Tank Erection Execution Plan
Date:
1,6 Hexanediol Plant Project Doe, No: 5205-87-001-00 9-Nov-2009
Owner:
Location:
Project:
UBE
1,6 Hexanediol Plant Project
UBE Fine Chemical (Asia) Co., Ltd.
Tapong, Muang, Rayong , Thailand
1,6 Hexanediol Plant Project
0 | 9/11/2009
Issued For Review
Rev, bare
PREPARED
escreTiON ‘CHECKED.
SY PEERS
APPROVED |
ree
Dorscse UBE
7 ~ - =. UBE Fine Chemical (Asia).Co,, Ltd,
DOCTENT NO:
5205-87-001-00
DUCUMERT NAME: A
“WORTPADIECT WO.
5205
‘CONTRATORI WENDOR DOCUMENT Woz
5205-87-001-00
Procedure -Tank Erection Execution Plan
DERN
‘Project No: 5205
Date: 8.NOv-2008
By: Thawitznal K.
File Name: Procedure Plant Sito
7.8 Hexanedio! Plant Project.
Procedura -Tank Erection Execution Plan
sonar 001-00
Revision: 0
Page: 1 of 5Procedure -
Tank Erection Execution Plan
Date:
Pages 2 of 16
4,8 Hexanediot Plant Project Doc. No.: §205-87-001-00 ‘9-Nov-2009
TABLE OF CONTENTS
1. General
2. Related Document ...
2.1 Applicable code and Standards
3. Welding Procedure Qualification ..
3.1 Welding Procedure Qualification
3.2 Welder Performance Qualification
4, Foundation Inspection
4.1 Cleanliness of foundation surface.
42 Levelness of foundation
43. Orientation and Center Marks on the foundation surface
44 Location of anchor bolts on the foundation (concrete ring wall)
4.5 Drain sump
8. Material Identification ..
6. Dimension Inspection ..
6.1. Radius of bottom annular
6.2 Dimensional inspection of 1* course (before welding)
6.3 Levelness
64 Plumpness
6.5 Roundness
6.6 Local deviations after completion of vertical & horizontal welding.
6.7 Nozzle, manhole, draw off sump and other attachments
6.8. Verticality of gauge well (gauge pole)
7. Fit-up Inspection ...
8. -Welainig Contror-..
9. Visual Inspection
10. Nondestructive Examination (NDE) .
Project No- 6208
Data: 9-NOv-2009,
By: Thawitehai K.
File Name: Procedure Plant Site
116 Hexanediol Plant Project
Procedure Tank Erection Execution Plan.
'5205.87-001-00
Revision: 0
Page: 2 of 16Pages 3 of 16
Gp severe ences moet Procedure - twee No I
Tank Erection Execution Plan |““*"°
Date
4,6 Hexanodiol Plant Project Doc. No.: §206-87-001.00 9-Nov-2008
TABLE OF CONTENTS
11. Repairs of weld ..
12, Hydrostatic Testing and Settlement check
13. Painting inspection ...........s0e0000
14. Submittal of Inspection and Test Records .
Projecto: S206 7,6 Hexanediol Plant Preject 205.87 091-00
Date: 9.Nov.2008 Procedure -Tank Erection Exceullon Plan Revision: 0
By: Thawitchal K. Page: Jf 16
File Name: Procedure Plant SiteProcedure -
Tank Erection Execution Plan
Pages 4 of 16
‘Area No.
[+ Monae! Pt ret
4. GENERAL,
Doc. No.: §205-87-001-00
Dale
‘9-Nov-2009
J
1.1 This method a be applied for Erection of storage Tank and Utilities tank a be supplied to 1,6
Hexanediol Piant Project under the UBE Fine Chemical (Asia) Co., Lid , Rayong province,
Thailand,
1.2 Item to be provided;
Tank No. Description Quantity |
1580~V1 EXTRACT TANK 1
1560 ~ V2 EXTRACTION RECOVERY TANK 1
1560 -V3 ‘COA TANK 1
1560 — V6 RAW HDL TANK 1
1860 -V10A PURE HOL TANK 1
1560 - V108 PURE HDL TANK 1
Total 6
2. RELATED DOCUMENTS
2.1. Applicable code and Standards
41) API 650 11" Edition Addendum 4
2) API620 11" Edition Addendum 4
3) ASME Section IX
4) ASME Section V
Welder Stee! Tanks for O¥ Storage
Design and Construction of Large, Welded
Low Pressure Storage Tanks
Qualification standard for welding and
brazing
procedure, welders, brazers, and welding
‘And brazing operators,
Nondestructive Examination
3. WELDING PROCEDURE QUALIFICATION
3.1 Welding Procedure Qualification
1). This welding procedure specification shall be supported by the records of
procedure qualification test. (POR), that have been performed in accordance
with ASME Section IX. It shall be approved customer prior to commencement of
production welding.
