This document provides calculations for the performance of a preheater heat exchanger with the following information: 1) It calculates the heat balance of the shell and tubes, determining the heat transfer of each to be 640,388 Btu/hr and 1,635,463 Btu/hr respectively. 2) It determines the log mean temperature difference (LMTD) to be 57.818°F and the overall heat transfer coefficient to be 18,445 Btu/hr(ft2)(°F). 3) It calculates various parameters needed for the design such as the flow areas, mass velocities, Reynolds numbers, heat transfer factors, and tube wall temperature.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views11 pages

PERHITUNGAN Hari Ke1

This document provides calculations for the performance of a preheater heat exchanger with the following information: 1) It calculates the heat balance of the shell and tubes, determining the heat transfer of each to be 640,388 Btu/hr and 1,635,463 Btu/hr respectively. 2) It determines the log mean temperature difference (LMTD) to be 57.818°F and the overall heat transfer coefficient to be 18,445 Btu/hr(ft2)(°F). 3) It calculates various parameters needed for the design such as the flow areas, mass velocities, Reynolds numbers, heat transfer factors, and tube wall temperature.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 11

95

LAMPIRAN A
PERHITUNGAN

Perhitungan kinerja preheater heat exchanger 6-1

Diketahui :
Shell = HCT
- T
1
= 143
o
C = 32 + (


o
C) = 289,4
o
F
- T
2
= 42
o
C = 32 + (


o
C) = 107,6
o
F
- T
1
T
2
= (289,4 - 107,6)
o
F = 181,8
o
F
- W = 71 T/D x 2205 lb/T x


= 6523,125 lb/hr
- Spgr
60/60
= 0,8534
-
o
API =

- 131,5 = 34,3074

Tube = Crude Oil
- t
1
= 40,4
o
C = 32 + (


o
C) = 104,72
o
F
- t
2
= 46,9
o
C = 32 + (


o
C) = 116,42
o
F
- t
2 -
t
1
= (116,42 104,72)
o
F = 11,7
o
F
- w = 3105 T/D x 2205 lb/T x


= 285.271,875 lb/hr
- Spgr
60/60
= 0,8331
-
o
API =

- 131,5 = 38,3475







96
1. NERACA PANAS (Heat Ballance), Q
Q = W. Cp (T
1
T
2
) = w. c
p
(t
2
t
1
)

a. PadaShell
Diketahui :
T
AVg
=
2
2 1
T T +
=
()

= 198,5
o
F
Cp = 0,54 Btu/lb.
o
F (Gambar. 13 Lampiran B)
Maka,
Q
1
= W x Cp x (T
1
T
2
)
= 6523,125 lb/hr x 0,54 Btu/lb.
o
F x 181,8
o
F
= 640.388,2275 Btu/hr

b. PadaTube
Diketahui :
t
AVg
=
2
1 2
t t +
=
( )

= 110,57
o
F
c
p
= 0,49 Btu/lb.
o
F (Gambar. 13 Lampiran B)
Maka,
Q
1
= w x cp (t
2
t
1
)
= 285.271,875 lb/hr x 0,49 Btu/lb.
o
F x 11,7
o
F
= 1.635.463,659 Btu/hr

2. LMTD dan t
Hot Fluid Cold Fluid Differences
T
1
289,4
o
F Higher Temp t
2
104,72
o
F 184,68 t
2

T
2
107,6
o
F Lower Temp t
1
116,42
o
F 8,82 t
1

181,8
o
F Differences 11,7
o
F 175,86 (t
2
- t
1
)
(T
1
T
2
) (t
2
t
1
)

97
LMTD =
1 2
1 2
/ ln t t
t t
A A
A A
=

()
= 57,818
o
F
R =
1 2
2 1
t t
T T

= 15,538
S =
1 1
1 2
t T
t t

= 0,06335
Berdasarkan data Desain HE 6-1 yang merupakan HE dengan 1Shell dan >
2Tube Pass, Maka didapat Faktor Koreksi F
T
= 0,85. (Gambar. 14 Lampiran B)
Sehingga,
t = LMTD x F
T

