This document summarizes the electrical load calculations and generator sizing recommendations for the Nokia Chennai plant. It finds that the total electrical load is 903KW, with the largest single load being a 326KW chiller. A 2000KVA generator is recommended to power the site, as voltage drops during chiller startups are calculated to be less than 15% with this generator size. The document also specifies the circuit breaker requirements for a temporary HVAC electrical panel.

Uploaded by

vaithy2011
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
777 views

DG Calculation

This document summarizes the electrical load calculations and generator sizing recommendations for the Nokia Chennai plant. It finds that the total electrical load is 903KW, with the largest single load being a 326KW chiller. A 2000KVA generator is recommended to power the site, as voltage drops during chiller startups are calculated to be less than 15% with this generator size. The document also specifies the circuit breaker requirements for a temporary HVAC electrical panel.

Uploaded by

vaithy2011
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

S.M.

Engineers & Consultants Sheet 01 of 03

06.02.2006 Nokia Chennai Plant I. Sl.No. 1. 2. 3. 4. 5. Additional Electrical Loads for Chiller / Pumps / Air compressors Rating Qty. 326KW 2 7KW 4 21KW 3 185KW 10KW 2 2 Working 2 2 2 1 1 Standby 2 1 1 1 Total Electrical Load 652 14 42 185 10 903KW

Description Screw Chiller Primary Pumps Secondary Pumps Air Compressors Air Dryer

Size of DG Recommended : 2000KVA

S.M. Engineers & Consultants Sheet 02 of 03

II. 1.0 Data Base Load Rating of Chiller Efficiency of Chiller Motor Power Factor Starter Used for Chiller Motor

DG Selection Calculation

: : : : : :

577KW (903 - 326KW) 326KW 0.95(Assumed) 0.83(Assumed) Star - Delta 2.5 Times Full Load Current 0.15 15%

Starting Current of Chiller Motor

Transient Reactance for 2000KVA Alternator : Allowable Voltage Drop During Starting 2.0 :

Selection of Alternator (with 1 Chiller Starting + Others Running) Base KVA Rating of Chiller Motor : : : : Steady KVA Required Starting KVA Required Instantaneous KVA : : : : 695.18KVA (577 / 0.83) 326KW 326 / 0.95 343.15KW 413.43KVA 1033.575KVA (413.43 x 2.5) 1033.575 + 695.18 1728.755KVA

Input KW required

3.0

Considering 2000KVA Alternator KVA available for Starting Drop in Voltage i.e : : : : : 2000 - 695.18KVA 1304.82KVA 1728.755 x 0.15 / 2000 0.1296 12.96%

Since Voltage Drop during starting is <15%, 2000KVA DG is recommended.

S.M. Engineers & Consultants Sheet 03 of 03

III. Incomer Outgoings

Particular Requirement of Temporary Panel - HVAC : : : : : 3200A TPN ACB 800A TPN MCCB 630A TPN MCCB 63A TPN MCCB 32A TPN MCCB : : : : 3Nos. 3Nos. 4Nos. 8Nos.

Incomer shall be provided with Digital Ammeter & Digital Voltmeter