Broject No: 5205
Date: 8.Nov-2009
By: Thawitehal K.
Filo Name: Procedure Plant Sita
7.6 Hexanedial Plant Project
Proceduro -Tank Eroction Execution Plan
'5205-67-001-00
Revision: 0
Page: 401 18.Pages 5 of 16
B sscee eet seat Procedure - eee
Tank Erection Execution Plan | °°
Date:
1,6 Hexanodial Plant Project Doc. No.: 5208-87-001-00 8-Nov-2008
3.2 Welder Performance Qualification
1) The welders who weld pressure parts and join non pressure parts, such as all
Permanent and temporary dlips and lugs, to pressure parts shall be qualified
in accordance with ASME Section IX
2) The qualified welder list and welders previous qualified records shall be
submitted to the purchaser's inspector for review prior to commencement of
‘any production welding work
3) Ha qualification new test for welders are to be taken, the welder performance
ualiication test shall be performed in accordance withthe test procedure.
4) Welders shall be intialy qualified by bend tests in addition to RT
4. FOUNDATION INSPECTION
Prior to commencement of erection work, tank foundation shall be checked as follows:
41 Cleanliness of foundation surface.
There shall be no steel scrap, concrete block or any other rubbish left on the
surface of the foundation.
4.2 Levelness of foundation
Measurements shall be taken at every 3.0 m of total circumference,
1) Where a sioping foundation is specified, the elevation differences
about the circumference shall be calculated from the specified high
Point Actual elevation differences about the circumference shall bs
determined irom the actual elevation difference by more than the
folowing tolerances.
(1) Where a conerete ring wall is provided, + 3.0 mm in any 9
meter of circumference and 6.0 mm in the total
circumference,
(2) ____ Where a concrete ring wall is not provided + 9.0 mm in any 3
‘meter of citcumference and 13mm in the total-circumference:-—
‘Measurements shall be taken at every 3 meter, minimum 8 points on
the circumferential length and at every 5 meter or minimum 2 points
on the radius axes of the tank as shown below.
Project Nor 6208 1.6 Hexanediol Plant Project '206.87-001-00
ate: 9-NOv-2008 Procedure Tank Erection Execution Plan Revision: 0
By: Thawitchal K. Page: 5 0f 6
File Namo: Procedure Plant Sitei)
Pages 6 of 18
Procedure -
Tank Erection Execution Plan
‘Area No.
180
43
44
1,8 Hexanediol Plant Project
Lo
1 a
Doe. No. §206-87-001-00 | "S-Nov-2000 |
Seale pole
ma
Orientation and Center Marks on the foundation surface
The datum points of 0°, 90°, 180°, 270° which are divided equally into
four parts shail be marked on the periphery of concrete ring wall as shown
below. and shall be confirmed against the reference bench mark established
for civil work.
14, 12, 13, 14, 11, 12, 13 and 14 to be measured
Location of anchor bolts on the foundation (concrete ring wall)
Where
anchor bolts shall be checked, The radius m
tank towards anchor bolt shall be within + 5 mm and also the
of anchor bolt and the top of anchor halt shall be with + 5 mm
anchor bolts for tank are installed in foundation, the location of
\easured horizontally from the center of
spacing between the top
The elevation of anchor bolt shall be with -0, + 10 mm and the vorticalty of anchor
bolt shall be within + 3.
Project Nor 6206
1,8 Hexanodiol Plant Project
‘520587-001-00
Date: §.Nov.2008 Procedure -Tank Erection Execttion Plan ovision: 0
By: Thawitehal K, Page: 6 of 15.
