0% found this document useful (0 votes)
23 views1 page

CapitalBudget LinearProgram

The document contains a table with project names in the first column, their net present values in the second column, required budgets in the third column, and constraints. The table evaluates multiple projects with the goal of maximizing total net present value within a capital outlay constraint of $130 for projects B1 and B2, and requiring that projects C1, C2, and C3 total less than the capital outlay.

Uploaded by

Djy Duhamy
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views1 page

CapitalBudget LinearProgram

The document contains a table with project names in the first column, their net present values in the second column, required budgets in the third column, and constraints. The table evaluates multiple projects with the goal of maximizing total net present value within a capital outlay constraint of $130 for projects B1 and B2, and requiring that projects C1, C2, and C3 total less than the capital outlay.

Uploaded by

Djy Duhamy
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

1

NPW
15

B1

11

-50

B2

-30

C1

13

-50

C2

14

-60

C3

-15

NPV

Required
Budget

29

120

-75

Constraints:
Capital Outlay
B1+ B2
M exc

130
1

C1+C2+C3
M exc

C2+C3
Cnt on A