2G Feeder System Swap Report: Euro Hotel

The document summarizes the results of a site survey conducted after replacing the feeder system at the Euro Hotel site. Key findings include: 1. Cell information, signal levels, and cross-sector verification showed normal operation across sectors. 2. Call setup success rate was 100% and call drop rate was 0%, indicating successful service quality. 3. Coverage plots showed normal coverage in idle and connected modes with one sector receiving a reflected signal. 4. Quality, handover, and throughput tests also showed normal network performance after the feeder swap.

Uploaded by

carlito_palicte
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
233 views17 pages

2G Feeder System Swap Report: Euro Hotel

The document summarizes the results of a site survey conducted after replacing the feeder system at the Euro Hotel site. Key findings include: 1. Cell information, signal levels, and cross-sector verification showed normal operation across sectors. 2. Call setup success rate was 100% and call drop rate was 0%, indicating successful service quality. 3. Coverage plots showed normal coverage in idle and connected modes with one sector receiving a reflected signal. 4. Quality, handover, and throughput tests also showed normal network performance after the feeder swap.

Uploaded by

carlito_palicte
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd

CABLE & WIRELESS Feeder System Swap Project Site Name : Euro Hotel 2G SSV Report Report Date

: 2012-07-30 Huawei, Sri Lanka

HUAWEI TECHNOLOGIES CO., LTD.

Contents:
1.Tool description 2.Route and site details 3.Cell Information and cross sector verification 4.Methodology 5.KPI summary 6.Coverage plot 7.Quality plot 8.Handover Plot

9.Throughput snap
10.Conclusion

HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR

Page 2

1. Tool description

HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR

Page 3

2. Route and Site Details

SITENAME BSCNAME CLUTTER TYPE CLUSTER ID SITE CONFIGURATION LONGITUDE

Euro Hotel CWS MBSC Rural 1 2+1+1

55.480219
-4.754361 LATITUDE SITE ADRESS SWAP OUT DATE TEST DATE TRACE FILE Mahe 7/27/2012 7/27/2012 Huawei_Team01_Mahe_Euro Hotel_G900_SC-BCCHLocked_IDLE_27_July_2012_SSV.log

HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR

Page 4

3. Cell information and Cross Sector Verification


SECTOR 1 ITEM DEFINED LAC Cell ID BCCH BSIC RAC E(GPRS) CROSS SECTOR 1 274 11 16 0 EDGE OK MEASURED 1 274 11 16 0 EDGE DEFINED 1 275 17 22 0 EDGE OK MEASURED 1 275 17 22 0 EDGE DEFINED 1 276 5 30 0 EDGE OK MEASURED 1 276 5 30 0 EDGE SECTOR 2 SECTOR 3

HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR

Page 5

4. Methodology:

HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR

Page 6

5. KPI Summary
CS Call Completion Statistics KPI REFERENCE TEST METHOD Count/ Site Description Total Completed/P REMARKS ercentage

Total Call Attempts Call Setup Success Rate Call Drop Rate Handover Success Rate 2G RxLev (dBm) 2G RxQual (Class)
Handover Testing Sector1 <=> Sector2 Sector1 <=> Sector3 Sector2 <=> Sector3 Sector1 <=> Sector1U Sector2 <=> Sector2U G900 OK OK OK N/A N/A

SHORTCALL MS3 SHORTCALL MS3 SHORTCALL MS3 SHORTCALL MS3 >-75 dBm <4
U2100 N/A N/A N/A OK OK

10 10/10 0/10 7/7 Rural Rural

10 100% 0.00% 100% 31.87% (168/527) 96.37% (532/552)

IDLE MS2 SHORTCALL MS3


REMARKS

Sector3 <=> Sector3U

N/A

OK

HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR

Page 7

6. Coverage Plot

Idle Mode

Connected Mode

HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR

Page 8

6. Coverage Plot Clarification

Idle Mode

Connected Mode

Euro Hotel Sector 1 signal is reflected off nearby mountain and is the reason for spot coverage in sector 0 direction. As it is a reflected signal it is weak and that area is covered by Baie Lazare sector 1 in the connected mode due to terrain as shown .

HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR

Page 9

6. Coverage Plot

Idle Mode

Connected Mode

HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR

Page 10

6. Coverage Plot

Connected Mode Idle Mode

HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR

Page 11

7. Quality Plot

HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR

Page 12

8. Handover Plot

HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR

Page 13

9. Throughput Snap

HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR

Page 14

9. Throughput Snap

HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR

Page 15

10. Conclusion
After feeder swap the GSM services are normal according to drive test analysis

HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR

Page 16

Thank you
www.huawei.com