Filo Namo: Procedure Plant Site—
| Pages 7 of 16
G srsemcarat amon | Procedure -
7 : ‘Area No.
Tank Erection Execution Plan
- | Date:
1,8 Hoxanodiol Plant Project Doc. No.: 5205-87-001.00 8-Nov-2009
°
20
45 Drain sump
The inside diameter and depth of drain sump shail be within -0, + 10. mm,
5. MATERIAL IDENTIFICATION
‘The mi-marking or coded numberof the plates stamped on the pressure retaining
parts such as shell plates, bottom piates and compression ring plate shall be checked
before erection and recorded on as-built sketch just after erection
6. DIMENSION INSPECTION
64 Radius of bottom annular
The radius of the bottom annular stall be measured at the middle of each
annular plate before welding, and it shall be with +20 mm, -O mm than the
spectied radius.
6.2 Dimensional inspection of 1* course (before welding)
Before commencement of welding for vertical joints of 1" course, the
following dimensional inspection shall be carried out and the tolerances for 1"
course shell plate are as follows
Project Nor S208 1,8 Hexanediol Plant Project 5208-87-001-00
Date: s.Nov-2008 Procedurs -Tank Erection Execution Plant Rovision:
By: Thawitehai K. Page: 7 of 16
File Name: Procedure Plant Site| Pages 8 of 16
Procedure - eee
Brea Ne
Tank Erection Execution Plan
FEE [ Date:
41.6 Hexanediol Plant Project Doc. No. §208-87.001-00 8-Nov-2009
2) Level (mam
Tank Diameter | (1) Plumbness 1 Eare! (et @)
(m) (mm) At feeeryct Roundness***
515 H/200 +3 | xevats 2B
15t0<45 7200 ao | ss #19
Note * Ditferences in any 9 m for concrete ring wall and in any 3 m i
concrete ringwalls not provided.
** Max. difference in total cicumference. (6 mm for concrete ringwall
‘And 13 mm if concrete ringwall is not provided
*** Difference from the reference marking in radius
6.3 Levelness
After erection of the lowest shell course, the leveliness of the shell shall be
measured at the center of each shell piate, the top of the lowest shell course shall
be within tolerance in paragraph 5.5.5
6.4 Plumbness
After welding of the lowest and the last number shell courses, the
plumbness of the tank shell shall be measured at eight points which are. equally
Givided at 0°, 45°, 90" to 315°in the circumference of tank, and the maximum out-
Gfplumb of the top of the shell relative to the bottom of the shell shall not exceed
11200 of the total height before commencement of welding and afier completion of
welding,
Project No: 6206 1.8 Hexanediol Plant Project ‘5205-87-001-00
Date: 9-Nov-2008 Procedure -Tank Erection Execution Plan Revision: 0
By: Thawitehai K. Page: 8 of 16
File Namo: Procedure Plant SiteTank Erection E:
Method Statement —
Pages 9 of 16
| Area No.
xecution Plan | 2100,2200,2400
4,8 Hexanediol Plant Project
Doe, No.: 6208-87-001-00
Date:
24-Aug-2009
{ee
uf
tea Pane |)
i 8 Bevo)
+t Por ok
0mm |
7
A tor Plate
6.5 Roundness
Alter welding of the lowest shell co
at the same position as levelness
urse, radii of the tank shal be measured
and 300 mm above the
bottom comer, it shall not exceed the following tolerances after comer
welding
r
Tank Diameter (m| Radius tolerance (m)
515 £13
From 15 to < 45 +19
Poa Eee ee
Reference mark
For measitement
Measuring,
L —_ Plate
Project Nor 6205
Date: 9-Nov.2008,
8y: Thawitehal K.
