0% found this document useful (0 votes)
79 views24 pages

Documents 2

aaa

Uploaded by

naganathan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
79 views24 pages

Documents 2

aaa

Uploaded by

naganathan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 24
SGS jo : INMUM/INDI2015 l eecsorereieriavaeal ‘SGS India Pvt. Ltd. Inspect inspection Report No. :- BPS/391/2018 Date of inspection : 26/08/2018 & 29/09/2015 | Time In : 9.00 AM | Time Out : 5.00 PM ‘Name of the Project ( if any ) Name of Glient Name Seller/ Manufacturer / Vendor Mis. Astec Valves & Fittings Pvt.Ltd ‘Thumbli water Filed upgradation Projects Ws. Caimn India Ltd Name Seller / Manufacturer / Vendor Client's P/O No. & Date Rajasthan / 4500026510 2 | Date of last inspection 27/07/2015 Inspection call reference 23/09/2015 Status of previous hold points / Deviation | - P.O. Status: Completed / Balance / Hold toms a8 por ‘contac ‘Order ‘Quantity Balance (Nos) Description & Sizo Fittings, Valves & Tubes as per attached manufacture Offer List Annexure -1 O Item 10, 20, 30, 40, 50, 60, 90, 100, 110, 120 & 150) Uncontrolled document when printed PE-IN-IND}-IN-003/ Ver.00/01-01-2010/ Page 1 of 4 i SGS SGS India Pvt. Ltd. Inspection Report No: BPS/391/2015 Dt. 29/09/2015 Reference Documents ‘Scope of inspection and Status ‘Annexure No of Hardness. Year : ASTM A 769 UNSS31603 (EDITION 2015) 2) 10% witness dimensional, gauge ‘QAP ITP No sTPIFIDUTO0B/I5-16 & 100%visual check of lot lssue 01 Rev 01 (for fitting) 3) Witness of 2 Loop per lot for ITP/T1008/15-16 Rov2 (for Tubes) o Watea paren ITPIBVIF60/008/15-16 Rev 00 (for ©) Winese of Packaging & valve) Labeling. ‘Approved Drawing No. : For Fitting = DUS0-8-MC-BN Rev0, DU-4-MC-4N | For Tubes: Rev01, DU-60-8-U Rev01, DU-6-FC- | HR os. ots a DSS Tilbe for BN Rev01, DU-4-C Rev01, S6-8-MC- ‘Chemical, Mech ropertieghy 8N Rev01, DU-8-UT Rev 01, Hardness, IGC Praeigg E.. For Tubes: DU-8-TU-0.085THK Rev0t, | 2) 10% witness dime oe DU-4-TU-0.035THK Rev 01, S6-TU- & 100%ysualicneck fit 0.049 Rev 01, 3) Witness of 2 Li paet for For Ball Valve: DU-GBV-8F RevOt Hydeo yaad Roforence standard / code / 4) Wiiness PML sitet. ‘specification & Edition / Version / 8), Witness of jaca 8 For ‘Sampling Standard & Edition? Version / Year : As per QAP . *enn-Chemical, Mech Properties & Hardness {0% witness dimensional, gauge &100%hveual check of Witness of 10% of lot for Hyatostatl Test or body) at 53000 psig & 2400 psig for seat. Witness of 10% of Lot for Pneumate test 100p8g for seat. ‘Wess Pil of 20% of ot Witness of Packaging & Labeting. Calculations of PREN bay 3) 4) 5) 6) 7 Detailed report PO No, : Rajasthan/4500026510 For Fittings: 1), Witness of 1 sample per lot for | Already witnessed by ‘Chemical, Mech Properties & | SGS 2| Arcody winessed by 305 Atready witnessed by Ses ‘Current Hold points / Deviation: material offered is UNSS32205 (F60) a: 18 per approved ITP. Remarks: For tem No. 20, 90, 170 120 & 180 drawing mention material as UNSS31803 (F51) were as Enclosure: Test Witness report PREN Value calculation Sheet. q Uncontrolled document when printed ‘QM-{IN}-{IND}-IN-003/ Ver.00/01-01-2010/ Page 2 of + we SGS sosinaia pvt uss Detailed Inspection Report File No: IN/MUM/IND/2015 ‘Annexure No? 1 Report No and Date: - BPS/391/2015 Dt. 29.09.2015 Page : 1 of Material and Quantity inspected: ‘As per page I of Report ‘Sr. No. Details of activity performed, findings and product marking Conclusion For Fittings: 1) 100% Visual check of fittings offered carried out for workmanship & fnish and found satisfactory. A Marking on fittings. ASTEC MATERIAL SPEC. BATCH NO. SIZE 2). 10% ofthe fitings dimensionally checked as per respective dgawing waLaWVIG] SeB9N OND ‘ss xgwuna swiyaiw went ‘av>..00 w/t ssa zanL avo] />-+-NA er oar sees panatea | posed 190 8110 “ou weg Ax au : a sod se uonétsaq wou fons ea hy | are [M80] sees | MPO (04 10d se won dhs peaney | sO astec valves & fittings pvt. Itd INSPECTION CERTIFICATE (SRETORCSNSNE —_rcrtcoea76 TE aiamas WS. CAIRN INDIA LIMITED, Rajasthan / 4500026510 18-01-2015 ‘Thumbli Water Field Upgradaet Project Domestic 008 / 15-16 100124030 MALE CONNECTOR, 1/2" ODTX 1 NPT 40 ‘DUGO-8-MC-8N DUPLEX DU60-8-MG-8N '35.NOS. MATERIAL TYPE, LOT NO., MANUFACTURER NAME, SIZE. RAW MATERIAL TRACEABILITY REPORT: BODY, NUT & FERRULE CHEMICAL ANALYSIS, PHYSICAL PROPERTIES, & HARDNESS: As per test certificates attached DIA 25MM F1064/ 07.07.2015 DIMENSIONAL & VISUAL CHECK RESULT: BORE ‘vz opT | wepcii70 |” Check wih go & no-go gauge and found ox —|-—AGGEPTED THREAD YE NPT | ATRG/423_| Check wih go & no-go gauge and found ok —| — ACCEPTED THREAD LENGTH 49.10 | ANRCIS | 18.10 19.16 | 19.12] 19.14 | ACCEPTED NUTLENGTH 47.50__|-AWRGIS | 17356 17.60__|_17.58_|-17.58 | ACCEPTED INNER DIA 10:30 | ~awRcrs | 10.40 oz | 10.38] 10.40 | ~AccePTeD HEX 22.00 | Aveces | 2210 22.10__| 2208 _| 22:12 ACCEPTED HEX 22.00 | AWRCR3 | 72.06 22.08 | 22.02 | 22.101 ACCEPTED ‘BODY LENGTH 36.10 AWRGRS [38.18 | 3620 | 8.12] 38.14 | ACCEPTED GENERAL TOLERANCE: + 2.0 MM + 100% VISUAL INSPECTION & DIMENSIONAL CHECK CARRIED OUT BY ASTEC. HYDRO TEST RESULT: Hydro Test "3000 Psig No leakage found REMARKS: 02 LOOP OF FITTINGS WERE INSTALLED ON HYDRO AND PNEUMATIC TEST AS MENTIONED IN THE ABOVE TABLE. NO LEAKAGE FOUND & HENCE FITTING PASSES THE TEST, DELIVERY CONDITION: UTHE FITTINGS WERE THROUGHLY CLEANED. THE THREAD ARE CAPPED AND PACKED IN ASTEC GARTONG. ] QC Inspector Sign / Date Inspector Sign / Date (Astec) (TPIA/ Client) FIQCIOS REV. 01 ‘astec valves & filings pvi.Ild. | Inspection certificate Page 1 of 1 astec valves & fittings pvt. Itd INSPECTION CERTIFICATE [ne aaa WIS. CAIRN INDIA LIMITED, Rajasthan / 4500026510 10-01-2015 Domestic 008 / 15-16 den] 100129068 ALE CONNECTOR, 1 20 DU-4-MC-4N uM DUPLEX BODY, NUT & Dae FERRULE, CHEMICAL ANALYSIS, PHYSICAL PROPERTIES, & HARDNESS: As per test certificates attached DIMENSIONAL & VISUAL CHECK RESULT: ‘and found ok e and found ok_ ‘ACCEPTED ‘ACCEPTED ‘Check with go & ‘Check with go & ‘AIBPGIN43, ‘ANTRGIS26 ‘BORE io THREAD, 74" ODT 1/4" NPT THREAD LENGTH, 14.20 AIRCI23 1422 44.20 14.24 ‘ACCEPTED, NUT LENGTH. 12.80. ANRC23 12.80. 12.82 12.82 ‘ACCEPTED, INNER OA. 470, ANVROI23 4.90) 4:90 4.88, ‘ACCEPTED, HEX 14.00, ‘ANRCI23 14.02 14.00. 