Fencing Cost Breakdown

This document provides a breakdown of costs to estimate a build-up rate for fencing work. It includes the following costs: - Machinery costs including a pickup truck, backhoe, and tools at $520 per day based on 91 meters of productivity. This results in a machinery cost of $5.75 per meter. - Workmen and manpower costs including a ganger at $130 per day and 5 general workers at $60 each, totaling $430 per day. With 91 meters of productivity, this results in a manpower cost of $4.75 per meter. - The total machinery and manpower cost is $10.50 per meter. Adding a 15% profit and

Uploaded by

Look
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
67% found this document useful (3 votes)
1K views2 pages

Fencing Cost Breakdown

This document provides a breakdown of costs to estimate a build-up rate for fencing work. It includes the following costs: - Machinery costs including a pickup truck, backhoe, and tools at $520 per day based on 91 meters of productivity. This results in a machinery cost of $5.75 per meter. - Workmen and manpower costs including a ganger at $130 per day and 5 general workers at $60 each, totaling $430 per day. With 91 meters of productivity, this results in a manpower cost of $4.75 per meter. - The total machinery and manpower cost is $10.50 per meter. Adding a 15% profit and

Uploaded by

Look
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

Build-Up Rates

FENCING
a) Machinery Cost
i)

Pick-up truck (3.0T) for carring,materials, workers and tools :1

ii)

RM

150.00 per day

= RM

150.00

per

day

1 day

RM

270.00 per day

= RM

270.00

per

day

= RM

100.00

per

day

= RM

520.00

per

day

= RM

5.75

per

Miscellaneous items (e.g. crowbar, hammer and hardware tools)


Allow a est. sum for

iv)

1 day

Backhoe operation, overhead cost incl. maintenance cost :1

iii)

1 day

RM

100.00 per day

Sub - Total Overall Cost for Machinery

Productivity of Work

Machinery Cost per Metr :

91
RM

520.00

per day

91

b) Workmen & Manpower Cost


i)

Ganger daily basic salary :1

ii)

1 day

RM

130.00 per day

= RM

130.00

per

day

RM

60.00 per day

= RM

300.00

per

day

= RM

430.00

per

day

= RM

4.75

per

= RM

10.50

per

= RM

1.57

per

= RM

12.07

per

RM

12.10

per

General Worker daily basic salary :5

iii)

1 day

Sub - Total Overall Cost for Workmen & Manpower

Productivity of Work

Manpower Cost per Metr :

91
RM

430.00

per day
91

c) Total Machinery + Workmen & Manpower Cost


so,

ADD

Profit & Overhead

15%

Total Rate per Unit

PROPOSED RATE

Build-Up Rates