E - Conduit, Trunking and Cable Tray INSPECTION CHECKLIST

The document is a checklist for inspecting conduit, trunking, and cable tray installation. It lists 12 items to check, including verifying materials and ensuring proper support, bending, painting, earthing, fittings, fasteners, and clearances. The checklist is to be completed by the main contractor and verified by the client's consultant to confirm inspection of the items and that the work conforms to specifications. Upon completion, representatives from each party sign off on the inspection results.

Uploaded by

mandelaria01
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
5K views1 page

E - Conduit, Trunking and Cable Tray INSPECTION CHECKLIST

The document is a checklist for inspecting conduit, trunking, and cable tray installation. It lists 12 items to check, including verifying materials and ensuring proper support, bending, painting, earthing, fittings, fasteners, and clearances. The checklist is to be completed by the main contractor and verified by the client's consultant to confirm inspection of the items and that the work conforms to specifications. Upon completion, representatives from each party sign off on the inspection results.

Uploaded by

mandelaria01
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

Company

LOGO

Contractor

Client :
CONDUIT, TRUNKING AND CABLE TRAY INSPECTION CHECKLIST

Project Title :
Type of Work :
Location :

No.
A

Date :

Main
Contractor

Items To Be Checked

Clients
Consultant

Remarks

Preparatory

1.

Material and product as per approved catalogue, sample and


specification

2.

Correct sizes, position and location as per approved drawing

3.

Approved Work Method Statement

B
4.

RFWI No :

Ref. Drawing No :

Installation
Conduit properly bend and connected without distortion

5.

Conduits, Trunking and Trays properly supported and brackets


rigidly fitted comply to the suggested maximum distances between
supports

6.

Flexible conduit installed with suitable fittings, adopters and


Securely griped to conduit.

7.

Conduits and accessories properly painted (if applicable)

8.

Trunking, Cable Tray and Ladder properly earthed

9.

Bends, elbows Ts, adaptor and jointing using standard


manufacturer fittings

10.

Screws, Bolts & nuts adequate provided and properly fastened

11.

Sufficient clearance in between others services

12.

Fire stops properly installed


Others (please state).

Status of Inspection
We have carried out all necessary inspections and verify that the above items/activities conform to the contract
specifications/document.
Checked By
Main-Contractor

Verified By
Clients Consultant

Signature
Name
Company
Date
* S t a t u s O f I n s p e c t i o n : = Acceptable, X = Not Acceptable, - = Not Applicable