14.06. ‘ACCEPTED, 714.08 ‘ACCEPTED ‘ACCEPTED HEX. 14,00 ‘ANRGI23 14.04 74.02 ‘BODY LENGTH 730.50, ANRCI23 30.60. 30.58 30.60. GENERAL TOLERANCE: + 2.0 MM ‘= 100% VISUAL INSPECTION & DIMENSIONAL CHECK CARRIED OUT BY ASTEC. HYDRO TEST RESULT: No leakage found REMARKS: ‘02 LOOP OF FITTINGS WERE INSTALLED ON HYDRO AND PNEUMATIC TEST AS MENTIONED IN THE ABOVE TABLE. NO LEAKAGE FOUND & HENGE FITTING PASSES THE TEST. DELIVERY CONDITION: (THE FITTINGS WERE THROUGHLY CLEANED. THE THREAD ARE CAPPED AND PACKED IN ASTEC CARTONS. J QC Inspector Sign / Date Inspector Sign / Date (Astec) (TPIA Client) FQCIOS REV. 01 astec valves & fitings pvt. td. | Inspection certificate Page | of | astec valves & fittings pvt. Itd. a Cc INSPECTION CERTIFICATE [Ts EaERLESRENENET ic eivecwae Tn ars] TiS. id Rajasthan 4500026510 [ERDEAER] 1-01 2015 Taras Wn Bad Unicon are 005 715-16 ace ‘Tube, 1/2" OD X 0.065" THK E eee er DUSTIODSST oe Manufacturer Name, Material Type, Batch Number 412" 0D x0.085" THK CHEMICAL ANALYSIS, PHYSICAL PROPERTIES & HARDNESS: As per test certificates attached DIMENSIONAL & VISUAL CHECK RESULT: Outer Dia 12.70, ANVRCI3 | 12.72 12.70 | 12.70 | 12.72 | ACCEPTED Thickness 1.65 ‘AIVRCI23 | 1.90. 1.89 1.90 | 1.86 ‘ACCEPTED (GENERAL TOLERANCE: + 2.0MM ‘© 100% Visual inspection and Dimensional check carried out by Astec and found satisfactory HYDRO TEST RESULT: Hydrostatic Test i 3000 Psig. No leakage found, REMARKS: 100% tubes were Hydro-Preumatic tested as per above mentioned pressure rating and duration and found satisfactory DELIVERY CONDITION: ‘The tubes were thoroughly cleaned, dried and ends are capped and packed. QC Inspector Sign / Date Inspector Sign / Date (Astec) (TPIA / Client) FIQCIOS REV. Of ‘astee valves & fitings pvt lid. | Inspection certificate Page | of 1 ‘astec valves & fittings pvt. It. INSPECTION CERTIFICATE Tere 0BIAS [GE oe 8 920s) MIS. Cairn India Limited Rajasthan 4500025510 [ROU ate) 1.01015 Thumb Water Feld Upgradaet Project Domestic 08 15-16 700128070 Tube, 14" OD X 0.036 THK 0 U-4-TU-0005 THK Duplex DU-#-TU-005 THK 25 Mt. ‘Manufacturer Name, Material Type, Batch Number THK CHEMICAL ANALYSIS, PHYSICAL PROPERTIES & HARDNESS: As per test certificates attached DIMENSIONAL & VISUAL CHECK RESULT: ‘Outer Dia 6.35. ANRCI23 ‘6.40 = = ‘ACCEPTED. Thickness 0.88, ‘ANRCI23 1.00, = = ‘ACCEPTED. GENERAL TOLERANCE: + 20MM. ‘= 100% Visual inspection and Dimensional check carried out by Astec and found satisfactory _ Hydrostatic Test 3000 Psig No leakage found REMARKS: 100% tubes were Hydro-Pneumatic tested as per above mentioned pressure rating and duration and found satisfactory DELIVERY CONDITION: “The tubes were thoroughly cleaned, dried and ends are capped and packed, j QC Inspector Sign / Date Inspector Sign / Date (Astec) (TPIA / Client) FIQGIOS REV. Of ‘aslec valves & filings pvt. td. | Inspection certificate Page 1 of | astec valves & fittings pvt. Itd INSPECTION CERTIFICATE J a wears aagarivas irae Rajasthan / 4500026510 [Rona ware aes Waar Sedna Domestic 008 /15-16 i 100124038 Tube, 1/2" OD X0.049° THK 9 '$6-8-TU-0.049 THK ‘36-8-TU-0.049 THK ‘Manufacturer Name, Materi ia Type, Batch Number F 2349 & F350 / Dt 112" 0D x 0.049" 28.07.2015 THK CHEMICAL ANALYSIS, PHYSICAL PROPERTIES, IGC PRACTICE E & HARDNESS: As per test certificates attached DIMENSIONAL & VISUAL CHECK RESULT: Outer Dia, 12.70 ANRCI23 1272 = = ‘ACCEPTED, “Thickness 1.24 ‘ANRCI23 1.30 = = ‘ACCEPTED, GENERAL TOLERANCE: + 2.0MM ‘+ 100% Visual inspection and Dimensional check carried out by Astec and found satisfactory HYDRO TEST RESULT: Hydrostatic. 