File Namo: Procedure Plant Site
Procedura -Tank Erection Execution Plan
$206-87-001-00
Revision: 0
Page: 9 0116
1.8 Hexanediol Plant ProjectPages 10 of 16
| Method Statement — eae
SSSkuetettt | Tank Erection Execution Plan | 2100,2200,2400
Date:
16 Hoxanodiol Plant Project | Doc. No.: 5205-87-001-00 24-Aug-2009
5.6 Local deviations after completion of vertical & horizontal welding,
1) Local deviations ftom the design shape of the shell shall be measured by
using sweep board 900 mm long
Peaking at vertical weld joints and banding at horizontal weld joints shall
not exceed 13 mr,
Banding Feaking
as
KH j==
A
Check point (inside view)
8.7 Nozzle, manhole, draw off sump and other attachments
Before cutting the opening of nozzie and manhole, orientation & elevation of
them shall be checked with the latest revision drawing
The nozzle, manhole, craw off sump and other attachments of the tank shall be
within the following allowable tolerance after completion of welding.
1) Nozzle, manhole and draw off sump :
Tolerance, mm
Item Draw off sump
Nee manhole
Elevation from bottom : A =3 +95 Stet
Orientation from reference centedine > B zs #254
inclination of Tanga face» D =043 213
Rotational orientation of Boll hole 77 af
Distance from roof of bottom canter to 2
nozzle, manhole and draw off sump: F = pee
Project Nor $208 11 Hexanodiol Plant Project 320537-005-00
Date: 2-NOv-2009 Procedure Tank Erection Execution Plan Revision: 0
By: Thawitehal Ke. Page: 10 of 16
File Name: Procedure Plant SitePagos 11 of 16
Method Statement —
: : area No.
Tank Erection Execution Plan | 2165 50 2400
|
Date
i" Hexanediol Plant Project, Doc. No,; 5205.87-001-00 24-Aug-2009
Note (1): Measured along the perimeter of the shell
(2) : Bolt hole location of nozzle may vary 41.5 at the bolt circle
from specified orientation.
Clins or similar structural attachment for platform, ladder or pipe support
Item Tolerance, mm
Location from support 495
Orientation from reference centerline #143
Ce
68 Verticality of gauge well (gauge pole)
If the roof will be provided with gauge well that complies with the
design, the verticality of each gauge well shall be checked and shell not
exceed the tolerance of instrument manufacturer specified in the purchaser
order.
7. FIT-UP INSPECTION
The surface of joints to be welded shall be free from rust, scale and any foreign material which
may be harmful to weld properties within at least 13 mm from the join
Tolerance for misalignment of plates of butt welded joints
1) __ Misalignment in completed vertical joints for plate thickness greater
than 16.0 mm thick shail not exceed 10% of he plate thickness of 3.2 mm,
Whichever is less; misalignment for plates less than or equal to 16 mm
thick shall not exceed 1.5 mm,
2) 'n completed horizontal butt joints, the upper plate shall not project
beyond the face of the lower plate at any point by more than 20% of the
thickness of the upper plate, with a maximum projection of 3.0 mm.
‘however, for upper plates less than 8.0 mm thick, the maximum projection
shall be jimited to 1.5 mm.
Project No: 5208 1,8 Hexanadiol Plant Project 5205-87-007-00
Date: 9-Nov-2009 Procedure -Tank Erection Execution Plan Revision: 0
By: Thawitchal K. Page: 11 0F 16
Filo Namo: Procodure Plant Site~
Pages 12 of 16
Method Statement —
20s aay grat : . “Area No.
Sekemesteseess | Tank Erection Execution Plan 2100,2200,2400
— _ Date:
4146 Hexanedio! Plant Project Doc. No.: 5205-87-001-00 24-Aug-2009
UPPER PLATE
i
ie
LOWER + '
PLATE
Back chipped surfaces shall be inspected by visually,
q
‘and shall be free from any visible defects.
i New ;
from any visible defects,
8. WELDING CONTROL
Welding control shall be performed in accordance with “Welding Procedure
Specification’,
VISUAL INSPECTION
All welds shall be visually inspected and meet the following requirements.
All welds shall be free from crack,
overlap, spatter, slag, and other deleterious defects and
undereutting
1.8 Hexanediol Plant Project
206-87-00%-00,
‘-Nov-2008 Procedure -Tank Erection Execution Plan
Revision: 0
awitenal K. Page: 1208 16
lamo: Procedure Plant SitePages 13 of 18
Ig Method Statement — ~
Flex se marc rerms : n Resa No:
emneesszecs | Tank Erection Execution Plan | see5%9 2499
— Date:
1.6 Hoxanedio! Plant Project Doe. No. $205-87.001.00 24-Aug-2009
_ne edges of sil welds shall merge smoothly with the surlace ofthe plate wilhou sharp angie.
