Saktivell Mach

Saktivell Mach

Seremban, Negeri Sembilan, Malaysia
3K pengikut 500+ kenalan

Perihal

Challenging the status quo is my strength.
Responsible for project management and…

Aktiviti

Sertai sekarang untuk melihat semua aktiviti

Pengalaman

  • Novugen Oncology Sdn. Bhd.

    Bandar Enstek, Negri Sembilan, Malaysia

  • -

    Bandar Enstek, Negri Sembilan, Malaysia

  • -

    Bandar Enstek @Negeri Sembilan

  • -

    Bangi Selangor

  • -

    Bangi

  • -

    Bangi,Selangor

  • -

    Bangi,Selangor

  • -

    Bangi,Selangor

  • -

  • -

    Singapore

Pendidikan

Lesen & Pensijilan

  • ISO 9001 : 2008 Transition

    -

    Dikeluarkan pada
  • Training on subconcious mind for greater result

    -

    Dikeluarkan pada
  • Performance Management % Measurement Using the Balance Scorecard Approach

    -

    Dikeluarkan pada
  • 7 QC Tools

    -

    Dikeluarkan pada
  • Electric power supply to industies & commercial building

    -

    Dikeluarkan pada
  • Root Cause Analysis For Maintenance

    -

    Dikeluarkan pada
  • ISO 9001:2008 Internal QMS Auditor

    -

    Dikeluarkan pada
  • Implementing AN ISO 9001 Quality Management System

    -

    Dikeluarkan pada
  • POKA YOKE Method-Achieving zero Defect Quality

    -

    Dikeluarkan pada
  • SMC Practical Electro Pneumatics

    -

    Dikeluarkan pada
Sertai sekarang untuk melihat semua pensijilan

Projek

  • Optimization of Gas consumption in Boiler operation

    -

    Investment of RM 10,000
    Yearly saving of RM 500,000.

  • Electricity energy saving Project

    -

    Investment of RM 20,000.
    Yearly saving of RM500,000.

  • Green Field Project of Pharmaceutical

    -

    Lead the team in Conceptual design, Basic design and detailed design
    Lead the team in Construction work.
    Lead the team in C&Q activities.
    Lead the team in NPRA audit.
    Lead the team in USFDA audit.
    Successfully handover the plant to Operation team to run the commercial batches.

  • Electricity Energy saving

    -

    Initiated Electricity energy saving projects which consist of
    1)Down sizing of plant 1 cooling tower - (ROI - less than 3 years). Annual saving of RM 30,000
    2) Centralized process cooling pipe system at plant 2 (Factory A& B) - (ROI -less than 2 years) Annual saving of RM 28,000
    3) Reduce of redundant compressed air pressure to the factory - Annual saving of RM 48,000
    Summary : Initiated Electricity energy saving projects close to RM 200,000 per annum within 3 years

    Pencipta lain
    • 2 of my subordinate
  • Enhance plant manpower efficiency through lean manufacturing approach

    -

    This assignment was initiated by Top Management to enhance the existing manpower efficiency to reduce operation cost.
    1) Established daily job sheet to identify every employee's routine and project base work.
    2) Created matrix to identify the resources leakage (double job, waiting for job , non- value added job)
    3) Carry out brainstorming with Top Management and department HOD on how to simplify , combine and eliminate current activities.
    4) Proposed to reduce the number of…

    This assignment was initiated by Top Management to enhance the existing manpower efficiency to reduce operation cost.
    1) Established daily job sheet to identify every employee's routine and project base work.
    2) Created matrix to identify the resources leakage (double job, waiting for job , non- value added job)
    3) Carry out brainstorming with Top Management and department HOD on how to simplify , combine and eliminate current activities.
    4) Proposed to reduce the number of department from 14 to 9 department.

  • Revamp plant Safety & Health to create safer workplace

    -

    1) Established new safety and health committee which comprises employer and employee's representative
    2) Established new Emergency Response team and their job responsibilities for 3 rotating shift.
    3) Established (HIRARC) to identify the hazards , assess the risk and control the risk
    4) Established new safety & health policy and target.
    5) Conduct safety and health promotion to reduce accident rate for safer workplace to reduce operation cost.

  • Review and Revise company policy

    -

    Company policy was reviewed and revised to suit the current market trend by adhering Employment Act

  • New factory setup (Green Field Project)

    -

    2005- New factory setup (Site 1)
    2008-New factory setup (Site 2)

  • ISO 9001 , 14001 Accredition

    Work as a team to achieve ISO 9001 & 14001 Accreditation
    1) Attended training of understanding , documenting and implementing 9001 & 14001 training to know the overview of ISO .
    2) Established mandatory policy , procedures and checklist.
    3) Conducted Internal audit and prepare audit report.
    4)Prepare for certification body audit.

Bahasa

  • Tamil

    Kemahiran profesional

  • Bahasa Malaysia

    Kemahiran profesional

  • English

    Kemahiran profesional

Lagi aktiviti oleh Saktivell

Lihat profil penuh Saktivell

  • Lihat kenalan yang anda berdua kenali
  • Minta diperkenalkan
  • Hubungi Saktivell secara terus
Sertai untuk melihat profil penuh

Profil lain yang serupa

Orang lain yang bernama Saktivell Mach

1 orang lain yang bernama Saktivell Mach berada di LinkedIn

Lihat orang lain yang bernama Saktivell Mach

Tambahkan kemahiran baharu melalui pengambilan kursus ini