3000 Pig o2 No leakage found | REMARKS: 100% tubes were Hydro-Pneumatic tested as per above mentioned pressure rating and duration and found satisfactory DELIVERY CONDITION: “The tubes were thoroughly cleaned, dried and ends are capped and packed 42] tas 2: 2 aw QC Inspector Sign / Date Inspector Sign / Date (Astec) (TPIA | Client) FIQCIOS REV. 01 astec valves & fittings pvt. Itd. | Inspection certificate Page lott astec valves & fittings pvt. itd. a ol INSPECTION CERTIFICATE (InpectoTCoRINSTET — roTL coca Tmasews | (WS, CAIRN INDIA LIMITED. Rajasthan / 4500026510 19-01-2015 ‘Thumbli Water Field Upgradaet Project Domestic 008 / 15-16 100124034 UNION, 172" ODT 60 DUBO-8-U DUPLEX ‘DUGO-8-U 30 NOS, MATERIAL TYPE, LOT NO., MANUFACTURER NAME, SIZE. RAW MATERIAL TRACEABILITY REPORT: BODY, NUT & FERRULE, CHEMICAL ANALYSIS, PHYSICAL PROPERTIES, & HARDNESS: As per test certificates attached DIMENSIONAL & VISUAL CHECK RESULT: BORE NUT LENGTH, INNER DIA HEX HEX. BODY LENGTH 172" ODT 17.50 10.30 22.00. 22.00. 31.00 ‘AIBPG/70 ‘ANROI23 ‘ANVRCI23 ‘ANRCI23 ‘ANRGI23 ‘ANRGI23 ‘Check with go & 17.50/17.52 10.40 22.10. 22.10 31.12 10 gauge and found ok. 17.52/17.50 | 17.58/17.54 10.38 10.40 22.10 22.06. 22.10 22.08) 31.10, 31.10 ‘ACCEPTED. ‘ACCEPTED. ‘ACCEPTED. ACCEPTED ‘ACCEPTED ‘ACCEPTED GENERAL TOLERANCE: + 2.0 MM ‘+ 100% VISUAL INSPECTION & DIMENSIONAL CHECK CARRIED OUT BY ASTEC. HYDRO TEST RESULT: Hydro Test 3000 Psig 2 No leakage found REMARKS: ‘02 LOOP OF FITTINGS WERE INSTALLED ON HYDRO AND PNEUMATIC TEST AS MENTIONED IN THE ABOVE. ‘TABLE. NO LEAKAGE FOUND & HENCE FITTING PASSES THE TEST. DELIVERY CONDITION: (THE FITTINGS WERE THROUGHLY CLEANED. THE THREAD ARE CAPPED AND PACKED IN ASTEC CARTONS. ] 3 on ee ere | QC Inspector Sign / Date Inspector Sign / Date (Asteo) (TPIA 1 Cilent) FIQCIOS REV. 01 ‘astec valves & filings pvt. td. | Inspection certificate Page | of 1 astec valves & fittings pvt. Itd. aS. or INSPECTION CERTIFICATE (igpeeHRCaRNSTEN] —_iorLCooaeae Tar ae) p 76 CARO TED = Se en ‘Thumbli Water Field Upgradaet Project Domestic 008 / 15-16 100129071 FEMALE CONNECTOR , 1/2" ODT X# NPTF 20, DU-B-FC-EN. DUPLEX (DU-B-FC-BN. 20 NOS, MATERIAL TYPE, LOT NO., MANUFACTURER NAME, SIZE. RAW MATERIAL TRACEABILITY REPORT: DIA 32MM BODY. ‘ASTM A162 Gr. F60, N269PS 1065 / 07.07.2015, DIA 25MM NUT & FERRULE ‘ASTM Ai82 Gr. FOO N268PS 1064 07.07.2015 CHEMICAL ANALYSIS, PHYSICAL PROPERTIES, & HARDNESS: As per test certificates attached DIMENSIONAL & VISUAL CHECK RESULT: ‘ACCEPTED ‘ACCEPTED ‘ACCEPTED, ‘ACCEPTED, ‘and found ok ‘and found ok_ ‘Check with go & ‘Check with go & no- 17.52 17.54 12" O0T _|_AIBPG/70 NPTF. 77.50 ‘BORE THREAD NUT LENGTH INNER DIA 10.30 10.40 40.42 “THREAD LENGTH, 19.10 19.16 19.14 ‘ACCEPTED, HEX. 27.00 27.02 27.08, ‘ACCEPTED, ‘ACCEPTED, ‘ACCEPTED, 22.06. 