1) The document reports on power plant and transmission line outages in the Eastern Region grid of India on June 17th, 2014. It lists two power plant outages of 300 MW and 500 MW capacity. 2) It also lists several transmission line outages and restorations at voltages of 400 kV, 220 kV, and 132 kV. The lines tripped due to issues like overvoltage, faults, and insulator replacement work. 3) Additional information is provided on minimum grid frequency of 49.7 Hz, minimum voltage of 384 kV, and maximum power flow of 672 MW on a transmission line.

Uploaded by

Chandan Mallick
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
65 views1 page

Shift Summary Report 170614-E

1) The document reports on power plant and transmission line outages in the Eastern Region grid of India on June 17th, 2014. It lists two power plant outages of 300 MW and 500 MW capacity. 2) It also lists several transmission line outages and restorations at voltages of 400 kV, 220 kV, and 132 kV. The lines tripped due to issues like overvoltage, faults, and insulator replacement work. 3) Additional information is provided on minimum grid frequency of 49.7 Hz, minimum voltage of 384 kV, and maximum power flow of 672 MW on a transmission line.

Uploaded by

Chandan Mallick
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

GENERATING STATION No. Capacity Tripped at Synch.

at
SAGARDIGHI 1 300 10:20 13:11
MEJIA 8 500 20:32
Tripped at Norm. at
06:59 15:56
13:09 18:35
13:16 14:34
15:10 16:09
14:14 14:55
50.27 HZ 18:04 HRS
49.70 HZ 14:41 HRS

Name of line
End at which
Installed
Purnea
Purnea
Ranchi
Ranchi
Rengali
Jeypore
Jeypore
Jeypore
Bihar DVC OPTCL WBSETCL NTPC IPP Others

1
Emerg(E) Daily (D)
Planned(P) Cont. (C)
P C 05-05-14 07:00 20-06-14 18:00 05-05-14 09:05
P C 07-06-14 08:00 17-06-14 19:00 08-06-14 07:43
ER-NR:TTC
2300 MW
E C 13-06-14 19:30 16-06-14 17:00 13-06-14 19:54
P C 25-05-14 08:00 18-06-14 19:00 25-05-14 07:55
P D 17-06-14 09:00 17-06-14 16:00 17-06-14 09:29 17-06-14 12:58
P D 17-06-14 07:00 17-06-14 17:00 17-06-14 07:35 17-06-14
20:22/
20:23
P D 17-06-14 09:00 17-06-14 17:00 17-06-14 08:59 17-06-14 16:01 220 KV BIRPARA-MALBASE
FOR DEFECTIVE INSULATOR REPLACEMENT
WORKS.
TOWER SHIFTING WORKS 400 RANCHI - NEW RANCHI - I &II
400 KV BARH-PATNA-I
DIVERSION WORK OF 400KV KHG-BARH-D/C AT
BARH
400 KV KAHALGAON-BARH-2 DIVERSION OF TOWER
Reason
220 KV DALKHOLA-SILLIGURI-D/C
STRINING OF 800KV HVDC BAROBISHA-
ISALMPUR
400 KV BUS-I @ DURGAPUR(PG) CARRYING OUT OF CIVIL EXCAVATION WORK
400 KV TALA-BINAGURI-1
REPLACEMENT OF DE-CAPPED INSULATOR AT
TALA END LOC:TKS-15
40%
Name of the element
VOLTAGE VIOLATION
DEVIATION VIOLATION
LOADING VIOLATION
To
Jharkhand
1
400 KV MAITHON-MEJIA -I RESTORED AT 19:21 HRS ON ERS.
Units tripped /Revived
(210 MW & above)
PROBLEM IN AIR PREHEATER
FLAME FAILURE
Additional information(if any) 3) INFIRM POWER INJECTION TO GRID: MAX GERATION WAS 215 MW (NTPC,BARH#4). UNIT TRIPPED AT 18:56 HRS DUE TO
TURBINE TRIPPED.
Purnea-Muzaffarpur 2
TTC/ATC Rev.
From
ZERO CROSSING VIOLATION
Details of major Line/ equipment S/D in ER
GI / GD -Please find attached Preliminary disturbance report.
ALERT
EMERGENCY
NON-COMPLINCE
Jeypore-Gazuwaka 1
40%
ALERT
Approved Shut down period Actual Shut down period
IN SERVICE
Rengali-Indravati
TAKEN INTO SERVICE AT 11-36 HRS OF 17-06-14 63%
Ranchi-Sipat 1 40%
IN SERVICE
17-Jun-14
UFR Operation
LINE TRIPPING /RESTORATION

Contigent Line Loading
Reason
Reason
Load disconnection in case O/D
EVENING SHIFT

Sudden Load crash
2) Min. Voltage At Jeerat S/Stn.: 384 KV at 18:52 Hrs.
1) Max. FLOW OF 400 KV FSTPS-BAHARAMPUR : 672 MW AT 18:51 HRS. Issues
LINE
TRIPPING/RESTORATION
DETAILS(HVDC/765
KV/400 KV/220 KV/132
KV) ELEMENTS. 400 KV ANGUL-BOLANGIR TRIPPED ON O/V
400 KV KAHALGAON- BANKA-I
REPORTEDLY O/V AT KAHALGAON AT THE TIME OF FIRE HAZARD IN RTU AT
KAHALGAON, DT RECEIVED AT BANKA
400 KV RANCHI-SIPAT-1 Y-N FAULT
HAND TRIPPED FROM MERAMANDALI AS HEAVY SPARK OBSERVED IN Y-PH ISOLATOR
OF MAIN BREAKER
400 KV MERAMANDALI-ANGUL
Scheduling details
NIL
Maximum
Open Access Curtailment ( In case of
contigency/ Unit Tripping etc..)
NIL
NIL ATC and congestion
Minimum
URS scheduled
Freqency Profile
Reason of Outage Compensation
NON-COMPLINCE
EMERGENCY
Ranchi-Sipat 2
INSERVICE Jeypore-Gazuwaka 2
220 KV RANCHI-CHANDIL R-N FAULT
IN SERVICE
40%
IN SERVICE
FREQUENCY VIOLATION
IN SERVICE
40% fixed, +15%/-5% dynamic
40%
Purnea-Muzaffarpur 1 40% fixed, +15%/-5% dynamic
Jeypore-Bolangir
IN SERVICE
To
Details of Grid Incidents
and Grid Disturbances
MESSAGES TO
CONSTITUENTS
From
Reason