For vertical but joins, the maximum acceptable understanding is O.4 mun of te tee metal, For
he frequency of surface porosity in the weld shall net exceed one cluster (one or more Pores) in any
{00.mm of length and the diameter of each cluster shall nt exceed 2.6 mm, Suess dere shall be
removed.
{ne height of the weld reinforcement in al but joints on each side ofthe plate shall not exceed the
following:
ieee Gze, gach shellto-bottom filet weld shall not be more than 12.7 mm. and shall not
rare'ss than the nominal thicknoss of the thinner of the two plates jored What gest
Plate or the annular plate immediately under the shell) or less than the following selics,
Max. height of reinforcement. mm
Plate thickness, mm
Vertical joint | Horizontal joint
Up to 13, ind, 25 3.0
>13 to 25 3 5
Nominal thickness (1) of shell | Minimum size of fillet weld,
plate, mm | mm
5 5.0
>6-20 6.0
‘The roof shall not have dimples that will permit accumulation of water
10. Nondestructive Examination (NDE)
The extent of NDE fs as shown in the following B table and NDI: shall be carried out in
accordance with the NDE procedure.
Project No: 6205 16 Hexanediol Plant Project '5205.87-007-00,
Date: $-Nov-2009, Procedure Tank Erection Execution Plan vision: 0
By: Thawitehai K. Page: 13 0f 15,
File Namo: Procedure Plant site[- Pages 4of 18
Bi Method Statement — aaa
[O)esencoreenssen Tank Erection Execution Plan
2100,2200,2400
a
1,8 Hexanediol Plant Project Doc. No.: 5205-87-001-00 24-Aug-2009 |
A.
Tina TPT chal bs erie ot
wot | Avoid Cxam
No, Weld ot don Remarks
| aprai | note
1. | Annular to annular (if any) Butt RT | (1)
2. | Anmisrf0 botom ender | Fle | ver
Bolton te baton aac ler
3. | Sump to bottom Butt VBT
4, | Annular or bottom to shell Filet | PT (3)
5, | Vertical & horizontal Joints of ba aH
5. | ert an | ort | ey
6. | Neck of shell manhole & Nozzle Butt MT or
{shell or voor or
Reinforcing pad to shell or roof wr
7. |-Rentersng pad to nece of | eat | MT
shat or toe manhole
r Fit | var
8 | Roof to Roof ae | Spot RT
But | eT
9. | Compression Ring Butt RT (2) ‘Spot RT
_L
Abbreviation :
BH Before hydrostatic test BP: Before PWHT
RT | Redogrphc oxminaton MT Magnes parte exaninaon
®T > Ligit penetant oxaminaion War | eanete a
CT: ttteatage txt
Note:
(9) a. For singl-welded but joints wih backup bar | spot on 1C0% ofthe
radial joints under the shell area.
b. Minimum RT length shall be 18 inches (380 mm.)
(2). Spot RT per API650, Section 6, Paragraph G1
b, Minimum RT length shall be 15’ inches (380 mm.)
(°3) a Final weld pass both inside and outside : Applying PT per APIGSO,
paragraph 6.4 ms
b. Cleaning per API650, paragraph 5.2.4.1 )
Project No: 8205 4,6 Hexanediol Plant Project a05.87-004-00
Date: 6-Noy-2008 Procedure -Tank Erection Execution Plan Revision: 0
8y: Thawitehai K. Pages 4 of 15
File Namo: Procedure Plant Site|
Pages 15 of 16
Method Statement —
Seema Tank Erection Execution Pian
Area No.