37.58. 22.10 37.60, 22.00 37.50, HEX ‘BODY LENGTH (GENERAL TOLERANCE: ¢ 2.0 MM ‘= 100% VISUAL INSPECTION & DIMENSIONAL CHECK CARRIED OUT BY ASTEC. HYDRO TEST RESULT: No leakage found Hydro Test REMARKS: ‘02 LOOP OF FITTINGS WERE INSTALLED ON HYDRO AND PNEUMATIC TEST AS MENTIONED IN THE ABOVE ‘TABLE, NO LEAKAGE FOUND & HENCE FITTING PASSES THE TEST. DELIVERY CONDITION: (THE FITTINGS WERE THROUGHLY CLEANED. THE THREAD ARE CAPPED AND PACKED IN ASTEC CARTONS. 1 - Eeieieerommnies cei | GC Inspector Sign / Date Inspector Sign / Date (Astec) (TPIA / Client) FIOCIOE REV. Of ‘astec valves & fitings pvt lid. | Inspection certificate Page 1 of | astec valves & fittings pvt. itd. INSPECTION CERTIFICATE TEMTLGIOGBIOTOO [Dato 20 2 2-0-2076] 7S. CARN NDA UNITED. Rajasthan 4600020610 [BOWERY e020 Thumbl Water Fit Uporadel Project Domestic 008 / 15-16 100124035 CAP. 12 ODT 700 Dusos-c DUPLEX Dusoe-c ZONOS. MATERIAL TYPE, LOT NO., MANUFACTURER NAME, SIZE. ‘BODY, NUT & FERRULE: CHEMICAL ANALYSIS, PHYSICAL PROPERTIES, & HARDNESS: As per test certificates attached DIA 25MM ASTM A182 Gr. F60 DIMENSIONAL & VISUAL CHECK RESULT: ‘ACCEPTED ‘ACCEPTED "ACCEPTED ‘ACCEPTED. ‘ACCEPTED, e and found ok ‘AIBPG/170, ‘ANRCRS ‘ANRCI23 ANRCI3 ‘ANRCI23 ‘Check with go & 17.50 22.04 22.08. 19.10 BORE NUT LENGTH HEX HEX. ‘BODY LENGTH “12 ODT. 17.50 22.00, 22.00 19.00. 17.54 22.02 22.04 19.09 GENERAL TOLERANCE: + 2.0 NM 100% VISUAL INSPECTION & DIMENSIONAL CHECK CARRIED OUT BY ASTEC. HYDRO TEST RESUL1 Hydro Test 3000 Psig No leakage found REMARKS: ‘2 LOOP OF FITTINGS WERE INSTALLED ON HYDRO AND PNEUMATIC TEST AS MENTIONED IN THE ABOVE TABLE. NO LEAKAGE FOUND & HENCE FITTING PASSES THE TEST. DELIVERY CONDITION: (CHE FITTINGS WERE THROUGHLY CLEANED. THE THREAD ARE CAPPED AND PACKED IN ASTEC CARTONS. ] QC Inspector Sign / Date Inspector Sign / Date (Astec) (TPIA Client) FIQGIOS REV. 01 astec valves &fitings pvt lid. | Inspection certificate Page | of | astec valves & fittings pvt. Itd. INSPECTION CERTIFICATE WS. CAIRN INDIA LIMITED. Rajasthan / 4500026510, 19-01-2015 “Thumbli Water Field Upgradaet Project Domestic 008 / 15-16 100128072 CAP , 1/4" ODT 110. DUC DUPLEX Duc 20 NOS. TEMLCROSETIO TEAS 28 2 29.00.2015] MATERIAL TYPE, LOT NO., MANUFACTURER NAME, SIZE. RAW MATERIAL TRACEABILITY REPORT: a BODY, NUT & DIA 25MM Peete F1064 / 07.07.2015 CHEMICAL ANALYSIS, PHYSICAL PROPERTIES, & HARDNESS: As per test certificates sched. DIMENSIONAL & VISUAL CHECK RESULT: BORE 14" ODT | A/BPG/143_| Chock with go & no-go gauge and found ok | ACCEPTED NUT LENGTH, 12.60 ANRCI23 12.82. 12.86. = "ACCEPTED, HEX 14.00. ANRCI23, 44.02 14.08 ‘ACCEPTED, HEX. 14.00 ‘AIVRCI23 14.04 14.02 ‘ACCEPTED, ‘BODY LENGTH 16.00 ‘AIVRCI23. 