE SER LA MAYOR
SPECTO A LA FUNCION OBJETIVO
A/PIBOTE DEBE SER EL MENOR
A/PIBOTE DEBE SER LA MAYOR
ARREGLO 1
-16.12 R1+ R2=R2
T1 ARREGLO 2
T2 -14.56 R1 +R3= R3
T3
DE ENTRADA Y EL
OTE DEBEN TRASFORMASE A CERO
-16.12 1 0.00066512 0.00818971 0.08097166
16.12 0.092 0.2478 2.2
0 0.0812782 0.11578195 0.89473684 R2
-14.56 1 0.00066512 0.00818971 0.08097166
14.56 0.1035 0.4838 2.8
0 0.09381579 0.36455789 1.62105263 R3
ARREGLO 1)
-0.008 R3+R1=R1
ARREGLO 2)
-0.11 R3+R2= R2
-0.00818971 0 0.25734126 1 4.44662605
1 0.00066512 0.00818971 0.08097166
1 -0.00144242 0 0.0445551
-0.11578195 0 0.25734126 1 4.44662605
0 0.0812782 0.11578195 0.89473684
0 0.05148272 0 0.37989779
ARREGLO 1)
0.0014424 R2+R1=R1
ARREGLO 2)
-0.25734126 R2+R3= R3
Costo Total
de
producción
1.4
2.2
2.8
1 4.855277E-05 0.00059783 0.00591077
(-12.772 R1+R2)=R2
(-11.526 R1+R3=R3
lor del punto pibote
0.10526316 R1
2.2 R2
0.89473684 Renglon2
0.10526316 R1
2.8 R3
1.62105263 Renglon 3
mo, y aplicar la división para todos los valores
12.6595745 R2
0.10526316 R1
0.09574468
12.6595745 R2
1.62105263 R3
0.58829787 Renglon 3
a división para todos los valores
3.0062517
0.09574468
0.07175863 RENGLON 1
3.0062517 R1
12.6595745 R2
8.48600163 RENGLON 2