0% found this document useful (0 votes)
240 views2 pages

Oliver Video Call Sheet

The call sheet summarizes the filming schedule and personnel for a video shoot titled "Oliver Rofix Video" taking place on February 4th, 2013. It lists Sonny Bacon as the director, producer, camera operator, sound technician, and gaffer. The shoot will take place at Suffolk Yacht Harbour in Levington and includes filming background shots of Oliver as well as a two hour interview between 10:05am and 2:15pm, with a lunch break from 12:30pm to 1:15pm. Transportation to and from the location is outlined.

Uploaded by

sonnybacon
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
240 views2 pages

Oliver Video Call Sheet

The call sheet summarizes the filming schedule and personnel for a video shoot titled "Oliver Rofix Video" taking place on February 4th, 2013. It lists Sonny Bacon as the director, producer, camera operator, sound technician, and gaffer. The shoot will take place at Suffolk Yacht Harbour in Levington and includes filming background shots of Oliver as well as a two hour interview between 10:05am and 2:15pm, with a lunch break from 12:30pm to 1:15pm. Transportation to and from the location is outlined.

Uploaded by

sonnybacon
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

CALL SHEET

TITLE: Oliver Rofix Video PERSONNEL CONTACT: Name & Mobile Number
Director: Sonny Bacon P.A: Sonny Bacon

DATE:2/4/13
Producer: Sonny Bacon

Producer: Sonny Bacon

Camera: Sonny Bacon Sound: Gaffa: Sonny Bacon Sonny Bacon

LOCATION INFORMATION:
Address 1:

Suffolk Yacht Harbour Levington Suffolk IP10 0LN.

Arrival Time: 10:00am

Contact Name/No: Oliver Rofix 07749528455 Travel: Map attached: YES Parking: Grid Ref: Arrival Time: Contact Name/No:

SCENES TODAY (Summary) Today I managed to film everything that I need to make my full video. I filmed some background shots of Oliver like I had planned as well as the interview which lasted around 2 hours. An extremely successful day.

SCHEDULE: 08:00am Equipment check. 08:45am Set off to Levington using provided map 10:00am Meet Oliver at Levington Marina 10:05am Begin filming fill in shots of Oliver 10:50am Film break 11:05am Begin setting up interview set 11:30am Begin Interview 12:30pm Lunch break 01:15pm Continue interview

02:15pm Finish interview 02:15pm Gather equipment 02:20pm Set off from Levington to Woodbridge 02:55pm Get train from Woodbridge to Halesworth 03:34pm Go to bus stop in Halesworth 03:50pm Get bus from Halesworth to Bungay 04:25pm Walk from bus stop to house 04:30pm Double check that al equipment is still to hand.

You might also like