16.18 16.20 ‘ACCEPTED, GENERAL TOLERANCE: + 2.0 MM ‘= 100% VISUAL INSPECTION & DIMENSIONAL CHECK CARRIED OUT BY ASTEC. HYDRO TEST RESUL1 Hydro Test No leakage found REMARKS: ‘2 LOOP OF FITTINGS WERE INSTALLED ON HYDRO AND PNEUMATIC TEST AS MENTIONED IN THE ABOVE, TABLE. NO LEAKAGE FOUND & HENCE FITTING PASSES THE TEST. DELIVERY CONDITION: (THE FITTINGS WERE THROUGHLY CLEANED. THE THREAD ARE CAPPED AND PACKED IN ASTEC CARTONS. QC Inspector Sign / Date Inspector Sign / Date (Astoc) (TPIA / Client) FIQGIOS REV. 07 TF ‘astec valves & filings pvt. td. | Inspection certificate Page 1 of | astec valves & fittings pvt. Itd. INSPECTION CERTIFICATE TerTLoooarGT2o — ate ea 02075] WS. CAIRN INDIA LIMITED. Rajasthan / 4500026510 ‘Thumbli Water Field Upgradaet Project Domestic 008 / 15-76 BALL VALVE, 1/2" NPT. DU-GBV-8F DU-GBV-8F MATERIAL TYPE, LOT NO., MANUFACTURER NAME, SIZE. RAW MATERIAL TRACEABILITY REPORT: 19-01-2015 100129083, 120 DUPLEX 42 NOS. Part Descriptio Batch No. | Rav DIA45MM__| BODY & ADAPTOR DIA 32MM BALL ‘ASTM A182 Gr. F60, ‘ASTM A182 Gr. F60 CHEMICAL ANALYSIS, PHYSICAL PROPERTIES, & HARDNESS: As per test certificates attached 3738 / 25.08.2015 1065 /07.07.2015 DIMENSIONAL & VISUAL CHECK RI THREAD 42 NPTF ‘Check with go & no-go gauge and found ok | ACCEPTED BODY LENGTH 70.00 70:50 70.62 Ss ACCEPTED DIA 42.50 12.60 12.64 = ACCEPTED ‘BODY 40.00 39.90, 4002 | = ‘ACCEPTED (GENERAL TOLERANCE: + 5.0MM_ ‘= 100% DIMENSIONS CHECK CARRIED OUT BY ASTEC AND FOUND SATISFACTORY. HYDRO / PNEUMATIC TEST RESULT: Hydro Test, 3000 Psig 2400 Pig 2 ‘No leakage found Pneumatic Test = 100 Psig ot No leakage found REMARKS: 700% OF VALVES WERE INSTALLED ON HYDRO AND PNEUMATIC TEST AS MENTIONED IN THE ABOVE TABLE, NO LEAKAGE FOUND & HENCE VALVE PASSES THE TEST. DELIVERY CONDITION: ([THE VALVES WERE THROUGHLY CLEANED. THE THREAD ARE CAPPED AND PACKED IN ASTEC CARTONS. ] QC Inspector Sign / Date Inspector Sign / Date (Astec) (TPIA / Client) FIOCIOS REV. 04 astec valves & fitngs pi. Rd. | Tnspedion cztfcate Page 1 of 1 astec valves & fittings pvt. Itd. INSPECTION CERTIFICATE icmmLcrooarets [aed] wanes MIS. CAIRN INDIA LIMITED. Rajasthan 4500026510, woes Thumbll Water Field Upgradaet Project Domestic 008 / 15-16 100129067 UNION TEE, 1/2" ODT 150. DU-8-UT DUPLEX OU-8-UT 45 NOS, MATERIAL TYPE, LOT NO., MANUFACTURER NAME, SIZE. RAW MATERIAL TRACEABILITY REPORT: DIA 32MM BODY. ‘ASTM A182 Gr. FOO. N269PS. 1065 / 07.07.2015 DIA 25MM NUT & FERRULE, ‘ASTM A182 Gr. FO, N268PS F064 / 07.07.2015 CHEMICAL ANALYSIS, PHYSICAL PROPERTIES, & HARDNESS: As per test certificates attached DIMENSIONAL & VISUAL CHECK RESULT: - Parameters Dimension SORE 2007 | ABPG/TO | Check win go & nogo gauge and undok_ | ACCEPTED ur LENGTH 750 | awnons | "Sztrso| rrsanzsr | T accepreo ARERR 030" awrees| 1040 —| toa =|“ ascerreD TEX 2a00 | “awncras [2.00 —| at 08 =| TABCEPTED HEX 2500 | “AWRGas [2008 | —an08 =|“ ASSEPTED CENTRE 36.00 —| -awnoras | —s586—| a. =—“accerre0 BODY LENGTH 5200 -Awacas [61.60 —[ 61.8 =)" AccEPTED (GENERAL TOLERANCE: 2.0 MM ‘© 100% VISUAL INSPECTION & DIMENSIONAL CHECK CARRIED OUT BY ASTEC. HYDRO TEST RESULT: Hydto Test REMARKS: (02 LOOP OF FITTINGS WERE INSTALLED ON HYDRO AND PNEUMATIC TEST AS MENTIONED IN THE ABOVE TABLE. NO LEAKAGE FOUND & HENCE FITTING PASSES THE TEST. DELIVERY CONDITION: (THE FITTINGS WERE THROUGHLY CLEANED. THE THREAD ARE CAPPED AND PACKED IN ASTEC CARTONS: J 3000 Psig No leakage found oe Vat SS QC Inspector Sign / Date