= 57,818
o
F x 0,85
= 49,1453
o
F

3. TEMPERATUR KALORI (Tc dan tc)
th
tc
A
A
=
2
1
t
t
A
A
=

= 0,04776
Diketahui :
T
1 -
T
2
= 181,8
o
F
t
2
-t
1
= 11,7
o
F
o
API = 34,3074
Maka didapat :
Kc = 0,25 (Gambar. 15 Lampiran B)
Fc = 0,275 (Gambar. 15 Lampiran B)
T
c
(Shell) = T
2
+ F
c
x (T
1
T
2
)
= 107,6
o
F + 0,275 x 181,8
o
F
= 157,595
o
F
t
c
(Tube) = t
1
+ F
c
x (t
2
t
1
)
= 104,72
o
F + 0,275 x 11,7
o
F
= 107,938
o
F


98

4. LUAS ALIRAN (Flow Area)

Diketahui :
ID = 735 mm
= 73,5 cm x 0,3937 in/cm = 28,937 in
P
T
= 1 in
B = 665 mm
=66,5 cm x 0,3937 in/cm = 26,1811 in
(C) = P
T
OD = 0,22 in

Maka :
a
s
=
T
P
xB IDxC
144
"

=



= 1,3153 ft
2


5. KECEPATAN MASSA (Mass Velocity)

Diketahui :
W = 6523,125 lb/hr
a
s
= 1,3153 ft
2

Maka :
G
s
=
s
a
W
=


= 4959,42 lb/hr.ft
2


6. BILANGAN REYNOLD (Re)
Diketahui :
Tc = 157,595
o
F
o
API = 34,3074
SG = 0,8534
= 1 cp (Gambar. 23 Lampiran B)
= 1 Cp x 2, 42
cp
hr ft
lb
.

= 2,42 lb/ft.hr


Diketahui :
JumlahTube (Nt) = 498 per shell
JumlahPass (n) = 4
Diameter Luar (OD) = 0,787 in
BWG = 12

Maka :
at = 0, 223 ft
2
(Tabel. 26 Lampiran B)
a
t
=
n
t a x N
t
144
'

=



= 0,1928 ft
2




Diketahui :
w = 285.271,875 lb/hr
a
t
= 0,1928 ft
2

Maka :
G
t
=
t
a
w
=


= 1479625,908 lb/hr.ft
2




Diketahui :
tc = 107,938
o
F
o
API = 38,3475
SG = 0,8331
= 0,96 cp (Gambar. 23 Lampiran B)
= 0,96 Cp x 2, 42
cp
hr ft
lb
.

= 2,3232 Ib/ft.hr

Fluida Panas (LCT) : Shell Fluida Dingin (CO) : Tube
99

Maka,
De =
( )
OD x
OD P
T
t
t 4 / . 4
2 2


=
*()


( )



= 0, 8317 in x
in
ft
12
1
= 0,0693 ft
R
es
=

s
G x De

=
hr ft lb
x ft
. / 42 , 2
lb/hr.ft 4959,42 0693 , 0
2

= 142,019

7. FAKTOR PERPINDAHAN PANAS (jH)
Diketahui :
R
es
= 142,019
Maka dari grafik didapat,
jH = 6,2 (Gambar. 16 Lampiran B)



8. KOEFISIEN PERPINDAHAN PANAS
Diketahui :
Tc = 157,595
o
F

o
API = 34,3074
Cp = 0,51 Btu/lb.
o
F
(Gambar. 13 Lampiran B)
K = 0,077 Btu/ft
2
.hr(
o
F/ft)
(Gambar. 18 Lampiran B)
Maka,

3 / 1
.
|
.
|

\
|
k
c
=
3 / 1
077 , 0
2,42 51 , 0
|
.
|

\
| x

= 2,5213

Maka,
Dt = 0.532 in
(Tabel. 26 Lampiran B)
= 0, 532 in
in
ft
12
1
= 0,0443 ft
R
et
=

t
G x Dt

=
hr ft lb
x ft
. / 3232 , 2
8lb/hr.ft 1479625,90 0443 , 0
2

= 28214,285



Diketahui :
L = 118,11 inch = 9,84 ft
D = 0,532 inch = 0,044 ft
L/D = 22,36
Maka dari grafik didapat,
jH = 90 (Gambar. 17 Lampiran B)



