Power Grid Corporation of India Limited S.R.L.D.C, Bangalore

This document is a weekly report from Power Grid Corporation of India for the period from March 22, 2010 to March 28, 2010. It provides information on frequency and voltage profiles, major generating unit outages, outages of transmission lines and ICTs, transmission constraints, grid disturbances, and regulatory measures taken during the week. Key outages included units at Vijayawada TPS, Neyveli TS I Exp, and North Chennai TPS for maintenance or technical issues. Major transmission line outages were also reported for maintenance work. No transmission constraints or grid disturbances were reported for the period.

Uploaded by

RAPRATSIN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
65 views

Power Grid Corporation of India Limited S.R.L.D.C, Bangalore

This document is a weekly report from Power Grid Corporation of India for the period from March 22, 2010 to March 28, 2010. It provides information on frequency and voltage profiles, major generating unit outages, outages of transmission lines and ICTs, transmission constraints, grid disturbances, and regulatory measures taken during the week. Key outages included units at Vijayawada TPS, Neyveli TS I Exp, and North Chennai TPS for maintenance or technical issues. Major transmission line outages were also reported for maintenance work. No transmission constraints or grid disturbances were reported for the period.

Uploaded by

RAPRATSIN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

POWER GRID CORPORATION OF INDIA LIMITED

S.R.L.D.C, BANGALORE
WEEKLY REPORT
YEAR:2010/WEEK No : 12

PERIOD FROM 22.03.2010 TO 28.03.2010

(A) FREQUENCY PROFILE:

DATE

MAX
HZ

22-Mar-10
23-Mar-10
24-Mar-10
25-Mar-10
26-Mar-10
27-Mar-10
28-Mar-10

50.04
49.99
49.85
49.84
50.34
50.15
50.06
50.34
49.84
50.04

MAX
MIN
AVG

FREQUENCY
MIN
Average
HZ
HZ

48.94
48.57
48.63
48.59
48.58
48.64
48.89
48.94
48.57
48.69

49.39
49.25
49.19
49.22
49.33
49.44
49.44
49.44
49.19
49.32

Variation
Index

4.09
6.02
6.83
6.49
4.92
3.54
3.46
6.83
3.46
5.05

(B) VOLTAGE PROFILE:

DATE

22-Mar-10
23-Mar-10
24-Mar-10
25-Mar-10
26-Mar-10
27-Mar-10
28-Mar-10
MAX
MIN
AVG

DATE

22-Mar-10
23-Mar-10
24-Mar-10
25-Mar-10
26-Mar-10
27-Mar-10
28-Mar-10
MAX
MIN
AVG

HYDERABAD
MAX
MIN
KV
KV

BANGALORE
MAX
MIN
KV
KV

MAX
KV

MIN
KV

403
404
403
399
399
401
406
406
399
402

406
405
404
405
405
405
405
409
404
405

411
413
412
413
412
411
412
413
411
412

391
395
394
391
377
380
395
395
377
389

391
394
393
388
388
386
392
394
386
390

378
383
382
379
370
369
387
392
369
378

KOLAR

GOOTY
MAX
MIN
KV
KV

MADRAS
MAX
MIN
KV
KV

TRIVANDRUM
MAX
MIN
KV
KV

411
412
410
408
408
411
410
412
408
410

404
398
399
396
394
395
400
404
394
398

425
424
423
424
423
429
424
429
423
425

398
400
398
395
392
391
400
400
391
396

367
364
365
371
359
360
382
382
359
367

408
400
396
397
399
404
406
408
396
401

WEEKLY REPORT 12/2010 (FROM 22.03.10 TO 28.03.10)

(C) MAJOR GENERATING UNITS OUTAGE DETAILS:


OUTAGE
SL No.

STATION

UNIT No.