Inspector Sign / Date (Astec) (TPIA | Client) FIQCIOS REV.01 astec valves &fitings pvt itd | Inspection certificate Page 1 of 1 astec valves & fittings pvt. td. asec PMI REPORT WS. CAIRN INDIA LIMITED, Rajasthan / 4500026510 ate Certo PMI READINGS: 20% PMI READING AS PER PO QUANTITY =e z 19.01.2015 Duplex (F 60) TWCALIAVITOO1 40 | MALE CONNECTOR, %” OD X 1" NPT (QTY. 35 no.) 7 BODY 2220 5.10 302 F60__| ACCEPTED NUT 22.36 §.22 3.10 F60 ACCEPTED FRONT FERRULE 22.60 521 3.12 F60__| ACCEPTED BACK FERRULE 22.38 5.45 3.12 F60__| ACCEPTED 2 BODY 214 4.59 322 F60__| ACCEPTED NUT 22.38 520 326 F60__|_ACCEPTED FRONT FERRULE 22.66 544 3.08 Fe0__| ACCEPTED BACK FERRULE 22.45 5.12 320 Fe0__| ACCEPTED 3 BODY 22.18 5.02 328 F60__|_ACEPTED NUT 22.87 496 3.08 F60_ ‘ACCEPTED FRONT FERRULE 22.54 4.90 3.40 F60__|_ ACCEPTED BACK FERRULE 22.10 5.12 312 F60__| ACCEPTED. a BODY 22.40 487 3.18 F60__| ACCEPTED NUT 22.32 492 3.12 F60__| ACCEPTED FRONT FERRULE 22.54 478 3:10 60 | ACCEPTED BACK FERRULE 22.86 490 3.08 F60__| ACCEPTED 5 BODY 22.45 488 320 F60__|_AGGEPTED NUT 22.35 4.95 3.15, F60__| ACCEPTED FRONT FERRULE 22.58 477 3.46 Fe0___|_ ACCEPTED BACK FERRULE 22.88 492 3.25 F60__| ACCEPTED é BODY 22.48 485 3.08 Fe0__|_AGGEPTED NUT 22.35 494 3.25 F60__| ACCEPTED FRONT FERRULE 22.58 475 3.92 F60__| ACCEPTED BACK FERRULE 22.22 4.90 342 F60__| ACCEPTED Z BODY 22.50 480 F60__|_AGGEPTED NUT 22:38 4.96 F60__| ACCEPTED FRONT FERRULE 22.58 482 F60__| ACCEPTED BACK FERRULE 22.25 ‘4gs—}—s1o | F60 | ACCEPTED = j = QC Inspector Sign / Bate fee Inspector Sign / Date (Astec) {4 \ [8 F_sneny 4 eee an | a | ‘sige valves & tings pvt-Ad" LV Pmi Report fh Page 1 of 5 astec valves & fittings pvt. itd . a Cc PMI REPORT PMICILO08 MALE CONNECTOR, 1/4” OD X 114” NPT (QTY. 25 no.) 1 BODY 22.45 5.00. 3.06) F60 ‘ACCEPTED, NUT 22.10 5.12. 3.42. F60 ‘ACCEPTED FRONT FERRULE: 22.56 5.16. 322, F60 ACCEPTED BACK FERRULE 22.30 5.10. 3.16 F60 ‘ACCEPTED. 2 BODY 22.86 4.98 3.08) F60 ‘ACCEPTED, NUT 22.10 5.02. 3:40 F60 ‘ACCEPTED FRONT FERRULE 22.56 5.10. 3:16 F60 ‘ACCEPTED BACK FERRULE 22.70 5.04 3.02. F60 ‘ACCEPTED 3 BODY 22.26 466 3:2 F60 ‘ACCEPTED, NUT 22.30 480. 3:10) F60 ‘ACCEPTED FRONT FERRULE 22.12 5.02. 3.16 F60 ‘ACCEPTED BACK FERRULE 22.24 496 3.04 F60 ‘ACCEPTED 4 BODY 22.28 468 315) F60 ACCEPTED NUT 22.25 4.82. 3:42. F60 "ACCEPTED FRONT FERRULE 22.14 5.08 3.18 F60 ACCEPTED BACK FERRULE 22.26 498. 3.08 F60 ACCEPTED 3 BODY 2275 478 340 F60 ACCEPTED NUT 22.35 4.85 3.15 F60 ‘ACCEPTED FRONT FERRULE 22.52 506 [318 F60 ‘ACCEPTED BACK FERRULE 22.72 498) Eg F60 ‘ACCEPTED 60 | UNION, 1/2" OD (QTY. 30 no.) 4 BODY 2226 5:10 316 F60__| ACCEPTED NUT 22:36 5.12 3.10 Feo | ACCEPTED FRONT FERRULE 22.50 5.06 3.10) Feo ACCEPTED BACK FERRULE 22.12 5.08 3.16 F60___| ACCEPTED 2 BODY 22.16 520 a4 F60__| ACCEPTED NUT 22.22 5.26 3.16 F60__| ACCEPTED FRONT FERRULE, 22.48 5.18 320 F60___| ACCEPTED BACK FERRULE 22.10 522 322, F60__| ACCEPTED 2 3 BODY 22.56 496 318 F60__| ACCEPTED NUT 22.45 4.90) 3.02, F60__| ACCEPTED FRONT FERRULE 22.20 5.02, 338 F60__| ACCEPTED BACK FERRULE 23.12 610 | 310 | 1F60 ACCEPTED : [an Sa} Qc inspector Sign Je | ve sre xa Iispector Sign / Date 3 i A (Astec) (=) kc 3} G4 ( TPIA / Client ) FIQGI15 REV. 90)" f -astec valves & fittings pvt. itd. | Pmi Report | i Page 2 of asteo valves & fifings pvt. td. asec PMI REPORT 4 ‘BODY 22.62 5.08. 