GENERATING STATION No. Capacity Tripped at Synch.
at
SAGARDIGHI 1 300 10:20 13:11
MEJIA 8 500 20:32
Tripped at Norm. at
06:59 15:56
13:09 18:35
13:16 14:34
15:10 16:09
14:14 14:55
50.27 HZ 18:04 HRS
49.70 HZ 14:41 HRS
Name of line
End at which
Installed
Purnea
Purnea
Ranchi
Ranchi
Rengali
Jeypore
Jeypore
Jeypore
Bihar DVC OPTCL WBSETCL NTPC IPP Others
1
Emerg(E) Daily (D)
Planned(P) Cont. (C)
P C 05-05-14 07:00 20-06-14 18:00 05-05-14 09:05
P C 07-06-14 08:00 17-06-14 19:00 08-06-14 07:43
ER-NR:TTC
2300 MW
E C 13-06-14 19:30 16-06-14 17:00 13-06-14 19:54
P C 25-05-14 08:00 18-06-14 19:00 25-05-14 07:55
P D 17-06-14 09:00 17-06-14 16:00 17-06-14 09:29 17-06-14 12:58
P D 17-06-14 07:00 17-06-14 17:00 17-06-14 07:35 17-06-14
20:22/
20:23
P D 17-06-14 09:00 17-06-14 17:00 17-06-14 08:59 17-06-14 16:01 220 KV BIRPARA-MALBASE
FOR DEFECTIVE INSULATOR REPLACEMENT
WORKS.
TOWER SHIFTING WORKS 400 RANCHI - NEW RANCHI - I &II
400 KV BARH-PATNA-I
DIVERSION WORK OF 400KV KHG-BARH-D/C AT
BARH
400 KV KAHALGAON-BARH-2 DIVERSION OF TOWER
Reason
220 KV DALKHOLA-SILLIGURI-D/C
STRINING OF 800KV HVDC BAROBISHA-
ISALMPUR
400 KV BUS-I @ DURGAPUR(PG) CARRYING OUT OF CIVIL EXCAVATION WORK
400 KV TALA-BINAGURI-1
REPLACEMENT OF DE-CAPPED INSULATOR AT
TALA END LOC:TKS-15
40%
Name of the element
VOLTAGE VIOLATION
DEVIATION VIOLATION
LOADING VIOLATION
To
Jharkhand
1
400 KV MAITHON-MEJIA -I RESTORED AT 19:21 HRS ON ERS.
Units tripped /Revived
(210 MW & above)
PROBLEM IN AIR PREHEATER
FLAME FAILURE
Additional information(if any) 3) INFIRM POWER INJECTION TO GRID: MAX GERATION WAS 215 MW (NTPC,BARH#4). UNIT TRIPPED AT 18:56 HRS DUE TO
TURBINE TRIPPED.
Purnea-Muzaffarpur 2
TTC/ATC Rev.
From
ZERO CROSSING VIOLATION
Details of major Line/ equipment S/D in ER
GI / GD -Please find attached Preliminary disturbance report.
ALERT
EMERGENCY
NON-COMPLINCE
Jeypore-Gazuwaka 1
40%
ALERT
Approved Shut down period Actual Shut down period
IN SERVICE
Rengali-Indravati
TAKEN INTO SERVICE AT 11-36 HRS OF 17-06-14 63%
Ranchi-Sipat 1 40%
IN SERVICE
17-Jun-14
UFR Operation
LINE TRIPPING /RESTORATION
Contigent Line Loading
Reason
Reason
Load disconnection in case O/D
EVENING SHIFT
Sudden Load crash
2) Min. Voltage At Jeerat S/Stn.: 384 KV at 18:52 Hrs.
1) Max. FLOW OF 400 KV FSTPS-BAHARAMPUR : 672 MW AT 18:51 HRS. Issues
LINE
TRIPPING/RESTORATION
DETAILS(HVDC/765
KV/400 KV/220 KV/132
KV) ELEMENTS. 400 KV ANGUL-BOLANGIR TRIPPED ON O/V
400 KV KAHALGAON- BANKA-I
REPORTEDLY O/V AT KAHALGAON AT THE TIME OF FIRE HAZARD IN RTU AT
KAHALGAON, DT RECEIVED AT BANKA
400 KV RANCHI-SIPAT-1 Y-N FAULT
HAND TRIPPED FROM MERAMANDALI AS HEAVY SPARK OBSERVED IN Y-PH ISOLATOR
OF MAIN BREAKER
400 KV MERAMANDALI-ANGUL
Scheduling details
NIL
Maximum
Open Access Curtailment ( In case of
contigency/ Unit Tripping etc..)
NIL
NIL ATC and congestion
Minimum
URS scheduled
Freqency Profile
Reason of Outage Compensation
NON-COMPLINCE
EMERGENCY
Ranchi-Sipat 2
INSERVICE Jeypore-Gazuwaka 2
220 KV RANCHI-CHANDIL R-N FAULT
IN SERVICE
40%
IN SERVICE
FREQUENCY VIOLATION
IN SERVICE
40% fixed, +15%/-5% dynamic
40%
Purnea-Muzaffarpur 1 40% fixed, +15%/-5% dynamic
Jeypore-Bolangir
IN SERVICE
To
Details of Grid Incidents
and Grid Disturbances
MESSAGES TO
CONSTITUENTS
From
Reason