2100,2200,2400
Date:
4,8 Hexanediol Plant Project Doc. No.: §205-87-001-00 24-Aug-2009
11. REPAIRS OF WELD
12. HYDROSTATIC TESTING AND SETTELMENT CHECK
The hydrostatic testing and settlement checking of the tank shall be taken in
accordance with the approved hydrostatic test procedure
13. PAINTING INSPECTION
Painting Inspection requirement is as follows
3} he brand name and RAL of Paint to be applied shall be checked,
2) No painting eperation shall be done in the following weather sonaiton of the
working area,
(1) Rain, fog, mist
(2) Relative Humicity is greater than 85%
(3) Dust effects adversely due to high wind
(4) Ambient temperature below 5°F above dew point
(6) Metal Surface temperature is fess than 5° F above dew point
°) Ai each step of painting work, number and dry fim thickness of coats sha
Fe confined whether it meets the required thickness in the painting
Procedure spectication. at least fve(s) spot measurements made st random
Gazi of dry ln thickness (DFT) shall be checked in every ©.0 same
meter area approximately.
4) Drying time and dryness of previous paint shall be checked by touching with
fingertip and by the manufacturer's instruction before subsequent ‘coating,
5) The fim shell be visually inspected for defects such as in adequate curing
runs and lack of adhesion.
8) After completion of painting work, the final color shall be visually checked
with the standard of color, whether it meets the specification ond
Project Nor 6205 1,6 Hexanediol Plant Project 205.87-001-00
Dato: 8.NOv-2003, Procedure -Tank Erection Execution Plan, Revision:
By: Thawitchat K. Page: 15 01 15,
File Namo: Procedure Plant SitePages 15 of 18
Zz Method Statement - “aN
Giormmsrmce | tank Erection Execution Plan | 29q)San.2400
Fe Date
1,8 Hexanediol Plant Project Doc. No.: 5205-87-001-00 24-Aug-2008
11. REPAIRS OF WELD
Winen defect apoears to be removed, repair welds shall be made in accordance
with approved welding procedure specification, and repaired area shall be wa.
examined by the same method originally taken,
12. HYDROSTATIC TESTING AND SETTELMENT CHECK
The hydrostatic testing and settlement checking of the tank shall be taken in
accordance with the approved hydrostatic test procedure,
13. PAINTING INSPECTION
Painting inspection requirement is as follows
2) The brand name and RAL of Paint to be applied shall be checked
2) No painting operation shall be done in the following weather condition of the
working area.
(1) Rain, fog, mist
(2) Relative Humidity is greater than 85%
(3) Dust effects adversely due to high wind
(4) Ambient temperature below 5°F above dew point
(5) Metal Surface temperature is less than 5°F above dew point.
5) At each step of painting work, number and dry film thickness of coats shell
be confirmed whether it meets the required thickness in the painting
Procedure specification. At least five(s) spot measurements made at random
tecation of dry film thickness (OFT) shall te checked in every 9.0 square
meter area approximately.
4 Roiing time and dryness of previous paint shall be checked by touching with
fingertip and by the manufacturers instuction before subsequent coating
5) The ‘film, shall be visually inspected for defects such as in adequate curing
runs and lack of adhesion,
8) After completion of painting work, the final color shall be ‘visually checked
with the standard of color, whether it meets the specification one.
Project No: 6205 1,6 Hexanediol Plant Project ‘205.87-007-00
Date: 9-Nov-2008 Procedure -Tank Erection Execution Plan Revision: 0
awitcnal K. Page: 15 0f 15
File Namo: Procedure Piant SitePages 16 of 16
Method Statement — "rea Wo.
‘Snsceosmzaiems | Tank Erection Execution Plan | 2100,2200,2400
|
Date:
4,8 Hexanediot Plant Project Doc. No.: §205-87-001-00 24-Aug-2009
14. SUBMITTAL OF INSPECTION AND TEST RECORDS
The results of inspection and test shall be properly recorded and shall be
submitted to the purchaser inspector for review and signature immediately after
the inspection and or test. The following inspection and test records shal be
submitted to the purchaser after completion of final inspection
(1) Letter of acceptance
(2) Material identification record
(3) Foundation inspection record
(4) Dimensional inspection record
(8) Nondestructive examination report
(8) Hydrostatic test record
(7) Settiement check record
(8) Painting inspection record
(9) Photograph or rubbing of name plate
Project Nor 5205 1,6 Hexanediol Plant Project 206.87-00%-00
Date: 3-Nov-2008 Procedure -Tank Erection Executlon Plan Revision: 0
By: Thawitohal K. Page: 160f 16
File Name: Procedure Plant Site