3.02. F60 ‘ACCEPTED, NUT 22.52 5.12 3.10 60) ‘ACCEPTED, FRONT FERRULE, 22.28 5.10 3.16 F60 ‘ACCEPTED, BACK FERRULE 22.18 5.16 3.02, F60 ‘ACCEPTED 3 BODY 22.68 498 ant F60 ‘ACCEPTED NUT. 22.40, 5.08) 3.08. F60 ‘ACCEPTED FRONT FERRULE, 22.32 5.10 3.10 F60 ‘ACCEPTED BACK FERRULE 22.20 518. 3.04 F60 ‘ACCEPTED 6 BODY 22.16 5.08) 302 F60 ‘ACCEPTED, NUT 22.26 5.14 3:10) F60 ACCEPTED FRONT FERRULE 22.08 5.42 3.08 60 ‘ACCEPTED BACK FERRULE, 22.42 5.10 3.08 60, ‘ACCEPTED. 0 | FEMALE CONNECTOR, 172700 14" NPTF (QTY. 20.no,) 1 BODY. 22.65 5.12. 342, F60 ACCEPTED NUT 22.58 5.10. 3.10 F60 ACCEPTED FRONT FERRULE 22.30 5.06. 3:10 F60 ACCEPTED BACK FERRULE, 22.16 5.12. 3.08 F60 ‘ACCEPTED, zi BODY 22.45, 4.96 322, F60 ‘ACCEPTED. NUT 22.50 5.02. 3.18, F60 ‘ACCEPTED FRONT FERRULE 22.38 4.90. 3.42. FBO ACCEPTED BACK FERRULE 22.55, 512 324 F60 ‘ACCEPTED 3 ‘BODY 22.40, 498 3.20 FOO) ‘ACCEPTED NUT 22.52. 5.04 3.12 F60 ‘ACCEPTED FRONT FERRULE, 22.42 492 3.14 F60 ‘ACCEPTED, BACK FERRULE 22.52 5.10. 326 F60 ‘ACCEPTED, 4 BODY 2238 5.05. 315) F60 ‘ACCEPTED NUT 22.47 5.15. 3.12 60 ‘ACCEPTED, FRONT FERRULE, 22.40 5.08 3.10, 60) ‘ACCEPTED, BACK FERRULE 22.56 8.7. 3.06) F60 ‘ACCEPTED, 400 | CAP, 172" OD (QTY. 20 no.) : S00 PY on 28 8 apnea FRONT FERRULE 22.50 5.12 3.24 F60_ ACCEPTED BACK FERRULE 22.44 5.22 3.10 F60 ACCEPTED a a ey m 3 Joe 0 a" QC Inspector Sign / Date 7 } Ln Inspector Sign / Date (Astec ) f (TPIA / Client ) FIQGI5 REV. 00 = astec valves & fittings pvt itd. | Pmi Report | es Sees astec valves & fitings pvt. td. a ec PMI REPORT 2 BODY 22.18 478 3.04 Fe0__| ACCEPTED NUT 22.40 470 3:10 FeO | ACCEPTED FRONT FERRULE 22.36 4.86 3.14 Fe0__| ACCEPTED BACK FERRULE 22.24 4.90 3.16 F60__| ACCEPTED 3 ‘BODY 2220 475 3.10 F60__| ACCEPTED NUT 22.45 472 3.16 Feo | ACCEPTED FRONT FERRULE 22.50 4.88, 3.16 F60__| ACCEPTED BACK FERRULE 22.28 4.92 3.20 F60___| ACCEPTED 4 ‘BODY 22.25 452 3.08) F60___|_AGCEPTED NUT 22.48 467 3.47) F60___| ACCEPTED FRONT FERRULE 22.52 482 3.12 Fo0__| ACCEPTED BACK FERRULE 22.30 4.90 3.44 F60___| ACCEPTED 110 | GAP, 114" OD _(GTY. 20 no) [eer BODY, 22:36 5.02 az Foo__| ACCEPTED NUT 22.42 5.10 3.10 Feo | ACCEPTED FRONT FERRULE 22.30 5.16 322 F60__| ACCEPTED BACK FERRULE 22.44 5.02 3.16 F60__| ACCEPTED 2 BODY 22.45 5.10 326 F60__| ACCEPTED NUT 22.36 5.08) 340 F60__| ACCEPTED FRONT FERRULE 22.38 5.16 3.02 F60__| ACCEPTED BACK FERRULE 22.12 4.90) 3.10 F60__| ACCEPTED 3 BODY, 22.28 5.08 345) F60___| ACCEPTED NUT 22.40 5.12 325 Fe0__| ACCEPTED FRONT FERRULE 22.15 5.18; 326 Fe0__| ACCEPTED BACK FERRULE 22.16 5.04 318) F60___| ACCEPTED 4 BODY 2252 5.08 3.08 F60__| ACCEPTED NUT 22.38 515 315 Fe0__| ACCEPTED FRONT FERRULE 22.28 5.18 3.12 Fe0__| ACCEPTED BACK FERRULE 22.40 512 3.25 F60__| ACCEPTED 20 | BALL VALVE, #” NPTF (QTY. 12 no.) i BODY 22:35 5.10 3.10) F60__| ACCEPTED ‘ADAPTOR 22.45 5.26 3.412 F60__| ACCEPTED 22.20 5.44, 3.08) F60__ | ACCEPTED Y el ap ey aeay ac for Sign /,Date dy

You might also like