In Part 1, we explored how surging demand for data centers is reshaping infrastructure planning and energy policy. Now, we turn to the forces that will determine where and how these facilities are sited. As energy markets, regulators, and infrastructure evolve, siting decisions will hinge on more than land availability and local tax incentives. They will reflect broader questions about fuel types, grid resilience, and the political feasibility of deploying distributed generation. Context-based solutions are no longer optional—they are essential.

Energy Markets and Fuel Types: A Diverse Landscape of Options and Constraints

Energy markets differ dramatically from region to region, influenced by regulatory frameworks, available fuel sources, and generation capacity. For data center developers, these variables are crucial, as they will determine both the cost and reliability of power. A data center in the Northeast, for example, may rely heavily on natural gas or nuclear generation, while one in Texas could be powered primarily by wind and solar with natural gas backup.

However, the “best” solution isn’t just about the cheapest or cleanest fuel—it’s about balancing reliability with cost and permitting feasibility. In regions where renewables dominate, collocated natural gas generation or battery storage may provide the necessary backup to meet the always-on nature of data centers. In states like Wyoming, which have abundant fossil fuel resources, combining traditional generation with carbon capture could make a site more politically palatable while also satisfying corporate sustainability goals.

This brings us to an important takeaway: There is no one-size-fits-all solution. Data center developers must assess local energy profiles and work within the existing regulatory and infrastructure framework to design bespoke power solutions.

Collocated Generation: Enhancing Grid Resilience

Collocating generation assets with data centers is an emerging strategy that serves multiple purposes. It not only provides a reliable power source for the facility but also strengthens the grid’s overall resilience. By generating electricity on-site through natural gas turbines, combined heat and power (CHP) systems, or utility-scale solar-plus-storage arrays, data centers can act as “microgrids,” capable of operating independently during outages or emergencies.

When collocated generation is properly integrated into the grid, it offers standby capacity during peak demand or unexpected disruptions. This flexibility has major implications for grid operators, who are increasingly concerned about load balancing and peak demand events as electrification grows. In this way, data centers can move from being energy consumers to grid assets, supporting grid stability while securing their own power needs.

Strategic Chokepoints: Transmission and Pipeline Infrastructure

Despite the potential benefits of collocated generation, siting decisions are often limited by the availability of transmission and pipeline infrastructure. Access to reliable, high-capacity transmission lines is critical to move power where it’s needed, and for data centers relying on natural gas, pipeline availability can be a make-or-break factor.

In regions where transmission networks are constrained or pipelines are at capacity, siting decisions become political. Expanding transmission lines often faces local opposition, lengthy permitting timelines, and environmental reviews. Similarly, natural gas pipeline expansions are politically sensitive, with public backlash and regulatory scrutiny slowing progress.

Because of these chokepoints, some developers are turning to regions with existing infrastructure or adopting innovative solutions like on-site hydrogen production, battery storage, or modular nuclear reactors to bypass external constraints. These strategies demonstrate the growing need for flexibility in energy planning and the importance of regulatory alignment between developers, utilities, and policymakers.

Regulators as Gatekeepers: Navigating Political and Permitting Realities

While energy availability and infrastructure are crucial, regulatory and political considerations often dictate whether a project can move forward. Permitting processes vary by jurisdiction, with some states offering streamlined approvals while others impose lengthy, complex reviews. Developers must also navigate environmental regulations, land use policies, and stakeholder opposition, particularly when collocated generation involves fossil fuels or large-scale transmission projects.

This reality underscores why context-based solutions are paramount. A successful data center project in Texas may rely on relaxed permitting for natural gas and renewable hybrids, while a project in California may require a more innovative mix of battery storage and solar to meet regulatory standards. Developers must engage regulators early, understand the local permitting landscape, and design power solutions that align with both regulatory requirements and community expectations.

The Feasibility of Distributed Generation as a Siting Driver

As strategic chokepoints in transmission and pipelines become more common, the siting of data centers may increasingly depend on where it is politically and economically feasible to deploy distributed generation. For instance, in states with policies favoring clean energy, distributed solar-plus-storage or small modular nuclear plants may be the preferred option. In regions with strong industrial gas infrastructure, natural gas turbines with CHP systems could be viable.

Data centers could soon act as “anchor tenants” for new distributed generation projects, particularly in rural or underserved areas. These facilities could help justify investment in local power infrastructure while providing grid benefits and job creation. However, in regions where local opposition to power plants remains high, developers may find themselves limited to regions with existing generation capacity or politically favorable environments.

Conclusion: Navigating the Data Center Energy Nexus

The data center revolution is reshaping how we think about energy markets, infrastructure, and regulatory strategies. Developers must take a holistic approach to siting and permitting, balancing fuel types, collocated generation, transmission constraints, and local political dynamics. As the demand for data centers grows, the ability to design flexible, context-specific solutions will separate successful projects from those mired in delays and opposition. By working within local constraints while leveraging emerging technologies, data centers can be more than energy consumers—they can be key players in building a resilient, distributed, and future-ready energy grid.

###


Drew B.

Force Multiplier | Problem Solver | Governmental, Regulatory & Public Affairs

8mo
Like
Reply
Drew B.

Force Multiplier | Problem Solver | Governmental, Regulatory & Public Affairs

8mo
Like
Reply

To view or add a comment, sign in

More articles by Drew B.

  • The Power Problem:

    Why Hyperscalers Must Get Smarter About Energy Procurement As artificial intelligence and cloud computing drive…

  • Siting the Cloud

    The New Land Use Politics of Power-Hungry Infrastructure In rural America, the landscape of power politics is being…

    1 Comment
  • From Merchant Chaos to Market Resilience:

    How Collocated Generation Becomes Dispatchable Power In much of the United States, the traditional vertically…

    2 Comments
  • Distressed Assets:

    A Smarter Path for Mid-Tier Data Center Development The growth of AI and cloud services has driven unprecedented demand…

    3 Comments
  • The Honeymoon Is Over:

    Data Centers Need a Social License to Operate For years, data centers benefited from the same kind of early acceptance…

    1 Comment
  • Veterans and the Private Sector:

    Beyond Hard Skills Much of the focus at DCAC Live 2025 was, understandably, on the data center industry. But there was…

    2 Comments
  • License to Operate

    The Most Important Design Constraint You’ve Never Heard Of I’ve been to more energy conferences than I can count. Over…

    2 Comments
  • Know Your Venue

    Bar Minimum, Room Rental Fees and the REAL Cost of Interconnection I’ve been putting out a lot of content lately — a…

  • McData

    The Data Center’s Ray Kroc Moment In the 2016 film The Founder, Michael Keaton’s Ray Kroc delivers a revelation that…

  • When Data Centers Become Utilities

    In the 20th century, utilities were vertically integrated monopolies that looked and behaved like government agencies…

    2 Comments

Others also viewed

Explore content categories