CAPACITY (MW)

CONSTITUENT

TIME

DATE

CURRENT
STATUS

REASON FOR OUTAGE

REVIVAL TIME
TIME

DATE

VIJAYAWADA TPS

UNIT 6

210 MW

APGENCO

15:22

23-Dec-09

OUT

NEYVELI TS I EXP

UNIT 2

210 MW

NLC

11:55

26-Feb-10

OUT

H/T FOR ANNUAL MAINTENANCE


TRIPPED DUE TO TURBINE VIBRATION HIGH

NORTH CHENNAI TPS

UNIT 2

210 MW

TNEB

10:23

12-Mar-10

OUT

H/T DUE TO LP TURBINE VIBRATION PROBLEM

TUTUCORIN TPS

UNIT 4

210 MW

TNEB

23:53

22-Mar-10

RUNNING

17:58

23-Mar-10 H/T DUE TO BOILER TUBE LEAKAGE

RAICHUR TPS

UNIT 2

210 MW

KPCL

15:57

23-Mar-10

RUNNING

21:10

23-Mar-10 H/T DUE TO COAL SHORTAGE

NEYVELI II

UNIT 4

210 MW

NLC

3:28

24-Mar-10

RUNNING

0:29

27-Mar-10 H/T DUE TO CLINKER FORMATION

NEYVELI II

UNIT 2

210 MW

NLC

3:02

26-Mar-10

OUT

RAICHUR TPS

UNIT 6

210 MW

KPCL

1:55

27-Mar-10

RUNNING

5:46

27-Mar-10 TRIPPED DUE TO CONDENSER PRESSURE LOW

11:43

27-Mar-10 H/T DUE TO BOILER TUBE LEAKAGE

H/T DUE TO ECONOMISER PUNCTURE

NORTH CHENNAI TPS

UNIT 1

210 MW

TNEB

6:51

27-Mar-10

RUNNING

10

VIJAYAWADA TPS

UNIT 7

500 MW

APGENCO

22:05

27-Mar-10

OUT

H/T DUE TO ECONOMISER PUNCTURE

11

METTUR TPS

UNIT 1

210 MW

TNEB

4:55

28-Mar-10

OUT

H/T DUE TO ECONOMISER PUNCTURE

(D) OUTAGES OF MAJOR TRANSMISSION LINES AND ICT'S:

OUTAGE
SL.NO

CONSTITUENT

TIME

DATE

CURRENT
STATUS

REVIVAL TIME
REASON FOR OUTAGE

TIME

DATE

220 kV GUMMUDIPUNDI - SULLURPET

AP/TN

8:27

5-Feb-10

OUT

400 KV VEMAGIRI - GAZUWAKA 1

POWERGRID

8:49

16-Mar-10

REVIVED

9:32

22-Mar-10 H/ TO CONTROL OVER LOADING OF VIJ - NLR LINES

TRIPPED DUE TO OVER LOAD.

400 kV KALPAKKA - VEMAGIRI 1

APTRANSCO

8:55

16-Mar-10

REVIVED

10:37

22-Mar-10 H/T TO CONTAIN O/L OF VIJ-NEL LINES

220 kV GOOTY - ALIPUR LINE

AP/KPTCL

9:20

22-Mar-10

REVIVED

18:15

22-Mar-10 L/C BY APTRANSCO FOR MAINTENANCE WORKS

400 KV GOOTY-RAICHUR 1

POWERGRID

11:12

22-Mar-10

REVIVED

11;26

22-Mar-10 TRIPPED DUE TO PLCC MAL-OPERATION AT RAICHUR END

400 kV JEYPORE - GAZUWAKA 2

POWERGRID

12:16

22-Mar-10

REVIVED

6:37

23-Mar-10 H/T TO CONTROL ER SIDE VOLTAGE

400/220 kV ICT-1 AT N'SAGAR

POWERGRID

15:00

22-Mar-10

REVIVED

18:33

22-Mar-10 H/T AS PER APTRANSCO REQUEST FOR OVER HAULING OF 220 KV BUS-I ISOLATOR.