Diketahui :
tc = 107,938
o
F

o
API = 38,3475
Cp = 0,49 Btu/lb.
o
F
(Gambar. 13 Lampiran B)
K = 0,08 Btu/ft
2
.hr(
o
F/ft)
(Gambar. 18 Lampiran B)
Maka,

3 / 1
.
|
.
|

\
|
k
c
=
3 / 1
08 , 0
2,3232 49 , 0
|
.
|

\
| x

= 2,4232

100

10. TUBE WALL TEMPERATURE

hi = 1600 Btu/hr(ft
2
)(
o
F) x Correction factor (Gambar 24,LampiranB)
= 1600 Btu/hr(ft
2
)(
o
F) x 1,02
= 1632 Btu/hr(ft
2
)(
o
F)
Maka, hio :
hio = hi x


= 1632 Btu/hr(ft
2
)(
o
F) x



= 1103,207 Btu/hr(ft
2
)(
o
F)
t
w
= t
c
+
o io
o
h h
h
+
(T
c
- t
c
)
=107,938
o
F +

( )
= 108,461
o
F
9. MENCARI NILAI ho danhio
Shell side (HCT) : ho
Diketahui :
jH = 6,2
k / De = 0,077 / 0,0693
= 1,11111
Maka :
h
o
= jH .
D
k
.
3 / 1
.
|
.
|

\
|
k
c
s
|
s
o
h
|
= jH .
D
k
.
3 / 1
.
|
.
|

\
|
k
c

s
o
h
|
= 6,2 x 1,11111 x 2,5213
= 17,369 Btu/(hr.ft
2
.
o
F)







Tube side (Crude Oil) : hio
Diketahui :
G
t
= 1479625,908 lb/hr.ft
2

tc = 107,938
o
F

Maka :
Velocity, V =



=



= 6,58 ft/sec
Pada velocity = 6,58 ft/sec dan tc = 107,938
o
F
Didapat, hi = 1600 Btu/hr(ft
2
)(
o
F) (Gambar
24, Lampiran B)



101
11. Mencari
s

Pada t
w
= 108,461
o
F
o
API = 38,3475
Maka didapat nilai

w
= 0,58 Cp x 2,42
cp
hr ft
lb
.

= 1,404 lb/(Ft)(hr)

s
=
14 , 0
|
|
.
|

\
|
w


= (


= 1,08

Maka, ho :

ho =

x
s

= 17,369 Btu/(hr.ft
2
.
o
F) x 1,08
= 18,759 Btu/(hr.ft
2
.
o
F)


13. CLEAN OVERALL COEFFI CIENT, Uc
Uc =
o io
o io
h h
h h
+
.
=
18,759 1103,207
18,759 x 1103,207
+
= 18,445 Btu/hr (ft
2
) (
o
F)

14. DESI GN OVERALL COEFFI CIENT, Ud
Diketahui :
OD = 0,787 in
BWG = 12
a = 0, 1963 ft
2
/in.ft (Tabel. 26 Lampiran B)
L = 118,11 inch = 9,8425 ft
102
Untuk Re
t
= 28214,285
F = 0,0002 ft
2
/ in
2

(Gambar. 19 Lampiran B)
tc = 107,938
o
F
o
API = 38,3475
s = 0,78
(Gambar. 21 Lampiran B)
1) Pressure drop(P
t
)
P
t
=
t
t
s D x
n L G f
| . . . 10 22 , 5
. .
10
2

=



= 9,62 psi



Nt = 498 / shell
Maka,
A = a x L x N
= 0,1963 ft
2
/ft x 9,8425 ft x 498/shell
= 962,1772 ft
Sehingga,
U
D
=
t A
Q
A .
=
49,1453 x 962,1772
Btu/hr 75 640.388,22
= 13,543 Btu/hr (ft
2
) (
o
F)

