78% found this document useful (9 votes)
4K views2 pages

Program of Works

The document is a program of works and estimates for proposed projects at Guing-oy Elementary School. It includes estimates for labor and materials for three projects: 1) rip rapping the lower portion of the school, 2) installing gutters, and 3) plastering the outside walls of the school building. It provides details of the labor needs, materials required, transportation costs, and a total estimated budget of 11,020 pesos. It was prepared by teacher Maribeth L. Buy-an.

Uploaded by

Jennie Amando
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
78% found this document useful (9 votes)
4K views2 pages

Program of Works

The document is a program of works and estimates for proposed projects at Guing-oy Elementary School. It includes estimates for labor and materials for three projects: 1) rip rapping the lower portion of the school, 2) installing gutters, and 3) plastering the outside walls of the school building. It provides details of the labor needs, materials required, transportation costs, and a total estimated budget of 11,020 pesos. It was prepared by teacher Maribeth L. Buy-an.

Uploaded by

Jennie Amando
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

Republic of the Philippines

Department of Education Cordillera Administrative Region Benguet Division Bakun District

GUING-OY ELEMENTARY SCHOOL


PROGRAM OF WORKS/ESTIMATES Proposed Project: 1.Rip rapping the lower portion of the school 2. Installation of Gutter 3. Plastering the outside wall of the school building Description Quantity Unit A. Labor 1. Rip rapping the lower portion of the school ** 6 laborers 12 days *Labor for the hauling of stones 2. Installation of Gutter ** 1 laborer 3.Plastering the outside wall of the classroom **2 Laborer **Labor for Hauling of sand B. Materials Stones Gutter PVC pipe 2 PVC Elbow 2 Fed Seal Excel cement Sand C. Transportation -Fare of materials from La Trinidad to Banglelao , Dalipey, Bakun: -Fare of purchaser from Bakun to La Trinidad during procurement/quotation -Hauling cost of purchased materials from Banglelao, Dalipey to Guing-oy ES Longboy Dalipey, Bakun

Unit Price Php. 200.00 __________

Total Php. 2,400.00 _______ __________ __________ __________ _________ __________ 1,700.00 1,200.00 150.00 640.00 2,270.00 _________ Php. 400.00 Php.520.00 Php. 1,740.00 Php.11,020

2 2 5 10 6 6 4 10 80 1 3

day days cubic pieces pieces pieces L bags cans trip Trips

__________ __________ __________ __________ __________ 170.00 200.00 25.00 160.00 Php. 227.00 ________ Php. 400.00 130.00 Php. 1,740.00

TOTAL Note : *The labor was not charged ,counterpart of parents for the Brigada plus ** The labor will be taken/charged from the next MOOE release. Prepared by: MARIBETH L. BUYA-AN Teacher I

Republic of the Philippines

Department of Education Cordillera Administrative Region Benguet Division Bakun District

GUING-OY ELEMENTARY SCHOOL


NANCY G. LUMBAS Schools Division Superintendent Benguet Division Wangal, La Trinidad, Benguet Maam: I am writing to officially state my reason for buying equipment a Radio/CD/DVD/MP3 from the MOOE fund. The said equipment is to be used as an instructional material in music, phonics, and a means of getting current information. Thank you for your consideration. Sincerely, MARIBETH L. BUYA-AN Teacher I