400 kV TALAGUPPA - NEELAMANGALA 2

KPTCL

23:10

22-Mar-10

REVIVED

18:36

23-Mar-10 H/T TO REGULATE FLOW ON 220 KV LINES

400/230 kV ICT-1 AT UDUMALPET

POWERGRID

5:36

23-Mar-10

OUT

10

400 kV NEYVELI - MADRAS

POWERGRID

8:01

23-Mar-10

REVIVED

11:18

23-Mar-10 H/T FOR L/C FOR CONNECTING E/W ON 400 KV LILO LINE OF PONDY S/S TO EXISTING NLY-MDS LINE
26-Mar-10 L/C BY KSEB FOR MAINTENANCE WORKS

TRIPPED ON DIFERENTIAL PROTECTION..DECAPTIALISED

11

220 kV IDUKKI - UDUMALPET

KSEB/TN

8:19

23-Mar-10

REVIVED

17:55

12

220 kV GOOTY - ALIPUR LINE

AP/KPTCL

8:20

23-Mar-10

REVIVED

17:55

23-Mar-10 L/C BY APTRANSCO FOR MAINTENANCE WORKS

13

400 kV JEYPORE - GAZUWAKA 1

POWERGRID

11:06

23-Mar-10

REVIVED

18:45

24-Mar-10 H/T TO CONTROL LOADING OF VJA-NLR LINES.

14

400 Kv RAMAGUNDAM - WARANGAL

POWERGRID

14:23

23-Mar-10

REVIVED

14:54

23-Mar-10 TRIPPED ON Y-N TRANSIENT FAULT.

15

220 kV KOLAR - CHINTAMANI 1

KPTCL

16:22

23-Mar-10

REVIVED

17:17

23-Mar-10 H/T FOR PHYSICAL REGULATORY MEASURES AS PER KPTCL.

16

220 kV KOLAR - CHINTHAMANI 2

KPTCL

16:22

23-Mar-10

REVIVED

17:17

23-Mar-10 H/T FOR PHYSICAL REGULATORY MEASURES AS PER KPTCL.

WEEKLY REPORT 12/2010 (FROM 22.03.10 TO 28.03.10)

17

400/220 kV ICT-2 AT N'SAGAR

POWERGRID

16:59

23-Mar-10

REVIVED

0:31

24-Mar-10 H/T AS PER APTRANSCO REQUEST FOR REPAIR WORKS OF 220 KV BUS-II ISOLATOR.

