0% found this document useful (0 votes)
81 views1 page

PR To NH-74 From KM 294.00 To 304.00 (Rates)

This document certifies rates for various items of work required for preparing an estimate to renew a section of road from km 294.000 to [km not provided]. It lists 31 items of work, including stress absorbing membrane, applying tack coat, bituminous macadam, and semi dense bituminous concrete. The rates provided are based on current labor and material costs and approved ministry standards. The Superintendent Engineer of the 28th Circle PWD in Bareilly certifies that he is authorized to approve the rates for all items as per his position.

Uploaded by

Perkresht Pawar
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
81 views1 page

PR To NH-74 From KM 294.00 To 304.00 (Rates)

This document certifies rates for various items of work required for preparing an estimate to renew a section of road from km 294.000 to [km not provided]. It lists 31 items of work, including stress absorbing membrane, applying tack coat, bituminous macadam, and semi dense bituminous concrete. The rates provided are based on current labor and material costs and approved ministry standards. The Superintendent Engineer of the 28th Circle PWD in Bareilly certifies that he is authorized to approve the rates for all items as per his position.

Uploaded by

Perkresht Pawar
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Ceritication of Rates

Name of Work :- Periodic Renuwal (2012-2013) from km 294.000 to


It is to certified that the rate of the following items of work i.e. for item No. 1 to 31 required for preparing the estimate for the work mentioned above are based on current rate of labour and material and on ministery's standard data book for analysis of rates for the inputs and are hereby approved.
S. No.

1 2

Item of work Stress absorbing membrane (SAM) crack width above 9 mm and cracked area above 50 per cent Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm . Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm . Providing and laying bituminous macadam 50mm thich with hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder,etc complete. Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, to the required grade, level and alignment, rolling etc. complete

Unit Sqm Sqm

Rate 54.40 10.80

Sqm

8.90

4 Cum 5700.40

Cum

7760.00

It is also certified that I am component to approve the rates of all these items as per post concerned in me as SE 28th circle NH, PWD , Bareilly by the state government.

Assistant engineer NH, PWD, Bareilly

Executive Engineer NH, PWD, Bareilly

Suprintending Engineer 28Th Circle, PWD, Bareilly