15. FAKTOR PENGOTOR, Rd
Rd =
D C
D C
U U
U U
.
.

=
13,543 18,445
13,543 18,445
x

= 0,02 hr.ft
2
.
o
F /Btu






























Pressure drop
Fluida Panas (LCT) : Shell Fluida Dingin (CO) : Tube
1) Untuk Re
s
= 142,019
f = 0,005 ft
2
/ in
2

(Gambar. 20 Lampiran B)
Tc = 157,595
o
F
o
API = 34,3074
s = 0,81
(Gambar. 21 Lampiran B)
D
s
=
ft in
ID
/ 12

=
ft in
in
/ 12
937 , 28
= 2,4114 ft
2) No.of crosses,
N + 1=
B
L 12
=
1811 , 26
11 , 118 12 x

= 54,1352




103













2) G
t
= 1479625,908 lb/ft
2
.hr
' 2
2
g
v
psi = 0,0024
(Gambar. 22 Lampiran
B)
Maka,
P
r
=
' 2
4
2
g
v
x
s
n x





= 0,049 psi
3) P
T
= P
t
+ P
r

= 9,62 + 0,049 = 9,669














3) Pressure drop (P
s
)
P
s
=
( )
s
s s
s De x
N D G f
| . . . 10 22 , 5
1 . . .
10
2
+

=
( )
1,08 0,81 0693 , 0 10 22 , 5
54,1352 4114 , 2 4959,42 005 , 0
10
2
x x x x
x x

= 0,005 Psi















16. EFEKTI FI TAS KERJ A HE
Laju kapasitas panas untuk fluida panas
Ch = m
s
x c
p

= 6523,125 lb/hr x 0,54 Btu/ lb
o
F
= 3522,49Btu/ hr
o
F
Laju kapasitas panas untuk fluida dingin
Cc = m
t
x Cp
= 285.271,875 lb/ hr x 0,49 Btu/ lb
o
F
= 139783,22 Btu/ hr
o
F
Karena Ch < Cc, maka :
=


=
()
()

104
=
( )

()


= 98,44 %
*m
t
= w ; m
s
= W












104

Berdasarkan metode perhitungan yang sama maka dapat ditabulasikan untuk data selanjutnya sehingga didapatkan hasil
perhitungan sebagai berikut :
Uraian Satuan
Nilai Satuan pada Hari ke-
Keterangan
2 3 4 5
Neraca Panas (Q) Btu/hr
7786582,650 6107897,606 4243762,211 4063854,039 Shell
4317478,200 3528371,542 3427820,896 3572210,801 Tube
LMTD
o
F 265,431 234,627 227,871 234,954 Shell and Tube
Temperatur Kalorik Ft
402,368 355,287 364,487 374,320 Shell
122,122 122,248 138,221 140,954 Tube
Flow Area
o
F
1,315 1,315 1,315 1,315 Shell
0,192 0,192 0,192 0,192 Tube
Kecepatan Massa lb/hr.ft
2

23051,138 29288,916 20766,980 19300,089 Shell
1715498,761 1758377,005 1592069,803 1615896,050 Tube
Bilangan Reynold
1041,338 1330,754 943,556 876,907 Shell
20951,344 21475,127 19444,011 19735,002 Tube
Temperatur Dinding
0
F 244,507 224,982 238,743 243,832 Shell and Tube
Koeff. Perpindahan Panas (h) Btu/hr.ft
2
.F
29,402 29,906 29,900 29,900 Shell
48,067 48,067 47,404 48,067 Tube
Coeffisient Overall clean (Uc) Btu/hr.ft
2
.F 18,243 18,433 18,335 18,433 Shell and Tube
Coeffisient Overall Design (Ud) Btu/hr.ft
2
.F 17,250 15,948 15,953 16,124 Shell and Tube
Dirt Factor (Rd) hr.ft
2
.F/Btu 0,003 0,008 0,008 0,007 Shell and Tube
Pressure Drop kg/cm
2

0,080 0,130 0,0654 0,056 Shell
8,307 8,361 8,158 8,186 Tube
Efektivitas % 80,156 65,785 65,936 665,972 Shell and Tube