18

400 kV TALAGUPPA - NEELAMANGALA 2

KPTCL

23:10

23-Mar-10

REVIVED

18:35

24-Mar-10 H/T TO REGULATE POWERFLOW ON 220KV NLM-TLG LINES

19

SALEM INTER-CONNECTORS 1 & 2

TNEB

14:57

24-Mar-10

REVIVED

15:53

24-Mar-10 H/T FOR PHYSICAL REGULATION DUE TO PERSISTENT O/D BY TNEB

20

SALEM INTER-CONNECTORS 1 & 2

TNEB

0:51

25-Mar-10

REVIVED

6:12

25-Mar-10 H/T FOR PHYSICAL REGULATION DUE TO PERSISTENT O/D BY TNEB

21

230kV HOSUR-SOOLAGIRI

TNEB

5:58

25-Mar-10

REVIVED

6:13

25-Mar-10 H/T FOR PHYSICAL REGULATION DUE TO PERSISTENT O/D BY TNEB

22

400 kV RAMAGUNDAM - N'SAGAR 1

POWERGRID

7:02

25-Mar-10

REVIVED

16:42

25-Mar-10

23

SALEM INTER-CONNECTORS 1 & 2

TNEB

20:15

25-Mar-10

REVIVED

6:04

26-Mar-10 H/T FOR PHYSICAL REGULATION DUE TO PERSISTENT O/D BY TNEB

24

230kV HOSUR-SOOLAGIRI

TNEB

5:25

26-Mar-10

REVIVED

6:05

26-Mar-10 H/T FOR PHYSICAL REGULATION DUE TO PERSISTENT O/D BY TNEB

25

400 kV RAMAGUNDAM - HYDERABAD 2

POWERGRID

7:09

26-Mar-10

REVIVED

19:08

28-Mar-10 H/T FOR LC BY APTRANSCO LILO WORKS AT MLKRM (LINE CHARGED AS HYD-MLKRM-R

26

400/220 kV ICT-3 AT N'SAGAR

POWERGRID

9:49

26-Mar-10

REVIVED

17:04

26-Mar-10 H/T AS PER APTRANSCO REQUEST FOR MAINTENANCE WORKS OF 220 KV BUS-III ISOL

27

400 Kv NEYVELI TS-II- TRICHY

POWERGRID

8:56

27-Mar-10

REVIVED

16:41

27-Mar-10 H/T FOR LC BY NLC FOR ROUTINE MAINTAINANCE WORKS

28

400/220 kV ICT-1 AT KALPAKA

APTRANSCO

9:20

27-Mar-10

REVIVED

17:37

27-Mar-10 H/T FOR LC FOR RELAY TESTING WORKS

29

400 kV NEELAMANGALA - MYSORE 1

POWERGRID

21:56

27-Mar-10

REVIVED

21:56

27-Mar-10 SUCESSFULLY AUTORECLOSED ON B-N TRANSIENT FUALT

30

400 Kv TRIVENDRUM-THIRUNELVELI 1

POWERGRID

6:31

28-Mar-10

REVIVED

21:41

28-Mar-10 H/T FOR LC FOR CONSTRUCTION OF TNLV - EDAMON EAST COCHIN LINE

31

400 KV TRIVENDRUM - TIRUNELVELI 2

POWERGRID

6:33

28-Mar-10

REVIVED

32

400 Kv CUDDAPPA - CHITTOOR

POWERGRID

7:41

28-Mar-10

REVIVED

19:50

28-Mar-10 H/T FOR LC FOR LA REPLACEMENT AND E/W STRINGING AND OTHER MAINTENANCE W

33

400 kV KHAMMAM - MAMIDIPALLY 2

APTRANSCO

10:10

28-Mar-10

REVIVED

15:16

28-Mar-10 H/T FOR LC FOR PRE MONSOON INSPECTION

34

400/220 Kv ICT-2 AT MUNIRABAD

POWERGRID

16:40

28-Mar-10

REVIVED

17:36

28-Mar-10 H/T TO ATTEND OIL LEAKAGE FROM 33KV SIDE MANHOLE

(E) TRANSMISSION CONSTRAINTS

NIL

(F) GRID DISTURBANCES

NIL

KPTCL

KSEB

TNEB

PONDY

AS PER IEGC CLAUSE 6.4.7

B MESSAGES

105

AS PER IEGC CLAUSE 6.4.12

C MESSAGES

38

APTRANSCO

H/T FOR LC FOR CONSTRUCTION OF TNLV - EDAMON EAST COCHIN LINE

NO OF 'B' & 'C' MESSAGES ISSUED DURING THE WEEK

(G) INSTANCES OF SIGNIFICANT NON COMPLIANCE OF IEGC :

(H) REGULATORY MEASURES

ON 24.03.10 AT
ON 25.03.10 AT
ON 25.03.10 AT
ON 25.03.10 AT
ON 26.03.10 AT

H/T FOR L/C BY POWERGRID FOR REPLACEMENT OF GAPPED SURGE ARRESTER WITH GAPLESS SURGE ARRESTER AND AMP WORKS

14:57 HRS SALEM INTERCONNECTOR - I & 2 WAS TAKEN OUT AND CLOSED AT 15:53 DUE TO PERSISTENT O/D BY TNEB
00:51 HRS SALEM INTERCONNECTOR - I & 2 WAS TAKEN OUT AND CLOSED AT 06:12 DUE TO PERSISTENT O/D BY TNEB
05:58 HRS TO 06:13 HRS HOSUR - SOOLAGIRI LINE WAS TAKEN OUT DUE TO PERSISTENT O/D BY TNEB
20:15 HRS TO 06:04 HRS (26-03-10) SALEM INTERCONNECTOR - I & 2 WAS TAKEN OUT DUE TO PERSISTENT O/D BY TNEB
05:25 HRS TO 06:05 HRS HOSUR - SOOLAGIRI LINE WAS TAKEN OUT DUE TO PERSISTENT O/D BY TNEB