75% found this document useful (4 votes)
14K views1 page

Build Up Rate Format - Hoarding

This document provides cost estimates for two types of metal deck hoarding for a construction project. The first is 3.60 meters high with supports every 2.40 meters, and costs 232.50 per meter. The second is 2.40 meters high also with supports every 2.40 meters, and costs 202.70 per meter. Both estimates include costs for footings, vertical and horizontal structural supports, metal hoarding, profit and overhead.

Uploaded by

Faiz Ahmad
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
75% found this document useful (4 votes)
14K views1 page

Build Up Rate Format - Hoarding

This document provides cost estimates for two types of metal deck hoarding for a construction project. The first is 3.60 meters high with supports every 2.40 meters, and costs 232.50 per meter. The second is 2.40 meters high also with supports every 2.40 meters, and costs 202.70 per meter. Both estimates include costs for footings, vertical and horizontal structural supports, metal hoarding, profit and overhead.

Uploaded by

Faiz Ahmad
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

BUILT-UP RATE FOR METAL DECK HOARDING

PROJECT :

LOCATION :

SUPPLIER :

SUB-CONTRACTOR :

QUOTATION DATE :

Metal Decking Hoarding ( 3.60m High @ 2.40m c/c/) Cost / m


Allow for 50% scrap value for structural steel & metal hoarding

Footing 1200mm x 600mm x 600mm deep 90.00


Vertical Struct 100mm x 50mm x 3mm thk ( 2nos.) 26.49
Horizontal Struct 100mm x 50mm x 3mm thk ( 3nos.) 52.99
Metal hoarding 2.40m x 3.60m 63.00
232.48
Profit & Overhead @ Inclusived -
Tender Price / m 232.48

Tender Cost / m @ say 232.50

Metal Decking Hoarding ( 2.40m High @ 2.40m c/c/) Cost / m


Allow for 50% scrap value for structural steel & metal hoarding

Footing 1200mm x 600mm x 600mm deep 90.00


Vertical Struct 100mm x 50mm x 3mm thk ( 2nos.) 17.66
Horizontal Struct 100mm x 50mm x 3mm thk ( 3nos.) 52.99
Metal hoarding 2.40m x 3.60m 42.00
202.65
Profit & Overhead @ Inclusived -
Tender Price / m 202.65

Tender Cost / m @ say 202.70